the A purge
valve(Its signal
light
is
A HFO valve (Its signal light is bright) at the same time. When the
instructions light of the flames scanner is bright (Or check if the oil
gun is lighting through observation port), ignition gun is burning for
10 seconds Press the button A withdraw ignition gun The fire
process will be completed when the ignition gun returning the original
position and its signal light is bright. If there is no fire after the
ignition gun igniting for 10 seconds, it is stated that igniting fails.
Close the A HFO valve quickly (The instruction light of A HFO
valve is bright). When the oil gun stops working, purge must be
carried out, finish purging close A purge valve and withdraw A oil
gun . And purge should be carried out again before igniting beginning
again.
A use LDO igniting:
Open the main valve first:
Make the revolve button to locale ignition Open the main
HFO valveIts signal light is brightand returning HFO valveIts
signal light is brightOpen the main LDO valveIts signal light
is bright and returning LDO valve Its signal light is
brightOpen the compressed air valve (Its signal light is bright).
Then we can ignite every angles (ABC),B angle and C angle are
same as above. Introduced emphatically A angle:
Press the button A enter oil gun(Its signal light is bright) Open
4
the A purge valve(Its signal light is bright), purge the oil pipes for
3minutes,then close
the A purge
valve(Its signal
light
is
valve, so the A LDO valve will close when the A HFO air open; vice
versa.
The igniting method through distance step panel control
Make the button revolving to distance control to ignite. The control
signal lines is connected with the ports for distance panel step control
according to igniting system principle diagram , lines diagram and ports
diagram. The igniting operation can be carried out through the buttons
controlling on distance panel (supplied by customer) or computer. Step
control to igniting will be finished through distance step panel control
in operation room.
The igniting method through distance DCS program control
Make the button revolving to distance control to ignite. The control
signal lines and signal reflecting lines are connected with the ports for
distance DCS program control according to igniting system principle
diagram, lines diagram and ports diagram. And the program in DCS
system should be made according to ignition logic (See the attached).
The igniting operation can be carried out automatically through distance
DCS program control in operation room.
6. Installment
1.
()
1400
750
position.
8.Ready for ignition.
1. Clear away welders (Important)
It is necessary to clear away welders in pipes by the way of sore
washing, water washing and purging when finished installation to
prevent the welders blocking valves and flow meters but flow meters
must be discharged when carried out the above action in first time.
2Purging Test (Important, Purged for 4-12 hours)
All pipes should be purged and the rust and welding must be
cleaned by smoke air or compressed air and all valve should be
opened at the same time before igniting.
Goal: a. To protect the valves from being blocked and closed
loosely.
b. To protect the nozzle of oil gun from being blocked.
3 Circulating Oil Test and Oil Atomizing Test (Important, for 2-4
hours)
3.1 Oil valves before oil gun should be closed and Returning Oil
valve should be opened. Oil pump should be run. Returning
Oil valve should be adjusted to watch the change of oil
pressure. The oil pressure should be 0-25Kgf.
3.2 Oil atomizing test should be carried out after one hour oil
circulating. Oil gun should be put to empty barrel and valves
before oil gun should be opened. Then Returning oil valve
should be adjusted until the oil pressure of pipe is 0-20Kgf and
the atomizing condition of oil gun should be watched.
3.3 Atomizing Test must be carried out every ignition.(The oil
pressure atomizing should be about 12-20 Kgf) .Igniting
should be carried out until oil atomizing well.
3.4 The output of oil gun can be adjusted through atomizing part
in oil gun according to the use of oil gun. The screw of nozzle
must be screwed tightly to prevent from the leakage of oil
every change of atomizing part .At the same time, atomizing
test should be carried out until the oil gun atomized well.
Goal: a. To check if the oil pump work well
b. To check if the pipe has the leakage of oil
c. To check if the nozzle of oil gun is screwed tightly
d. To check if the pipe is cleaned.
e. To prevent the coal pit from making
agglomeration or burning badly or spoiling
9. Formal igniting
1 Igniting (on the basis of atomizing well for oil gun)
10
a) The oil pump should be run and the entering-oil regulate valve
should be adjusted until the oil pressure of pipe is about 12
18Kgf.
b) Igniting Process (by locale step igniting): The revolving button
locale and distance should be in locale position and its related
bulb is bright. Then the lighter should be entered until the bulb
lighter returned to its position is brightIgnitingOpen oil
valveReturn lighter until the bulb lighter returned to its
position is bright after the bulb igniting is dark
c) If the igniting fails, please close the oil valve quickly.
Reasons of Fails as follows:
a) The matched air is not appropriate
b) The atomizing part of oil gun is blocked
c) Atomizing test is not good (The atomizing part of oil gun is
blocked or distorted.)
d) Pipe is blocked
e) The lighter is not in the atomizing position.
2 Burning load regulation (Oil guns flux regulation)
a) Please lower oil pressure/ Adjust the gas valve position or
increase burning wind or change little flux atomizing part if the
temperature of the chamber of boiler is risen too quickly;
b) Please lower oil pressure if the temperature of the burning room
is risen too quickly;
c) Please lower oil pressure if the temperature of the first wind
room is risen too quickly; at the same time, it mustnt affect
with the oil gun/gas gun burning.
3 When the oil gun stop working, please shut off the oil valve
quickly ,when the gas gun stop working ,please shut off the gas
valve and open the relief valve ,after any time ,close relief
valve .Then the oil or gas system all need purge for 3-5 minutes
must be carried out.
10. Others
1. Igniting test should be carried out every formal ignition to check if
the igniting equipment is working well and guarantee igniting
succeeded one time.
2. The nozzle should be cleaned or atomizing part should be changed
before used again when the oil gun was unused for a long time.
3. Valves and oil strainer should be cleaned in regular time.
4. Valves and oil strainer should be cleaned in regular time. Power
should be broken after unused for a long time.
5. Please according to the instruction manual when operating.
6. Please take right measure to dustproof and waterproof ; examine
and repair.
11