Nafra HEP

POWER HOUSE STABILITY ANALYSIS

Rev. 00

ANNEXURE-A
CALCULATION OF FORCES

S.No.

Component

Description

Force (T)
No.

Length
(m)

Breadth
(m)

Area
(m2)

Height /
Thickness

Volume
(m3)

Vertical
Horizontal
Downward (+)
Towards
Upward (-)
Upstream (+)
Towards Downstream
(-)

Lever Arm from


Point A

MY

MX
X(m)

Y(m)

(T-m)

(Tm)

FIRST STAGE CONCRETE


A

Sub Structure Concrete

A-1

Triangular Portion of concrete from EL.


786.3 to EL. 793.5m

GA's

3.4

D-1

Deduction of Penstock

GA's

1.5

A-2

Rectangular Portion of concrete from EL.


786.3 to EL. 793.5m

GA's

8.5

D-2

Deduction of Penstock

GA's

8.6

A-3

Rectangular Portion of concrete from EL.


786.3 to EL. 793.5m

GA's

2.6

D-3

Deduction of Penstock

GA's

2.6

A-4

Triangular portion of concrete below


Access Gallery

GA's

0.6

A-5

Rectangular portion of concrete below


Access Gallery

GA's

A-6

Rectangular portion of concrete below


Access Gallery

GA's

A-7

Triangular portion of concrete below


Draft tube invert

A-8
A-9

16

16

12.2

7.2

195.84

489.60

39.82

9.42

19497

4614

7.07

3.0

-10.60

-26.51

39.45

7.80

-1046

-207

61.2

7.2

979.20

2448.0

34.55

8.20

84578

20074

-51.64

-129.10

19.45

7.80

-2511

-1007

12.38
18.7

7.2

299.52

748.80

29.00

8.20

21715

6140

3.80

2.2

-9.88

-24.71

29.00

7.80

-717

-193

16

0.78

2.6

12.48

31.20

29.20

3.74

911

117

4.8

16

12.5

2.6

199.68

499.20

26.7

3.30

13329

1647

4.0

16

10.4

2.6

166.4

416.00

22.3

3.30

9277

1373

GA's

1.0

16

1.0

2.0

16.00

40.00

23.5

1.32

941

53

Rectangular portion of concrete below


Draft tube invert

GA's

2.9

16

5.8

2.0

92.80

232.00

21.75

1.00

5046

232

Rectangular portion of concrete below


Draft tube invert

GA's

6.9

16

8.28

1.2

132.48

331.20

16.85

0.60

5581

199

03/05/2016

16

file:///var/www/apps/conversion/tmp/scratch_5/307673952.xls

SH 1 OF 52

Nafra HEP

POWER HOUSE STABILITY ANALYSIS

Rev. 00

ANNEXURE-A
CALCULATION OF FORCES
Lever Arm from
Point A

Description

Force (T)
No.

A-10

Rectangular portion of concrete below


Draft tube invert

GA's

3.1

16

7.44

2.4

119.04

297.60

11.55

1.20

3437

357

A-11

Rectangular portion of concrete above


draft tube invert & below c/l of penstock

GA's

13.5

16

74.25

5.5

1188.0

2970.0

6.75

5.05

20048

14999

D-4

Deduction of Draft tube

GA's

12

5.61

6.0

1.0

-33.66

-84.15

9.54

2.97

-803

-250

D-5

Deduction of Draft tube

GA's

12

5.61

13.2

1.1

-74.05

-185.13

7.50

3.85

-1388

-713

D-6

Deduction of Draft tube

GA's

5.5

5.61

4.95

1.8

-27.77

-69.42

9.82

4.99

-681

-347

D-7

Deduction of Draft tube

GA's

6.4

5.61

11.52

1.8

-64.63

-161.57

4.70

5.30

-759

-856

D-8

Deduction of Draft tube

GA's

6.4

5.61

3.84

1.2

-21.54

-53.86

3.61

6.40

-195

-344

A-12

Rectangular portion of concrete below


Draft tube invert

GA's

10

16

6.0

0.6

96.00

240.00

5.00

2.00

1200

480

A-13

Triangular portion of concrete below


Draft tube invert

GA's

10

16

5.0

1.0

80.00

200.00

6.70

1.37

1340

274

A-14

Rectangular portion of concrete above


c/l of penstock & below turbine floor

GA's

12

16

48.0

4.0

768.00

1920.00

6.00

9.80

11520

18816

Deductions for Gate Notch

GA's

1.5

5.61

12.6

8.4

-70.69

-176.72

0.75

7.50

-133

-1325

S.No.

D-9

Component

03/05/2016

Length
(m)

Breadth
(m)

Area
(m2)

Height /
Thickness

Volume
(m3)

Vertical
Horizontal
Downward (+)
Towards
Upward (-)
Upstream (+)
Towards Downstream
(-)

file:///var/www/apps/conversion/tmp/scratch_5/307673952.xls

MY

MX
X(m)

Y(m)

(T-m)

(Tm)

SH 2 OF 52

Nafra HEP

POWER HOUSE STABILITY ANALYSIS

Rev. 00

ANNEXURE-A
CALCULATION OF FORCES
Lever Arm from
Point A

Description

Force (T)
No.

D-10

Deductions for drainage sump top EL


786.3 & Bottom EL 783.56

GA's

1.7

8.22

2.74

-13.97

-34.94

21.30

3.23

-744

-113

D-11

Deductions for Dewatering sump top EL


793.5 & Bottom EL 782.92

GA's

3.5

1.7

37.03

10.58

-62.95

-157.38

16.95

6.51

-2668

-1025

A-15

Weight of Earth on Heel side

GA's

4.2

16

44.52

10.6

712.32

1282.18

40.30

17.10

51672

21925

4616

11042

238447

84920

S.No.

Component

Length
(m)

Breadth
(m)

Area
(m2)

Height /
Thickness

Volume
(m3)

Sub Total
B

Vertical
Horizontal
Downward (+)
Towards
Upward (-)
Upstream (+)
Towards Downstream
(-)

MY

MX
X(m)

Y(m)

(T-m)

(Tm)

Concrete Walls

B-1

1.0m thk. Wall along E-Line from EL.


793.50 m to EL. 804.1 m

SK1

16.0

10.6

10.6

169.6

424.0

37.70

17.10

15985

7250

B-2

2.5m thk. Wall along draft tube width


from EL. 793.50 m to EL. 804.1 m

SK1

2.5

16.0

26.5

10.6

424.0

1060.0

1.25

17.10

1325

18126

Deductions for Gate Notch from EL


793.5m to 804.1m

GN-2

1.5

5.61

15.9

10.6

-89.2

-223.0

0.75

17.10

-167

-3813

B-3

Wall along Grid-5 from EL. 793.5m to EL.


804.1m

GA's

34.8

1.0

368.9

10.6

368.9

922.2

19.90

17.10

18352

15770

B-4

Masonary Wall from EL 799.1 to 804.1

MW-1

6.00

0.23

60.0

5.0

13.8

27.6

34.30

19.90

947

549

887

2211

36441

37882

BGN-2

Sub Total

03/05/2016

file:///var/www/apps/conversion/tmp/scratch_5/307673952.xls

SH 3 OF 52

Nafra HEP

POWER HOUSE STABILITY ANALYSIS

Rev. 00

ANNEXURE-A
CALCULATION OF FORCES

S.No.

Component

Description

Force (T)
No.

Length
(m)

Breadth
(m)

Area
(m2)

Height /
Thickness

Volume
(m3)

Vertical
Horizontal
Downward (+)
Towards
Upward (-)
Upstream (+)
Towards Downstream
(-)

Lever Arm from


Point A

MY

MX
X(m)

Y(m)

(T-m)

(Tm)

1st Stage Floor Slabs and Beams between D and E Lines

C1

Machine Hall Floor at EL 799.1

FL-1

8.0

15

2.4

0.30

36

90.0

33.2

17.55

2988.0

1579.5

C2

Service bay Floor at EL 804.1

FL-2

8.0

15

2.8

0.35

42

105

32.2

21.775

3381.0

2286.4

C3

Machine Hall Beams at EL 799.1

B-1

8.0

0.4

4.8

0.30

1.92

4.80

32.2

16.95

154.6

81.4

C4

Service bay Beams at EL 804.1

B-2

8.0

0.4

4.0

0.25

1.60

4.00

32.2

21.325

128.8

85.3

C5

Machine Hall Beams at EL 799.1 along


Grid-D

B-3

0.6

6.4

0.72

0.60

4.61

11.52

28.9

18.1

332.9

208.5

C6

Service bay Floor beams at EL 804.1


along Grid-D

B-4

0.6

6.4

0.72

0.60

4.61

11.52

28.9

21.5

332.9

247.7

91

227

7318

4489

Sub Total

03/05/2016

file:///var/www/apps/conversion/tmp/scratch_5/307673952.xls

SH 4 OF 52

Nafra HEP

POWER HOUSE STABILITY ANALYSIS

Rev. 00

ANNEXURE-A
CALCULATION OF FORCES

S.No.

Component

Description

Force (T)
No.

Length
(m)

Breadth
(m)

Area
(m2)

Height /
Thickness

Volume
(m3)

Vertical
Horizontal
Downward (+)
Towards
Upward (-)
Upstream (+)
Towards Downstream
(-)

Lever Arm from


Point A

MY

MX
X(m)

Y(m)

(T-m)

(Tm)

1st Stage Floor Slabs and beams between A and B Lines

D1

Machine Hall Floor at EL 799.1

Fl-3

8.0

15.0

2.4

0.30

36

90.0

6.50

17.55

585

1580

D2

Service bay Floor at EL 804.1

Fl-4

8.0

15.0

2.8

0.35

42

105

6.50

21.775

683

2286

D3

Machine Hall Beams at EL 799.1

B-5

8.0

0.30

7.2

0.30

2.16

5.40

6.50

16.95

35

92

D4

Service bay Beams at EL 804.1

B-6

8.0

0.3

6.0

0.25

1.8

4.50

6.50

21.325

29

96

D5

Machine Hall Beams at EL 799.1 along


Grid-B

B-7

0.3

6.0

0.36

0.60

2.16

5.40

10.75

18.1

58

98

D6

Service bay floor Beams at EL 804.1


along Grid-B

B-8

0.3

6.0

0.36

0.60

2.16

5.40

10.75

21.5

58

116

86

216

1448

4267

Sub Total
E

Crane Columns along D & B Lines

E-1

Column along D-Line for Vertical Gantry


from EL. 793.5m to 814.2m

E-1

1.50

1.00

62.1

20.7

62

155

28.35

21.95

4401

3408

E-2

Column along B-Line for Vertical Gantry


from EL. 793.5m to 814.2m

E-2

1.50

1.00

62.1

20.7

62

155

11.25

21.95

1747

3408

124

311

6148

6815

Sub Total

03/05/2016

file:///var/www/apps/conversion/tmp/scratch_5/307673952.xls

SH 5 OF 52

Nafra HEP

POWER HOUSE STABILITY ANALYSIS

Rev. 00

ANNEXURE-A
CALCULATION OF FORCES

S.No.

Component

Description

Force (T)
No.

Length
(m)

Breadth
(m)

Area
(m2)

Height /
Thickness

Volume
(m3)

Vertical
Horizontal
Downward (+)
Towards
Upward (-)
Upstream (+)
Towards Downstream
(-)

Lever Arm from


Point A

MY

MX
X(m)

Y(m)

(T-m)

(Tm)

Crane Beams & Haunches

F-1

Crane Gantry beam at EL. 814.2m along


D-line

GA's

1.80

6.00

4.3

1.20

26

65

28.20

31.90

1827

2067

F-2

Crane Gantry beam at EL. 814.2m along


B-line

GA's

1.80

6.00

4.3

1.20

26

65

11.40

31.90

739

2067

F-3

Haunch at B-line

GA's

0.3

1.00

0.09

0.30

0.09

0.23

12.1

31.2

2.7

7.0

F-4

Haunch at B-line

GA's

0.3

1.00

0.09

0.30

0.09

0.23

27.5

31.2

6.2

7.0

52

130

2575

4148

Sub Total
G

Steel Roof Truss including Cladding

GA's

16.9

19.70

36.60

333.32

619.27

Vertical Steel Gantry

GA's

100

1.30

22.60

130.00

2260.00

292841

145401

Total of Dead Load in First Stage

03/05/2016

5857

14253

file:///var/www/apps/conversion/tmp/scratch_5/307673952.xls

SH 6 OF 52

Nafra HEP

POWER HOUSE STABILITY ANALYSIS

Rev. 00

ANNEXURE-A
CALCULATION OF FORCES

S.No.

Component

Description

Force (T)
No.

Length
(m)

Breadth
(m)

Area
(m2)

Height /
Thickness

Volume
(m3)

Vertical
Horizontal
Downward (+)
Towards
Upward (-)
Upstream (+)
Towards Downstream
(-)

Lever Arm from


Point A

MY

MX
X(m)

Y(m)

(T-m)

(Tm)

SECOND STAGE SUB STRUCTURE CONCRETE


I-1

Concrete around Draft Tube Liner

SK1

I-2

Deduction for Draft tube liner volume

SK1

I-3

Concrete Below Spiral case

SK1

I-4

Concrete around stator,barrel,spiral case

SK1

I-5

Deduction of Staircase cutout

GA's

3.0

I-6

Deduction of Strator top

GA's

I-7

Deduction of Strator bottom

GA's

I-8

Deduction of Barrel

GA's
Sub Total

03/05/2016

6.8

245.1

612.7

17.0

2.9

10415.6

1776.8

-45.6

-114.1

16.6

3.3

-1895.1

-371.7

2.0

63.6

159.0

15.0

5.6

2385.0

890.4

84.01

10.8

907.3

2268.3

18.6

12.0

42189.8

27219.2

1.6

6.00

2.0

-9.6

-24.0

15.0

10.3

-360.0

-247.2

7.4

10.6

22.20

3.0

-235.3

-588.3

18.6

16.1

-10942.4

-9471.6

4.7

4.5

7.99

1.7

-36.0

-89.9

18.6

13.8

-1671.9

-1236.0

2.20

4.00

4.84

2.2

-19.4

-48.4

18.6

5.70

-900.2

-275.9

870

2175

39221

18284

3.0

10.6

23.12

4.0

11.41

10.6

6.00

3.4

file:///var/www/apps/conversion/tmp/scratch_5/307673952.xls

SH 7 OF 52

Nafra HEP

POWER HOUSE STABILITY ANALYSIS

Rev. 00

ANNEXURE-A
CALCULATION OF FORCES

S.No.

Component

Description

Force (T)
No.

Length
(m)

Breadth
(m)

Area
(m2)

Height /
Thickness

Volume
(m3)

5.58

0.30

83.7

84.01

0.30

Vertical
Horizontal
Downward (+)
Towards
Upward (-)
Upstream (+)
Towards Downstream
(-)

Lever Arm from


Point A

MY

MX
(T-m)

(Tm)

X(m)

Y(m)

209.3

19.8

12.0

4143.2

2500.5

-25.20

-63.01

18.6

12.0

-1171.9

-752.9

Turbine & Machine hall Floor Slabs, beams & Columns (Between Grid B & D)

J-1

Slabs at EL. 793.5 (Turbine Floor)

GA's

J-2

Deduction of Octogonal concrete around


GA's
turbine at EL 793.5

J-3

Beam at EL 793.5 Along Grid 9

GA's

4.0

0.6

1.20

0.30

0.72

1.8

25.8

11.4

46.4

20.4

J-4

Beam at EL 793.5 Along Grid 8

GA's

14.4

0.4

4.32

0.30

1.73

4.3

19.2

11.4

82.9

49.0

J-5

Beam at EL 793.5 between Grid 8 & 9 and


GA's
9 & 10

2.2

0.3

1.32

0.30

0.40

1.0

13.1

11.4

13.0

11.2

J-6

Slabs at EL.799.1 (Machine Hall Floor)

GA's

18.6

15.0

5.58

0.30

83.7

209.3

19.8

17.5

4143.2

3651.4

J-7

Deduction of Octogonal concrete around


GA's
turbine at EL 799.1

84.01

0.30

-25.20

-63.01

18.6

17.5

-1171.9

-1099.5

J-8

Beam at EL 799.1 Along Grid 9

GA's

4.0

0.6

1.20

0.30

0.72

1.80

25.8

17.0

46.4

30.5

J-9

Beam at EL 799.1 Along Grid 8

GA's

14.4

0.4

4.32

0.30

1.73

4.32

19.2

17.0

82.9

73.2

J-10

Beam at EL 799.1 between Grid 8 & 9 and


GA's
9 & 10

2.2

0.3

1.32

0.30

0.40

0.99

13.1

17.0

13.0

16.8

J-11

Deduction of Octogonal runner hatch at


EL 793.5

GA's

6.01

0.30

-1.80

-4.51

25.6

11.8

-115.4

-53.0

J-12

Deduction of Octogonal runner hatch at


EL 799.1

GA's

6.01

0.30

-1.80

-4.51

25.6

17.5

-115.4

-78.7

03/05/2016

18.6

15.0

file:///var/www/apps/conversion/tmp/scratch_5/307673952.xls

SH 8 OF 52

Nafra HEP

POWER HOUSE STABILITY ANALYSIS

Rev. 00

ANNEXURE-A
CALCULATION OF FORCES

S.No.

Component

Description

Force (T)
No.

Length
(m)

Breadth
(m)

Area
(m2)

Height /
Thickness

Volume
(m3)

Vertical
Horizontal
Downward (+)
Towards
Upward (-)
Upstream (+)
Towards Downstream
(-)

Lever Arm from


Point A

MY

MX
X(m)

Y(m)

(T-m)

(Tm)

J-13

Deduction of rectangular MIV hatch at


EL 793.5

GA's

3.0

4.0

0.90

0.30

-0.27

-0.68

25.8

11.8

-17.4

-7.9

J-14

Deduction of rectangular MIV hatch at


EL 799.1

GA's

3.0

4.0

0.90

0.30

-0.27

-0.68

25.6

17.5

-17.3

-11.8

J-15

Secondary II Stage Floor Column from


EL. 786.3 to EL. 799.1

GA's

0.6

0.6

15.36

12.80

9.2

23.0

18.6

11.0

428.5

253.4

Sub Total

128

319

6390

4603

Total of Second Stage Concrete

998

2495

45611

22887

Permanent Machineries

K-1

Wt of Dt liner

BHEL

2.00

18.60

4.00

37.2

8.0

K-2

Weight of water in DT liner

BHEL

37.70

18.60

4.00

701.2

150.8

K-3

Weight of DT Cone

BHEL

1.50

18.60

7.40

27.9

11.1

K-5

Wt of Spiral Inlet pipe

BHEL

0.50

20.60

13.38

10.3

6.7

K-7

Wt. of water in penstock pipe

BHEL

57.5

33.04

7.80

1899.6

448.5

K-8

Wt of Spiral casing,stay ring & other


turbine parts including water

BHEL

300.0

18.60

7.80

5580.0

2340.0

K-10

Stator Load

BHEL

150.0

18.60

13.60

2790.0

2040.0

03/05/2016

16.18

57.50

file:///var/www/apps/conversion/tmp/scratch_5/307673952.xls

SH 9 OF 52

Nafra HEP

POWER HOUSE STABILITY ANALYSIS

Rev. 00

ANNEXURE-A
CALCULATION OF FORCES

S.No.

Component

Description

Force (T)
No.

Length
(m)

Breadth
(m)

Area
(m2)

Height /
Thickness

Volume
(m3)

Vertical
Horizontal
Downward (+)
Towards
Upward (-)
Upstream (+)
Towards Downstream
(-)

Lever Arm from


Point A

MY

MX
X(m)

Y(m)

(T-m)

(Tm)

K-11

Bottom Bracket

BHEL

0.50

18.60

13.38

9.30

6.69

K-12

Runner Weight

BHEL

4.00

18.60

13.38

74.4

53.5

11130

5065

Total
L

Equipment Load

L-1

Pressure Pumping Set

L-2

Oil Pressure Unit

L-3

Nitrogen Bottle Bank

L-4

Electric control panel

L-5

Brake and Jack Panel

L-6

554

7.5

31.5

11.8

236.3

88.5

10.0

31.6

11.8

316.0

118.0

5.8

31.6

11.8

183.3

68.4

2.5

31.6

11.8

79.0

29.5

2.5

21.5

11.8

53.8

29.5

Brake dust collector

1.4

22.8

11.8

31.9

16.5

L-7

Starter panel for GOV. OPU. system

0.7

16.2

11.8

11.3

8.3

L-8

Excitation Transformer

2.0

23.5

11.8

47.0

23.6

L-9

NG cubicle

5.0

14.9

11.8

74.5

59.0

BHEL Station layout Plan at

03/05/2016

BHEL Station layout Plan at

file:///var/www/apps/conversion/tmp/scratch_5/307673952.xls

SH 10 OF 52

Nafra HEP

POWER HOUSE STABILITY ANALYSIS

Rev. 00

ANNEXURE-A
CALCULATION OF FORCES

S.No.

Component

LAVT Cubicle

L-11

Marshalling Box

L-12

No.

Length
(m)

Breadth
(m)

Area
(m2)

Height /
Thickness

Volume
(m3)

Vertical
Horizontal
Downward (+)
Towards
Upward (-)
Upstream (+)
Towards Downstream
(-)

Lever Arm from


Point A

MY

MX
X(m)

Y(m)

(T-m)

(Tm)

3.0

25.4

11.8

76.2

35.4

6.0

18.6

11.8

111.6

70.8

Unit Auxillary board

0.9

12.0

11.8

10.8

10.6

L-13

Electro hydraullic Governer

1.0

12.0

11.8

12.0

11.8

L-14

LP Air compressor equipment

0.7

29.6

11.8

20.7

8.3

L-15

Unit Control Board

3.30

11.8

17.4

38.9

57.4

L-16

Unit Control Board

1.60

14.8

17.4

23.7

27.8

L-17

Regulation Panel

1.00

16.5

17.4

16.5

17.4

L-18

Thyristor Panel

2.10

21.8

17.4

45.8

36.5

L-19

Field Flashing panel

0.80

11.8

17.4

9.4

13.9

L-20

Field Braker Panel

154.0

20.20

17.4

3110.80

2679.6

L-21

Excitation Transformer

150.0

25.50

BHEL Station layout Plan at

L-10

BHEL Station layoutDescription


Plan at

Force (T)

Sub Total

03/05/2016

362

file:///var/www/apps/conversion/tmp/scratch_5/307673952.xls

3825.00
8335

3411

SH 11 OF 52

Nafra HEP

POWER HOUSE STABILITY ANALYSIS

Rev. 00

ANNEXURE-A
CALCULATION OF FORCES
Lever Arm from
Point A

S.No.

M
M-1

Component

Description

Force (T)
No.

Length
(m)

Breadth
(m)

Area
(m2)

Height /
Thickness

Volume
(m3)

Vertical
Horizontal
Downward (+)
Towards
Upward (-)
Upstream (+)
Towards Downstream
(-)

MY

MX
X(m)

Y(m)

(T-m)

(Tm)

Hydraulic Thrust
2600 t hydraulic thrust on taper portion
from 3.0 dia to 2.2 dia of penstock being BHEL
transferred to rock

-2600

7.80

-20280

Sub Total

-2600

-20280

0.5*(803-781.7 )^2*1 *16.0

3629.5

7.10

25769.6

Tail Water Pressure

N-1

Maximum TWL (803)

N-2

Minimum TWL (794.84)

0.5*(794.84-781.7)^2* 1
*16.0

1381.3

4.38

6050.0

N-3

Normal TWL (796.57)

0.5*(796.57-781.7)^2* 1
*16.0

1768.9

4.96

8768.0

Upstream Water Pressure

O-1

Maximum TWL (803)

0.5*(803-781.7)^2*1 *16.0

-3630

7.10

-25770

O-2

Normal TWL (796.57)

0.5*(796.57-781.7)^2*1
*16.0

-1769

4.96

-8768

03/05/2016

file:///var/www/apps/conversion/tmp/scratch_5/307673952.xls

SH 12 OF 52

Nafra HEP

POWER HOUSE STABILITY ANALYSIS

Rev. 00

ANNEXURE-A
CALCULATION OF FORCES

S.No.

Component

Description

Force (T)
No.

Length
(m)

Breadth
(m)

Area
(m2)

Height /
Thickness

Volume
(m3)

Vertical
Horizontal
Downward (+)
Towards
Upward (-)
Upstream (+)
Towards Downstream
(-)

Lever Arm from


Point A

MY

MX
X(m)

Y(m)

(T-m)

Uplift Force

P-1a

1-2

16.0

47.18

-755

-755

40.03

-30220.30

P-1b

2-3

16.0

150.39

-2406

-2406

33.90

-81571.54

P-1c

3-4

16.0

10.78

-172

-172

29.09

-5017.50

4-5

16.0

90.33

-1445

-1445

26.45

-38229.35

5-6

16.0

20.27

-324

-324

23.59

-7649.28

P-1f

6-7

16.0

277.03

-4432

-4432

16.60

-73579.17

P-1g

7-8

16.0

6.29

-101

-101

9.95

-1002.08

P-1h

8-9

16.0

197.23

-3156

-3156

4.94

-15596.90

P-1d
P-1e

(Tm)

Uplift Force due to Water table at EL.


803 on U/s and EL. 803 on D/s
(Maximum-maximum)

Total Uplift

03/05/2016

-12792

file:///var/www/apps/conversion/tmp/scratch_5/307673952.xls

-252866

SH 13 OF 52

Nafra HEP

POWER HOUSE STABILITY ANALYSIS

Rev. 00

ANNEXURE-A
CALCULATION OF FORCES

S.No.

Component

Description

Force (T)
No.

Length
(m)

Breadth
(m)

Area
(m2)

Height /
Thickness

Volume
(m3)

Vertical
Horizontal
Downward (+)
Towards
Upward (-)
Upstream (+)
Towards Downstream
(-)

Lever Arm from


Point A

MY

MX
X(m)

Y(m)

(T-m)

P-2a

1-2

16.00

46.12

-738

-738

40.0

-29547

P-2b

2-3

16.00

140.76

-2252

-2252

33.9

-76452

P-2c

3-4

16.00

9.82

-157

-157

29.1

-4571

4-5

16.00

80.72

-1292

-1292

26.5

-34185

5-6

16.00

17.74

-284

-284

23.6

-6696

P-2f

6-7

16.00

228.80

-3661

-3661

16.7

-61265

P-2g

7-8

16.00

4.85

-78

-78

10.0

-773

P-2h

8-9

16.00

142.19

-2275

-2275

5.1

-11494

P-2d
P-2e

Uplift Force due to Water table at EL.


803.00 on U/s and EL. 796.57 on D/s
(Maximum-Normal)

Total Uplift

03/05/2016

-10736

file:///var/www/apps/conversion/tmp/scratch_5/307673952.xls

(Tm)

-224983

SH 14 OF 52

Nafra HEP

POWER HOUSE STABILITY ANALYSIS

Rev. 00

ANNEXURE-A
CALCULATION OF FORCES

S.No.

Component

Description

Force (T)
No.

Length
(m)

Breadth
(m)

Area
(m2)

Height /
Thickness

Volume
(m3)

Vertical
Horizontal
Downward (+)
Towards
Upward (-)
Upstream (+)
Towards Downstream
(-)

Lever Arm from


Point A

MY

MX
X(m)

Y(m)

(T-m)

P-3a

1-2

16.00

23.81

-381

-381

39.9

-15195

P-3b

2-3

16.00

90.27

-1444

-1444

33.9

-48988

P-3c

3-4

16.00

6.68

-107

-107

29.1

-3111

P-3d

Uplift Force due to Water table at EL.


796.57m on U/s and EL. 794.84 m on D/s

4-5

16.00

57.67

-923

-923

26.5

-24412

P-3e

(Normal-Minimum)

5-6

16.00

13.18

-211

-211

23.6

-4974

P-3f

6-7

16.00

180.77

-2892

-2892

16.6

-48144

P-3g

7-8

16.00

3.98

-64

-64

10.0

-634

P-3h

8-9

16.00

119.36

-1910

-1910

5.0

-9553

Total Uplift

03/05/2016

-7932

file:///var/www/apps/conversion/tmp/scratch_5/307673952.xls

(Tm)

-155011

SH 15 OF 52

Nafra HEP

POWER HOUSE STABILITY ANALYSIS

Rev. 00

ANNEXURE-A
CALCULATION OF FORCES
Lever Arm from
Point A

S.No.

Component

Description

Force (T)
No.

Length
(m)

Breadth
(m)

Area
(m2)

Height /
Thickness

Volume
(m3)

Vertical
Horizontal
Downward (+)
Towards
Upward (-)
Upstream (+)
Towards Downstream
(-)

MY

MX
(T-m)

(Tm)

X(m)

Y(m)

18.8

33

7050.0

12187.5

Stationary and Moving Crane (Not considered for calulating min. foundation pressure)

Q-1

stationary Crane

375

Q-2

Moving Crane Load Pull at B-Line

655

32.75

11.6

33

-7598.0

1064.4

Q-3

Moving Crane Load Thrust at B-Line

655

-32.75

11.6

33

7598.0

-1064.4

Q-4

Moving Crane Load Pull at D-Line

655

-32.75

28.0

33

-18340.0

-1064.4

Q-5

Moving Crane Load Thrust at D-Line

655

32.75

28.0

33

18340.0

1064.4

Live Load (Not considered for calulating min. foundation pressure)

R-1

Live Load at EL.793.5 (Turbine Floor)


between Grid D-E

9.60

15.40

147.84

221.76

32.60

7229.4

R-2

Live Load at EL.793.5 (Turbine Floor)


between Grid D-B

15.60

15.40

156.23

234.35

18.60

4358.82

R-3

Live Load at EL.793.5 (Turbine Floor)


between Grid B-A

9.60

15.40

147.84

221.76

7.30

1618.8

R-4

Live Load at EL.799.1 (Machine Hall


Floor) between Grid D-E

9.60

15.40

147.84

221.76

32.60

7229.4

R-5

Live Load at EL.799.1 (Machine Hall


Floor) between Grid D-B

15.60

15.40

156.23

234.35

18.60

4358.82

R-6

Live Load at EL.799.1 (Machine Hall


Floor) between Grid B-A

9.60

15.40

147.84

221.76

7.30

1618.8

03/05/2016

file:///var/www/apps/conversion/tmp/scratch_5/307673952.xls

SH 16 OF 52

Nafra HEP

POWER HOUSE STABILITY ANALYSIS

Rev. 00

ANNEXURE-A
CALCULATION OF FORCES

S.No.

Component

Description

Force (T)
No.

Length
(m)

Breadth
(m)

Area
(m2)

Height /
Thickness

Volume
(m3)

Vertical
Horizontal
Downward (+)
Towards
Upward (-)
Upstream (+)
Towards Downstream
(-)

Lever Arm from


Point A

MY

MX
X(m)

Y(m)

(T-m)

R-7

Live Load at EL. 804.1(Service bay floor)


between Grids D-E

9.60

15.40

147.84

369.60

7.30

2698.1

R-8

Live Load at EL. 804.1(Service bay floor)


between Grids B-A

9.60

15.40

147.84

369.60

7.30

2698.1

(Tm)

Uplift Force for calulating Foundation base pressure

S-1

Uplift Force due to Water table at EL.


803.00 on U/s and el. 803.00 on D/s

-12792

-12792

-252866

S-2

Uplift Force due to Water table at EL.


796.57 on U/s and el. 794.84 on D/s

-7932

-7932

-155011

03/05/2016

file:///var/www/apps/conversion/tmp/scratch_5/307673952.xls

SH 17 OF 52

Nafra HEP

POWER HOUSE STABILITY ANALYSIS

Rev. 00

Bottom Level

781.70

Penstock area and volume


Dia

Area

Length

Volume

Cg_x

Area*Cg_x

3.00

7.07

3.40

24.03

6.90

48.77

2.60

5.31

5.20

27.61

2.73

14.51

12.38

8.60

51.64

63.29
Cg_x =

03/05/2016

5.11

file:///var/www/apps/conversion/tmp/scratch_5/307673952.xls

SH 18 OF 52

Nafra HEP

03/05/2016

POWER HOUSE STABILITY ANALYSIS

file:///var/www/apps/conversion/tmp/scratch_5/307673952.xls

Rev. 00

SH 19 OF 52

Nafra HEP

03/05/2016

POWER HOUSE STABILITY ANALYSIS

file:///var/www/apps/conversion/tmp/scratch_5/307673952.xls

Rev. 00

SH 20 OF 52

Nafra HEP

03/05/2016

POWER HOUSE STABILITY ANALYSIS

file:///var/www/apps/conversion/tmp/scratch_5/307673952.xls

Rev. 00

SH 21 OF 52

Nafra HEP

03/05/2016

POWER HOUSE STABILITY ANALYSIS

file:///var/www/apps/conversion/tmp/scratch_5/307673952.xls

Rev. 00

SH 22 OF 52

Nafra HEP

POWER HOUSE STABILITY ANALYSIS

Rev. 00

Area X-sectional
28.20

m^2

03/05/2016

file:///var/www/apps/conversion/tmp/scratch_5/307673952.xls

SH 23 OF 52

Nafra HEP

03/05/2016

POWER HOUSE STABILITY ANALYSIS

file:///var/www/apps/conversion/tmp/scratch_5/307673952.xls

Rev. 00

SH 24 OF 52

Nafra HEP

03/05/2016

POWER HOUSE STABILITY ANALYSIS

file:///var/www/apps/conversion/tmp/scratch_5/307673952.xls

Rev. 00

SH 25 OF 52

Nafra HEP

POWER HOUSE STABILITY ANALYSIS

Rev. 00

Water in Penstock :2.40

3.00

7.07

16.96

9.80

69.27

5.20

2.60

5.31

27.61

4.13

21.95

16.18

57.50

03/05/2016

97.68

file:///var/www/apps/conversion/tmp/scratch_5/307673952.xls

SH 26 OF 52

Nafra HEP

POWER HOUSE STABILITY ANALYSIS

CG_x

03/05/2016

Rev. 00

6.04

file:///var/www/apps/conversion/tmp/scratch_5/307673952.xls

SH 27 OF 52

Nafra HEP

03/05/2016

POWER HOUSE STABILITY ANALYSIS

file:///var/www/apps/conversion/tmp/scratch_5/307673952.xls

Rev. 00

SH 28 OF 52

Nafra HEP

03/05/2016

POWER HOUSE STABILITY ANALYSIS

file:///var/www/apps/conversion/tmp/scratch_5/307673952.xls

Rev. 00

SH 29 OF 52

Nafra HEP

03/05/2016

POWER HOUSE STABILITY ANALYSIS

file:///var/www/apps/conversion/tmp/scratch_5/307673952.xls

Rev. 00

SH 30 OF 52

Nafra HEP

03/05/2016

POWER HOUSE STABILITY ANALYSIS

file:///var/www/apps/conversion/tmp/scratch_5/307673952.xls

Rev. 00

SH 31 OF 52

Nafra HEP

03/05/2016

POWER HOUSE STABILITY ANALYSIS

file:///var/www/apps/conversion/tmp/scratch_5/307673952.xls

Rev. 00

SH 32 OF 52

Nafra HEP

03/05/2016

POWER HOUSE STABILITY ANALYSIS

file:///var/www/apps/conversion/tmp/scratch_5/307673952.xls

Rev. 00

SH 33 OF 52

Nafra HEP

03/05/2016

POWER HOUSE STABILITY ANALYSIS

file:///var/www/apps/conversion/tmp/scratch_5/307673952.xls

Rev. 00

SH 34 OF 52

Length

Max-Max

Max-Normal

Normal-Min

9.5

9.5

3.07

Average pressure at bottom


Max-Max Max-Normal

1-2

3.6

16.71

16.12

10.16

13.11

12.81

2-3

9.0

16.71

15.16

9.90

16.71

15.64

3-4

0.6

19.22

17.57

12.38

17.97

16.37

4-5

4.7

19.22

16.78

12.16

19.22

17.18

5-6

1.0

21.31

18.70

14.20

20.27

17.74

6-7

13.0

21.31

16.50

13.61

21.31

17.60

7-8

0.3

20.65

15.86

12.94

20.98

16.18

8-9

9.8

19.6

13.159

11.42

20.13

14.51

Max-Max

Lever Arm from "A"


Max-Normal Normal-Min

1-2

38.4

40.03

40.04

39.88

2-3

29.4

33.90

33.95

33.92

3-4

28.8

29.09

29.09

29.09

4-5

24.1

26.45

26.47

26.46

5-6

23.1

23.59

23.59

23.59

6-7

10.1

16.60

16.74

16.65

7-8

9.8

9.95

9.95

9.95

8-9

4.94

5.05

5.00

10

15

20

25

30

35

40

45

10

Col
15

20

25

15

20

25

pressure at bottom
Normal-Min

40

Total pressure at bottom


Max-Max Max-Normal Normal-Min

Max-Max

Lever Arm
Max-Normal

Normal-Min

6.62

47.18

46.12

23.81

1.63

1.64

1.48

10.03

150.39

140.76

90.27

4.50

4.55

4.52

11.14

10.78

9.82

6.68

0.29

0.29

0.29

12.27

90.33

80.72

57.67

2.35

2.37

2.36

13.18

20.27

17.74

13.18

0.49

0.49

0.49

13.91

277.03

228.80

180.77

6.50

6.64

6.55

13.28

6.29

4.85

3.98

0.15

0.15

0.15

12.18

197.23

142.19

119.36

4.94

5.05

5.00

0
3.6
12.6
13.2
17.9
18.9
31.9
32.2
42.0

9.5
16.71
16.71
19.22
19.22
21.31
21.31
20.65
19.6

45

Column M

Nafra HEP

POWER HOUSE STABILITY ANALYSIS

Rev. 00

ANNEXURE-B
SUMMARY OF LOADS
Force

H (T)
V (T)
Downward Towards Upstream (+)
(+) Upward (-)
Towards Downstream
(-)

S.No

Load

DL1

Total Concrete Dead Load (First Stage + Second stage)

16748

338452

DL2

First Stage Concrete

14253

292841

ML1

Total Machine and Equipment load including Water inside Machine

915

19464

HT

Hydraulic Thrust

Mx (T-m)

-2600

PD_796.57 Water Pressure due to Normal tail water level (EL. 796.57m) at D/s

1769

PD_794.84 Water Pressure due to Minimum tail water level (EL. 794.84) at D/s

1381

PD_803.00 Water Pressure due to Max. tail water level (EL. 803.00m) at D/s

3630

PU_803.00 Water Pressure due to Max. tail water level (EL. 803.00m) at U/s

-3630

PU_796.57 Water Pressure due to Normal tail water level (EL. 796.57m) at U/s

-1769

10

UL1

Uplift Force due to Max water level at EL.803.00m at U/s and Normal tail
water level at EL. 796.57m at D/s side

-10736

-224983

11

UL2

Uplift Force due to Normal water level at EL.796.57m at U/s and Minimum
tail water level at EL. 794.84m at D/s side

-7932

-155011

12

UL3

Uplift Force due to Maximum water level at EL.803.00m at U/s and Maximum
tail water level at EL. 803.00m at D/s side

-12792

-252866

13

ULf1

Uplift Force due to Maximum water level at EL.803.00m at U/s and Maximum
tail water level at EL. 803.00m at D/s side for Foundation Pressure

-12792

-252866

14

ULf2

Uplift Force due to Normal water level at EL.796.57m at U/s and Minimum
tail water level at EL. 794.84m at D/s side for Foundation Pressure

-7932

-155011

7050.0

15

E.O.T Crane in Operation

15a

CrSt

Stationary Crane

375.0

15b

CrBP

Moving Crane Load Pull at B-Line

655.0

32.75

-7598.0

15c

Crbt

Moving Crane Load Thrust at B-Line

655.0

-32.75

7598.0

15d

CrDP

Moving Crane Load Pull at D-Line

655.0

-32.75

-18340.0

15e

CrDT

Moving Crane Load Thrust at D-Line

655.0

32.75

18340.0

15

Live Load on Floors

15a

LL1

Live Load at EL.793.5 (Turbine Floor) between Grid D-E

221.76

7229.4

15b

LL2

Live Load at EL.793.5 (Turbine Floor) between Grid D-B

234.35

4358.8

15c

LL3

Live Load at EL.793.5 (Turbine Floor) between Grid B-A

221.76

1618.8

15d

LL4

Live Load at EL.799.1 (Machine Hall Floor) between Grid D-E

221.76

7229.4

15e

LL5

Live Load at EL.799.1 (Machine Hall Floor) between Grid D-B

234.35

4358.8

15f

LL6

Live Load at EL.799.1 (Machine Hall Floor) between Grid B-A

221.76

1618.8

15g

LL7

Live Load at EL. 804.1(Service bay floor) between Grids D-E

369.60

2698.1

15h

LL8

Live Load at EL. 804.1(Service bay floor) between Grids B-A

369.60

2698.1

2094.93

31810

Total Live Load on Floors

03/05/2016

file:///var/www/apps/conversion/tmp/scratch_5/307673952.xls

SH 39 OF 52

Nafra HEP

POWER HOUSE STABILITY ANALYSIS

Rev. 00

SUMMARY OF LOADS
S.No

16

Load

Force

H (T)
V (T)
Downward Towards Upstream (+)
(+) Upward (-)
Towards Downstream
(-)

Mx (T-m)

Horizontal Earthquake : Right & Upward (ah = 0.23 , av = 30% of 0.153)

16a

SEx1

Seismic Force (Total Structure wt.)

-768.7

-3852.0

-15534.9

16b

SEx2

Seismic Force (First Stage Concrete Structure wt.)

-654.2

-3278.2

-13441.4

16c

SEx3

Seismic Force (Machine wt. of Permanent nature)

-42.0

-210.6

-893.4

16d

SEx5

Seismic Force (Stationary Crane)

-17.2

-86.3

-323.6

17

Horizontal Earthquake : Left & Upward (ah = 0.23 , av = 30% of 0.153)

17a

SEx1

Seismic Force (Total Structure wt.)

-768.7

3852.0

-15534.9

17b

SEx2

Seismic Force (First Stage Concrete Structure wt.)

-654.2

3278.2

-13441.4

17c

SEx3

Seismic Force (Machine wt. of Permanent nature)

-42.0

210.6

-893.4

17d

SEx5

Seismic Force (Stationary Crane)

-17.2

86.3

-323.6

18

Vertical Earthquake Upward & Right (a v = 0.153 , ah = 30% of 0.23)

18a

SEy1

Seismic Force (Total Structure wt.)

-2562.4

-1155.6

-51783.1

18b

SEy2

Seismic Force (First Stage Concrete Structure wt.)

-2180.7

-983.5

-44804.6

18c

SEy3

Seismic Force (Machine wt. of Permanent nature)

-140.1

-63.2

-2978.0

18d

SEx5

Seismic Force (Stationary Crane)

-57.4

-25.9

-1078.7

19

Vertical Earthquake Upward & Left (av = 0.153 , ah = 30% of 0.23)

19a

SEy1

Seismic Force (Total Structure wt.)

-2562.4

1155.6

-51783.1

19b

SEy2

Seismic Force (First Stage Concrete Structure wt.)

-2180.7

983.5

-44804.6

19c

SEy3

Seismic Force (Machine wt. of Permanent nature)

-140.1

63.2

-2978.0

19d

SEx5

Seismic Force (Stationary Crane)

-57.4

25.9

-1078.7

20

Horizontal Earthquake : Right & Downward (a h = 0.23 , av = 30% of 0.153)

20a

SEx1

Seismic Force (Total Structure wt.)

768.7

-3852.0

15534.9

20b

SEx2

Seismic Force (First Stage Concrete Structure wt.)

654.2

-3278.2

13441.4

20c

SEx3

Seismic Force (Machine wt. of Permanent nature)

42.0

-210.6

893.4

20d

SEx5

Seismic Force (Stationary Crane)

17.2

-86.3

323.6

21

Horizontal Earthquake : Left & Downward (a h = 0.23 , av = 30% of 0.153)

21a

SEx1

Seismic Force (Total Structure wt.)

768.7

3852.0

15534.9

21b

SEx2

Seismic Force (First Stage Concrete Structure wt.)

654.2

3278.2

13441.4

21c

SEx3

Seismic Force (Machine wt. of Permanent nature)

42.0

210.6

893.4

21d

SEx5

Seismic Force (Stationary Crane)

17.2

86.3

323.6

22

Vertical Earthquake Downward & Right (av = 0.153 , ah = 30% of 0.23)

22a

SEy1

Seismic Force (Total Structure wt.)

2562.4

-1155.6

51783.1

22b

SEy2

Seismic Force (First Stage Concrete Structure wt.)

2180.7

-983.5

44804.6

22c

SEy3

Seismic Force (Machine wt. of Permanent nature)

140.1

-63.2

2978.0

22d

SEx5

Seismic Force (Stationary Crane)

57.4

-25.9

1078.7

03/05/2016

file:///var/www/apps/conversion/tmp/scratch_5/307673952.xls

SH 40 OF 52

Nafra HEP

POWER HOUSE STABILITY ANALYSIS

Rev. 00

SUMMARY OF LOADS
S.No

23

Load

H (T)
V (T)
Downward Towards Upstream (+)
(+) Upward (-)
Towards Downstream
(-)

Force

Mx (T-m)

Vertical Earthquake Downward & Left (av = 0.153 , ah = 30% of 0.23)

23a

SEy1

Seismic Force (Total Structure wt.)

2562.4

1155.6

51783.1

23b

SEy2

Seismic Force (First Stage Concrete Structure wt.)

2180.7

983.5

44804.6

23c

SEy3

Seismic Force (Machine wt. of Permanent nature)

140.1

63.2

2978.0

23d

SEx5

Seismic Force (Stationary Crane)

57.4

25.9

1078.7

25

Hydrodynamic Pressure at D/s

25a

Hd1

Hydrodynamic Water pressure thrust at D/s P = 0.726xpxH,


= 0.299xpxH3

25b

Hd2

Hydrodynamic Water pressure Suction at D/s P = -0.726xpxH,


M =- 0.299xpxH3

03/05/2016

file:///var/www/apps/conversion/tmp/scratch_5/307673952.xls

543
-543

SH 41 OF 52

Nafra HEP

POWER HOUSE STABILITY ANALYSIS

Rev. 00

ANNEXURE-B

MMARY OF LOADS
My (T-m)

168287
145401
8476
-20280
8768
6050
25770
-25770
-8768

###

12187.5
1064.4
-1064.4
-1064.4
1064.4

03/05/2016

file:///var/www/apps/conversion/tmp/scratch_5/307673952.xls

SH 42 OF 52

Nafra HEP

POWER HOUSE STABILITY ANALYSIS

Rev. 00

MMARY OF LOADS
My (T-m)

-38706.1
-33442.1
-1949.5
-2803.1

38706.1
33442.1
1949.5
2803.1

-11611.8
-10032.6
-584.9
-840.9

11611.8
10032.6
584.9
840.9

-38706.1
-33442.1
-1949.5
-2803.1

38706.1
33442.1
1949.5
2803.1

-11611.8
-10032.6
-584.9
-840.9

03/05/2016

file:///var/www/apps/conversion/tmp/scratch_5/307673952.xls

SH 43 OF 52

Nafra HEP

POWER HOUSE STABILITY ANALYSIS

Rev. 00

MMARY OF LOADS
My (T-m)

11611.8
10032.6
584.9
840.9

3324
-3324

03/05/2016

file:///var/www/apps/conversion/tmp/scratch_5/307673952.xls

SH 44 OF 52

Nafra HEP

POWER HOUSE STABILITY ANALYSIS

Rev-00

ANNEXURE-C: Check Against Floatation


Load
Case

Load Case Description

Load Case
Definition

Construction Case + Design


flood (U/s water table at EL.
Normal Loading
803.00m & D/s water at EL.
803.00m)
Construction case + Vertical
Upward Seismic + Design
Flood (U/s water at EL.
796.57 & D/s Water at EL.
794.84m)

S. No.
(Ref.
Annexu
re-1)
2

Operational Case (U/s water


table at EL. 803.00m & D/s Normal Loading
water at EL. 803.00m)

VD
(T)

03/05/2016

(T)

Sum of
Upward
Forces

VU

F.O.S
Calculated

F.O.S
Allowable

(T)

(T)

VD
VU

14253

12792

1.11

1.10

OK

-14253

-10112

1.41

1.10

OK

17663

12792

1.38

1.20

OK

17663

10634

1.66

1.10

OK

-12792
14253

11

-7932

18b

-2181

16748

915

12

Operational Case + Vertical


upward Seismic+ Design
Extra-ordinary
flood (U/s water table at EL.
Loading
796.57m & D/s water at EL.
794.84m)

Sum of
Upward
Downward
Force
Forces
VU
VD

14253

12
2

Extra-ordinary
Loading

Downward
Force

-12792

16748

915

11

-7932

18a

-2562

18c

-140

file:///var/www/apps/conversion/tmp/scratch_5/307673952.xls

45 of 52

NAfra HEP

POWER HOUSE STABILITY ANALYSIS

Rev-00

ANNEXURE-D: Check Against Overturning


Load
Case

Load Case Description

Load Case
Definition

S. No. (Ref.
Annexure-1)

Constructional Case +
Design Flood (U/s water at Normal Loading
EL. 803.00 m & D/s Water
(Static case)
at EL. 796.57m)
Constructional Case +
Design Flood (U/s water at Normal Loading
EL. 796.57 m & D/s Water
(Static case)
at EL. 794.84m)

Construction case +
Horizontal Seismic (L-R) + Extra-ordinary
Design Flood (U/s water at
Loading
EL. 796.57m & D/s Water (Seismic case)
at EL. 794.84m)

Resisting
Moment

Over-turning
Moment

Sum of
Resisting
Moments

Sum of Overturning
Moments

F.O.S
Calculated

T-m

T-m

T-m

T-m

T-m

301609

250752

1.20

1.10

298891

163779

1.82

1.10

298891

213986

1.40

1.10

298891

218616

1.37

1.10

366684

271032

1.35

1.50

363966

184059

1.98

1.10

363966

251016

1.45

1.10

363966

244467

1.49

1.10

292841

8768

-25770

10

-224983

292841

6050

-8768

11

-155011

292841

6050

-8768

11

-155011

16b

-46884

25b

Construction case +
Vertical Upward Seismic + Extra-ordinary
Design Flood (U/s water at
Loading
EL. 796.57m & D/s Water (Seismic case)
at EL.794.84m)

Operational Case + Design


Flood (U/s water at EL.
803.00 m & D/s Water at
EL. 796.57m)

Operational case + Design


Flood (U/s water at EL.
796.57m & D/s Water
table at EL. 794.84m)

Normal Loading
(Static
case)

Normal Loading
(Static
case)

Operational Case + Vertical


Upward Seismic Force +
Extra-ordinary
Design Flood (U/s water at
Loading
EL. 796.57m & D/s Water (Seismic case)
at EL. 794.84m)

-3324

292841

6050

-8768

11

-155011

18b

-54837

338452

19464

8768

-20280

-25770

10

-224983

338452

19464

6050

-20280

-8768

11

-155011

338452

19464

6050

-20280

-8768

11

-155011

18a

-63395

18c

Operational Case +
Horizontal Seismic Force
L-R + Design Flood (U/s
water at EL. 796.57m &
D/s Water table at EL.
794.84m)

03/05/2016

Extra-ordinary
Loading
(Seismic case)

-3563

338452

19464

6050

F.O.S
Allowable

-20280

-8768

11

-155011

16a

-54241

16c

-2843

25b

-3324

file:///var/www/apps/conversion/tmp/scratch_5/307673952.xls

46 of 52

Nafra HEP

POWER HOUSE STABILITY ANALYSIS

Rev-05

ANNEXURE-E: Check Against Sliding


Load
Case

Load Case Description

Operational Case +
Design Flood (U/s
water table at EL.
803.00m & D/s water
at EL. 796.57m)

Operational Case +
Horzontal Seismic
Force L-R + Design
Flood (U/s water table
at EL. 796.57m & D/s
water at EL. 794.84m)

Load Case
Definition

Normal Loading
(Static case)

Vertical
Force

Horizontal
Force

Sum of
Horizontal
Forces

F.O.S Calculated

S. No. (Ref.
Annexure-1)

Sum of
Vertical
Forces

(CA+f V)

16748

915
6927

4461

1.48

1.40

8921

7593

1.12

1.10

1769

-2600

Extra-ordinary
Loading
(Seismic case)

03/05/2016

OK

-3630

10

-10736

16748

915

1381

-2600

-1769

11

-7932

16a

-769

16c

-42

25b

F.O.S
Allowable

OK

-3852
-211
-543

file:///var/www/apps/conversion/tmp/scratch_5/307673952.xls

47 of 52

KAMENG HEP (4x150MW)

POWER HOUSE STABILITY ANALYSIS

Rev-05

ANNEXURE-F
Foundation Base Pressure

Load
Case

Load Case Description

Operational Case +
Design Flood (U/s water
at EL. 803.00 m & D/s
Water at EL. 803.00 m)

Operational Case +
Design Flood (U/s water
at EL. 796.57 m & D/s
Water at EL. 794.84 m)

Load Case
Definition

Normal
Loading

List of
Moments

Sum of
Vertical
Forces

Sum of
Moments

Resultant
from Toe

Eccentricity

y
V

e = 0.5xb-y

T-m

T-m

T/m2

T/m2

16748

338452

915

4871

84770

17.4

2.45

10.96

4.90

9732

179907

18.5

1.36

19.21

12.47

8921

122823

13.8

6.08

28.32

0.72

8921

204135

22.9

-3.03

7.64

21.40

7029

112949

16.1

3.78

18.20

4.68

7029

137343

19.5

0.31

12.00

10.88

10542

155680

14.8

5.08

30.79

3.53

S. No. (Ref.
Annexure-1)

Normal
Loading

Operartional + Seismic :
Left & Upward + Design
Extraordinary
Flood (U/s water at EL.
Loading
796.57 m & D/s Water at
EL. 794.84 m)

Operartional + Seismic :
Upward & Right +
Extraordinary
Design Flood (U/s water
Loading
at EL. 796.57 m & D/s
Water at EL. 794.84 m)

Operartional + Seismic :
Upward & Left + Design
Extraordinary
Flood (U/s water at EL.
Loading
796.57 m & D/s Water at
EL. 794.84 m)

Operartional + Seismic :
Right & Downward +
Extraordinary
Design Flood (U/s water
Loading
at EL. 796.57 m & D/s
Water at EL. 794.84 m)

Base
Base
Pressure at Pressure at
Toe
Heel

V
(bxL)(16e/b)

19464

-20280

25770

Operartional + Seismic :
Right & Upward +
Extraordinary
Design Flood (U/s water
Loading
at EL. 796.57 m & D/s
Water at EL. 794.84 m)

03/05/2016

List of
Vertical
Forces

-25770

13

-12792

-252866

16748

338452

915

19464

-20280

6050

-8768

14

-7932

-155011

16748

338452

915

19464
-20280

6050

-8768

14

-7932

-155011

16a

-769

-54241

16c

-42

-2843

16748

338452

915

19464
-20280

6050

-8768

14

-7932

-155011

17a

-769

23171

17c

-42

1056

16748

338452

915

19464

-20280

6050

-8768

14

-7932

-155011

18a

-2562

-63395

18c

-140

-3563

16748

338452

915

19464

-20280

6050

-8768

14

-7932

-155011

19a

-2562

-40171

19c

-140

-2393

16748

338452

915

19464

-20280

6050

-8768

14

-7932

-155011

20a

769

-23171

file:///var/www/apps/conversion/tmp/scratch_5/307673952.xls

48 of 52

KAMENG HEP (4x150MW)

POWER HOUSE STABILITY ANALYSIS

Rev-05

ANNEXURE-F
Foundation Base Pressure

Load
7
Case

10

Operartional + Seismic :
Right & Downward +
Extraordinary
Design Flood (U/s water Load Case
Load Case Description
Loading
Definition
at EL. 796.57 m & D/s
Water at EL. 794.84 m)

Operartional + Seismic :
Left & Downward +
Extraordinary
Design Flood (U/s water
Loading
at EL. 796.57 m & D/s
Water at EL. 794.84 m)

Operartional + Seismic :
Downward & Right+
Extraordinary
Design Flood (U/s water
Loading
at EL. 796.57 m & D/s
Water at EL. 794.84 m)

Operartional + Seismic :
Downward & Left+
Extraordinary
Design Flood (U/s water
Loading
at EL. 796.57 m & D/s
Water at EL. 794.84 m)

03/05/2016

S. No. (Ref.
Annexure-1)

List of
Vertical
Forces

List of
Moments

T-m

T-m

T/m2

T/m2

10542

236991

22.5

-2.63

10.11

24.21

12434

222472

18

1.96

26.43

14.05

12434

246865

20

0.00

20.23

20.25

20c

42

-1056

16748

338452

915

19464

-20280

6050

-8768

14

-7932

-155011

21a

769

54241

21c

42

2843

16748

338452

915

19464

-20280

6050

-8768

14

-7932

-155011

22a

2562

40171

22c

140

2393

16748

338452

915

19464

-20280

6050

-8768

14

-7932

-155011

23a

2562

63395

23c

140

3563

Sum of
Vertical
Forces
10542

Sum of
Moments

Resultant
from Toe

155680

14.8
y

file:///var/www/apps/conversion/tmp/scratch_5/307673952.xls

Eccentricity
5.08
e = 0.5xb-y

Base
Base
Pressure at Pressure at
Toe
Heel
30.79
3.53
V

(bxL)(16e/b)

49 of 52

KAMENG HEP (4x150MW)

POWER HOUSE STABILITY ANALYSIS

Rev-05

ANNEXURE-G: Minimum Foundation Base Pressure at EL. 215.00m for Unit bay-III

Load
Case

Load Case
Description

Sum of
Vertical
Forces

Sum of
Moments

T-m

T/m2

T/m2

Normal
Loading

4871

84770

17.4

3.07

41.05

Load Case
Definition

Base
Base
Resultant
Eccentricity Pressure at Pressure at
from Toe
Toe
Heel
Effective
base (L')

V
y
e = 0.5xb-y
V
(bxL)(16e/b)

Operational Case

Max TWL at EL.


259.3.0 during
operation

Extraordinary
Loading

9732

179907

18.5

1.99

15

Operartional +
Horizontal Earthquake
Extraordinary
: Right & Upward (ah
Loading
= 0.23 , av = 30% of
0.153)

8921

122823

13.8

6.71

22

41.46

Operartional +
Horizontal Earthquake
Extraordinary
: Left & Upward (ah =
Loading
0.23 , av = 30% of
0.153)

8921

204135

22.9

-2.36

15

41.05

Operartional + Vertical
Earthquake Upward & Extraordinary
Right (av = 0.153 , ah
Loading
= 30% of 0.23)

7029

112949

16.1

4.46

14.1

2.98

41.05

03/05/2016

file:///var/www/apps/conversion/tmp/scratch_5/307673952.xls

Revised Base Pressure


(Zero tension for given
load cases)

4xL

kV / BL'

3(L-2e)

(Refer Sheet of
Modified pressure for
calculation)

1.98

U/s

D/s

T/m2

T/m2

0.0

713.11

21.3

0.00

50 of 52

KAMENG HEP (4x150MW)

POWER HOUSE STABILITY ANALYSIS

Rev-05

ANNEXURE-G: Minimum Foundation Base Pressure at EL. 215.00m for Unit bay-III
Sum of
Vertical
Forces

Sum of
Moments

T-m

T/m2

T/m2

Operartional + Vertical
Earthquake Upward & Extraordinary
Left (av = 0.153 , ah =
Loading
30% of 0.23)

7029

137343

19.5

0.99

10

41.05

Operartional +
Horizontal Earthquake
Extraordinary
: Right & Downward
Loading
(ah = 0.23 , av = 30%
of 0.153)

10542

155680

14.8

5.76

24

44.91

Operartional +
Horizontal Earthquake
Extraordinary
: Left & Downward (ah
Loading
= 0.23 , av = 30% of
0.153)

10542

236991

22.5

-1.95

17

41.05

Operartional + Vertical
Earthquake
Extraordinary
Downward & Right (av
Loading
= 0.153 , ah = 30% of
0.23)

12434

222472

17.9

2.63

21

41.05

10

Operartional + Vertical
Earthquake
Extraordinary
Downward & Left (av
Loading
= 0.153 , ah = 30% of
0.23)

12434

246865

19.9

0.67

17

14

41.05

Load
Case

Load Case
Description

03/05/2016

Load Case
Definition

Base
Base
Resultant
Eccentricity Pressure at Pressure at
from Toe
Toe
Heel
Effective
base (L')

V
y
e = 0.5xb-y
V
(bxL)(16e/b)

file:///var/www/apps/conversion/tmp/scratch_5/307673952.xls

Revised Base Pressure


(Zero tension for given
load cases)

4xL

kV / BL'

3(L-2e)

1.85

U/s

D/s

T/m2

T/m2

21.8

0.00

51 of 52

M
P
L
B
e
Stress
x

=
=
=
=
=
=
=

5E+006
97710
41.05
20
-28.207
7131.09
27.4039

KNm
KN
m
m
m
KN/m2
m

Vous aimerez peut-être aussi