Vous êtes sur la page 1sur 8

Job Information

Name:
Date:

Engineer

Checked

Prakash
28-Jan-16

R. Hada

RCC Frame
Structure Type
Number of Nodes
Number of Elements
Number of Plates
Number of Design Groups
Number of Design Slabs
Number of Load Cases
Number of Design Briefs
Included in this printout are data for:
Design Group

SPACE FRAME
22 Highest Node
10
55 Highest Element
20
53 Highest Plate
1
00
0
17
1

Design Brief

G1: Design Group 1

Approved

B1: GFBeams

2255
3069
2961

Design Code

Members

IS456 Beam

M3

Design Group Summary - Design Group 1


Member

Design

M3

Initial

Span

Main Bars
Hog
Sag
Ok
Ok
Ok
Ok

Type
1
2

Beam
Beam

Shear
Bars
Ok
Ok

Span
Depth
Ok
Ok

Summary: the group is safe

Beam Spans
Member

Span

M3

Type
1
2

Beam
Beam

Length
(m)
5.000
5.000

Top
(cm)
2.5
2.5

Cover
Btm
(cm)
2.5
2.5

Side
(cm)
2.5
2.5

Link Size
10
10

Beam Supports
Member

Node

M3

N9
N27

Length
(m)
8.000
8.000

Support
Type
Fixed
Fixed

Col. Width
(cm)
60.0
60.0

Member 3 - Main Steel Summary


Distance
(m)
0.000

Span
1(s)

0.300

0.417

0.833

1.000

1.250

1.667

2.000

2.083

2.500

2.917

3.333

3.750

Moment
(kNm)
435.041
-367.437
374.235
-332.614
351.092
-318.769
270.920
-267.835
241.638
-248.557
198.629
-218.172
131.486
-166.473
79.403
-122.395
65.191
-109.483
3.358
-49.307
27.081
-66.600
92.385
-121.923
160.593
-172.116

As Req.
(mm2)
2178
1849
1889
1648
1753
1571
1318
1303
1171
1205
895
986
596
749
440
557
440
452
440
440
440
440
440
564
733
784

As' Req.
(mm2)
244
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Bottom Layers
Bars
Area
3927

Top Layers
Bars
Area
4825

1963

2413

1963

2413

1963

2413

1963

2413

1963

2413

1963

2413

1963

2413

1963

2413

1963

2413

1963

2413

1963

2413

1963

2413

4.000

4.167

4.583

4.700

5.000

1(e)

5.000

2(s)

5.300

5.417

5.833

6.000

6.250

6.667

7.000

7.083

7.500

7.917

8.000

2(e)

204.969
-202.031
236.568
-222.919
318.210
-273.552
341.764
-287.312
403.628
-321.919
383.759
-304.023
326.987
-273.557
305.412
-261.408
230.841
-216.526
202.070
-197.939
161.637
-171.074
100.264
-126.359
52.797
-87.868
39.887
-76.591
0.817
-33.705
42.289
-79.123
55.176
-90.401

998
984
1150
1084
1573
1336
1704
1407
2051
1593
1954
1478
1603
1319
1486
1257
1106
1037
969
950
721
763
457
568
440
440
440
440
440
440
440
440
440
440

0
0
0
0
0
0
0
0
111
0
10
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

1963

2413

1963

2413

1963

2413

1963

2413

3927

4825

3927

4825

1963

2413

1963

2413

1963

2413

1963

2413

1963

2413

1963

2413

1963

2413

1963

2413

1963

2413

1963

2413

1963

2413

Summary: the member is safe

Member 3 - Shear Results Summary


Distance
Span
(m)
0.000
1(s)
0.300
1
0.417
1
0.833
1
1.000
1
1.250
1
1.667
1
2.000
1
2.083
1
2.500
1
2.917
1
3.333
1
3.750
1
4.000
1
4.167
1
4.583
1
4.700
1
5.000
1(e)
5.000
2(s)
5.300
2
5.417
2
5.833
2
6.000
2
6.250
2
6.667
2
7.000
2
7.083
2
7.500
2
7.917
2
8.000
2
Summary: the member is safe

Shear Force
(kN)
206.008
199.483
196.945
187.883
184.258
174.940
165.877
158.627
153.924
145.680
140.242
133.992
128.554
126.413
124.238
118.801
117.278
113.363
192.564
186.039
183.502
174.439
170.814
161.820
152.758
145.508
140.863
131.800
126.324
125.237

Shear Stress
(N/mm2)
0.000
1.074
1.064
1.029
1.009
0.828
0.793
0.765
0.632
0.613
0.648
0.830
0.865
1.037
1.051
1.086
1.096
0.000
0.000
0.998
0.988
0.953
0.938
0.763
0.728
0.700
0.570
0.535
0.569
0.740

Asv Required
(mm2)
0
89
89
89
9
26
51
45
16
11
19
60
34
89
89
89
89
0
0
89
89
89
89
11
37
31
2
89
2
39

Member 3 - Shear Zones Summary


Range
(m)
0.300 - 0.825
0.825 - 4.700
5.300 - 5.825
5.825 - 9.700
10.300 - 10.825
10.825 - 14.700
15.300 - 15.825
15.825 - 16.000
Summary: the member is safe

Asv Provided
(mm2)
157
236
157
236
157
236
157
236

Spacing
(cm)
22.5
22.5
22.5
22.5
22.5
22.5
22.5
22.5

Legs
2
3
2
3
2
3
2
3

Span / Effective Depth


Member

Span

M9

1
2
3
4
5
Summary: the group is safe

Length
(m)
5.000
5.000
5.000
5.000
5.000

Basic
Limit
26.0
26.0
26.0
26.0
26.0

Type
Beam
Beam
Beam
Beam
Beam

Modified
Limit
64.2
64.2
64.2
64.2
64.2

Span
Depth
8.3
8.3
8.3
8.3
8.3

Members
Member

Element

M3

34
311
312
313
314
77
377
378
379
380
120
483
484
485
486
163
589
590
591
592
206
695
696
697
698

Node
A
9
173
181
189
197
27
255
263
271
279
45
337
345
353
361
63
419
427
435
443
81
501
509
517
525

Node
B
173
181
189
197
27
255
263
271
279
45
337
345
353
361
63
419
427
435
443
81
501
509
517
525
99

Property
430 x 649

Member 3 - Main Reinforcing Bars


Bar

Size
1
2
3
4
5
6
7

25
25
25
32
32
32
25

Design Length
Start
End
(m)
(m)
0.001
24.999
0.001
24.999
0.001
24.999
0.001
24.999
0.001
24.999
0.001
24.999
0.001
24.999

Anchorage
(cm)
141.5
141.5
141.5
181.2
181.2
181.2
141.5

Emt Length
(m)
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000
1.000

O. Length
(m)
16.000

Member 3 - Scheduled Bars


Bar
Type and
No. of
Bar Length
Mark
size
bars
(mm)
01
T25
4
18700
02
T25
5
20450
03
T10
105
2075
04
T10
90
650
The shape codes are based on Table B-2 of IS SP:34-1987

Shape
code
21
21
51
13

A
(mm)
1145
1540
595
30

B
(mm)
16550
16550
380
595

C
(mm)

D
(mm)

60

Member M3 Span 1
Detailed IS456 Design Requirements
Section Property: 430 x 649
Beam Designed for : Vertical Bending and Shear
Span Length
= 5.000 mRectangular section
Width
= 430 mmDepth
= 650 mm
Covers: Top = 25 mm Bottom = 25 mm Side = 25 mm

Member M3 Span 1
Detailed IS456 Main Reinforcement
Section at 0.000 m from start of member: Hogging
Moment applied to section
= 465.67 kNm
Effective depth to tension reinforcement
d
= 599 mm
Depth to compression reinforcement
d'
= 48 mm
Compression steel required.
Asc'
= 244.15 mm2
G-1.2
Stress in compression steel,fsc
= 416.78 N/mm2
Asc
= ((Mu-Mulim)/(fsc) (d - d'))
= 244.15 mm2
G-1.2
Required tension steel area
= 2178 mm2
Required compression steel area
= 244 mm2
Tension bars provided
= 3T32 ( 2413 mm2 )
Minimum area of tension reinforcement
= 438 mm2
26.5.1.1(a)
Maximum area of tension reinforcement
= 11180 mm2
26.5.1.1(b)
Compression bars provided
= 4T25 (= 1963 mm2 )
Maximum area of compression reinforcement
= 11180 mm2
26.5.1.2
Minimum horizontal bar spacing
= 40 mm 26.3.2
Smallest actual horizontal space between bars
= 87 mm
Maximum allowable spacing for tension bars (for 0% redistribution)
= 150 mm26.3.3
Largest actual space between tension bars
= 132 mm
Beam Designed as a Doubly Reinforced Section
Actual neutral axis depth of section
= 273.16 mm
Moment capacity of section
= 521.97 KNm
OK
Section at 0.000 m from start of member: Hogging
Moment applied to section
= 465.67 kNm
Effective depth to tension reinforcement
d
= 599 mm
Depth to compression reinforcement
d'
= 47 mm
Compression steel required.
Asc'
= 244.15 mm2
G-1.2
Stress in compression steel,fsc
= 416.78 N/mm2
Asc
= ((Mu-Mulim)/(fsc) (d - d'))
= 244.15 mm2
G-1.2
Required tension steel area
= 2178 mm2
Required compression steel area
= 244 mm2
Tension bars provided
= 6T32 ( 4825 mm2 )
Minimum area of tension reinforcement
= 438 mm2
26.5.1.1(a)
Maximum area of tension reinforcement
= 11180 mm2
26.5.1.1(b)
Compression bars provided
= 8T25 (= 3927 mm2 )
Maximum area of compression reinforcement
= 11180 mm2
26.5.1.2
Minimum horizontal bar spacing
= 40 mm 26.3.2
Smallest actual horizontal space between bars
= -25 mm
Maximum allowable spacing for tension bars (for 0% redistribution)
= 150 mm26.3.3
Largest actual space between tension bars
= 132 mm
Beam Designed as a Doubly Reinforced Section
Actual neutral axis depth of section
= 273.16 mm
Moment capacity of section
= 1100.79 KNm
OK
Section at 5.000 m from start of member: Hogging
Moment applied to section
= 435.08 kNm
Effective depth to tension reinforcement
d
= 599 mm
Depth to compression reinforcement
d'
= 48 mm

E/R
(mm)

Compression steel required.


Asc'
= 111.07 mm2
G-1.2
Stress in compression steel,fsc
= 416.78 N/mm2
Asc
= ((Mu-Mulim)/(fsc) (d - d'))
= 111.07 mm2
G-1.2
Required tension steel area
= 2051 mm2
Required compression steel area
= 111 mm2
Tension bars provided
= 3T32 ( 2413 mm2 )
Minimum area of tension reinforcement
= 438 mm2
26.5.1.1(a)
Maximum area of tension reinforcement
= 11180 mm2
26.5.1.1(b)
Compression bars provided
= 4T25 (= 1963 mm2 )
Maximum area of compression reinforcement
= 11180 mm2
26.5.1.2
Minimum horizontal bar spacing
= 40 mm 26.3.2
Smallest actual horizontal space between bars
= 87 mm
Maximum allowable spacing for tension bars (for 0% redistribution)
= 150 mm26.3.3
Largest actual space between tension bars
= 132 mm
Beam Designed as a Doubly Reinforced Section
Actual neutral axis depth of section
= 273.16 mm
Moment capacity of section
= 521.97 KNm
OK
Section at 5.000 m from start of member: Hogging
Moment applied to section
= 435.08 kNm
Effective depth to tension reinforcement
d
= 599 mm
Depth to compression reinforcement
d'
= 47 mm
Compression steel required.
Asc'
= 111.07 mm2
G-1.2
Stress in compression steel,fsc
= 416.78 N/mm2
Asc
= ((Mu-Mulim)/(fsc) (d - d'))
= 111.07 mm2
G-1.2
Required tension steel area
= 2051 mm2
Required compression steel area
= 111 mm2
Tension bars provided
= 6T32 ( 4825 mm2 )
Minimum area of tension reinforcement
= 438 mm2
26.5.1.1(a)
Maximum area of tension reinforcement
= 11180 mm2
26.5.1.1(b)
Compression bars provided
= 8T25 (= 3927 mm2 )
Maximum area of compression reinforcement
= 11180 mm2
26.5.1.2
Minimum horizontal bar spacing
= 40 mm 26.3.2
Smallest actual horizontal space between bars
= -25 mm
Maximum allowable spacing for tension bars (for 0% redistribution)
= 150 mm26.3.3
Largest actual space between tension bars
= 132 mm
Beam Designed as a Doubly Reinforced Section
Actual neutral axis depth of section
= 273.16 mm
Moment capacity of section
= 1100.79 KNm
OK

Member M3 Span 1
Detailed IS456 Span / Effective Depth Check
Basic span / effective depth ratio
= 26.0
23.2.1 a
fs = 0.58 fy AsReqd / AsProv
= 65.05 22.2.1 SP:24
Mod. factor for tension rft.= (1/0.225 + 0.00322 fs-0.625 log10(1/pt)) 2.0
Mod. factor for compression rft.
= (1.6 pc/pc + 0.275) 1.5
= 1.24
Hence, modified span / effective depth ratio
= 64.23
Actual span / effective depth ratio
= 8.30
SAFE

= 2.00

23.2.1 c

23.2.2

Member M3 Span 1
Detailed IS456 Shear Reinforcement
Minimum links zone: 0.300 m to 0.825 m
Maximum shear force within zone, Vu
= 265.02 kN
v
= (Vu/bd)
= 1.03 N/mm2
40.1
cmax = 2.8
Hence dimensions adequate
c = (0.85 0.8fck((1 + 5) - 1)/6)
where =0.8fck/6.89pt
= 0.61 N/mm2
Face of support is less than 2d away from section,
Hence enhancement of shear strength possible
40.5.2
distance to face of support, av
= 533 mm
vc
= 2d vc / av
= 1.37 N/mm2
v < c, Hence provide nominal links
26.5.1.6
Spacing provided, sv
= 225 mm
Minimum area of links = 0.4 b sv / 0.87 fy
= 88.97 mm2
Area of links provided (2T10), Asv
= 157.08 mm2
Shear Reinforcement provided
= 2T10 @ 225 c/c
OK
High shear zone: 0.825 m to 4.700 m

4.1 SP:16

Maximum shear force within zone, Vu


= 214.98 kN
v
= (Vu/bd)
= 0.83 N/mm2
40.1
cmax = 2.8
Hence dimensions adequate
c = (0.85 0.8fck((1 + 5) - 1)/6)
where =0.8fck/6.89pt
= 0.56 N/mm2
c < v < cmax
40.4
Spacing provided, sv
= 225 mm
Minimum area of links = b sv (v - c) / 0.87 fy
= 59.52 mm2
Area of links provided (3T10), Asv
= 235.62 mm2
Shear Reinforcement provided
= 3T10 @ 225 c/c
OK

4.1 SP:16

Member M3 Span 2
Detailed IS456 Design Requirements
Section Property: 430 x 649
Beam Designed for : Vertical Bending and Shear
Span Length
= 5.000 mRectangular section
Width
= 430 mmDepth
= 650 mm
Covers: Top = 25 mm Bottom = 25 mm Side = 25 mm

Member M3 Span 2
Detailed IS456 Main Reinforcement
Section at 5.000 m from start of member: Hogging
Moment applied to section
= 411.91 kNm
Effective depth to tension reinforcement
d
= 599 mm
Depth to compression reinforcement
d'
= 48 mm
Compression steel required.
Asc'
= 10.28 mm2
G-1.2
Stress in compression steel,fsc
= 416.78 N/mm2
Asc
= ((Mu-Mulim)/(fsc) (d - d'))
= 10.28 mm2
G-1.2
Required tension steel area
= 1954 mm2
Required compression steel area
= 10 mm2
Tension bars provided
= 3T32 ( 2413 mm2 )
Minimum area of tension reinforcement
= 438 mm2
26.5.1.1(a)
Maximum area of tension reinforcement
= 11180 mm2
26.5.1.1(b)
Compression bars provided
= 4T25 (= 1963 mm2 )
Maximum area of compression reinforcement
= 11180 mm2
26.5.1.2
Minimum horizontal bar spacing
= 40 mm 26.3.2
Smallest actual horizontal space between bars
= 87 mm
Maximum allowable spacing for tension bars (for 0% redistribution)
= 150 mm26.3.3
Largest actual space between tension bars
= 132 mm
Beam Designed as a Doubly Reinforced Section
Actual neutral axis depth of section
= 273.16 mm
Moment capacity of section
= 521.97 KNm
OK
Section at 5.000 m from start of member: Hogging
Moment applied to section
= 411.91 kNm
Effective depth to tension reinforcement
d
= 599 mm
Depth to compression reinforcement
d'
= 47 mm
Compression steel required.
Asc'
= 10.28 mm2
G-1.2
Stress in compression steel,fsc
= 416.78 N/mm2
Asc
= ((Mu-Mulim)/(fsc) (d - d'))
= 10.28 mm2
G-1.2
Required tension steel area
= 1954 mm2
Required compression steel area
= 10 mm2
Tension bars provided
= 6T32 ( 4825 mm2 )
Minimum area of tension reinforcement
= 438 mm2
26.5.1.1(a)
Maximum area of tension reinforcement
= 11180 mm2
26.5.1.1(b)
Compression bars provided
= 8T25 (= 3927 mm2 )
Maximum area of compression reinforcement
= 11180 mm2
26.5.1.2
Minimum horizontal bar spacing
= 40 mm 26.3.2
Smallest actual horizontal space between bars
= -25 mm
Maximum allowable spacing for tension bars (for 0% redistribution)
= 150 mm26.3.3
Largest actual space between tension bars
= 132 mm
Beam Designed as a Doubly Reinforced Section
Actual neutral axis depth of section
= 273.16 mm
Moment capacity of section
= 1100.79 KNm
OK
Section at 10.000 m from start of member: Hogging
Moment applied to section
= 417.43 kNm
Effective depth to tension reinforcement
d
= 599 mm

Depth to compression reinforcement


d'
= 48 mm
Compression steel required.
Asc'
= 34.30 mm2
G-1.2
Stress in compression steel,fsc
= 416.78 N/mm2
Asc
= ((Mu-Mulim)/(fsc) (d - d'))
= 34.30 mm2
G-1.2
Required tension steel area
= 1977 mm2
Required compression steel area
= 34 mm2
Tension bars provided
= 3T32 ( 2413 mm2 )
Minimum area of tension reinforcement
= 438 mm2
26.5.1.1(a)
Maximum area of tension reinforcement
= 11180 mm2
26.5.1.1(b)
Compression bars provided
= 4T25 (= 1963 mm2 )
Maximum area of compression reinforcement
= 11180 mm2
26.5.1.2
Minimum horizontal bar spacing
= 40 mm 26.3.2
Smallest actual horizontal space between bars
= 87 mm
Maximum allowable spacing for tension bars (for 0% redistribution)
= 150 mm26.3.3
Largest actual space between tension bars
= 132 mm
Beam Designed as a Doubly Reinforced Section
Actual neutral axis depth of section
= 273.16 mm
Moment capacity of section
= 521.97 KNm
OK
Section at 10.000 m from start of member: Hogging
Moment applied to section
= 417.43 kNm
Effective depth to tension reinforcement
d
= 599 mm
Depth to compression reinforcement
d'
= 47 mm
Compression steel required.
Asc'
= 34.30 mm2
G-1.2
Stress in compression steel,fsc
= 416.78 N/mm2
Asc
= ((Mu-Mulim)/(fsc) (d - d'))
= 34.30 mm2
G-1.2
Required tension steel area
= 1977 mm2
Required compression steel area
= 34 mm2
Tension bars provided
= 6T32 ( 4825 mm2 )
Minimum area of tension reinforcement
= 438 mm2
26.5.1.1(a)
Maximum area of tension reinforcement
= 11180 mm2
26.5.1.1(b)
Compression bars provided
= 8T25 (= 3927 mm2 )
Maximum area of compression reinforcement
= 11180 mm2
26.5.1.2
Minimum horizontal bar spacing
= 40 mm 26.3.2
Smallest actual horizontal space between bars
= -25 mm
Maximum allowable spacing for tension bars (for 0% redistribution)
= 150 mm26.3.3
Largest actual space between tension bars
= 132 mm
Beam Designed as a Doubly Reinforced Section
Actual neutral axis depth of section
= 273.16 mm
Moment capacity of section
= 1100.79 KNm
OK

Member M3 Span 2
Detailed IS456 Span / Effective Depth Check
Basic span / effective depth ratio
= 26.0
23.2.1 a
fs = 0.58 fy AsReqd / AsProv
= 65.05 22.2.1 SP:24
Mod. factor for tension rft.= (1/0.225 + 0.00322 fs-0.625 log10(1/pt)) 2.0
Mod. factor for compression rft.
= (1.6 pc/pc + 0.275) 1.5
= 1.24
Hence, modified span / effective depth ratio
= 64.23
Actual span / effective depth ratio
= 8.30
SAFE

= 2.00

23.2.1 c

23.2.2

Member M3 Span 2
Detailed IS456 Shear Reinforcement
Minimum links zone: 5.300 m to 5.825 m
Maximum shear force within zone, Vu
= 245.35 kN
v
= (Vu/bd)
= 0.95 N/mm2
40.1
cmax = 2.8
Hence dimensions adequate
c = (0.85 0.8fck((1 + 5) - 1)/6)
where =0.8fck/6.89pt
= 0.61 N/mm2
Face of support is less than 2d away from section,
Hence enhancement of shear strength possible
40.5.2
distance to face of support, av
= 533 mm
vc
= 2d vc / av
= 1.37 N/mm2
v < c, Hence provide nominal links
26.5.1.6
Spacing provided, sv
= 225 mm
Minimum area of links = 0.4 b sv / 0.87 fy
= 88.97 mm2
Area of links provided (2T10), Asv
= 157.08 mm2
Shear Reinforcement provided
= 2T10 @ 225 c/c
OK

4.1 SP:16

High shear zone: 5.825 m to 9.700 m


Maximum shear force within zone, Vu
= 198.87 kN
v
= (Vu/bd)
= 0.77 N/mm2
40.1
cmax = 2.8
Hence dimensions adequate
c = (0.85 0.8fck((1 + 5) - 1)/6)
where =0.8fck/6.89pt
c < v < cmax
Spacing provided, sv
Minimum area of links = b sv (v - c) / 0.87 fy
Area of links provided (3T10), Asv
Shear Reinforcement provided
OK

= 0.56 N/mm2

40.4
= 225 mm
= 45.69 mm2
= 235.62 mm2
= 3T10 @ 225 c/c

4.1 SP:16

Vous aimerez peut-être aussi