Académique Documents
Professionnel Documents
Culture Documents
Contents
Page
26
38
43
50
This document shall be treated as confidential. RBSC does not assume any responsibility for the completeness and accuracy of the statements made in this document.
Roland Berger Strategy Consultants
Road_Logistics_for _Finished_Vehicles_India.pptx
A. Global trends in
Automotive Road
Logistics Market
Road_Logistics_for _Finished_Vehicles_India.pptx
Example/cases
New
Technologies
Outsourcing/
Cost Pressure
E-Commerce &
Digitalization
> New structures in the supply chain (e.g. bypassing of hubs, direct ordering, transparency)
> Demand for value added services on B2B and B2C level (e.g. packaging, return deliveries)
> Refinement of service levels (e.g. same day delivery, utmost flexibility)
Demographic
Change/
Urbanization
Globalization
of Operations
Regulatory
developments
> Traffic gridlocks result in stricter regulations for urban transportation (e.g. tolls, bans)
> Understanding and management of tariff and tax regulations becomes increasingly
decisive, particularly in Russia, India, Argentina (e.g. local content)
Sustainability
> Establishment of green standards across the entire supply chain (mainly driven by industry
players)
> Use of more efficient vehicles, hybrids and alternative fuels
Low relevance
Source: Roland Berger
High relevance
Road_Logistics_for _Finished_Vehicles_India.pptx
"Pain-points"
Not relevant
Very important
Key sectors
1 Complexity management
2 SC network optimization
3 SC standardization/modularization
4 Supply chain risk management
5 Service level management
6 Inventory management
7 Insourcing/Outsourcing
8 Supplier relationship management
9 3PL/4PL management
10 Integrated planning/scheduling
11 Route planning
12 Return delivery management
13 LEAN organization
14 Process automation
15 Data-enabled processes
Automotive
Mechanical
Chemical/Pharma
Electronics
Metal processing
Transportation/LSPs
Road_Logistics_for _Finished_Vehicles_India.pptx
3.2%
4.2%
5.9%
8.1%
151.2
78.4
156.0
81.2
162.5
91.6
85.5
11.1%
206.6
CAGR +6%
172.0
186.0
99.7
110.9
(54%)
APAC
+7%
Americas
+6%
EMEA
+5%
36.5
37.5
39.0
41.2
44.5
49.2
(24%)
36.4
37.3
38.0
39.2
41.9
46.5
(22%)
2013
2014
2015
2016
2017
2018
CAGR
Comments
> The automotive logistics market
in these key regions is expected
to have a steady growth of 6%
and the market size is expected
to reach USD 206.6 billion by
2018
> The APAC market has the
highest growth rate (7%) and is
expected to reach USD 110.9
billion by 2018
> APAC is expected to increase its
share during the forecast period
because of a rise in the number
of vehicles being produced in
China, Japan, India, Thailand
and Korea
> It is also supported by a higher
export demand from these
countries
Road_Logistics_for _Finished_Vehicles_India.pptx
Comments
> The share of finished vehicles in
the overall market is expected to
marginally compress as the trend
for smaller cars increases
63.7
(42%)
65.5
67.8
70.9
75.5
87.5
(58%)
90.5
94.7
101.5
110.5
2013
2014
2015
2016
2017
82.7
(40%)
123.9
(60%)
2018
CAGR
Road_Logistics_for _Finished_Vehicles_India.pptx
B. Europe: A
Benchmark in
Logistics
Competitiveness
Road_Logistics_for _Finished_Vehicles_India.pptx
ECONOMY
Germany
Netherlands
Belgium
UK
Singapore
Sweden
Norway
Luxembourg
US
Japan
Ireland
Canada
France
Switzerland
HongKong
Australia
% OF HIGHEST
RANK SCORE PERFORMER
1
2
3
4
5
6
7
8
9
10
11
12
13
15
16
20
4.12
4.05
4.04
4.01
4.00
3.96
3.96
3.95
3.92
3.91
3.87
3.86
3.85
3.84
3.83
3.81
100.0
97.6
97.5
96.6
96.2
94.9
94.8
94.4
93.5
93.4
91.9
91.5
91.2
91.1
90.5
90.0
Road_Logistics_for _Finished_Vehicles_India.pptx
10
FY 2012
180
17
29
1,320
1,600
40
345
165
495
335
85
805
3,200
8,800
Q1 2012
6
0
23
145
395
28
53
10
104
0
0
92
540
1,400
Q1 2013
15
0
35
240
540
24
33
0
13
0
0
138
790
3,000
YoY [%]
YoY [EUR m]
+9
-15
+12
+52
+95
+65
+145
+37
-4
-14
-20
-38
-10
-91
-88
+46
+50
+250
+46
+1,600
+110
Road_Logistics_for _Finished_Vehicles_India.pptx
11
0-50
100-200
0-50
On an average, EU
has 2x the road
capacity compared
to other developed
nations
50-100
0-50
0-50
Road_Logistics_for _Finished_Vehicles_India.pptx
12
Source: Notteboom
Road_Logistics_for _Finished_Vehicles_India.pptx
13
Logistics hotspots are well distributed all over Western Europe and
CEE excellent coverage of all markets and countries
Logistics Hotspots Across Europe
1
Birmingham, UK
21
Oslo, Norway
41
Tallinn, Estonia
London, UK
22
Gothenburg, Sweden
42
Riga, Latvia
Vilnius, Lithuania
Dublin, Ireland
23
Malmo, Sweden
43
Cork, Ireland
24
Stockholm, Sweden
44
Minsk, Belorussia
Amsterdam/Schiphol, Netherland
25
Helsinki, Finland
45
Gdansk, Poland
Rotterdam, Netherland
26
Copenhagen, Denmark
46
Warsaw, Poland
Breda/Tilburg, Netherland
27
Hamburg, Germany
47
Poznan, Poland
Venlo, Netherland
28
Berlin, Germany
48
Antwerp, Belgium
29
Dsseldorf/Kln, Germany
49
25
21
22
40
42
23
Gent, Belgium
30
Frankfurt, Germany
50
Kiev, Ukraine
11
Brussels, Belgium
31
Munich, Germany
51
Bratislava, Slovakia
12
Lige, Belgium
32
Geneva, Switzerland
52
Budapest, Hungary
45
1
5
7
10 9 8 29
11 12
30
13
13
Paris, France
33
Bern, Switzerland
53
32
Lyon, France
34
Vienna, Austria
54
Bucharest, Romania
15
Lorraine, France
35
Turin, Italy
55
Sofia, Romania
16
Madrid, Spain
36
Milan, Italy
56
Ljubljana, Slovenia
17
Zaragoza, Spain
37
Bologna, Italy
57
Istanbul, Turkey
18
Barcelona, Spain
38
Rome, Italy
58
Thessaloniki, Greece
19
Porto, Portugal
39
Saint-Petersburg, Russia
59
Athens, Greece
20
Lisbon, Portugal
40
Moscow, Russia
14
27
48
51
52
54
56
35 36
55
57
17
16
49
34
53
33
50
46
28
37
19
44
47
31
15
Szkesfehrvr, Hungary
14
43
26
3
10
39
41
24
18
38
58
20
59
Road_Logistics_for _Finished_Vehicles_India.pptx
14
POPULATION
Inhabitants / Sqkm
Below 20
20-50
50-100
100-200
25
21
200-500
39
41
24
22
500-1,000
40
1,000-2,000
42
23
43
26
45
5
7
8
10 9
29
11 12
30
13
14
10,000-20,000
48
49
34
53
33
20,000-40,000
51
52
40
54
56
35 36
Logistics Hotspot
55
57
17
16
5,000-10,000
50
46
28
37
19
2,000-5,000
44
47
31
15
32
27
18
38
58
20
59
Road_Logistics_for _Finished_Vehicles_India.pptx
15
GDP
m EUR / Sqkm
Below 20
20-50
50-100
100-200
25
21
200-500
39
41
500-1,000
24
22
1,000-2,000
42
23
43
26
45
5
7
8
10 9
29
11 12
30
13
14
17
16
18
5,000-10,000
50
46
28
10,000-20,000
48
49
34
20,000-40,000
51
53
33
52
No data
54
56
35 36
40
37
19
2,000-5,000
44
47
31
15
32
27
38
Logistics Hotspot
55
58
20
59
Road_Logistics_for _Finished_Vehicles_India.pptx
16
Looking at the latest GDP and retail sales forecasts per capita, the
current set-up already fits to future developments
RETAIL SALES PER CAPITA ANNUAL FORECAST
GROWTH 2013-2018 [%]
Finland
Finland
Sweden
Sweden
25
Norway
21
41
24
22
Norway
39
Russia
Estonia
Latvia
42 Latvia
26
Denmark
3
Ireland
4
19
16
Portugal
20
Spain
27
Lithuania
Denmark
43
Lithuania
44 Belarus
45
Belarus
Ireland
47
50
6 5
46
28
7
Poland
Netherlands
10 9 8 29
Ukraine
Germany
11Belgium
12
48 49
30
Czech Republik
51Slovakia
Luxembourg
31
13
15
34
Moldova
52
53
33
Hungary
Austria
Romania
54
France 32Switzerland
56
Slovenia
14
35 36
Croatia
Serbia55
37
Bulgaria
Bosnia and Herzegovina
57
Italy
Montenegro
58
38
18
Macedonia
Albania
United Kingdom
2
17
23
Russia
Estonia
40
United Kingdom
Poland
Netherlands
Ukraine
Belgium Germany
Luxembourg
France
Czech Republik
Slovakia
Austria
Switzerland
Slovenia
Croatia
Serbia
Bosnia and Herzegovina
Italy
Turkey
Portugal
Spain
Moldova
Hungary
Romania
Bulgaria
Montenegro
Macedonia
Albania
Turkey
Greece
59
Greece
Cyprus
Cyprus
10
Malta
Malta
5
1
-6.1%-0.0%
0.0%-1.0%
1.0%-2.0%
2.0%-3.7%
No data
40
Logistics Hotspot
Road_Logistics_for _Finished_Vehicles_India.pptx
17
0%
Defining1
2+
3x
4th
5
6bn
7%
10
18
Let's take a deeper look at 3 key strategies, relevant for this forum
The Trans- European Transport Network
0%
Defining1
2+
3x
4th
5
6bn
7%
10
19
EU Infrastructure Funds
26
8
Euro billion
(2007-2013)
Euro billion
(2014-2020)
Euro
250
billion
Road_Logistics_for _Finished_Vehicles_India.pptx
20
Investments in
R&D
+50%
focused on
60% reduction
in CO2
Road_Logistics_for _Finished_Vehicles_India.pptx
21
> In 2013, the EU revised the rules governing the TransEuropean Transport Network (TEN-T) (designed to build by
2030), a core network of national railways, roads, airports, rivers
and canals into an efficient network to connect all corners of
Europe
> Nine corridors, each one spanning several thousand kilometres,
will form the backbone of the planned core network
> Each corridor will include at least three different forms of
transport, three EU countries and two cross-border sections
> Ports will also be fully integrated into the corridors with proper
onward rail and river connections to the wider network
Road_Logistics_for _Finished_Vehicles_India.pptx
22
Road_Logistics_for _Finished_Vehicles_India.pptx
23
6,6%
17,5%
85%
Road
40,9%
35,1%
Comments
> Out of the total India logistics
market amounting to USD 107.11
billion in 2013, the automotive
sector comprises of almost 41%
of the market
> In 2013, Indian automotive
logistics market was USD 43.81
billion
> Out of this, automotive road
logistics for India was 85% of the
overall market
Rail
Automotive
Steel
Healthcare
10%
4%
1%
Sea
Air
Road_Logistics_for _Finished_Vehicles_India.pptx
24
+12.0%
4,793
310
1,494
2,468
2,534
2,571
2,431
119
526
18
233
155 3
99
359
60
418
1,136
788
568
21
FY11
FY12
FY13
FY14
819
99
Vans1)
17%
UV
19%
Premium/
Luxury
84%
Executive
22%
Midsize
15%
Supercompact
10%
Compact
6%
Mini
6%
Micro
29%
FY20E
1) Vans segment includes Maruti Omni/Eeco and does not include Tata Magic/IRIS
Source: SIAM, LMC, IHS, Roland Berger Analysis
Road_Logistics_for _Finished_Vehicles_India.pptx
25
Comments
CAGR
FY14-FY20
+12%
1,378
55 42
51
311
-22%
893
910
729
712
43
39 29
169
72
167
752
360
FY11
FY12
FY13
FY14
LCV Passenger
4%
LCV Goods
6%
M&HCV Passenger
5%
M&HCV Goods
11%
SCV Passenger1)
15%
SCV Goods2)
13%
FY20E
1) SCV Passenger segment includes Tata Magic/IRIS and does not include Maruti Omni and Eeco 2) SCV Goods segment includes <3.5 ton cargo vehicles such as ACE, Dost, Super Ace, etc.
Source: SIAM, LMC, IHS, Roland Berger Analysis
Road_Logistics_for _Finished_Vehicles_India.pptx
26
29.5
+12%
10.5
Scooters
17.9
Motorcycles 9.4%
19.5%
20.0
11.7
13.4
13.8
14.8
3.6
10.5
FY11
FY12
FY13
5.9
13.3
0.7
0.9
1.1
FY14
2017E
FY20E
Mopeds
7%
27
The demand for road logistics for finished vehicles and the growth
rate in road development are mismatched
Sales figures ('000 units)
Comments
35,671
12.1%
1,378
11.0%
5,103
4,271 163 669
FY2002
17,943
712 2,431
4,793 PV
CV
29,500
2 wheeler
14,800
FY2014
FY2020
2.8%
4,691
4,885
93
143
4,378
3,929
4,649
3,326
2000
2005
2010
2012
2014
Source: SIAM, IHS, Ministry of Road Transport and Highways, Roland Berger Analysis
National Highways
State highways
Rural & district roads
28
Rail
Rank
Country
Port
Rank
UAE
Japan
Japan
Germany
USA
Germany
Korea
10
USA
China
10
13
16
18
49
China
15
17
Thailand
India
50
76
Russia
26
India
27
Brazil
122
Thailand
Russia
124
Brazil
Korea
Rank
Country
Singapore
USA
Rank
1
Netherlands
USA
Germany
Japan
Korea
China
1
12
14
74
Thailand
India
Russia
54
76
81
China
India
Russia
37
58
71
79
95
Brazil
122
Brazil
113
Country
Air
Germany
Japan
26
27
53
Korea
Thailand
9
13
27
31
Road_Logistics_for _Finished_Vehicles_India.pptx
29
Rank
On-time Performance
Ability to Track
Country
Country
Rank
1
Singapore
6
8
18
28
Germany
Japan
5
7
10
China
25
31
Thailand
India
36
42
Brazil
65
Russia
119
Singapore
Japan
5
14
22
Germany
USA
Thailand
Korea
Brazil
27
29
31
49
Brazil
30
36
47
71
Russia
83
Russia
86
USA
Korea
China
Thailand
India
China
India
Rank
USA
Korea
Road_Logistics_for _Finished_Vehicles_India.pptx
30
Average truck
distance per day
(kms)
Total length of
expressways
(kms)
Share of paved
roads (%)
India Average
30
Global Average
70
Comments
India's average truck speed is
~50% lower than the global
average
Trucks in India cover only
about 16% of the average
global mileage
80,000
500,000
325
500 (BRIC)
750 (US & EU)
~1,000
74,0001)
54%
68% (BRIC)
90% (US & EU)
Road_Logistics_for _Finished_Vehicles_India.pptx
31
Indore Guwahati
24.9
Delhi Kolkata
Mumbai Kolkata
15.1
Toll Plaza
20.7
Distance
kms
2,156
Journey time
hrs
102
Vehicle speed
km/hr
22
Delhi Chennai
7.8
nos
15
Pune Hyderabad
7.5
nos
10
% of trip time
% of trip expenses
15
% of stoppage
expenses
47
Mumbai Chennai
5.7
Delhi Bangalore
5.1
Delhi Mumbai
5.1
Chennai Kolkata
4.7
Source: Ministry Of Road Transport & Highways, Transport Corporation of India, Roland Berger
Stoppage delay
Stoppage expenses
Toll expenses
Road_Logistics_for _Finished_Vehicles_India.pptx
32
NHDP Phase /
Year of
approval
Ph I / Dec 2000
Golden Quadrilateral
(GQ), North South- East West
(NSEW) Corridor, Ports & others
Ph 2 / Dec 2003
Ph 3 / Apr 2007
Strengthening / Up Gradation Of
2-Lane into 4-Lane
Ph 4 / Feb 2012
Ph 5 / Feb 2012
Ph 6 / Nov 2006
Expressways
Ph 7 / Dec 2007
Length (km)
/ Scheduled
completion
date
7616 km / Dec
2005
7300 km / Dec
2007
12109 km / Dec
2012
Not completed /
6134 km
Not completed /
5296 km
20,000 km / Dec
2017-18
6500 km / Dec
2012
1000 km / Dec
2015
700 km / Dec 2014
Not completed /
172 km
Not completed /
1492 km
Not completed /
NIL
Not completed /
21 km
Section
Appointed
Date
Scheduled
completion
date
Status as on Mar
31, 2014
Not completed
10/31/2011
rescheduled to
31/01/2014
Feb 8 2013
Jan 27 2011
Jul 25 2013
Not completed
Aug 1 2010
Jan 27 2013
Not completed
Sep 12 2011
Sep 28 2011
Mar 9 2014
Not completed
Jan 14 2014
Not completed
Patna-Bhaktiyarpur
Sep 26 2011
Mar 25 2014
Not completed
Barhi-Hazaribagh
Feb 11 2012
Feb 10 2014
Not completed
Jun 7 2011
Dec 4 2013
Not completed
Vijayawada Chilakaluripet
May 1 2009
HazipurMuzaffarpur
Chapra-Hajipur
Hazaribagh-Ranchi
Varanasi-Aurangabad
Pune-Solapur-II
Krishnagiri-Walajhapet
Not completed
COMMENTS
> Delays can be attributed to policy inaction, inefficient methods of environmental and other clearances, among others
> However, it will be a key area of performance for the new government, with need for rapid and quantifiable progress on
these key projects
> Consistent government action at the centre and state level is required to overcome such bottlenecks
Source: Ministry Of Road Transport & Highways, Transport Corporation of India, Roland Berger
Road_Logistics_for _Finished_Vehicles_India.pptx
33
Ahmadabad
Project timelines
Western Corridor 1,490 km DELAYS
Phases Length
Last year
status
Expected
completion
Phase I
920 kms
2009-2016
2011-2017
2010-2017
2012-2018
2010-2017
2013-2018
Calcutta
Nagpur
Kharagpur
Mumbai
Length
Phase I
343 kms
Phase II
390 kms
2010-2016 2013-2018
Phase III
397 kms
2011-2016
2014-2019
2011-2016
2014-2019
Phase V
2010-2016 2010-2016
Vijayawada
DFCs planned
Bangalore
Chennai
125 kms
Last year
status
Expected
completion
Phases
Goa
Road_Logistics_for _Finished_Vehicles_India.pptx
34
Road_Logistics_for _Finished_Vehicles_India.pptx
35
Strategic
setup
Operational
setup
Operational
efficiency
Impact area
Key component
Car model sales and distribution spread for each production base
Road_Logistics_for _Finished_Vehicles_India.pptx
36
Road_Logistics_for _Finished_Vehicles_India.pptx
37
Road_Logistics_for _Finished_Vehicles_India.pptx
38
Road_Logistics_for _Finished_Vehicles_India.pptx
39
Road_Logistics_for _Finished_Vehicles_India.pptx
40
4,792
PV
+12.0%
1,378
CV
+11.6%
29,500
2 Wheeler
+12.2%
2,431
712
14,800
FY14
FY20
Road_Logistics_for _Finished_Vehicles_India.pptx
41
32
2008
Petrol (Rs / l)
63
51 40
45 33
2009
2010
Diesel (Rs / l)
193
177
163
148
134
122
46
Impact
73
71
38
38
49
2011
2012
2013
1.5-2.5%
0.8-1.2%
India
China
Japan
Korea
Road_Logistics_for _Finished_Vehicles_India.pptx
42
Impact
Road_Logistics_for _Finished_Vehicles_India.pptx
43
Improving infrastructure With rising demand for vehicles and bulk of the road network being poorly paved, there is
a pressing demand to improve infrastructure to support intermodal services
Continuous investment Continuous investments to improve the infrastructure is the need of the hour to increase
capacity and service speeds significantly
Removing Red tape Increasing regulations, high interest rates, complexities with respect to environmental and
safety standards, complications in obtaining permits, use of inter-state permits, complex and opaque tax regime need
to be done away with
Faster implementation of GST Implementation of Goods and Services Tax (GST), which is meant to centralise
certain taxes and help make India a common market across its state borders, will go a long way in building a
competitive automotive road logistics capability
Completing pending projects With sales of passenger and commercial vehicles expected to increase by over
11% in the coming years, pending projects such as the Eastern and Western corridors, NHDP and other NHAI
projects in the southern part of the country need to be completed
Road_Logistics_for _Finished_Vehicles_India.pptx
44
Integrated Logistics Plan for India Implementation of an integrated logistics plan for India is key for building a
competitive automotive road logistics capability for India. Long term plan for 2030 instead of a shorter term plan for
2020 is required incorporating future projections of population growth, migration patterns, GDP and industrial
production
Improving rail connectivity to reduce burden on roads While only 2-3% of automotive freight currently moves by
rail, initiatives should be taken to increase this level to reduce burden on the road network. Initiatives such as rail
network through the AFTO and the dedicated rail freight corridor need to be expedited
Newer targets for CO2 norms in Urban cities Following the Europe example, India should aim for an ambitious
plan of CO2 free urban cities for cleaner cities and for reducing dependence on scarce fossil fuels
More investment in research and innovation required Investment in research and innovation for the next
generation of cutting edge cleaner, cost effective technologies leading to lesser dependence on natural resources
10
Improving safety on roads Better road safety policies need to be implemented through the use of safety devices
and modern technology, tougher rules on vehicle testing and enforcing stricter penalties
Road_Logistics_for _Finished_Vehicles_India.pptx
45