For Construction of Control Room Building, Store Building, Store Yard, Kiosk, Sump House and Pump Hous
Auraiya).
S.No.
Description
unit
Qty
1 Excavation in foundation in ordinary soil (Loam Clay or Sand) including lift upto 1.5m
and lead upto 30m and including filling, watering and ramming of excavated earth into
the trenches or into the space between the building and sides of the foundation trenches
or into the plinth and remaval and disposal of surplus earth as directed by by the
engineer-in-charge upto a distance of 30m from the foundation trenches. (CSI 4.01)
CuM
800.00
2 Add to Earth work item (SI No. 4.01) for every additional 30m lead or part thereof or
for every additional 1.5M lift or part thereof. (CSI No. 4.04)
CuM
50.00
3 Sand filling in plinth including supply of necessary quantity of local sand from outside
the UPPCL premises including watering, dressing etc. Rate to include cost of all
materials, labour and T&P etc. required for proper completion of work. (CSI No. 4.05)
CuM
300.00
4 Clearing jungle including uprooting of rank vegetations,grass, bush, wood, trees and
saplings of girth upto 30cm measured at a height of 1.0m above ground level and
removal of rubbish upto a distance of 50m outside the periphery of UPPCL area
cleared. (CSI No. 4.09)
SqM
250.00
5 Earth filling under floors and/or sub station area including cost of earth when obtained
from outside UPPCL area including its carriage including watering, ramming in 20 cm
layers and dressing of earth etc. all complete.(CSI No. 4.11)
CuM
800.00
6 Levelling and dressing and making proper slope including cutting and filling of earth
upto a depth of 100 mm if so required including all labour, T&P, etc.required for proper
completion of the work. (CSI 4.12)
SqM
2000.00
7 Concrete with 4cm gauge Ist class brick ballast, coarse sand (F.M. 1.80 to 2.50) and
cement in proportion of 12:6:1 in foundations and under floors including supply of all
materials, labour and tools and plants etc. required for proper completion.(CSI No. 5.01)
CuM
10.00
8 Concrete with 4cm gauge stone ballast, coarse sand (F.M. 1.80 to2.50) and cement in
proportion of 12:6:1 in foundations and under floors including supply of all materials,
labour and tools andplants etc. required for proper completion.(CSI No. 5.02)
CuM
148.10
9 Cement concrete with 2cm gauge approved hard stone ballast, coarse sand (F.M. 1.80 to
2.50) and cement in proportion of 4:2:1 including supply of all materials,labour,side
shuttering if required and T&P etc. required for proper completion of work. (CSI No.
5.06)
Cum
18.00
For Construction of Control Room Building, Store Building, Store Yard, Kiosk, Sump House and Pump Hous
Auraiya).
S.No.
Description
unit
Qty
10 RCC work with cement approved coarse sand (F.M. 1.80 to 2.50) and 2 cm gauge
graded approved hard stone ballast in proportion 1:2:4 in strip foundations and column
footing,Transformer plinth base slab etc. excluding supply of reinforcement and its
bending but including its fixing and binding the same with binding the same with 24
B.W.G. G.I. binding wire, and including necessary centring and shuttering etc. and also
including cost of all other materials labour and T&Petc. required for proper completion
of the work.( CSI No. 5.15)
CuM
5.00
11 RCC work with cement approved coarse sand (F.M.1.5 to 2.0) and 2 cm gauge graded
approved hard stone ballast like grainite, quartzite etc from Dalla, Jhansi or other
quarries, in proportion 1:1.5:3 in lintels of doors and windows, excluding supply of
reinforce- ment and its bending but including its fixing and binding the same with
binding wire, including cost of all other materials labour and T&P. (CSI No. 5.25)
CuM
22.42
12 RCC work with cement approved coarse sand (F.M. 1.80 to 2.50) and 2 cm gauge
graded approved hard stone ballast in proportion 1:1.5:3 in columns and walls
excluding supply of reinforcement and its bending but including its fixing and binding
the same with binding wire, including cost of all other materials labour and T&P. (CSI
No. 5.17)
Cum
70.00
13 RCC work with cement approved coarse sand (F.M. 1.80 to 2.50) and 2 cm gauge graded
approved hard stone ballast like grainite, quartzite etc in proportion 1:1.5:3 in RCC
slabs, excluding supply of reinforcement and its bending but including its fixing and
binding the same with binding wire, including cost of all other materials labour and T&P.
(CSI No. 5.26)
CuM
50.00
14 As in item 12 above in the lighter beams i.e. Having span upto 6m. (CSI 5.27)
CuM
3.00
15 RCC work with cement approved coarse sand (F.M. 1.80 to 2.50) and 2 cm gauge
graded approved hard stone ballast like grainite, quartzite etc in proportion 1:2:4 in
heavier beams having span above 6 M. with coarse sand, excluding supply of
reinforcement and its bending but including its fixing and binding the same with binding
wire, including cost of all other materials labour and T&P. (CSI No. 5.13)
CuM
8.00
16 Concreting of 40 mm thick RCC trench covers in mild steel frame work with C.C
1:1.5:3 in Cement, coarse sand (F.M. 1.80 to 2.50) and 2cm gauge graded hard stone
ballast with 3mm thick floating coat of neat cement finish on top of cover complete with
all labour, materials,etc. (SI No. 5.19)
Sqm
30.00
17 2.5 cm thick damp proof course of cement concrete consisting of 1 part cement 1.5 parts
approved coarse sand, and 3 parts approved 12 mm. graded stone grit and also including
liquid water proofing material of Dr. Fixit or equivalent as approved by the EngineerIncharge in the proportions specified by the manufacturer. (SI No. 7.02)
SqM
27.81
For Construction of Control Room Building, Store Building, Store Yard, Kiosk, Sump House and Pump Hous
Auraiya).
S.No.
Description
unit
Qty
18 Providing Gola 75 x 75 mm. in C.C. 1:2:4 with coarse sand and 10 mm. down grit
including finishing with cement mortar 1:3 as per standard design. (CSI 10.17)
Sqm
300.00
19 First class brick (class-150) work in 1:6 cement and coarse sand (2.25) mortar in
foundation and plinth including supply of all materials, labour & T&P etc. required for
proper completion of work.. (CS. I. No. 6.01)
Cum
65.00
20 First class brick (class-150) work in 1:6 cement and coarse sand (2.25) mortar in
superstructure for walls of one brick thickness .including supply of all materials, labour
& T&P etc. required for proper completion of work.(CSI NO. 6.01+6.08)
Cum
120.00
21 First class brick work in 1:4 cement and coarse sand (2.25) mortar in in cable trenches,
Culverts, where earth is to be retained by the brick wall /115mm thick walls in Control
room / store buildings etc. (S. I. No. 6.03)
Cum
55.00
22 First class brick (class-150) work in 1:6 cement and coarse sand (2.25) mortar in
superstructure including necessary cutting and moulding of bricks as required and also
including honeycomb brick work,thickness of walls not less than 1.5 brick including
supply of all materials, labour & T&P etc. required for proper completion of work.. (S. I.
No. 6.01+6.07)
Cum
60.00
23 First class brick(class-150) work in 1:4 cement and coarse sand (F.M. 1.5 to 2.0) mortar
in super structure in steps, parapet and facia including necessary cutting moulding of
bricks and including supply of all materials, labour and T&P required for proper
completion of the work including placing and fixing of reinforcement in position with
24 B.W.G. binding wire with centering shuttering complete but excluding cost of
reinforcement and its bending which shall be measured seperately. (CSI.No. 6.25)
Cum
12.17
24 Supply and dumping of brick bats in soak pit including cost of all materials labour and
T&P Complete (Material rate+10% C.P.)
CuM
8.00
25 First class brick work in 1:4 cement and coarse sand (2.25) mortar in superstructures for
walls of one brick thickness including supply of all materials, labour & T&P etc.
required for proper completion of work.. (S. I. No. 6.03+6.08)
cum
8.00
26 First class brick work in 1:4 cement and coarse sand (2.25) mortar in superstructures for
walls of half brick thickness including supply of all materials, labour & T&P etc.
required for proper completion of work.(CSI NO. 6.03+6.09)
CUM
5.00
For Construction of Control Room Building, Store Building, Store Yard, Kiosk, Sump House and Pump Hous
Auraiya).
S.No.
Description
unit
Qty
27 First class brick(class-150) work in 1:4 cement and coarse sand (2.25) mortar in super
structure in steps, parapet and facia with R.B. work including necessary cutting moulding
ofbricks and including supply of all materials, labour and T&P required for proper
completionof the work including placing and fixing of reinforcement in position with 24
B.W.G. binding wire with centering shuttering complete but excluding cost of
reinforcement and its bendingwhich shall be measured seperately. (CS. I. No. 6.25)
CUM
20.00
28 First class brick (class-150) laid dry in foundation and plinth as in circular soakpit wall
of one brick thickness and 2.0 m depth including cutting and moulding of bricks as
required including cost of all materials, labour and T&P etc. for proper completion of
work. (S. I. No. 6.24)
Cum
14.00
29 Indian Sal wood wrought framed and fixed including simple mouldings & straight work
as in Chaukhats including supply of all materials, labour and T&P etc.required for
propercompletion of the work.(CSI NO. 8.04)
Cum
0.25
30 Supply and fixing single leaf, 35mm thick, hot pressed, phenol Formaldehyde resin
bonded, boiling water resistant, commercial quality "Sitapur ply wood" or other ISI
Marked Factory made flush door shutters conforming to IS: 2202 Part-1 ( 1983)
including fixing of wooden cleats and stoppers and including fixing and adjustment of
hinges, bolts, locks, handles, springs and/or other fittings approved by Engineer-incharge but excluding their ( fittings) supply but including painting two coats of black
Japan on iron fittings if necessary.(CSI NO 8.71a)
Sqm
14.00
31 Same as above item no. 30 but for double leaf shutters. Approximate cost of Anodized
Aluminium Door fittings. (CSI 8.71b+8.78)
SqM
6.00
32 S/F of 3.5 cm thick Shisham wood fully glazed door and window shutter including
supplying and fixing of wooden cleats and stoppers and including fixing and adjustment
of hinges, bolts, locks, handles, springs and/or other fittings but excluding thier supply
but including painting with two coats of black japan on all iron fittings if necessary and
including the fixing of glass panes with putty and necessary screws (glass panes to be
4mm thick.) (CSI. 8.31)
Sqm
8.50
33 Supplying & fixing 24 gauge anodized aluminium sheet of approved quality including
cutting, wastage and fixing the same over the wooden door shutters with nails with all
material, labour and T&P.(CSI NO. 8.79)
SqM
6.00
34 Supply and mixing Dr. Fixit or approved water proofing compound in cement mortar in
plaster or concrete work in the proportion as recommended by the manufacturer.(CSI
NO. 11.18)
per bag
280.00
35 Supply and fixing 5.08 cm dia 25cm.long G.I. pipe in chhajja etc.(CSI 10.14)
N0
50.00
For Construction of Control Room Building, Store Building, Store Yard, Kiosk, Sump House and Pump Hous
Auraiya).
S.No.
Description
unit
Qty
36 S/F water proof craft paper in double layer with grease in between over 4cm thick C.C.
1:1.5:3 in cement, coarse sand & 12mm gauge stone grit.(CSI NO. 10.13)
SqM
35.00
37 Fixing and grouting of trench edging in proper level and alignment including cost of all
labour, and T&P etc. required for proper completion of the work but excluding cost of
C.C.(CSI NO. 9.45)
RM
40.00
38 Supply and fixing galvanised mosquito proof jali (16x24 gauge) with M.S. flat of 20x3
mm. size, on both sides screwed or welded to window or door frame.(CSI NO. 9.25)
SqM
6.00
39 S/F of 4 mm thick glass panes with and including putty brads and including supply of all
materials ,labours and T&Petc.required for proper completion of the work.(CSI NO.
MATERIAL RATE 12b+10%CP+20.07)
SQM
30.00
40 P/F fully glazed Anodized aluminium fixed shutters with HINDALCO or equivalent
extruded standard sections14gauge (2.41mm thick) of various cross sections and joints
mitred and jointed as shown in drawing including providing & fixing 5.5 mm thick
toughened glass with Neoprene beading & aluminium glazing clips all around. The
minimum thickness of anodizing on all aluminium sections should be 20 microns with a
(+-) 2 microns tolerance . The rate should include the cost of fixing the aluminum frame
on wooden frame or finished wall (RB/RCC/Masonry) surface by means of 80 mm long
approved counter sunk screws provided at 500 mm c/c or part there of starting from 100
mm above the bottom in vertical member and 100 mm from both the ends of horizontal
top and bottom member excluding cost of wood frame but including cost of all other
material, labour, tools & plants etc. complete. (CSI 8.67)
Sqm
15.00
41 Same as above item No. 40 but for openable or sliding or pivoting window portion as
shown in drawings, including cost of Aluminium hinges and all other fittings like
concealed tower bolts handles etc of approved quality and including cost of all other
material, labour, tools & plants etc. complete. (CSI 8.68)
Sqm
15.00
42 Same as in item No. 41 but for openable or sliding or pivoting gate/door portion as
shown in drawings including cost of hinges and Aluminium fittings like tower bolts,
handles, stoppers, push plates, brass body with brass component 6 levers cocealed lock
etc of heavy & approved quality and including cost of all other material, labour, tools &
plants etc. complete. (CSI 8.69)
Sqm
36.00
43 Supplying and fixing double action floor spring including cutting in floor and RCC slab
and grouting the same with CC and finished the surface properly as and where required
under Aluminium door as per direction of E/I including supply of all materials, labour &
T&P etc required for proper completion of the work (CSI 8.81).
Each
30.00
For Construction of Control Room Building, Store Building, Store Yard, Kiosk, Sump House and Pump Hous
Auraiya).
S.No.
Description
unit
Qty
44 S\F brass polished hydraulic door closure of approved make and quality its fixing and
adjustment with the help of screws, nuts and bolts including supply of all labour, T & P
etc. required for proper completion of the work. (CSI 8.74)
Each
12.00
45 Mild steel or iron work in heavy large size sections such as trusses, built-up gates, roof
work, window/ boundry grill or railing, trench covers, grating, T/F rail etc. wrought to
required form including supply of steel bolts, nuts, wastage etc. and their fixing charges,
welding, required for proper completion of the work. (CSI 9.03)
MT
1.50
46 Mild steel ( TMT or Tor steel bars Fe415 or higher grade) in plain work such as
reinforced concrete or reinforced brick work (when not included in an over all rates)
wrought to required shape as necessary including bending for proper completion of the
work and including supply of steel its wastage, bend, hooks and authorized overlapping
shall be measured. (Steel shall be arranged by the contractor) (CSI 9.05)
MT
14.70
47 Supplying and fixing rolling shutters of approved make made of 80x1.25 mm. Gauge
cold rolled M.S. lathes inter locked through out their inner length and joined together at
the end by end lock guides and arrangements for inside and outside locking with push
and pull operation complete but excluding the cost of top cover and springs. (CSI 9.13)
(PWD 520)
SqM
18.00
48 Providing and fixing 27.5cm. long wire spring grades 2 for rolling shutters.(CSI 9.13)
(521)
No
4.00
Rmt
6.00
No
4.00
51 S/F hold fasts 300x40x6mm. flat iron with 10mm. dia bolts with nut, grouting in CC
1:2:4 size of block 230x115x75mm. ( CC. shall be measured separately). (CSI 9.28)
No
70.00
52 12 mm. thick plaster in cement mortar consisting of one part of cement & four part of
coarse sand (1.8 to 2.5 FM) over brick work, minimum thickness not less than 10 mm.,
including supply of all materials, labour & T&P etc. required for proper completion of
the work.(1:4) (CSI 11.08)
Sqm
2220.99
53 Add for extra labour and materials for plaster over rough face of wall in item 43. (CSI
11.15)
Sqm
1100.00
54 6 mm. thick plaster with 1:3 cement and coarse sand including labour, materials and
T&P etc. required for proper completion of the work.(CSI-11.20)
Sqm
600.00
55 Providing (12x15)mm section groove in plaster at the junction of ceiling & walls,
including all material, labour and T&P etc. required for proper completion of the work.
(CSI 11.19)
Rmt
700.00
For Construction of Control Room Building, Store Building, Store Yard, Kiosk, Sump House and Pump Hous
Auraiya).
S.No.
Description
unit
Qty
56 Making drip course (25x12) mm in 1:2 cement and course sand including supply of all
materials, labour and T&P etc required for proper completion of work. (CSI 11.22)
Rmt
450.00
57 4 cm thick 1:2:4 plain cement concrete floor with cement, approved coarse sand and 2cm
graded approved stone ballast laid in panels finished with 3mm floating coat of neat
cement or cement and marble dust in ratio of 5:1 as specified over and removing any
overlapping mortar at the joints of the panels if any and giving them a uniform finish
including supply of all materials, labour and T&P etc, required for proper completion of
the work.(without base concrete) (CSI 12.03)
Sqm
280.00
58 P/F 20mm thick mirror polished machine cut black Granite for column facia, kitchen
platforms, and similar location of required size of approved shade, colour and texture
laid over 20 mm thick base concrete mortar 1:4 (1 cement:4 coarse sand) with joints
treated with cement mixed with matching pigment, epoxy touch ups, including rubbing,
curing etc. complete at all levels. (CSI 12.28b)
Sqm
12.00
59 S/F 6 or 8mm thick white glazed Somany, Johnson or equivalent 1st Quality tiles of size
400x400 mm in Flooring, laid with 1:3 cement and approved coarse sand mortar, joint
finished with white cement slurry, jointing and polishing complete, including supply of
all materials labour and Tools and Plants etc. required for proper completion of the work.
(CSI 12.17a)
Sqm
18.00
60 S/F 6 mm thick white glazed tiles of size 200x300 mm in skirting / dado laid with 1:3
cement and approved coarse sand mortar finished with white cement slurry, jointing and
polishing complete, including supply of all materials labour and Tools and Plants etc.
required for proper completion of the work. (CSI 12.17b)
Sqm
45.00
61 Providing and laying vitrified floor tiles600 x 600 mm with water absorption less than
0.08% and conforming to IS : 15622, of approved make, in all colours and shades, laid
on 20mm thick cement mortar 1:4 (1 cement : 4 coarse sand), including grouting the
joints with white cement and matching pigments etc. complete. (CSI 12.26)
Sqm
600.00
62 S/F 20mm thick acid resisting tiles of Parsuram or equivalent approved make in
flooring or skirting (confirming to I.S. 4457 - 1967) in ordinary Portland cement and
coarse sand in ratio 1:3 with the joints filled with acid resistant cement Accocide of
A.C.C. or equivalent make acid resistant cement and liquid supplied with cement, mixed
in 1:3 ratio to make a workable paste in G.I. Tray. The joints should be kept as 5mm and
to be cured for 7 days with dilute HCL (One part acid and three parts of water). Rate
should be including the cost of all materials, labour and T&P etc. required for proper
completion of the work. (CSI 12.23)
Sqm
50.00
For Construction of Control Room Building, Store Building, Store Yard, Kiosk, Sump House and Pump Hous
Auraiya).
S.No.
Description
unit
Qty
63 Providing and fixing glass strips of 40mm deep and 3.15 mm thickness in joints of floor
and skirting at the time of laying ,floors flush with floor level including labour, Tools
and plants etc. complete. (CSI 12.19)
RM
125.00
64 Providing and applying white cement based putty of average thickness 1mm, of approved
brand and manufacturer, over the plastered wall surface to prepare the surface even and
smooth complete. (CSI 13.27)
Sqm
850.00
65 Applying P.O.P. With minimum 6mm to 10mm thick plaster of paris putty on plastered
surface of wall for smooth finish including cost of all materials, labour and T&P etc
required for priper completion of the work. (CSI 13.32)
Sqm
750.00
66 White washing three coat including supply of all materials,labour and T&P etc. required
for proper completion of the work.(CSI-14.03)
Sqm
350.00
67 Painting or varnishing on new iron works in small areas or new wood work with one
coat of ready mixed priming paint and two coat of approved superior quality ready
mixed paint "Luxol" or equivalent brand or clear synthetic varnish including supply of
all materials, labour and T&P etc. required for proper completion of the work. Paint to be
used should conform to the I.S.I. No.- 103-1950 (CSI 13.01+13.02)
Sqm
200.00
68 One priming coat and two coats oil bound distemper on new work including supply of
all materials,labour and T&P etc. required for proper completion of the work.(CSI
13.17+13.14)
Sqm
350.00
69 Painting one priming coat and two coats of water proof exterior emulsion paint of APEX
ULTIMA (ASIAN) /Whether Shield Max (ICI) or equivalent brand Apex paint of
BERGER /ASIAN/ICI or equivalent including supply of all materials,labour and T&P
etc. required for proper completion of the work.(CSI 13.29+13.30)
Sqm
850.00
70 Painting first coat of Berger paint VINYL or equivalent (Paint and water in the ratio1:1
by volume) over prepared and primed surface of cement concrete, cement plaster and
bricks including all labour, material and T&P etc required for proper completion of work,
including preparation of base with linseed oil , putty etc.complete.(CSI NO. 13.10)
Sqm
725.00
71 Same as above in item no.( CSI 13.10)but for every coat after first coat or on previously
coated surface (Paint and water shall be mixed in the ratio 1:2 by volume) including all
material.labour and T&P etc. required for proper completion of the work.(CSI NO.
13.11)
Sqm
725.00
For Construction of Control Room Building, Store Building, Store Yard, Kiosk, Sump House and Pump Hous
Auraiya).
S.No.
Description
unit
Qty
Sqm
400.00
73 Fixing and grouting of trench edging in proper level and alignment including cost of all
labour, and T&P etc. required for proper completion of the work but excluding cost of
C.C.(CSI 9.45)
RM
40.00
74 Supply and mixing Dr. Fixit or equivalent as approved water proofing compound in per bag
cement mortar in plaster or concrete work in the proportion as recommended by the
manufacturer. (CSI 11.18)
188.00
75 Placing of trench cover of all size in proper position including transportation from
different places within the S/S area including all labour, T&P etc. required for proper
completion of the work as per direction of Engineer - in - charge. (CSI 20.11)
No
50.00
76 3 mm thick floating coat of neat cement finish including supply of all materials,labour
and T&P etc. required for proper completion of the work.( including cost of cement),
cement consumtion 0.044 bag/Sq.m. (CSI 20.23)
Sqm
250.00
77 Providing and fixing 15 mm dia B-class Jindal,JTC, ISI marked G.I. pipes complete with
with special such as bend, tee, socket, cross, clamp etc earth work including filling the
trenches etc required for proper completion of the work. the rate also includes concealed
GI fitting where required, cutting and making good the walls etc and all materials, labour
and T&P complete. (CSI 26.01)
RM
55.00
RM
95.00
79 Same as above item no. 77 but for 25mm dia. (CSI 26.03)
RM
27.00
Job
5.00
For Construction of Control Room Building, Store Building, Store Yard, Kiosk, Sump House and Pump Hous
Auraiya).
S.No.
Description
unit
Qty
81 Providing and fixing full way G.M. gate valve 15 mm dia with wheel, ISI mark heavy
quality including supply of all materials, labour and T&P required for proper completion
of work. (CSI 26.22)
Each
6.00
Each
2.00
Each
2.00
84 Providing and fixing 20 mm dia PVC ball float valve with brass rod and union complete
ISI mark including supply of all materials, labour and T&P etc required for proper
completion of work. (CSI 26.29)
Each
3.00
85 Supply and fixing of Syntex or equivalent make water storage tank including all
materials, labours, T&P etc required for proper completioon of work. (CSI NO. 26.50)
Litre
1500.00
86 Supply and fixing Brass Bib cock heavy quality 15 mm dia (400 Gms) ISI mark
including supply of all materials, labour, T&P etc required for proper completion of
work. (CSI 26.51)
Each
8.00
87 Same as item no. 86 but for 15mm dia CP brass bib cock.(CSI No. 26.53)
Each
4.00
88 Supply and fixing C.P. brass stop cock heavy quality 15 mm dia ISI mark including
cutting and threading the pipe if required, including supply of all materials, labour, T&P
etc required for proper completion of work..(CSI No. 26.59)
Each
8.00
89 Providing and fixing 15 mm dia C.P. piller cock of approved make including cost of all
materials, cartage, labour, T&P etc required for proper completion of work..(CSI No.
26.66)
Each
4.00
90 Supply and fixing of brass shower heavy quality 100 mm dia (Weight not less than 225
gms) including supply of all materials, labour, T&P etc required for proper completion of
work. (CSI 26.56)
Each
1.00
91 Providing and fixing white glazed "P" or "S" trap including cement concrete and all
materials, labour cartage T&P etc.required for proper completion of the work.(For W.C.)
(CSI 27.22)
No.
3.00
92 Supply and fixing white glazed earthern ware W.C."Orissa" Pan Hindustan make of size
(58 x 44)cm. including supply of all materials,labour and T&P etc.complete.(CSI 27.02b)
Each
2.00
93 Supply and fixing white glazed earthern ware W.C."European Type" Pan Hindustan make
of size (58 x 44)cm. including supply of all materials,labour and T&P etc.complete.(CSI
27.04a)
Each
1.00
94 Supply and fixing Nahani Trap India make of heavy approved quality complete with C.P.
brass grating, Nahani Trap laid over base cement concrete 1:6:12 including cost of
cement supply of all materials,labour and T&P etc. required for proper completion of the
work.(CSI 27.70)
Each
6.00
For Construction of Control Room Building, Store Building, Store Yard, Kiosk, Sump House and Pump Hous
Auraiya).
S.No.
Description
unit
Qty
95 Supply and fixing P.V.C. Low level flushing cistern Hindustan or equivalent make 10
litres. Capacity including supply of all materials, labour and T&P etc complete.(CSI
27.16b)
Each
3.00
96 Providing and fixing 550 mm x 400 mm. wash hand basin of white glazedearthern ware
first quality I.S.I. marked (Hindustan,Neycer / Cera make) with R.S. or C.I bracket
painted white 15 mm dia C.P. brass pillar cock with C.P.metal handle (Weight not less
than 400 gms).I.S.I. marked and 32 mm dia C.P. brass chain with rubber plug,32 mm dia
C.P. brass waste standard pattern with check nut with 32 mm dia C.P. brass "P" or "S"
trap and unions complete with P.V.C. connection .5" size including supply of all
materials, labour and T&P etc. required for proper completion of the work and including
cutting and making good the walls and floor with cement, coarse sand and grit fittings
used should of superior quality. (CSI 27.07)
Each
3.00
97 Providing and fixing white glazed earthern ware first quality (Hindustan, Neycer
make)I.S.I. marked angular fromt lipped urinal basin for corner of 430 mm x 370 mm x
340 mm. or squatting type 450 mm x 350 mm. including C.P. brass union coupling,P.V.C.
waste including supply of all materials, labour and T&P etc. required for proper
completion of the work. (CSI 27.06)
Each
1.00
98 Providing and fixing 610mm x 450mm x 200mm 100% stainless steel sink ofapproved
quality as per approved sample with R.S, or C.I. brackets, 32mm C.P. brass waste
complete with checknut, 32mm dia PVC waste pipe with bend including cost of all
materials, labour and T&P etc. required for proper completion of the work .(CSI NO.
27.12a)
Each
2.00
99 Providing and fixing 600 mm x 450 mm beveled edge mirror of Atul,Kiran makeglass
with Indian polish 6.50 mm thick complete with back of 600 mm x450 mm x 6 mm hard
board sheet fixed to wooden cieats with C.P. brass screws and washers including supply
of all materials, labour and T&P etc.required for proper completion of the work. (CSI
27.23a)
Each
3.00
100 As in item no.101 above but for glass self 7/32" (5.50) thick of 600 mm x130 mm. size
with C.P. brass guard rail of standard size and brackets fixed to wooden cleats with C.P.
brass screws including supply of all materials,labourand T&P etc. required for proper
completion of the work. (CSI 27.24)
Each
3.00
101 Providing and fixing 750 mm x 20 mm size C.P. brass towel rail of approved quality
(weight 275 gms. including brackets) with pair of C.P. brass brackets. (to fit the size of
towel rail).Fixed on the wall on wooden cleats with C.P. brass screws including supply of
all materials,labour and T&P etc. required for proper completion of the work and cutting
and making good the wall plaster etc. required for work. (CSI 27.25)
Each
1.00
For Construction of Control Room Building, Store Building, Store Yard, Kiosk, Sump House and Pump Hous
Auraiya).
S.No.
Description
unit
Qty
102 Providing and fixing CP brass soap dish with brackets fixed to wooden cleats with brass
screws including supply of all materials,labour and T&P etc.required for proper
completion of the work and cutting the making good the wall plaster etc required for
work. (CSI 27.27)
Each
3.00
103 Providing and fixing of 110 mm dia. PVC pipe 6 Kg/ Sq.cm for water supply mains with
special such as Tee, bend, socket, elbow etcincluding cutting of pipe where necessary
and including excavation of trenches for laying the pipe line of approved size ( 600 x
900mm) and including its back filling after testing the pipe line, watering, ramming etc
.complete including disposal of surplus earth from the sides upto 100 Meter as per
direction of Engineer I/C as required for proper completion of work.(CSI NO. 26.64a)
RM
42.00
104 Same as in item no.103 above but for7.50cm dia.(CSI NO. 26.64c)
RM
8.00
RM
15.00
106 P/F mineral Fibre Board modular False Ceiling in USG or Armstrong or equvalent make
as approved by Architect in Tengularedge Mineral textured tiles with approved surface
pattern of size 600x600 mm having Noise reduction coefficient 0.5-0.6 , light reflection
over 75 % , Relative Humidity 95 % , Suspension system of trulok exposed grid system
with 15 mm wide fkabges of white color, fixed to the structural soffit by Butterfly clip
hangers, suspenstion wires & anchor fastener as per the manufacturer's specification .
Suspension wires to be provided at every 600 mm C/c with two nos. of ties on each
anchor fastener, perimeter trim of Trulok wall angle in white color secured to wall at 450
mm maimum centers. The work to completed as per direction of E/I (CSI 10.21)
Sqm
260.00
107 Providing and fixing sun-film of Gareware or equivalent make on glass panes of door
and window shutters including cost of all materials,labour and T&P etc. required for
proper completion of the work. (CSI 22.54)
Sqm
60.00
Annexure-A
Amount
in Word
112.00
89600.00
810.00
177300.00
1175.00
591.00
seventy only
230.00
184000.00
9600.00
33090.00
582477.30
97812.00
eighty only
Amount
in Word
6021.00
30105.00
6801.00
152478.42
596820.00
422250.00
25335.00
70824.00
293.00
8790.00
7174.98
Amount
in Word
14100.00
239005.00
491520.00
212080.00
233340.00
67847.75
8360.00
34200.00
21895.00
47.00
Amount
in Word
57614.00
111500.00
54936.00
14403.50
20244.00
12516.00
19992.00
2358.00
40.00
11200.00
5500.00
Amount
in Word
69.00
15.00
537.00
2415.00
600.00
3888.00
16110.00
46320.00
65775.00
126792.00
62490.00
Amount
in Word
65984.00
14436.00
115678.50
969964.80
35406.00
2924.00
4362.00
2916.00
5110.00
275402.76
only
124.00
107.00
18040.00
64200.00
6370.00
Amount
in Word
5175.00
86520.00
36996.00
14904.00
31680.00
802200.00
101100.00
nine only
four only
Amount
in Word
3200.00
64600.00
25.60
115.00
86250.00
5460.00
16840.00
23030.00
90950.00
sixy only
107.00
34800.00
20735.00
Amount
in Word
142.60
15.00
40.00
57040.00
600.00
7520.00
280.00
7000.00
sixty only
163.00
8965.00
203.00
19285.00
274.00
7398.00
2795.00
Amount
in Word
3162.00
1424.00
1942.00
681.00
13950.00
527.00
twelve only
227.00
thirty only
264.00
2112.00
525.00
2100.00
535.00
4280.00
2616.00
257.00
four only
seven only
218.00
654.00
3268.00
2984.00
4446.00
Amount
in Word
3714.00
7041.00
1682.00
2866.00
2706.00
1899.00
only
three only
459.00
Amount
in Word
729.00
12894.00
243.00
seven only
181.00
1448.00
108.00
1620.00
345280.00
16260.00
271.00
Total
7881636.01