Vous êtes sur la page 1sur 4

RESUME

NAME
PRESENT DESIGNATION
E- Mail id: XXXXXXXXXXXXXXXXX
Mobile: XXXXXXXXXXXXXXXXXXXXXXX

Working Experience: 5 years 3 months


CAREER OBJECTIVE:
Personal
Profile:
Academic
Qualification
:

Seeking a challenging and rewarding opportunity with an organization in


the business of process control & Instrumentation of Oil & Gas
refineries / Manufacturing etc., which recognizes my true potential and
effectively utilizes/ nurtures my excellent analytical and technical skills.
PROFILE:

b.tech details

Intermediat
e in +2
details

Dedicated, resourceful and innovative Engineer having an experience of 5


years 3 months with expertise in Erection & commissioning, Operations
& Maintenance, DCS-Execution, troubleshooting along with Site
Engineering and Project Management skills.

Currently spearheading as Instrumentation Engineer (C&I) with Aarvi


Encon pvt. Ltd. at Coal Gasification Plant (Jindal Steel Power
Limited , Angul, Orissa)

SSC
10 th
standard
details

DETAILS OF PROJECTS WORKED

Execution of Erection & Commissioning of MOTOR SPIRIT BLOCK at


Hindustan Petroleum Corporation Limited.
Execution of Erection & Commissioning of HYDROGEN GENERATION
UNIT at Hindustan Petroleum Corporation Limited.
Execution of Erection & Commissioning of DIESEL HYDRO TREATER UNIT
at Hindustan Petroleum Corporation Limited.
Execution of Erection, Commissioning & Operation and Maintenance of
SULPHUR RECOVERY UNIT at Hindustan Petroleum Corporation
Limited.
Execution of Commissioning & Operation and Maintenance of COAL
GASSIFICATION PLANT (REDUCTION GAS, COAL GASSIFICATION PLANT) at
JINDAL STEEL & POWER LIMITED.

Fathers
Name:
Sex:
Marital
Status:
Single

PROFESSIONAL EXPERIENCE
AARVI
ENCON
APRIL 2014 TO PRESENT

PVT

LTD

Employer: AARVI ENCON PVT LTD MUMBAI.


Client: JINDAL STEEL & POWER LIMITED, ANGUL (ORISSA).
Date
Birth:

of INDUSTRY TYPE: Coal Gasification Plant(CGP-Plant)


Multinational company involved in the mining, steel production, power
generation, oil exploration and making new presence in producing steel through
Coal Gasification (Syn gas) with Syn Gas based DRI route and involvement in
Coal to Diesel Project. At Angul, JSPL setting up a 12.5 MTPA mega green field
steel plant with 810 MW power plant and Coal Gasification Plant.

Language
Known:
Nationality
Indian

Working for coal gasification project: Indias first Coal Gasification Project
(Consult: LURGI South Africa) for conversion of coal to synthetic gas(which is a
combination of CO2, H2, CO and CH4) for using it as reducing agent in DRI of
steel plant. Coal gasification process is also one step before the coal to
liquefaction process.
Capacity
: 3,30,000 Nm3/hr
Duration: April 2014 to Present.
Role: Instrumentation Engineer (Operations & Maintenance).

Executed Projects are:Permanent


Address:
Pass-Port
Number:

1) Phenosolvan Unit , 2) Ammonia Recovery Unit , 3)Sulphur Recovery Unit,


4) Tank Form Unit Job Description:
Operation & Maintenance of all the Instruments & electrical equipments
including Transmitters, control valves, DCS panels, Switchgears, Drives
(VFD , VSD).
Preparation of Preventive Maintenance Schedule and procurement of all
types of instruments Spares.
Coordination with the Process Engineer for the smooth running of the
Plant.
Proactively identifying areas of obstruction/ breakdowns and take steps to
rectify the equipments through application of trouble shooting tools.
Imparting continuous on job training to the workforce for accomplishing
greater operational effectiveness/ efficiency.
Control systems, DCS, PLC and field instruments maintenance and
troubleshooting which includes preventive maintenance .
Monitor and the execution of Preventive Maintenance (PM), Breakdown
Maintenance, activities. Liaises closely with operations and other
Maintenance units Trouble Shooting & Calibration of all smart Instruments.
Responsible for Preparation of Risk Assessments & Job Risk Analysis Near
miss reporting, Incident
Investigation. Preparing task based risk assessment and executing the
jobs safely.
Reviews and discusses maintenance and engineering work progress and
related issues with technicians. Ensures systematic and consistent
implementation of work method and procedures used in maintenance and
engineering and recommends improvements.
EPKS Engineering tools - Control Builder, HMI Web Display Builder and
Quick Builder.
M.M.K
ENTERPRISES
OCTOBER 2013 TO MARCH 2014
Employer: M.M.K Enterprises (GROUP OF KUSHAL ENGINEERS) MUMBAI.
Client: JINDAL STEEL & POWER LIMITED, ANGUL (ORISSA).
INDUSTRY TYPE: Coal Gasification Plant(CGP-Gas plant)
Executed Projects are:1) Coal Gasification Unit, 2) Gas Liquor Separation Unit , 3) Gas Cooling
Unit , 4) Rectisol Unit 5)Sub station -1 & 2
Duration: October 2013 to March 2014.
Role:
Instrumentation
Commissioning).

Engineer

(Project,

Pre-Commissioning

&

Erection & Commissioning DCS marshalling cabinets, ESD marshalling


cabinets, System Cabinets, Networking Cabinet, Aux console Panel.
Cold & Hot loop checking of instruments and control valve stroke check.
Hot loop checking for HART instruments with Emerson 475 like pressure
Tx , Level Tx and Flow Tx make ROSE MOUNT,ABB,E & H, Honeywell and
YOKOGAWA.
Logic checking, graphic checking, Cause effects checking.
Execution of pumps logic checking with co ordination of electrical in
Substation-1 , substation -2.
SENSTIVE
ENTERPRISES
OCTOBER 2009 TO SEPTEMBER 2013
Employer: Sensitive Enterprises, Visakhapatnam (Andhra Pradesh).

PMC: Toyo Engineering India Limited


Client: Hindustan Petroleum Corporation Limited, Visakhapatnam (Andhra
Pradesh).
Role: Instrumentation Engineer.
Executed Projects are:1) Hydrogen Generation Unit (Duration: October 2009 To December 2010).
2) Diesel Hydro Treater Unit (Duration: January 2011 To November 2012).
3) Sulphur Recovery Unit (Duration: May 2012 To September 2013).
A
N
INSTRUMENTS
PVT
LTD
MAY 2009 TO SEPTEMBER 2009
Employer: A N INSTRUMENTS PVT LTD, Calcutta.
Client: Hindustan Petroleum Corporation Limited, Visakhapatnam (Andhra
Pradesh).
PMC: Engineering India Limited (EIL).
Role: Instrumentation Engineer (Duration: May 2009 to September 2009).
Executed Projects are:1) Motor Spirit Block.
WORK SUMMARY:

FIELD ENGG. :

Planning, Monitoring and executing of all I&C activities at site.


Coordination/weekly progress review meetings with Consultants, clients.
Review of Instrumentation data sheets and documents. Calibration,
Erection and Commissioning of the Process Control Instruments.
Hot loop checking for HART and FIELD BUS instruments with Emerson 475
like pressure Tx , Level Tx and Flow Tx make ROSE MOUNT and
YOKOGAWA.
Execution Yokogawa DCS (CENTUN VP), PLC (PROSAFE RS version R3)
panels.
Technical discussions with Clients and Vendors.
Stroke checking for control valve with smart positioners neles mesto and
dresser with Emerson 475 make MIL, Mesoneilan & Fisher model.
Calibration of field instruments like Pressure Gauges, Differential Pressure
Gauges, Pressure Transmitters, Temperature Gauges, Temperature
Transmitters, Flow Transmitters & Level Transmitters, Pressure Switches
and Temperature Switches.
Good knowledge of various
P&ID, Hookup, Loop drawings, Field
Engineering and As Built drawing, interconnection drawings etc.,
Practical knowledge of Cable laying / Trays/ Instrument Panels/Junction
Box erection works.
Experience in Field Engineering / Estimation of recourses (Manpower /
Materials / Duration)
Material control / identifying short / damaged / supply items.
Preparation of documents for all types of Instrumentation works.
Supporting all the activities related to Health, Safety and Environment
policy of the Organization.

SYSTEM ENGG. DCS :


Technical knowledge on Honeywells EPKS-DCS with
C300/C200Controllers
Have knowledge in I/O assignment, Cabinet assignment, and Cable
termination details with programming skill on open loop / close loop

control scheme and logic development.


Have good experience on DCS and ESD Logics in Oil & Gas Plant with
ability to test DCS & PLC Logics in commissioning stage.
Have knowledge in I/O assignment, Cabinet assignment, and Cable
termination details with programming skill on open loop / close loop
control scheme and logic development.
Good knowledge on DCS System Configuration, DCS architecture, I/O
Count, review of P&ID, preparation of design basis, preparation of
logic diagram, loop Schematics and review of electrical control
schematics.
Experience on instrument mounting details, review of Junction Box
wiring details, loop diagram, level sketches, review of Control room
layouts, Control room/MCC interconnection drawings, review of cable
schedule and overall instrumentation.
Experience on arrangement of DCS marshalling boxes in field side and
related cabling from field to DCS marshalling panel in control room
side for different AI, AO, DI, DO and good knowledge on trouble
shooting from field side to DCS marshalling panel.
CENTUM-VP Engineering tools - Control Builder, HMI Web Display
Builder and Quick Builder, Technical knowledge on Yokogawa-CENTUM
VP with Field Bus Foundation
Experience on MCC, Variable Frequency Drives, Variable Speed Drives
power plants steam & Water treatment, boiler, water & oil storage,
instrument & service air compressors, ultrasonic transmitters, Hart
Communicator, flow, level, pressure, temperature, vibrations and
alarm systems.
QUALITY ACTIVITIES:
Welder test qualification (1F-5F), (1G-6G), Field Welding inspection, fit
up, joint test, PWHT, NDT.

IMIR clearance for all inward materials like, welding electrodes, Filler
wire(CS,AS,SS,P91,P22),instruments ,valves ,cables, cable trays (ladder,
perforated), JBs, Bus ducts.

Software Exposure:
Operating System:
Packages
:
Declaration:

WIN 7 & WIN Vista, Win XP, Server 2003, MS Office.


Computer Hardware & Networking, CCNA.

I consider myself familiar with the Commissioning &


maintenance aspects in relation to its overall Electrical, Instrumentation and also
confident to taking initiative of any work related to my field efficiently. I hereby
declare that the information furnished above is true to the best of my
knowledge.
NAME
Date :
Place :

Vous aimerez peut-être aussi