Site Test Record

BUS SECTION D220


FUNCTION TEST

Sheet No.

SUD1-03-001
Page 1 of 8

Data and Information:

Manufacture

HICO

2. Mechanical Checks and Visual Inspections as Per TCS P105 Rev 01, Item no
4.1
Item
1

Description
Inspect for physical damage / defects Check tightness of all
connections
Check tightness of all connections
Panel condition, cleanliness, organization, labeling, readiness
for service, panel doors, handles...etc
CT shorting and CT, VT isolating checked
Indications checked
Check the ferrules as per specification
Confirm that each panel has been properly secured to the floor in
its
final
location.
Panelservice
Earthing
checked
Confirm that panels are constructed and wired as per SEC
relevant
specification.
Check
case cover and gasket for proper seal against dust.
Check all installed equipment nameplate information for compliance
to
approved drawings and equipment /material lists.

Checked
Yes

N/A

Yes

N/A

Yes

N/A

Yes
Yes
Yes

N/A
N/A
N/A

Yes

N/A

Yes

N/A

Yes

N/A

Yes

N/A

Yes

N/A

12

For all internal and external panel wiring, confirm that all
screw
terminations are tight and that crimp connectors are firmly secured
to the wire and to the termination point. Ensure that no part of the
wire is bent at the termination point.

Yes

N/A

13

Check that panel equipment is mounted securely and


protected
against mal operation due to vibration, shock, etc

Yes

N/A

14

Use of ring type terminals for wire termination for current


circuit wires.

Yes

N/A

15

Disconnectors Manual operation by handle and related interlocking


conditions to be checked

Yes

N/A

16

Mechanical interlocking between DS & ES to be checked

Yes

N/A

2
3
4
5
6
7
8
9
10
11

Test Performed by:


Name:
Signature:

ENG/MOHAMED AMIN

Test Witnessed by:


ENG/MOHAMED HAIDER

Date of Test
08/06/2014
Control/Record No.: R/PP/TC/1.084

Customer

SEC COA

Substation No.

S/S : 8515

Contractor

DELTA Co.

Contract No.

Site Test Record

BUS SECTION D220


FUNCTION TEST

Sheet No.

SUD1-03-001
Page 2 of 8

Projects & Supplies Co.

3. Electrical Tests
Item
1
2
3
4
5

Description
Insulation Resistance Test report of all wires to be submitted
By the contractor prior witnessing and made available
DC Power supply and control checked
AC Power supply and control checked.
Circuit Breaker, Disconnector and Earth Switch Open/Close
status checked
All CBS, DSWs and ESWs should be tested before starting
function check

Checked
Yes

N/A

Yes
Yes

N/A
N/A

Yes

N/A

Yes

N/A

4. Circuit breaker closing / tripping blocking conditions:


Sl no.
1
2
3
4
5

st

SF6 Gas pressure 1 Stage


nd
SF6 Gas pressure 2 Stage
rd
SF6 Gas pressure 3 Stage
CB spring charged condition
Anti-Pumping condition

Test Performed by:


Name:
Signature:

Setting
values

Description

ENG/MOHAMED AMIN

5.7 bar
5.5 bar
6.7 bar
20 SEC
----

CB blocked status
Closing
Tripping

Test Witnessed by:


ENG/MOHAMED HAIDER

Remarks

OK
OK
OK
OK
OK

Date of Test
08/06/2014
Control/Record No.: R/PP/TC/1.084

Customer

SEC COA

Substation No.

S/S : 8515

Contractor

DELTA Co.

Contract No.

Site Test Record

BUS SECTION D220


FUNCTION TEST

Sheet No.

SUD1-03-001
Page 3 of 8

Projects & Supplies Co.

6. Checking of operation and indications:


Operation

Equipment
Command
Refrence
124A
124B

Open/Close
Open/Clos
e

226A

Open/Close

226B

Open/Close

120

Open/Close
Open/Close

121A
121B
221A
221B
261A
261B
141A
141B

Open/Close

Indication

LCC

CR

SAS

LCC

CR

SAS

Condition

Remarks

Service
Test
Service
Test
Service
Test
Service
Test
Service
Test
Service
Test

OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK

Independet
condition

OK
OK
OK
OK
OK
OK
OK
OK

7. Functional and interlocking test for circuit breaker 220:


Operation

Condition
Test

Close
Service
Trip

Independent

Equipments
DS 226A
DS 226B
DS 226A
DS 226B

Status
FO
FO
FC
FC

Protection Relays

Operated

Remarks
OK
OK
As per the
schematic Drawing

All checked under normal sf6 gas pressure operating conditions


* Protection Relays Reset, Bus VT Mcb ON & Synchro0 condition ok

Test Performed by:


Name:
Signature:

ENG/MOHAMED AMIN

Test Witnessed by:


ENG/MOHAMED HAIDER

Date of Test
08/06/2014
Control/Record No.: R/PP/TC/1.084

Customer

SEC COA

Substation No.

S/S : 8515

Contractor

DELTA Co.

Contract No.

Site Test Record

BUS SECTION D220


FUNCTION TEST

Sheet No.

SUD1-03-001
Page 4 of 8

Projects & Supplies Co.

8. Functional Test for C.B trip & Open Blocking:


C.B Open Blocking while load transfer in one feeder or more to be connected to
Two bus bars which coupled by this bus section (220).
9. Functional Test for Bus Disconnector 226A:
Operation

Condition
Test

Close/open
Service

Equipments
ES 261A & 221B
ES 221A
ES 261A & 221B & 221A
CB 220

Status
FC
FO
FO
O

Remarks
OK
OK

10. Functional and Interlocking Test for Bus Disconnector 226B :


Operation

Condition

Close/open

Test

Close/open

Service

Equipments
ES 261B & 221A
ES 221B
ES 261B & 221B & 221A
CB 220

Status
FC
FO
FO

Remarks
OK
OK

11. Functional and interlocking test for Bus Disconnector 124A :


Operation

Condition

Close/open

Test

Close/open

Service 1

Close/open

Service 2

Close/open

Service 3

Test Performed by:


Name:
Signature:

ENG/MOHAMED AMIN

Equipments
ES 141A &121B
ES 121A
ES 141A ,121B ,121A
&124B
DS 141A
226B,121B &121A,
ES
DS 604 , 404, 204 & 234
Ds -206,406,606
236
ES
141A , 121B , &121A
DS134 , 104 , 304 , 504
&704

Test Witnessed by:


ENG/MOHAMED HAIDER

Status
FC
FO

Remarks

FO

OK

FO

OK

FO

OK

OK

Date of Test
08/06/2014
Control/Record No.: R/PP/TC/1.084

Customer

SEC COA

Substation No.

S/S : 8515

Contractor

DELTA Co.

Contract No.

Site Test Record

BUS SECTION D220


FUNCTION TEST

Sheet No.

SUD1-03-001
Page 5 of 8

Projects & Supplies Co.

12. Functional and interlocking test for Bus Disconnector 124B :


Operation

Condition

Close/open

Test

Close/open

Service 1

Close/open

Service 2

Close/open

Service 3

Equipments
ES 141B &121A
ES 121B
ES 141B ,121B ,121A
&124A
DS 141B,121B
226B
ES
&121A,
DS134 , 104 , 304 , 504
&704
ES 141B , 121B , 121A
DS 604 , 404, 204 & 234

Status
FC
FO

Remarks

FO

OK

OK

FO

OK

FO

OK

13. Functional and interlocking test for Earth Switch 121A:


Operation
Close/open

Condition
------------

Equipments
DS 124A & 124B

Status
FO

Remarks
OK

14. Functional and interlocking test for Earth Switch 121B:


Operation
Close/open

Condition
------------

Equipments
DS 124A & 124B

Status
FO

Remarks
OK

15. Functional and interlocking test for Earth Switch 221A:


Operation

Condition

Close/open

------------

Equipments

DS 226A & 226B

Status

FO

Remarks

OK

16. Functional and interlocking test for Earth Switch 221B:


Operation Condition
Equipments
Close/open ------------ DS 226A & 226B

Test Performed by:


Name:
Signature:

ENG/MOHAMED AMIN

Status
FO

Test Witnessed by:


ENG/MOHAMED HAIDER

Remarks
OK

Date of Test
08/06/2014
Control/Record No.: R/PP/TC/1.084

Customer

SEC COA

Substation No.

S/S : 8515

Contractor

DELTA Co.

Contract No.

Site Test Record

BUS SECTION D220


FUNCTION TEST

Sheet No.

SUD1-03-001
Page 6 of 8

Projects & Supplies Co.

17. Functional and interlocking test for Earth Switch 261A:


Operation

Condition

Close/open

---------

Equipments
DS 226A , 106,306,506,706
& 136

Status

Remarks

FO

OK

Status
FO

Remarks
OK

18. Functional and interlocking test for Earth Switch 261B:


Operation
Close/open

Condition
------------

equipments
DS 226B,206,406,606 & 236

19. Functional and interlocking test for Earth Switch 141A:


Operation
Close/open

Condition
------------

Equipments
Status
DS 124A , 104,304,504,704 &134
FO

Remarks
OK

20. Functional and interlocking test for Earth Switch 141B:


Operation Condition
Equipments
Close/open ------------ DS 124B , 204,404,604 & 234

Status
Fo

Remarks
OK

Note:-

FO: fully open

FC: fully close

Test Performed by:


Name:
Signature:

ENG/MOHAMED AMIN

O: open

Test Witnessed by:


ENG/MOHAMED HAIDER

C: close

Date of Test
08/06/2014
Control/Record No.: R/PP/TC/1.084

Projects14.
& Supplies
Co.
Checking

Channel
no.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35

Customer

SEC COA

Substation No.

S/S : 8515

Contractor

DELTA Co.

Contract No.

Site Test Record

BUS SECTION D220


FUNCTION TEST

Sheet No.

Signature:

Page 7 of 8

of LCC, Annun. Indication &Alarm :( annunciator)


Events

CB MOTOR SUPPLY FAIL


DS/ES MOTOR SUPPLY FAIL
CB CLOSE SUPPLY FAIL
DS/ES CONTROL SUPPLY FAIL
CB TRIP-1 SUPPLY FAIL
CB TRIP-2 SUPPLY FAIL
INDICATION & GAS ALARM SUPPLY FAIL
SPARE
ALARM DC SUPPLY FAIL
ALARM AC SUPPLY FAIL
BCU SUPPLY FAIL
LCC AC SUPPLY FAIL
DS SWITCHING INCOMPLETE
ES SWITCHING INCOMPLETE
CB MOTOR RUNTIME EXCEED &SPRING UNCHARGE
CB OPERATING MECHANISM FAIL
DS/ES MANUAL MODE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
COMP.G220-1 SF6 GAS PRESSURE LOW STAGE-1
COMP.G220-1 SF6 GAS PRESSURE LOW STAGE-2
COMP.G220-2 SF6 GAS PRESSURE LOW STAGE-1
COMP.G220-2 SF6 GAS PRESSURE LOW STAGE-2
COMP.G220-3 SF6 GAS PRESSURE LOW STAGE-1
COMP.G220-3 SF6 GAS PRESSURE LOW STAGE-2
COMP.G220-5 SF6 GAS PRESSURE LOW STAGE-1
COMP.G220-5 SF6 GAS PRESSURE LOW STAGE-2
COMP.G220-6 SF6 GAS PRESSURE LOW STAGE-1
COMP.G220-6 SF6 GAS PRESSURE LOW STAGE-2
COMP.G220-7 SF6 GAS PRESSURE LOW STAGE-1

Test Performed by:


Name:

SUD1-03-001

ENG/MOHAMED AMIN

Test Witnessed by:


ENG/MOHAMED HAIDER

Status
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK

Date of Test
08/06/2014
Control/Record No.: R/PP/TC/1.084

Customer

SEC COA

Substation No.

S/S : 8515

Contractor

DELTA Co.

Contract No.

Site Test Record

BUS SECTION D220


FUNCTION TEST

Sheet No.

SUD1-03-001
Page 8 of 8

Projects & Supplies Co.

Channel
no.
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68

Events
COMP.G220-7 SF6 GAS PRESSURE LOW STAGE-2
COMP.G220-1 SF6 GAS PRESSURE HIGH
COMP.G220-8 SF6 GAS PRESSURE LOW STAGE-1
COMP.G220-2 SF6 GAS PRESSURE HIGH
COMP.G220-9 SF6 GAS PRESSURE LOW STAGE-1
COMP.G220-3 SF6 GAS PRESSURE HIGH
COMP.G220-10 SF6 GAS PRESSURE LOW STAGE-1
COMP.G220-5 SF6 GAS PRESSURE HIGH
COMP.G220-11 SF6 GAS PRESSURE LOW STAGE-1
COMP.G220-6 SF6 GAS PRESSURE HIGH
COMP.G220-12 SF6 GAS PRESSURE LOW STAGE-1
COMP.G220-7 SF6 GAS PRESSURE HIGH
CB SF6 GAS PRESSURE LOW STAGE-1
COMP.G220-8 SF6 GAS PRESSURE LOW STAGE-2
COMP.G220-8 SF6 GAS PRESSURE HIGH
COMP.G220-9 SF6 GAS PRESSURE LOW STAGE-2
COMP.G220-9 SF6 GAS PRESSURE HIGH
COMP.G220-10 SF6 GAS PRESSURE LOW STAGE-2
COMP.G220-10 SF6 GAS PRESSURE HIGH
COMP.G220-11 SF6 GAS PRESSURE LOW STAGE-2
COMP.G220-11 SF6 GAS PRESSURE HIGH
COMP.G220-12 SF6 GAS PRESSURE LOW STAGE-2
COMP.G220-12 SF6 GAS PRESSURE HIGH
CB SF6 GAS PRESSURE LOW STAGE-2
CB SF6 GAS PRESSURE HIGH
CONTACT MULTIPLICATION ROR LOAD TRANSFERB FAIL-1
CONTACT MULTIPLICATION ROR LOAD TRANSFERB FAIL-2
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE

Status
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK
OK

Note:
All interlock points were checked according to interlocking conditions table
which is
Approved by system operation department
Test Performed by:
Name:
Signature:

ENG/MOHAMED AMIN

Test Witnessed by:


ENG/MOHAMED HAIDER

Date of Test
08/06/2014
Control/Record No.: R/PP/TC/1.084