Project Name: ‫انشاء مبنى مؤسسة بكري احمد للمقاوالت‬ Location: ‫ المحـــــــــالة‬/‫ابها‬

contractor : ‫عبد الكريم‬ Date : Thursday, December 04, 2008


location : ‫الدور االول‬
Quantities of foundations
top length of length of length of length of concrete
found. no. of long short thick long short steel used in short steel surrounding
Type found. dir.(m) dir.(m) (cm) reinforcement reinforcement
surround cantilever in cantilever in steel in steel in quantitiy steel used in long dir. dir. top foundation
steel dia. long dir. short dir. long dir. short dir. per m3
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
1‫ق‬ 3 3.6 2.2 45 8 f 16 20 f 20 8 27 18.6 100.8 168 14 201.96 kg of 16 mm 460.75 kg of 20 mm 13.52 kg of 8 mm
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0

summary of column steel summary concrete in m3


plain concrete in( m3 ) = 3 m3
14 kg of 8 mm reinforcement concrete in( m3 ) = 11 m3

202 kg of 16 mm

461 kg of 20 mm
Project Name: ‫انشاء مبنى مؤسسة بكري احمد للمقاوالت‬ Location: ‫ المحـــــــــالة‬/‫ابها‬
contractor : ‫عبد الكريم‬ Date : Thursday, December 04, 2008
location : ‫الدور االول‬
Quantities of columns
no. of total length concret
column no. of length( Breadth( height( main stirrups length of steel used in steel used in main
stirrups(cm) spacing
stirrups in of stirrups in quantitiy
type column cm) cm) cm) reinforcement reinforcement all length all length per m3 stirrups length

c1 25 40 25 360 4 f 22 5 f 8 / m' 140 20 18 630 9 m3 248.89 kg of 8 mm 1284.7 kg of 22 mm

summary of column steel summary of column concrete


10 m3
249 kg of 8 mm

1285 kg of 22 mm
Project Name: ‫انشاء مبنى مؤسسة بكري احمد للمقاوالت‬ Location: ‫ المحـــــــــالة‬/‫ابها‬
contractor : ‫عبد الكريم‬ Date : Thursday, December 04, 2008
location : ‫الدور االرضي‬
Quantities of Ground beams
SEC. SEC. no. of total length concret steel used in
Gr. no. of length( BREADTH length of spacing stirrups in of stirrups in
HEIGHT bottom reinf. upper reinf. stirrups reinforcement stirrups(cm) (cm) quantitiy bottom steel upper steel
Beam G.B m) (CM) (CM) all length all length(m) per m3 stirrups
14mm
1‫م‬ 1 4.2 30 60 3 f 18 3 f 18 5 f 18 / m' 125 20.0 21 26.25 0.756 m3 52.5 kg of 18 mm 34.2 kg of 18 mm 34.2 kg of 18 mm ###
2‫م‬ 1 4.2 20 40 8 f 18 8 f 18 5 f 18 / m' 125 20.0 21 26.25 0.336 m3 52.5 kg of 18 mm 91.2 kg of 18 mm 91.2 kg of 18 mm ###
###
###
###
###
###
###
###
###

summary of column steel summary of column concrete ###


2 m3

356 kg of 18 mm
Project Name: Location:
contractor : Date :
location :
Quantities of beams
SEC. SEC. no. of total length concret steel used in
no. of length( BREADTH length of spacing stirrups in
Beam HEIGHT bottom reinf. upper reinf. stirrups reinforcement stirrups(cm) (cm) of stirrups in quantitiy bottom steel upper steel
beam m) (CM) (CM) all length all length(m) per m3 stirrups
14mm
1‫ك‬ 1 4.2 30 60 3 f 18 3 f 18 5 f 8 / m' 125 20.0 21 26.25 0.756 m3 10.37 kg of 8 mm 37.2 kg of 18 mm 37.2 kg of 18 mm ###
2‫ك‬ 1 4.2 20 40 8 f 18 8 f 18 5 f 8 / m' 125 20.0 21 26.25 0.336 m3 10.37 kg of 8 mm 99.2 kg of 18 mm 99.2 kg of 18 mm ###
###
###
###
###
###
###
###
###

summary of column steel summary of column concrete ###


2 m3
21 kg of 8 mm

273 kg of 18 mm