Project Title
Document Title
Document Number
9PKE-16-2010-Rev00
FWEL Project
Number
8209
Revision Number
00
CONSORTIUM
QIP No. E1 (Installation checks wiring, termination and earthing checks.)
Installation checks
Wiring checks
Termination checks
Earthing checks
[ ] O.K. [ ] N.A.
[ ] O.K. [ ] N.A.
[ ] O.K. [ ] N.A.
[ ] O.K. [ ] N.A.
COMMISSIONING REPORT
Powerline Carrier Equipment: Series ETL600R4
Project :
..
ABB Order N :
..
Station :
..
Link :
..
Equipment N :
..
Frequency :
Tx = kHz
Direction :
..
Rx = kHz
FILE: 1KHW002587AE Commissioning Report ETL600R4; TEMPLATE: TECHN_DOC_STAND_P.dot R0; SKELETON: ; SAVEDATE: 5/15/2012 11:55:00 AM
SAFETY INSTRUCTIONS
Meaning
REVISION
Rev.
ind.
Page (p.)
Chapter (c.)
Description
Date
Dept./Init.
Test
Permissible
No.
Test procedure
Test point
C.1.
General
C.1.1
value
Test
Units
result
C.1.2
Visual checks
C.2.
Left
C.2.1
C.2.2
C.2.3
C.3.
Upload configuration
C.4.
C.4.1
red
r min
red
r min
r min
red
Right
Test
Permissible
No.
Test procedure
C.5.
Transmitter
C.5.1
Adjust Tx RF level
C.5.2
C.6.
Receiver
C.6.1
Adjust Rx RF level
C.6.2
Test point
value
Test
Units
result
Test
Permissible
No.
Test procedure
C.6.3
C.6.4
C.6.5
SNR pilot
C.7.
Equalization
C.7.1
C.7.2
Select Equalizer
C.8.
R1BC, if present
C.9.
C.9.1
Test point
value
Test
Units
result
Test
No.
C.9.2
Test
No.
Permissible
Test procedure
Test point
value
Test
Units
result
Test procedure
C.10.
C.10.1
C.10.2
Command transmission
time
Test point
Permissible
value
Units
Test
result
Test
No.
Permissible
Test procedure
C.10.3
Reset counters
C.11.
Testing of O4LE
C.11.1
Service Phone.
C.11.2
Test point
value
Test
Units
result
Test
No.
Permissible
Test procedure
Test point
value
Test
Units
result
Test
No.
Permissible
Test procedure
Test point
value
Test
Units
result
Test
No.
Permissible
Test procedure
C.12.
V.11 ports
C.12.2
V.11 Port 2
Test point
value
Test
Units
result
Test
No.
Permissible
Test procedure
C.13.
V.24 ports
C.13.1
V.24 Port 1
C.13.2
V.24 Port 2
C.13.3
V.24 Port 3
C.13.4
V.24 Port 4
C.14.
C.14.1
LAN Port 1
C.14.2
LAN Port 2
C.14.3
LAN Port 3
Test point
value
Test
Units
result
Test
No.
Permissible
Test procedure
C.14.4
LAN Port 4
C.14.5
C.15.
Testing of O4CV
Test point
value
Test
Units
result
Test
No.
Permissible
Test procedure
C.16.
Manual reset
C.17.
Documentation
Test point
value
Test
Units
result
YES
Commissioning Approved:
NO
YES
Exceptions Noted:
NO
CONSORTIUM
Test Instrument
Type
Test
Instrument
No.
Remarks:
Date:
Tested by:
ABB
Witnessed by:
FWEL
Witnessed by:
DESCON
Witnessed by:
LI