Vous êtes sur la page 1sur 4

Ahammed Rashel Hasan

CONTACT DETAILS
C/O: Md. Hashem Ali
Village: PakseyBazer, Post: Paksey
P.S: IshurdiDist: : Pabna, Bangladesh
Mobile : +88-01723995542
E-mail : arhbappy@yahoo.com, bappy114@gamil.com

CAREER
OBJECTIVES

To make an excellent career as an Engineer having a challenging position in


any specialization concerning Mechanical Engineering that offers good
potential advancement.
May
2009
to
April
2013

EDUCATIONAL
QUALIFICATIONS

Certificate
Department
University

Bachelor of Science in Engineering


Mechanical Engineering
Dhaka University of Engineering&Technology.
(DUET), Gazipur, Bangladesh
Four years
2013
3.23

Duration
Year of Passing
CGPA

March Certificate
2004
Department
to
Institute
Dec.
2008
Duration
Board

Diploma in Engineering
PowerTechnology
Rajshahi Polytechnic Institute
Sopura,Rajshahi Bangladesh.
Four years
Bangladesh Technical Education Board
(BTEB), Dhaka, Bangladesh.
December, 2008
3.85 out of 4.00
Board First class 2nd

Year of Passing
CGPA
Achievement
Jan.
1992
to
July
2002

Certificate
School

Secondary School Certificate


Bangladesh Railway Government Chandra
PravaBiddyapit
Rajshahi
Science
Ten Years
3 rd July, 2002
3.50 out of 5.00 (without four subject)

Board
Group
Duration
Year of passing
GPA

Operating System

Other Software

COMPUTER SKILLS
Programming language:

Windows 98, Windows 2003, Windows7


Windows XP
MS Word, MS Excel, MS PowerPoint.
Auto CAD - 2D& 3D, MeQuay design
tools. Microcalorigin ,Tora,Adobe
Acrobat.
C/C++, FORTRAN

TRAINING

Title of Training :

Industrial Attachment

Institution

Bangladesh Machine Tools Factory Ltd (BMTF).

Duration

16thJuly, 2012 to 5thAugust, 2012 (Three Weeks)

Title of Training :

Industrial AttachmentR

Institution

JonyAutomobile,Workshop,Rajshahi ,Bangladesh.

Duration

23thOcto. 2007 to 16thDece. 2007 (Three Month)

Title of Training :

Refrigeration & Air condition Repairing

Institution

Bangladesh Small & Cottage Industries

Corporation(BSCIC)
Duration

1st Januray,2008 to 30th June,2008 (Six mMonth)

1.

ACHIEVEMENT

KNOWLEDGE

EXPERIENCE-1
COMPANY NATURE

JOB
RESPONSIBILITY

Prepare cooling load calculation by manually according to ASHRAE guide


line.
2. Prepare duct design by manually and ductsizer software according to
ASHRAE & SMACNA guide line.
3. Prepare pipe size by pipesizer software.
4. Selecting Ventilation fan size by manually according to ASHRAE guide
line.
5. Selecting cooling tower size by manually and software according to
ASHRAE guide line.
6. Prepare DQ, IQ & OQ according to guide line.
7. Prepare Material Inspection Request(MIR),Work Inspection Request
(WIR), Testing Inspection Request etc for client.
Depth knowledge of all utility into Commercial, Residential and Industrial
building, like as
1. Water supply system (cold water, Hot water, Soft water system).
2. Fire Fighting system.
3. Boiler
4. Laundry
5. Sewerage Treatment plant (STP).
6. Water Treatment Plant (WTP).
6. Air Compressor system.
7. Power Generation ( like as diesel engine generator)
8. Vertical Transportation System (VTS).
9. Building Management System (BMS).

I work as a Mechanical Engineer in Shams Engineering from 3rd


January 2015 to till now.
E&M co-ordination, consultancy & Project Management.
1. Design monitoring and co-ordination.
2. Management and mobilization of project personnel.
3. Technical co-ordination of the project.
4. Visiting site periodically.
5. Continuous review of the project progress and activities.
6. Management and guidance of all staff assigned to the project.
7. Taking measures for quality cost and time control.
8. Prepare BOQ according to design.
9. Prepare Tender according to Tender Guide line.

EXPERIENCE-2
COMPANY NATURE

JOB
RESPONSIBILITY

PROJECT STATUS

PERSONAL
INFORMATION

PERMANENT
ADDRESS

I worked as a Project Engineer in Confidence Trade Limited from 2 nd


May, 2013 to 2nd October 2015.
Supply, installation & servicing of HVAC System.
1.Supervision, Installation ,Operation & maintenance of water cooled water
chiller, Air cooled chiller, FCU, AHU, Pump, Dehumidifier ,Post cooler& pre
cooler, Fan, Cooling tower, Ducting, piping, Exhausting work etc .
2. Co-ordination of management side of HVAC system between client and
right person of our office.
3. Prepare Material requisition of project.
4. Prepare Bill of paper.
5. To maintain manpower & Engineer of project.
1. Project Name: Acme Pharmaceuticals Limited.
Capacity of chiller: 405 TR
Duration: 25Th march 2015 to till date.
2. Project Name: Labaid Pharmaceuticals Limited.
3. Project Name : Radisson Bay View Hotel, Chittagong.
Capacity of chiller: 3000TR
Duration:1st May 2013 to 14Th march 2015.
4. Project Name: Kulshli Town Center Concord, Chittagong.
Capacity of chiller: 600TR
Duration: 15th May 2013 to till date.
5. Project Name : Banglalink Call Center, Chittagong.
Capacity of chiller: 84TR
Duration: 18th February to 21thApril.
6. Project Name :Transcom Bavarage, Chittagong.
Capacity of chiller: 250TR
Duration:25th February to 10th April
Fathers Name :
Mothers Name :
Birth Place
:
Date of Birth
:
Sex
:
Religion
:
Nationality
:
Interest
:
Marital Status :
Blood Group
:
C/O
Village
Post office
Police station
Distric

Md.Hashem Ali
Mst.Rahima Begum
Pakshy,Pabna, Bangladesh.
15th September, 1986
Male
Islam
Bangladeshi (By Birth)
Watching movie, Traveling, Sports etc.
Unmarried
A+(positive)

: Md. Hashem Ali


: PakseyBazer
: Paksey
: Ishurdi
:Pabna

1.Engr. Md. Hasmotuzzamann


REFERENCES

DECLARATION

Chife Executive Officer (CEO)


Utility Professionals
House # 38 (1st Floor), Road # 07
Block # B, BanasreeRampura, Dhaka1219.
Mobile NO.:+88-01819222764
Email:utility.bd@gmail.com

2. Engr.MD.Monirul Islam
Operative Director (OD)
Confidence Trade Limited
09-05 Navana Tower 45 ,
GulshanAveneu .Dhaka
Mobile NO.:+88-01714-014662
Email: monir@contradeltd.com

I undersigned hereby & declare that all information given herewith is


accurate and up-to-date.

Date:10.28.2015

(Ahammed

Rashel Hasan)

Vous aimerez peut-être aussi