Substation:
Transformer
rating
90/120 MVA
Transformer ID:
T201
Voltage Level
Primary
Date:
24-Feb-16
220
Secondary
kV
34.5
kV
The test is done by keeping the LV Side Short Circuited and HV Side is supplied with 3 phase 400V AC Supply.
b.
The test have been carried out for Nominal Tap, Highest and Lowest TAP
HV
Ea
LV
Eb
Ec
Tap Position
Voltage Applied
(V)
238.4
11
229.6
25
228.9
Transformer
rating
90/120 MVA
Transformer ID:
T201
Voltage Level
Primary
Date:
24-Feb-16
220
Secondary
kV
34.5
kV
The test is carried out by suplying a current of rated frequency between parallel connected phase terminals and the neutral termina
current.
b.
LV
Tap Position
Voltage Applied
(V)
231.9
11
233.9
Transformer
rating
90/120 MVA
Transformer ID:
T201
Voltage Level
Primary
Date:
24-Feb-16
220
A
V
Secondary
kV
34.5
kV
13B
233.7
25
228.9
LV
A
V
Tap Position
Voltage Applied
(V)
232.8
11
232.2
13B
232
25
229.8
The test is carried out by suplying a current of rated frequency between parallel connected phase terminals and the neutral termina
current.
Transformer
rating
90/120 MVA
Transformer ID:
T201
Voltage Level
Primary
Date:
24-Feb-16
b.
220
Secondary
kV
34.5
kV
HV
A
V
Voltage Applied
(V)
5.13
11
5.43
13B
5.67
25
5.52
HV
Tap Position
Voltage Applied
(V)
5.59
Transformer
rating
90/120 MVA
Transformer ID:
T201
Voltage Level
Primary
Date:
24-Feb-16
220
Secondary
kV
34.5
kV
A
V
Calculation To Determine The Equivalent Zero Sequence Impedance at HV, LV and Tertiary
ZHT
Impedance Measured in Primary circuit with Teritary Shorted and Secondary Open
ZLT
Impedance measured in Secondary Circuit with Teritary Shorted and Primary Open
ZHLT
Impedance Measured in Primary circuit with Teritary Shorted and Secondary Shorted
ZLHT
Impedance Measured in Secondary circuit with Teritary Shorted and Primary Shorted
ZH
Primary Impedance
ZHT-ZT
ZL
Secondary Impedance
ZLT-ZT
ZT
Tertiary Impedance
SQRT(ZHT*(ZLT-ZLHT))
Tertiary
9.9
kV
nce
Impedance
Calculated ()
MVA Base
% of 120MVA Base
1.817
131.21
120
25.71
2.34
98.12
120
24.34
3.599
63.60
120
23.19
Tertiary
9.9
kV
Impedance
Calculated ()
MVA Base
Zero Sequence
Impedance %
7.82
88.96
120
10.06
10.65
65.89
120
9.43
Tertiary
9.9
kV
11.3
62.04
120
9.34
16.2
42.39
120
8.92
Impedance
Calculated ()
MVA Base
Zero Sequence
Impedance %
7.8
89.54
120
10.13
10.52
66.22
120
9.48
11.17
62.31
120
9.38
16.24
42.45
120
8.93
Tertiary
9.9
kV
Impedance
Calculated ()
MVA Base
Zero Sequence
Impedance %
19.85
0.78
120
4.51
21.52
0.76
120
4.41
22
0.77
120
4.50
21.4
0.77
120
4.50
Impedance
Calculated ()
MVA Base
Zero Sequence
Impedance %
21.71
0.77
120
4.50
Tertiary
9.9
kV
nd Tertiary Winding
65.89
0.77
64.88
-0.24
66.22
0.76
1.01
64.88
-0.24
1.01
Transformer
rating
90/120 MVA
Transformer ID:
T202
Voltage Level
Primary
Date:
24-Feb-16
220
Secondary
kV
34.5
kV
The test is done by keeping the LV Side Short Circuited and HV Side is supplied with 3 phase 400V AC Supply.
b.
The test have been carried out for Nominal Tap, Highest and Lowest TAP
HV
Ea
LV
Eb
Ec
Tap Position
Voltage Applied
(V)
228.6
11
229.6
25
228.9
Transformer
rating
90/120 MVA
Transformer ID:
T202
Voltage Level
Primary
Date:
24-Feb-16
220
Secondary
kV
34.5
kV
The test is carried out by suplying a current of rated frequency between parallel connected phase terminals and the neutral termina
current.
b.
LV
Voltage Applied
(V)
218.7
11
215.8
Transformer
rating
90/120 MVA
Transformer ID:
T202
Voltage Level
Primary
Date:
24-Feb-16
220
A
V
Secondary
kV
34.5
kV
13B
216.5
25
216
A
V
LV
Voltage Applied
(V)
217.3
11
217
13B
216.7
25
215.7
The test is carried out by suplying a current of rated frequency between parallel connected phase terminals and the neutral termina
current.
Transformer
rating
90/120 MVA
Transformer ID:
T202
Voltage Level
Primary
Date:
24-Feb-16
b.
220
Secondary
kV
34.5
kV
HV
A
V
Voltage Applied
(V)
5.691
11
5.674
13B
5.665
25
5.602
HV
Voltage Applied
(V)
5.7
Transformer
rating
90/120 MVA
Transformer ID:
T202
Voltage Level
Primary
Date:
24-Feb-16
220
Secondary
kV
34.5
kV
A
V
Calculation To Determine The Equivalent Zero Sequence Impedance at HV, LV and Tertiary
ZHT
Impedance Measured in Primary circuit with Teritary Shorted and Secondary Open
ZLT
Impedance measured in Secondary Circuit with Teritary Shorted and Primary Open
ZHLT
Impedance Measured in Primary circuit with Teritary Shorted and Secondary Shorted
ZLHT
Impedance Measured in Secondary circuit with Teritary Shorted and Primary Shorted
ZH
Primary Impedance
ZHT-ZT
ZL
Secondary Impedance
ZLT-ZT
ZT
Tertiary Impedance
SQRT(ZHT*(ZLT-ZLHT))
Tertiary
9.9
kV
nce
Impedance
Calculated ()
MVA Base
% of 120MVA Base
1.747
130.85
120
25.64
2.34
98.12
120
24.33
3.599
63.60
120
23.16
Tertiary
9.9
kV
Impedance
Calculated ()
MVA Base
Zero Sequence
Impedance %
7.35
89.27
120
10.10
9.82
65.93
120
9.44
Tertiary
9.9
kV
10.5
61.86
120
9.31
15.31
42.33
120
8.90
Impedance
Calculated ()
MVA Base
Zero Sequence
Impedance %
7.32
89.06
120
10.07
9.93
65.56
120
9.38
10.52
61.80
120
9.31
15.34
42.18
120
8.87
Tertiary
9.9
kV
Impedance
Calculated ()
MVA Base
Zero Sequence
Impedance %
21.17
0.81
120
4.69
20.84
0.82
120
4.75
20.81
0.82
120
4.75
20.99
0.80
120
4.66
Impedance
Calculated ()
MVA Base
Zero Sequence
Impedance %
21.33
0.80
120
4.67
Tertiary
9.9
kV
nd Tertiary Winding
65.93
0.80
65.38
0.26
65.56
0.82
0.54
65.38
0.26
0.54
Transformer
rating
90/120 MVA
Transformer ID:
T203
Voltage Level
Primary
Date:
24-Feb-16
220
Secondary
kV
34.5
kV
The test is done by keeping the LV Side Short Circuited and HV Side is supplied with 3 phase 400V AC Supply.
b.
The test have been carried out for Nominal Tap, Highest and Lowest TAP
HV
Ea
LV
Eb
Ec
Tap Position
Voltage Applied
(V)
240.9
11
239.7
25
239.2
Transformer
rating
90/120 MVA
Transformer ID:
T203
Voltage Level
Primary
Date:
24-Feb-16
220
Secondary
kV
34.5
kV
The test is carried out by suplying a current of rated frequency between parallel connected phase terminals and the neutral termina
current.
b.
LV
Tap Position
Voltage Applied
(V)
233.9
11
232.2
Transformer
rating
90/120 MVA
Transformer ID:
T203
Voltage Level
Primary
Date:
24-Feb-16
220
A
V
Secondary
kV
34.5
kV
13B
232.8
25
230.9
LV
A
V
Tap Position
Voltage Applied
(V)
234.5
11
232.9
13B
232.9
25
233.8
The test is carried out by suplying a current of rated frequency between parallel connected phase terminals and the neutral termina
current.
Transformer
rating
90/120 MVA
Transformer ID:
T203
Voltage Level
Primary
Date:
24-Feb-16
b.
220
Secondary
kV
34.5
kV
HV
A
V
Voltage Applied
(V)
5.5
11
5.4
13B
5.6
25
5.7
HV
Tap Position
Voltage Applied
(V)
5.6
Transformer
rating
90/120 MVA
Transformer ID:
T203
Voltage Level
Primary
Date:
24-Feb-16
220
Secondary
kV
34.5
kV
A
V
Calculation To Determine The Equivalent Zero Sequence Impedance at HV, LV and Tertiary
ZHT
Impedance Measured in Primary circuit with Teritary Shorted and Secondary Open
ZLT
Impedance measured in Secondary Circuit with Teritary Shorted and Primary Open
ZHLT
Impedance Measured in Primary circuit with Teritary Shorted and Secondary Shorted
ZLHT
Impedance Measured in Secondary circuit with Teritary Shorted and Primary Shorted
ZH
Primary Impedance
ZHT-ZT
ZL
Secondary Impedance
ZLT-ZT
ZT
Tertiary Impedance
SQRT(ZHT*(ZLT-ZLHT))
Tertiary
9.9
kV
nce
Impedance
Calculated ()
MVA Base
% of 120MVA Base
1.849
130.29
120
25.71
2.451
97.80
120
24.34
3.778
63.31
120
23.19
Tertiary
9.9
kV
Impedance
Calculated ()
MVA Base
Zero Sequence
Impedance %
7.93
88.49
120
10.01
10.64
65.47
120
9.37
Tertiary
9.9
kV
11.32
61.70
120
9.29
16.4
42.24
120
8.88
Impedance
Calculated ()
MVA Base
Zero Sequence
Impedance %
7.92
88.83
120
10.05
10.65
65.61
120
9.39
11.3
61.83
120
9.31
16.62
42.20
120
8.88
Tertiary
9.9
kV
Impedance
Calculated ()
MVA Base
Zero Sequence
Impedance %
21.18
0.78
120
4.53
20.58
0.79
120
4.58
21.65
0.78
120
4.52
21.74
0.79
120
4.58
Impedance
Calculated ()
MVA Base
Zero Sequence
Impedance %
21.25
0.79
120
4.60
Tertiary
9.9
kV
nd Tertiary Winding
65.47
0.79
65.00
0.32
65.61
0.79
0.47
65.00
0.32
0.47