Académique Documents
Professionnel Documents
Culture Documents
V-2151-100-A-070_000
Vendor
Maloney
Date: 17.02.16
Sl. No
Document /
Drawing No. Rev. No.
Document Title
Sheet No./
Section
001
V-2151-100-A-070_000
FOUNDATION AND ANCHOR BOLT DETAILS DISCHARGE COALESCER FILTER SKID N53-U-0004
1 OF 1
Please show plant North as per equipment actual orientation on plot plan drawing.
Noted
002
V-2151-100-A-070_000
FOUNDATION AND ANCHOR BOLT DETAILS DISCHARGE COALESCER FILTER SKID N53-U-0004
1 OF 1
Noted
003
V-2151-100-A-070_000
FOUNDATION AND ANCHOR BOLT DETAILS DISCHARGE COALESCER FILTER SKID N53-U-0004
1 OF 1
Provide holes for anchor bolts, in the flange of main perimeter beams of skid base. Holding
down bracket to be removed.
Noted
004
V-2151-100-A-070_000
FOUNDATION AND ANCHOR BOLT DETAILS DISCHARGE COALESCER FILTER SKID N53-U-0004
1 OF 1
Noted
005
V-2151-100-A-070_000
FOUNDATION AND ANCHOR BOLT DETAILS DISCHARGE COALESCER FILTER SKID N53-U-0004
1 OF 1
Please provide transportation, lifting and inplace analysis calculations for reference.
Noted
006
V-2151-100-A-070_000
FOUNDATION AND ANCHOR BOLT DETAILS DISCHARGE COALESCER FILTER SKID N53-U-0004
1 OF 1
JGC Comments
Please include design code (ASCE 7-05) and basic parameters in drawing notes, as shown
below:
A- Wind loads are calculated as per ASCE 7-05 with below basic parameters:
i. Basic Wind Speed [3-sec gust, 50 year recurrence] : 96 mph
ii. Exposure Category : C
Maloney Response
JGC reply
Remarks
Noted
B- Seismic loads are calculated as per ASCE 7-05 with below basic parameters:
i. Short Period Acceleration (SS) in %g : 18.6
ii. 1-Sec Period Acceleration (S1) in %g : 5.3
iii. Site Class: C
1 OF 1
Washer (ASTM A36) for over size holes shall be required to cover the hole (supply by JGC).
Vendor to confirm washer thickness and size and field welding requirement based on shear Noted
force.
OK. Please show anchor bolts sectional view (as per SAMPLE provided in comments) in the
drawing.
Also, please specify washer thickness, size and field welding requirements on drawing.
V-2151-100-A-070_000
FOUNDATION AND ANCHOR BOLT DETAILS DISCHARGE COALESCER FILTER SKID N53-U-0004
1 OF 1
Please confirm,
1) Operating load is:
DEAD Load + Content Load or Content load only
&
2) Test load is:
DEAD Load + Test Fluid Load or Test Fluid load only.
-. Please confirm max load on Operating load : Empty weight + Fluid/gas weight during operation
OR only Fluid/gas weight during operation.
-. (why max load on empty condition is same with operating condition ..?)
-. Please confirm max load on Hydrotest are : empty weight + Fluid/gas weight during hydrotest OR
only Fluid/gas weight during hydrotest.
009
V-2151-100-A-070_000
FOUNDATION AND ANCHOR BOLT DETAILS DISCHARGE COALESCER FILTER SKID N53-U-0004
1 OF 1
010
V-2151-100-A-070_000
FOUNDATION AND ANCHOR BOLT DETAILS DISCHARGE COALESCER FILTER SKID N53-U-0004
1 OF 1
011
V-2151-100-A-070_000
FOUNDATION AND ANCHOR BOLT DETAILS DISCHARGE COALESCER FILTER SKID N53-U-0004
1 OF 1
012
V-2151-100-A-070_000
FOUNDATION AND ANCHOR BOLT DETAILS DISCHARGE COALESCER FILTER SKID N53-U-0004
1 OF 1
Please check that selected anchor bolts size is safe for all loading conditions
Noted
013
V-2151-100-A-070_000
FOUNDATION AND ANCHOR BOLT DETAILS DISCHARGE COALESCER FILTER SKID N53-U-0004
1 OF 1
Noted
014
V-2151-100-A-070_000
FOUNDATION AND ANCHOR BOLT DETAILS DISCHARGE COALESCER FILTER SKID N53-U-0004
1 OF 1
Noted
015
V-2151-100-A-070_000
FOUNDATION AND ANCHOR BOLT DETAILS DISCHARGE COALESCER FILTER SKID N53-U-0004
1 OF 1
Delete Please.
Noted
016
V-2151-100-A-070_000
FOUNDATION AND ANCHOR BOLT DETAILS DISCHARGE COALESCER FILTER SKID N53-U-0004
1 OF 1
017
V-2151-100-A-070_000
FOUNDATION AND ANCHOR BOLT DETAILS DISCHARGE COALESCER FILTER SKID N53-U-0004
1 OF 1
Total Dead Load = 29.8+29.8+44.8+44.8 = 149kN is less than max dead load of 17400kg
specified in plan. Check please.
018
V-2151-100-A-070_000
FOUNDATION AND ANCHOR BOLT DETAILS DISCHARGE COALESCER FILTER SKID N53-U-0004
1 OF 1
019
V-2151-100-A-070_000
FOUNDATION AND ANCHOR BOLT DETAILS DISCHARGE COALESCER FILTER SKID N53-U-0004
1 OF 1
020
V-2151-100-A-070_000
FOUNDATION AND ANCHOR BOLT DETAILS DISCHARGE COALESCER FILTER SKID N53-U-0004
1 OF 1
021
V-2151-100-A-070_000
FOUNDATION AND ANCHOR BOLT DETAILS DISCHARGE COALESCER FILTER SKID N53-U-0004
1 OF 1
Please show framing arrangement of skid base. Indicate size of skid beams and their
location.
Noted
022
V-2151-100-A-070_000
FOUNDATION AND ANCHOR BOLT DETAILS DISCHARGE COALESCER FILTER SKID N53-U-0004
1 OF 1
Please check wind and seismic load values. Please provide wind and seismic force
calculation for reference.
Noted
023
V-2151-100-A-070_000
FOUNDATION AND ANCHOR BOLT DETAILS DISCHARGE COALESCER FILTER SKID N53-U-0004
1 OF 1
Sleeper support will be provided shown in grey color (parallel to 4m edge of skid base).
Please confirm this is ok for skid base design.
024
V-2151-100-A-070_000
FOUNDATION AND ANCHOR BOLT DETAILS DISCHARGE COALESCER FILTER SKID N53-U-0004
1 OF 1
V-2151-100-A-070_000
FOUNDATION AND ANCHOR BOLT DETAILS DISCHARGE COALESCER FILTER SKID N53-U-0004
008
007
Please provide slotted or over size holes (maximum possible size) based on beam flange
size.
Select and specify anchor bolts as per JGC standard drawing D-000-1320-005.
This can be done if the required, although it goes against the concept of using a loose bracket with
Please select and specify anchor bolts from JGC Standard Drawing as commented.
vertical slotted hole
Please delete this additional holding down bracket and provide holes for anchor bolts, in the
Noted
flange of main perimeter beams of skid base.
OK. Please delete additional holding down bracket and update anchor bolts arrangement in
drawings accordingly.
OK
Noted
Noted. The structure will be designed for the worst case spans between H.D. fixings. Therefore OK. Based on Vendor confirmation, it is recommended to show foundation at anchor point as
extent of clients civil bases is irrelevant.
marked in Attachment 3.
In the table, foundation loads shall be presented for each load case separately, not for load
Noted
combinations as per PIP STC01015. Please confirm and delete this note.
1 of 1