CONSORTIUM
QIP No. E1 (Installation checks wiring, termination and earthing checks.)
Installation checks
Wiring checks
Termination checks
Earthing checks

[ ] O.K. [ ] N.A.
[ ] O.K. [ ] N.A.
[ ] O.K. [ ] N.A.
[ ] O.K. [ ] N.A.

QIP No. E2 (Interfacing to SAS, PABX, power supply)


QIP No. E3 (Checking unit and system functions as far as possible)

9PKE-16-2010-Rev00 - Power Line Carrier Equipment

COMMISSIONING REPORT
Powerline Carrier Equipment: Series ETL600R4

Project :

..

ABB Order N :

..

Station :

..

Link :

..

Equipment N :

..

Frequency :

Tx = kHz

Direction :

..

Rx = kHz

Commissioning Report contains

FILE: 1KHW002587AE Commissioning Report ETL600R4; TEMPLATE: TECHN_DOC_STAND_P.dot R0; SKELETON: ; SAVEDATE: 5/15/2012 11:55:00 AM

SAFETY INSTRUCTIONS

Designations and abbreviations used:


Designation

Meaning

REVISION
Rev.
ind.

Page (p.)
Chapter (c.)

Description

Date
Dept./Init.

Test

Permissible

No.

Test procedure

Test point

C.1.

General

C.1.1

Checking the line of communication

value

Test
Units

result

C.1.2

Visual checks

C.2.

Check power supply B5LD

Left

C.2.1
C.2.2
C.2.3
C.3.

Upload configuration

C.4.

Change configuration, if necessary

C.4.1

Reducing output power, if necessary


r min

red
r min
red

r min

r min

red

Right

Test

Permissible

No.

Test procedure

C.5.

Transmitter

C.5.1

Adjust Tx RF level

C.5.2

Adjust Tx alarm level

C.6.

Receiver

C.6.1

Adjust Rx RF level

C.6.2

Connect RF cable and set alarm


thresholds

Test point

value

Test
Units

result

Test

Permissible

No.

Test procedure

C.6.3

Check link alarms

C.6.4

Tune hybrid on E5TH

C.6.5

SNR pilot

C.7.

Equalization

C.7.1

Measure frequency response

C.7.2

Select Equalizer

C.8.

R1BC, if present

C.9.

Configure Real time Clock (RTC)

C.9.1

Setting real time clock

Test point

value

Test
Units

result

Test
No.

C.9.2

Test
No.

Permissible
Test procedure

Test point

value

Test
Units

result

Test external real time clock


synchronization, if available

Test procedure

C.10.

NSD600 / G4AI, if present

C.10.1

NSD600 loop test

C.10.2

Command transmission
time

Test point

Permissible
value

Units

Test
result

Test
No.

Permissible
Test procedure

C.10.3

Reset counters

C.11.

Testing of O4LE

C.11.1

Service Phone.

C.11.2

Hot line direct phone

C.11.3 Remote subscriber

Test point

value

Test
Units

result

Test
No.

Permissible
Test procedure

C.11.4 Pax 2-wire

C.11.5 Pax 4-wire

C.11.6 Pax 4/2-wire

Test point

value

Test
Units

result

Test
No.

Permissible
Test procedure

C.11.7 Transit mode for E&M wire

C.11.8 Testing the teleoperation


ports
C.11.9

Teleoperation AF1, if not


used for telephony

C.11.10 Teleoperation AF2

Test point

value

Test
Units

result

Test
No.

Permissible
Test procedure

C.11.11 Teleoperation AF3

C.11.12 Teleoperation AF4

C.11.13 Teleoperation AF4 used for


ext. teleprotection

C.12.

V.11 ports

C.12.1 V.11 Port 1

C.12.2

V.11 Port 2

Test point

value

Test
Units

result

Test
No.

Permissible
Test procedure

C.13.

V.24 ports

C.13.1

V.24 Port 1

C.13.2

V.24 Port 2

C.13.3

V.24 Port 3

C.13.4

V.24 Port 4

C.14.

Testing of LAN port

C.14.1

LAN Port 1

C.14.2

LAN Port 2

C.14.3

LAN Port 3

Test point

value

Test
Units

result

Test
No.

Permissible
Test procedure

C.14.4

LAN Port 4

C.14.5

HMI over LAN

C.15.

Testing of O4CV

C.15.1 Slot positions of O4CV


boards

C.15.2 Service Phone

C.15.3 Hot line direct phone

Test point

value

Test
Units

result

Test
No.

Permissible
Test procedure

C.15.4 Remote subscriber

C.15.5 Pax 2-wire

C.15.6 Pax 4-wire

C.16.

Manual reset

C.17.

Documentation

Test point

value

Test
Units

result

Pending Items List:

YES

Commissioning Approved:

NO

YES

Exceptions Noted:

NO

CONSORTIUM

Test Instrument
Type

Test
Instrument
No.

Remarks:

Date:

Tested by:

ABB

Witnessed by:

FWEL

9PKE-16-2010-Rev00 - Power Line Carrier Equipment

Witnessed by:

DESCON

Witnessed by:

LI