5. The implementation and control phase of the production planning and control
system, is:
(a) Purchasing and production activity control
(b) Master production schedule
(c) Material requirement plan.
6. A major input to an material requirements plan MRP system is:
The production plan (b) the capacity plan (a)
The master production Schedule (c)
7. The time span for which plans are made is called the:
(a) time fence( b) planning horizon (c) time bucket
8. Basic concept in TQM:
(a)Focus in the customer (b) supplier partnering (c) all are right
9. Which of the following is a factor is selecting suppliers.
(a) Technical ability ( b) measurement (c) purchasing
10. -------------------is responsible for planning and controlling materials flow :
(a)Materials management (b) marketing management
(c) Production management
(15X1=15 Marks)
1. [
2. [
3. [
4. [
5. [
6. [
7. [
8. [
] The time span for which plans are made is called the planning horizon
9. [
10. [
11. [
12. [
13. [
14. [
] In the long and short run, manufacturing must devise plans to balance
the demand of the market place with its resources and capacity.
15. [
] Priority relates to what products are needed, how many are needed
and when they are needed.
(2x5=10 Marks)
(10x2=20 Marks)
4.C
5.A
6.C
7.B
8.C
9.A
10.C
PARTB-B: True or False Questions
(15X1=15 Marks)
1.T
2.T
3.T
4.T
5.F
6.T
7.T
8.T
9.F
10.F
11.F
12.F
13.F
14.T
15.T
PART-C: Short Answer Questions
(2x5=10 Marks)
1/ answer page(216)
2/ answer page ( 79)
3/ answer page( 81)
4/ answer page (79)
PART-D: Fill in the Blank Questions as per the WORDS given below
Purchasing
Requesting quotation
Purchase order
Outsourcing
Stocking out