THREE MONTHS ROLLING

PLAN / OCTOBER -2015


Activity ID

Public Works Authority

IA 13/14 C 40 M-5

DESIGN AND CONSTRUCTION OF LATERAL INTERCEPTOR SEWERS (CONTRACT LIS-02)

Activity Name

BL Project
Duration

Original
Duration

Start

Finish

2015
Sep

Oct

Nov

Dec

1169
1184
04-Oct-15 A 30-Dec-18
DESIGN AND CONSTRUCTION OF LATERAL INTERCEPTOR SEWERS (CONTRACT LIS-02) (DRAFT BASELINE PROGRAMME)
1169
1184
04-Oct-15 A 30-Dec-18
GENERAL

CONTRACTUAL DATES
G-GN-CD-D101

Project duration

INTERFACE ISSUES
COORDINATION WITH INTERFACING PARTIES
MTS-02 CONTRACT AND WORK AT SHAFT WS7

1169

1169

04-Oct-15 A

30-Dec-18

1169

1169

04-Oct-15 A

30-Dec-18

90

90

30-Nov-15

27-Feb-16

90

90

30-Nov-15

27-Feb-16

90

90

30-Nov-15

27-Feb-16

G-IF-WS07-D100

Coordinating with MTS-02 Contractor to confirm the vertical and horizontal alignment
between two contracts

90

90

30-Nov-15

27-Feb-16

G-IF-WS07-D101

Coordinating with MTS-02 contractor to allow scheduled access to shaft location WS7

90

90

30-Nov-15

27-Feb-16

90

90

30-Nov-15

27-Feb-16

MTS-03 CONTRACT AND WORK AT SHAFT WS7


G-IF-WS07-D103

Coordinating with MTS-03 Contractor to confirm the vertical and horizontal alignment
between two contracts

90

90

30-Nov-15

27-Feb-16

G-IF-WS07-D104

Coordinating with MTS-03 Contractor to minimise potential work shaft usage conflicts

90

90

30-Nov-15

27-Feb-16

90

90

30-Nov-15

27-Feb-16

90

90

30-Nov-15

27-Feb-16

CONTRACT TPS/STW-01 (OCF-2) AT THE INDUSTRIAL AREA LAT ERAL SEWER - SH8/60
G-IF-WS07-D106

Coordinating with TPS/STW-01 Contractor to confir m the vertical and hori zontal
alignment between two contracts

1141

OFFICES & TEMPORARY FACILITIES


SUBMISSION

1156

01-Nov-15 A

30-Dec-18

28

28

01-Nov-15 A

28-Nov-15

28-Nov-15, SUBMISSION

G-SO-LIS02-D100

Site office location and layout plan and location

28

28

01-Nov-15 A

28-Nov-15

Site office location and layou

G-SO-LIS02-D101

Laydown area and storage area plan and location

28

28

01-Nov-15 A

28-Nov-15

Laydown area and storage ar

14

14

29-Nov-15

12-Dec-15

12-Dec-15, REV

G-SO-LIS02-D104

Site office location and layout plan

14

14

29-Nov-15

12-Dec-15

Site office locati

G-SO-LIS02-D105

Laydown area and storage area

14

14

29-Nov-15

12-Dec-15

Laydown area a

1107

20-Dec-15

30-Dec-18

28

20-Dec-15

16-Jan-16

REVIEW & APPROVAL

1092

ESTABLISHMENT
G-SO-LIS02-D109

Providing measuring and recording equipments to the Engineer (Performance)

G-SO-LIS02-D110

Providing measuring and recording equipments to the Engineer (Time)

INSURANCES

28
1092

1107

20-Dec-15

30-Dec-18

90

121

04-Oct-15 A

01-Feb-16

G-IN-LIS02-D100

Submission of Construction and Erection All Risks Insurance

90

90

04-Oct-15 A

01-Feb-16

G-IN-LIS02-D105

Submission of Professional Indemnity Insurance

90

90

04-Oct-15 A

01-Feb-16

G-IN-LIS02-D101

Submission of Third Party Liability Insurance

90

90

04-Nov-15

01-Feb-16

Remaining Level of Effort

Critical Remaining ...

Actual Work

Milestone

Remaining Work

Baseline Milestone

PAGE 1 OF 9

THREE MONTHS ROLLING


PLAN / OCTOBER -2015
Activity ID

Public Works Authority

IA 13/14 C 40 M-5

DESIGN AND CONSTRUCTION OF LATERAL INTERCEPTOR SEWERS (CONTRACT LIS-02)

Activity Name

BL Project
Duration

Original
Duration

Start

Finish

2015
Sep

Oct

Nov

Dec

G-IN-LIS02-D102

Submission of Worker's Compensation and Employer's Liability Insurances

90

90

04-Nov-15

01-Feb-16

G-IN-LIS02-D103

Submission of Contractor's Plant and Equipment Insurance

90

90

04-Nov-15

01-Feb-16

G-IN-LIS02-D104

Submission of Automobile Liability Insurance

90

90

04-Nov-15

01-Feb-16

28

59

04-Oct-15 A

01-Dec-15

01-Dec-15, BONDS AND G

28

28

04-Oct-15 A

01-Dec-15

Submission of Performance Guarantee


Submission of Materials Guarantee

BONDS AND GUARANTEE S


G-BG-LIS02-D100

Submission of Performance Guarantee

G-BG-LIS02-D103

Submission of Materials Guarantee

PROJECT ASSURANCES
PROJECT QUALITY PLAN

28

04-Nov-15

01-Dec-15

1169

28

1184

04-Oct-15 A

30-Dec-18

100

100

18-Oct-15 A

11-Jan-16
Submission of Quality Organisation Plan to QCE

G-QP-LIS02-G010

Submission of Quality Organisation Plan to QCE

14

14

18-Oct-15 A

04-Nov-15

G-QP-LIS02-G020

Submission of Project Quality Plan to QCE

42

42

18-Oct-15 A

14-Nov-15

Submission of Project Quality Plan to QCE

G-QP-LIS02-H010

Review of Quality Organisation Plan by QCE and obtaining approval

30

30

18-Oct-15 A

16-Nov-15

Review of Quality Organisation Plan by

G-QP-LIS02-H020

Review of Project Quality Plan by QCE and obtaining approval

30

30

15-Nov-15

14-Dec-15

Review of Pro

G-QP-LIS02-J010

QCE Submission Quality Organisation Plan to the Engineer and obtaining


no-objection

28

28

17-Nov-15

14-Dec-15

QCE Submiss

G-QP-LIS02-J020

QCE Submission Project quality plan to the Engineer and obtaining no-objection

28

28

15-Dec-15

11-Jan-16

100

100

04-Oct-15 A

11-Jan-16

CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN

100

100

04-Oct-15 A

11-Jan-16

G-CEMP-LIS02-G010

Submission of Construction Environmental Management Plan to QCE

42

42

18-Oct-15 A

14-Nov-15

Submission of Construction Environmental

G-CEMP-LIS02-H010

Review of Construction Environmental Management Plan by QCE and obtaining


approval

30

30

15-Nov-15

14-Dec-15

Review of Con

G-CEMP-LIS02-J010

Review of Construction Environmental Management Plan by the Engineer and


obtaining no-objection

28

28

15-Dec-15

11-Jan-16

28

28

28-Oct-15 A

04-Nov-15

04-Nov-15, ENVIRONMENTAL MANAGEMENT SYSTEM

28

28

28-Oct-15 A

04-Nov-15

Registering the works with CEEQUAL International and GSAS

86

89

04-Oct-15 A

31-Dec-15

CEMP (CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN)

ENVIRONMENTAL MANAGEMENT SYSTEM


G-CEMP-LIS02-D020 Registering the works with CEEQUAL International and GSAS
ENVIRONMENTAL RISK ASSESSMENT (ERA)
G-ERA-LIS02-G010

Submission of Environmental Risk Assessment (ERA) to QCE

28

28

04-Oct-15 A

04-Nov-15

Submission of Environmental Risk Assessment (ERA) to QCE

G-ERA-LIS02-G020

Establishmet of Environmental Permitting and Compliance Matrix and Submission to


the Engineer

28

28

04-Oct-15 A

04-Nov-15

Establishmet of Environmental Permitting and Comp

G-ERA-LIS02-H010

Review of Environmental Risk Assessment (ERA) by QCE and obtaining approval

30

30

04-Nov-15

03-Dec-15

Review of Environmenta

G-ERA-LIS02-H020

Review of Environmental Permitting and Compliance Matrix by QCE and obtaining


approval

30

30

04-Nov-15

03-Dec-15

Review of Environmenta

G-ERA-LIS02-J010

Review of Environmental Risk Assesment by the Engineer and obtaining no-objection

28

28

04-Dec-15

31-Dec-15

G-ERA-LIS02-J020

Review of Environmental Permitting and Compliance Matrix by the Engineer and


obtaining no-objection

28

28

04-Dec-15

31-Dec-15

100

100

04-Oct-15 A

11-Jan-16

WASTE MANAGEMENT PLAN

Remaining Level of Effort

Critical Remaining ...

Actual Work

Milestone

Remaining Work

Baseline Milestone

PAGE 2 OF 9

THREE MONTHS ROLLING


PLAN / OCTOBER -2015
Activity ID

Public Works Authority

IA 13/14 C 40 M-5

DESIGN AND CONSTRUCTION OF LATERAL INTERCEPTOR SEWERS (CONTRACT LIS-02)

Activity Name

BL Project
Duration

Original
Duration

Start

Finish

2015
Sep

Oct

G-WMP-LIS02-G010

Submission of Draft Waste Manangement Plan to the Engineer

42

42

04-Oct-15 A

14-Nov-15

Nov
Dec
Submission of Draft Waste Manangement

G-WMP-LIS02-H010

Review of Waste Manangement Plan by QCE and obtaining approval

30

30

15-Nov-15

14-Dec-15

Review of Wa

G-WMP-LIS02-J010

Review of Waste Manangement Pl an by the Engineer and obtaining no-objection

28

28

15-Dec-15

11-Jan-16

84

104

25-Oct-15 A

15-Jan-16

G-WAP-LIS02-G010

Submission of Welfare Adherence Plan (Draft) to the Engineer

42

42

25-Oct-15 A

14-Nov-15

Submission of Welfare Adherence Plan (D

G-WAP-LIS02-G101

Submission of Welfare Adherence Plan to the Engineer

56

56

25-Oct-15 A

18-Dec-15

Submissio

G-WAP-LIS02-J100

Review of Welfare Adherence plan by the Engineer and obtaining no-objection

28

28

18-Dec-15

15-Jan-16

42

42

18-Oct-15 A

04-Nov-15

04-Nov-15, CONTRACTOR'S QUALITY ASSURANC

42

42

18-Oct-15 A

04-Nov-15

Quality assurance and Quality control regime (Performance)

1184

18-Oct-15 A

30-Dec-18

42

18-Oct-15 A

14-Nov-15

WELFARE ADHERENCE PLAN

CONTRACTOR'S QUALITY ASSURANCE AND QUALITY CONTROL REGIME


G-QC-LIS02-D010

Quality assurance and Quality control regime (Performance)

1169

ENGAGING QCE
G-QCE-LIS02-D010

Engaging QCE up on approval from the Engineer

G-QCE-LIS02-D020

QCE planned period of operation on site

METHOD STATEMENTS
SUBMISSION

42
1127

1142

15-Nov-15

30-Dec-18

79

79

05-Nov-15

22-Jan-16

63

63

05-Nov-15

06-Jan-16

Engaging QCE up on approval from the Engineer

Submission of detailed method s

G-MS-LIS02-G010

Submission of detailed method statement for utility diversion

21

21

05-Nov-15

25-Nov-15

G-MS-LIS02-G011

Submission of detailed method statement for the temporary shaft construction using
diaphragm wall method

21

21

26-Nov-15

16-Dec-15

Submission

G-MS-LIS02-G012

Submission of detailed method statement for the temporary shaft construction works
using VSM method

21

21

26-Nov-15

16-Dec-15

Submission

G-MS-LIS02-G013

Submission of detailed method statement for the temporary shaft construction using
Seacant pile method

21

21

26-Nov-15

16-Dec-15

Submission

G-MS-LIS02-G014

Submission of detailed method statement for the temporary shaft construction using
shotcrete method

21

21

17-Dec-15

06-Jan-16

51

51

26-Nov-15

15-Jan-16

G-MS-LIS02-H010

Review and approval of detailed method statement for utility diversion by QCE

30

30

26-Nov-15

25-Dec-15

G-MS-LIS02-H011

Review and approval of detailed method statement for the temporary shaft
construction using diaphragm wall method by QCE

30

30

17-Dec-15

15-Jan-16

G-MS-LIS02-H012

Review and approval of detailed method statement for the temporary shaft
construction using using VSM method

30

30

17-Dec-15

15-Jan-16

G-MS-LIS02-H013

Review and approval of detailed method statement for the temporary shaft
construction using Seacant pile method

30

30

17-Dec-15

15-Jan-16

28

28

26-Dec-15

22-Jan-16

28

28

26-Dec-15

22-Jan-16

114

145

04-Oct-15 A

25-Feb-16

APPROVAL BY QCE

NO-OBJECTION BY THE ENGINEER


G-MS-LIS02-J010

Obtaining no objection from the Engineer for the submitted detailed method
statement for utility diversion

OTHER CONTRACTUAL REQUIREMENTS

Remaining Level of Effort

Critical Remaining ...

Actual Work

Milestone

Remaining Work

Baseline Milestone

PAGE 3 OF 9

Rev

THREE MONTHS ROLLING


PLAN / OCTOBER -2015
Activity ID

Public Works Authority

IA 13/14 C 40 M-5

DESIGN AND CONSTRUCTION OF LATERAL INTERCEPTOR SEWERS (CONTRACT LIS-02)

Activity Name

BL Project
Duration

COMMUNICATION PLAN

Original
Duration

Start

Finish

114

114

04-Oct-15 A

25-Jan-16

2015
Sep

Oct

Nov

Dec

G-CP-LIS02-G010

Submission of Communication Plan to QCE

56

56

04-Oct-15 A

28-Nov-15

Submission of Communicatio

G-CP-LIS02-H010

Review of Communication Plan by QCE and obtaining approval

30

30

29-Nov-15

28-Dec-15

G-CP-LIS02-J010

QCE Submission Communication Plan to the Engineer and obtaining no-objection

28

28

29-Dec-15

25-Jan-16

114

114

04-Nov-15

25-Feb-16

G-SMP-LIS02-G010

Submission of Stakeholder Management Plan to QCE

56

56

04-Nov-15

29-Dec-15

G-SMP-LIS02-H010

Review of Stakeholder Management Plan by QCE and obtaining approval

30

30

30-Dec-15

28-Jan-16

G-SMP-LIS02-J010

QCE Submission Stakeholder Management Plan to the Engineer and obtaining


no-objection

28

28

29-Jan-16

25-Feb-16

98

98

04-Oct-15 A

09-Jan-16

98

98

04-Oct-15 A

09-Jan-16

STAKEHOLDER MANAGEMENT PLAN

TRAFFIC MANAGEMENT PLAN


PRELIMINARY
G-TMP-LIS02-G010

Submission of Preliminary Traffic Management Plan to the Engineer

42

42

04-Oct-15 A

14-Nov-15

G-TMP-LIS02-H010

Review of detailed Traffic Management Plan by the Engineer and obtaining


no-objection

28

28

15-Nov-15

12-Dec-15

G-TMP-LIS02-J010

Submission of Preliminary Traffic Management Plan to Authori ties and obtaining


approval

28

28

13-Dec-15

09-Jan-16

100

100

04-Oct-15 A

11-Jan-16

UTILITIES DIVERSION PLAN


G-UDP-LIS02-G010

Submission Utilities Diversion plan to QCE

42

42

04-Oct-15 A

14-Nov-15

G-UDP-LIS02-H010

Review of Utilities Diversion Plan by QCE and obtaining approval

30

30

15-Nov-15

14-Dec-15

G-UDP-LIS02-J010

QCE Submission Utilities Diversion Plan to the Engineer and obtaining no-objection

28

28

15-Dec-15

11-Jan-16

Submission of Preliminary Traffic Managem


Review of detail

Submission Utilities Diversion plan to QCE


Review of Util

100

100

04-Oct-15 A

11-Jan-16

G-CMP-LIS02-G010

Submission preliminary Construction Management Plan to QCE

42

42

04-Oct-15 A

14-Nov-15

G-CMP-LIS02-H010

Review of preliminary Construction Management Plan by QCE and obtaining


approval

30

30

15-Nov-15

14-Dec-15

G-CMP-LIS02-J010

QCE Submission preliminary Construction Management Plan to the Engineer and


obtaining no-objection

28

28

15-Dec-15

11-Jan-16

98

98

18-Oct-15 A

23-Jan-16

51

51

15-Nov-15

04-Jan-16

21

21

15-Nov-15

05-Dec-15

05-Dec-15, SUBMISSION

CONSTRUCTION MANAGEMENT PLAN

PROCUREMENT - GENERAL
GENERAL AND BULK MATERIALS
SUBMISSION

Submission preliminary Construction Mana


Review of pre

P-MA-LIS02-G010

Safety Barriers

21

21

15-Nov-15

05-Dec-15

Safety Barriers

P-MA-LIS02-G011

Diversion utility works (materials)

21

21

15-Nov-15

05-Dec-15

Diversion utility works (materials)

P-MA-LIS02-G012

Cement

21

21

15-Nov-15

05-Dec-15

Cement

P-MA-LIS02-G013

Blinding concrete materials(C12/15)

21

21

15-Nov-15

05-Dec-15

Blinding concrete mate

P-MA-LIS02-G014

Concrete (C30/37-Materials)

21

21

15-Nov-15

05-Dec-15

Concrete (C30/37-Materials)

P-MA-LIS02-G015

Concrete (C40/50-Materials)

21

21

15-Nov-15

05-Dec-15

Concrete (C40/50-Materials)

Remaining Level of Effort

Critical Remaining ...

Actual Work

Milestone

Remaining Work

Baseline Milestone

PAGE 4 OF 9

THREE MONTHS ROLLING


PLAN / OCTOBER -2015
Activity ID

Public Works Authority

IA 13/14 C 40 M-5

DESIGN AND CONSTRUCTION OF LATERAL INTERCEPTOR SEWERS (CONTRACT LIS-02)

Activity Name

BL Project
Duration

Original
Duration

Start

Finish

2015

P-MA-LIS02-G016

Concrete (C50/60-Precast Concrete Tunnel Lining Segments and other precast items)

21

21

15-Nov-15

05-Dec-15

Dec
Concrete (C50/60-Prec

P-MA-LIS02-G017

Steel reinforcement

21

21

15-Nov-15

05-Dec-15

Steel reinforcement

P-MA-LIS02-G018

Concrete additives

21

21

15-Nov-15

05-Dec-15

Concrete additives

P-MA-LIS02-G019

GRP lined concrete pipe

21

21

15-Nov-15

05-Dec-15

GRP lined concrete pipe

P-MA-LIS02-G020

Bitumen waterproofing membrane

21

21

15-Nov-15

05-Dec-15

Bitumen waterproofing membrane

P-MA-LIS02-G024

Backfill

21

21

15-Nov-15

05-Dec-15

Backfill

30

30

06-Dec-15

04-Jan-16

APPROVAL BY QCE

Sep

P-MA-LIS02-H010

Safety Barriers

30

30

06-Dec-15

04-Jan-16

P-MA-LIS02-H011

Diversion utility works (materials)

30

30

06-Dec-15

04-Jan-16

P-MA-LIS02-H012

Cement

30

30

06-Dec-15

04-Jan-16

P-MA-LIS02-H013

Blinding concrete materials(C12/15)

30

30

06-Dec-15

04-Jan-16

P-MA-LIS02-H014

Concrete (C30/37-Materials)

30

30

06-Dec-15

04-Jan-16

P-MA-LIS02-H015

Concrete (C40/50-Materials)

30

30

06-Dec-15

04-Jan-16

P-MA-LIS02-H016

Concrete (C50/60-Precast Concrete Tunnel Lining Segments and other precast items)

30

30

06-Dec-15

04-Jan-16

P-MA-LIS02-H017

Steel reinforcement

30

30

06-Dec-15

04-Jan-16

P-MA-LIS02-H018

Concrete additives

30

30

06-Dec-15

04-Jan-16

P-MA-LIS02-H019

GRP lined concrete pipe

30

30

06-Dec-15

04-Jan-16

P-MA-LIS02-H020

Bitumen waterproofing membrane

30

30

06-Dec-15

04-Jan-16

P-MA-LIS02-H024

Backfill

30

30

06-Dec-15

04-Jan-16

98

98

18-Oct-15 A

23-Jan-16

84

84

18-Oct-15 A

09-Jan-16

SUB CONTRACTORS
PROPOSAL

Oct

Nov

G-SC-LIS02-G010

Proposal of Sub contractor for carring out Geo technical investigation works

14

14

18-Oct-15 A

04-Nov-15

Proposal of Sub contractor for carring out Geo techn

G-SC-LIS02-G011

Proposal of Sub contractor for carring out Site survey works

14

14

18-Oct-15 A

04-Nov-15

Proposal of Sub contractor for carring out Site survey works

G-SC-LIS02-G012

Proposal of Sub contractor for carring out material testing works

14

14

01-Nov-15 A

14-Nov-15

Proposal of Sub contractor for carring out

G-SC-LIS02-G013

Proposal of Sub contractor for carring out Utility diversion works (Electrical works)

28

28

15-Nov-15

12-Dec-15

G-SC-LIS02-G014

Proposal of sub contractor for carring out Seacent pile, Diaphragm wall and VSM
works for making temporary shafts

28

28

13-Dec-15

09-Jan-16

Proposal of Sub

56

53

04-Nov-15

26-Dec-15

26

G-SC-LIS02-H010

Approval of Sub contractor for carring out Geo technical investigation works

14

14

04-Nov-15

17-Nov-15

Approval of Sub contractor for carring o

G-SC-LIS02-H011

Approval of Sub contractor for carring out Site survey works

14

14

04-Nov-15

17-Nov-15

Approval of Sub contractor for carring o

G-SC-LIS02-H012

Approval of Sub contractor for carring out material testing works

14

14

15-Nov-15

28-Nov-15

Approval of Sub contractor fo

G-SC-LIS02-H013

Approval of Sub contractor for carring out Utility diversion works (Electrical works)

14

14

13-Dec-15

26-Dec-15

Ap

70

67

18-Nov-15

23-Jan-16

APPROVAL BY QCE

NO-OBJECTION BY THE ENGINEER

Remaining Level of Effort

Critical Remaining ...

Actual Work

Milestone

Remaining Work

Baseline Milestone

PAGE 5 OF 9

THREE MONTHS ROLLING


PLAN / OCTOBER -2015
Activity ID

Public Works Authority

IA 13/14 C 40 M-5

DESIGN AND CONSTRUCTION OF LATERAL INTERCEPTOR SEWERS (CONTRACT LIS-02)

Activity Name

BL Project
Duration

Original
Duration

Start

Finish

2015

G-SC-LIS02-J010

Obtaining no-objection from the Engineer for the proposed Sub contractor for Geo
technical investigation works

28

28

18-Nov-15

15-Dec-15

Dec
Obtaining no

G-SC-LIS02-J011

Obtaining no-objection from the Engineer for the proposed Sub contractor for carring
out Site survey works

28

28

18-Nov-15

15-Dec-15

Obtaining no

G-SC-LIS02-J012

Obtaining no-objection from the Engineer for the proposed Sub contractor for carring
out material testing works

28

28

29-Nov-15

26-Dec-15

Ob

G-SC-LIS02-J013

Obtaining no-objection from the Engineer for the proposed Sub contractor for Utility
diversion works (Electrical works)

28

28

27-Dec-15

23-Jan-16

51

51

29-Nov-15

18-Jan-16

21

21

29-Nov-15

19-Dec-15

19-Dec-1

21

21

29-Nov-15

19-Dec-15

Submissi

30

30

20-Dec-15

18-Jan-16

PRECAST SEGMENTS
SUBMISSION
P-MA-LIS02-G025

Submission of precast concrete shaft segment

APPROVAL BY QCE
P-MA-LIS02-H025

Approval of precast concrete shaft segment by QCE

EXECUTION
EXECUTION GENERAL
COORDINATION & DATA COLLECTION
EXPRESSWAYS PROGRAMME

30

Sep

30

20-Dec-15

18-Jan-16

1169

1169

04-Oct-15 A

30-Dec-18

1169

1169

04-Oct-15 A

30-Dec-18

120

120

05-Nov-15

03-Mar-16

120

120

05-Nov-15

03-Mar-16

C-DC-LIS02-C010

Coordination with the Third Parties undertaking design & construction Project No.15
and finalising LIS-02 alignment

120

120

05-Nov-15

03-Mar-16

C-DC-LIS02-C011

Coordination with the Third Parties undertaking design & construction Project No.17
and finalising LIS-02 alignment

120

120

05-Nov-15

03-Mar-16

C-DC-LIS02-C012

Coordination with the Third Parties undertaking design & construction Project No. 23
and finalising LIS-02 alignment

120

120

05-Nov-15

03-Mar-16

C-DC-LIS02-C013

Coordination with theThird Party engaged by the Authority to finalise shaft location at
Junction 11, Project No. 15

120

120

05-Nov-15

03-Mar-16

120

120

05-Nov-15

03-Mar-16

120

120

05-Nov-15

03-Mar-16

60

60

05-Nov-15

03-Jan-16

60

60

05-Nov-15

03-Jan-16

90

90

05-Nov-15

02-Feb-16

90

90

05-Nov-15

02-Feb-16

100

100

04-Nov-15

11-Feb-16

100

100

04-Nov-15

11-Feb-16
15-Dec-15

QATAR RAILWAYS COMPANY


C-DC-LIS02-C014

Liasoning with QRC to confirm all interface points on Al Wakrah Main Road

QATAR PETROLEUM
C-DC-LIS02-C021

Coordinating with QP to carry the works at shaft SH 8/1 and between MTS shaft W7
and shaft SH 8/2

WATER SECURITY MEGA RESERVOIRS


C-DC-LIS02-C024

Coordinating with Qatar General Electricity and Water Company (Kahr amaa) for the
Water Security Mega Reservoirs project

SURVEY WORKS & SUPPLEMENTARY SOIL INVESTIGATION


SURVEY WORKS
C-SW-LIS02-G010

Submission of Key Sub contractor for Topogr aphic Survey works to the Engineer

42

42

04-Nov-15

C-SW-LIS02-H010

Obtaining approval from the QCE

30

30

16-Dec-15

14-Jan-16

C-SW-LIS02-J010

Obtaining approval from the Engineer

28

28

15-Jan-16

11-Feb-16

Remaining Level of Effort

Critical Remaining ...

Actual Work

Milestone

Remaining Work

Baseline Milestone

PAGE 6 OF 9

Oct

Nov

Submission o

THREE MONTHS ROLLING


PLAN / OCTOBER -2015
Activity ID

Public Works Authority

IA 13/14 C 40 M-5

DESIGN AND CONSTRUCTION OF LATERAL INTERCEPTOR SEWERS (CONTRACT LIS-02)

Activity Name

BL Project
Duration

DESIGN CRITERIA & OTHER G ENERAL SUBMITTALS


DESIGN CRITERIA
DESIGN MANAGEMENT PLAN

Original
Duration

Start

Finish

1169

1169

04-Oct-15 A

30-Dec-18

1169

1169

18-Oct-15 A

30-Dec-18

100

100

18-Oct-15 A

11-Jan-16

2015
Sep

Oct

Nov

Dec

C-DMP-LIS02-G010

Submit breakdown of design services into design packages (work element) to QCE

42

42

18-Oct-15 A

14-Nov-15

Submit breakdown of design services into

C-DMP-LIS02-G011

Submit Design programme outlining the stages of design to QCE

42

42

18-Oct-15 A

14-Nov-15

Submit Design programme outlining the st

C-DMP-LIS02-G012

Submit Design Method statement with a description of the design processes and
management system to QCE

42

42

18-Oct-15 A

14-Nov-15

Submit Design Method statement with a de

C-DMP-LIS02-G013

Submit Design Organization and their responsabilities and accountability to QCE

42

42

18-Oct-15 A

14-Nov-15

Submit Design Organization and their resp

C-DMP-LIS02-G014

Submit Design Assurance system to the Engineer (Design Calculation and Checking
of Documents, Document Control, etc)

42

42

18-Oct-15 A

14-Nov-15

Submit Design Assurance system to the En

C-DMP-LIS02-H014

Review and Approval of Design management Plan by QCE and forwarding to the
Engineer

30

30

15-Nov-15

14-Dec-15

Review and Ap

C-DMP-LIS02-J014

Review and Approval by the Engineer and obtaining no-objection to the Contractor

28

28

15-Dec-15

11-Jan-16

100

100

18-Oct-15 A

11-Jan-16

C-DAS-LIS02-G010

Submit Design calculation Procedures to QCE for review

42

42

18-Oct-15 A

14-Nov-15

Submit Design calculation Procedures to Q

C-DAS-LIS02-G011

Submit Document checking procedure to QCE

42

42

18-Oct-15 A

14-Nov-15

Submit Document checking procedure to QCE

C-DAS-LIS02-G012

Submit Document control procedure to QCE

42

42

18-Oct-15 A

14-Nov-15

Submit Document control procedure to QCE

C-DAS-LIS02-G013

Submit Design checking and verification procedure to QCE

42

42

18-Oct-15 A

14-Nov-15

Submit Design checking and verification pr

C-DAS-LIS02-G014

Submit Corrective action procedure to QCE

42

42

18-Oct-15 A

14-Nov-15

Submit Corrective action procedure to QCE

C-DAS-LIS02-G015

Submit Design Assurance System to Engineer for no-objection

42

42

18-Oct-15 A

14-Nov-15

Submit Design Assurance System to Engin

C-DAS-LIS02-H010

Approval of Design Assurance System by QCE and forwarding to the Engineer

30

30

15-Nov-15

14-Dec-15

C-DAS-LIS02-J010

Review and Approval by the Engineer and obtaining no-objection to the Contractor

28

28

15-Dec-15

11-Jan-16

DESIGN ASSURANCE SYSTEM

86

89

18-Oct-15 A

31-Dec-15

C-DCR-LIS02-G010

Preparation of Design Criteria Report and submit to QCE

28

28

18-Oct-15 A

04-Nov-15

C-DCR-LIS02-H010

Review and approval of design criteria report by QCE

30

30

04-Nov-15

03-Dec-15

C-DCR-LIS02-J010

Review and approval by the Engineer and obtaining no-objection to the contractor

28

28

04-Dec-15

31-Dec-15

1139

1139

02-Nov-15 A

30-Dec-18

1139

1139

02-Nov-15 A

30-Dec-18

114

114

18-Oct-15 A

25-Jan-16

DESIGN CRITERIA REPORT

MONTHLY REPORT
C-MR-LIS02-D010

Monthly Reporting

CONSTRUCTION IMPACT ASSESSMENT (CIA)

Approval of De

Preparation of Design Criteria Report and submit to QCE


Review and approval of

C-CIA-LIS02-G010

Preliminary Construction Impact Assessment Report

56

56

18-Oct-15 A

28-Nov-15

Preliminary Construction Imp

C-CIA-LIS02-G011

Submit Preliminary Construction Impact Assessment to QCE

30

30

29-Nov-15

28-Dec-15

C-CIA-LIS02-G012

Submit CIA to the Engineer and obtaining no-objection

28

28

29-Dec-15

25-Jan-16

114

114

18-Oct-15 A

25-Jan-16

PRELIMINARY HYDRAULIC DESIGN


C-PHD-LIS02-G010

Preliminary Hydraulic Design using Info Works

56

56

18-Oct-15 A

28-Nov-15

Preliminary Hydraulic Design

C-PHD-LIS02-G011

Define locations of shafts and manholes

56

56

18-Oct-15 A

28-Nov-15

Define locations of shafts and manholes

Remaining Level of Effort

Critical Remaining ...

Actual Work

Milestone

Remaining Work

Baseline Milestone

PAGE 7 OF 9

THREE MONTHS ROLLING


PLAN / OCTOBER -2015
Activity ID

Public Works Authority

IA 13/14 C 40 M-5

DESIGN AND CONSTRUCTION OF LATERAL INTERCEPTOR SEWERS (CONTRACT LIS-02)

Activity Name

BL Project
Duration

Original
Duration

Start

Finish

2015
Sep

C-PHD-LIS02-G012

Develop Plan and Profile dwgs

56

56

18-Oct-15 A

28-Nov-15

Dec
Develop Plan and Profile dwgs

C-PHD-LIS02-G013

Preliminary Hydraulic Report

56

56

18-Oct-15 A

28-Nov-15

Preliminary Hydraulic Report

C-PHD-LIS02-H010

Submit preliminary Design to QCE and obtaining approval

30

30

29-Nov-15

28-Dec-15

C-PHD-LIS02-J010

QCE submit Preliminary Design to Engineer

28

28

29-Dec-15

25-Jan-16

58

58

29-Nov-15

25-Jan-16

C-CFD-LIS02-G010

Prepare CFD Modelling Method Statement and CFD Modelling Report

28

28

29-Nov-15

26-Dec-15

C-CFD-LIS02-H010

Submit CFD Method Statement to QCE

30

30

27-Dec-15

25-Jan-16

CFD MODELLING

58

58

29-Nov-15

25-Jan-16

C-PMD-LIS02-G010

Prepare Method of Statement

28

28

29-Nov-15

26-Dec-15

C-PMD-LIS02-H010

Submit Physical Method Statement to QCE

30

30

27-Dec-15

25-Jan-16

160

160

18-Oct-15 A

11-Mar-16

PHYSICAL MODELLING

BUILDING INFORMATION MODEL (BIM)

Oct

Nov

Pre

Pre

C-BIM-LIS02-G010

Set up BIM common data environment system and system library

14

14

18-Oct-15 A

04-Nov-15

Set up BIM common data environment system and system library

C-BIM-LIS02-G011

Preliminary BIM Execution Plan

21

21

18-Oct-15 A

04-Nov-15

Preliminary BIM Execution Plan

C-BIM-LIS02-G012

Preliminary Project BIM standards manual

21

21

18-Oct-15 A

04-Nov-15

Preliminary Project BIM standards manual

C-BIM-LIS02-G013

Draft BIM details

28

28

01-Nov-15 A

21-Nov-15

C-BIM-LIS02-G014

Meeting on BIM with Engineer and Authority

22-Nov-15

22-Nov-15

C-BIM-LIS02-H010

Final BIM Execution Plan and Submission it to the QCE

110

110

23-Nov-15

11-Mar-16

70

70

18-Oct-15 A

12-Dec-15

DURABILITY ASSESSMENT REPORT

Draft BIM details


Meeting on BIM with Engineer and Authority
12-Dec-15, DUR

C-DAR-LIS02-G010

Durability Assessment Report

42

42

18-Oct-15 A

14-Nov-15

Durability Assessment Report

C-DAR-LIS02-G020

Durability Specification

42

42

18-Oct-15 A

14-Nov-15

Durability Specification

C-DAR-LIS02-J010

Submit DAR to Engineer for no-objection

28

28

15-Nov-15

12-Dec-15

60

60

01-Nov-15 A

31-Dec-15

PRELIMINARY DESIGN
C-PD-LIS02-G010

Preliminary design

OTHER GENERAL SUBMITTALS


PROJECT CONTROLS PLAN
MONITORING AND REPORTING SYSTEM PLAN

60

60

01-Nov-15 A

31-Dec-15

114

114

04-Oct-15 A

25-Jan-16

84

90

04-Oct-15 A

01-Jan-16

70

70

04-Oct-15 A

12-Dec-15

C-RSP-LIS02-G010

Submission of Monitoring and Reporting System plan

42

42

04-Oct-15 A

14-Nov-15

C-RSP-LIS02-J010

Review and approval of Monitoring and Reporting System plan by the Engineer

28

28

15-Nov-15

12-Dec-15

Submit DAR to E

12-Dec-15, MON
Submission of Monitoring and Reporting System plan
Review and app

84

90

04-Oct-15 A

01-Jan-16

C-BP-LIS02-G010

Submission of draft Baseline programme to the Engineer

21

21

04-Oct-15 A

04-Nov-15

C-BP-LIS02-G020

Submission of preliminary Baseline programme to the Engineer

56

56

04-Oct-15 A

04-Dec-15

Submission of prelimina

C-BP-LIS02-J010

Review of draft Baseline programme by the Engineer with the QBC

14

14

26-Oct-15 A

13-Nov-15

Review of draft Baseline programme by the

C-BP-LIS02-J020

Issue of comments on draft baseline programme by the Engineer to QBC

13-Nov-15

20-Nov-15

C-BP-LIS02-G030

Addressing comments and resubmission of draft Baseline Programme

20-Nov-15

27-Nov-15

C-BP-LIS02-J030

Review and approval of Baseline programme by the Engineer

BASELINE PROGRAMME

RISK MANAGEMENT PLAN

Remaining Level of Effort

Critical Remaining ...

Actual Work

Milestone

Remaining Work

Baseline Milestone

28

28

04-Dec-15

01-Jan-16

114

114

02-Nov-15 A

25-Jan-16

PAGE 8 OF 9

Submission of draft Baseline programme to the Engineer

Issue of comments on draft baseline


Addressing comments and res

THREE MONTHS ROLLING


PLAN / OCTOBER -2015
Activity ID

Public Works Authority

IA 13/14 C 40 M-5

DESIGN AND CONSTRUCTION OF LATERAL INTERCEPTOR SEWERS (CONTRACT LIS-02)

Activity Name

BL Project
Duration

Original
Duration

Start

Finish

2015
Sep

Oct

Nov
Dec
Submission of Preliminary Risk register to QCE

C-RMP-LIS02-G010

Submission of Preliminary Risk register to QCE

42

42

02-Nov-15 A

14-Nov-15

C-RMP-LIS02-G011

Submission of Preliminary Risk Mananagemet Plan to QCE

56

56

02-Nov-15 A

28-Nov-15

Submission of Preliminary Ri

C-RMP-LIS02-H010

Review of Preliminary Risk register by QCE and obtaining approval

30

30

15-Nov-15

14-Dec-15

Review of Pre

C-RMP-LIS02-H011

Review of Preliminary Risk Mananagemet Plan by QCE and obtaining approval

30

30

29-Nov-15

28-Dec-15

C-RMP-LIS02-J010

QCE Submission risk register to the Engineer and obtaining no-objection

28

28

15-Dec-15

11-Jan-16

C-RMP-LIS02-J011

QCE Submission Preliminary Risk Mananagemet Plan to the Engineer and obtaining
no-objection

28

28

29-Dec-15

25-Jan-16

88

89

04-Oct-15 A

31-Dec-15

C-HSP-LIS02-G010

Submission of Occupational Health and Safety plan to QCE

30

30

18-Oct-15 A

04-Nov-15

C-HSP-LIS02-H010

Review of Occupational Health and Safety plan by QCE and forwarding it to the
Engineer

30

30

04-Nov-15

03-Dec-15

C-HSP-LIS02-J010

Review of Occupational Health and Safety plan by the Engineer and obtaining
no-objection

28

28

04-Dec-15

31-Dec-15

52

52

04-Oct-15 A

24-Nov-15

24-Nov-15, REQUIREMENTS

52

52

04-Oct-15 A

24-Nov-15

Implementation of occupational h

HEALTH & SAFETY PLAN

REQUIREMENTS
C-HSP-LIS02-D010

Implementation of occupational health and safety management sysytem

91

91

04-Oct-15 A

02-Jan-16

C-LMP-LIS02-G010

Submission of Logistics Management Plan to the QCE

56

56

04-Oct-15 A

28-Nov-15

C-LMP-LIS02-H010

Review of Logistics Management Plan by QCE and obtaining approval

30

30

29-Nov-15

02-Jan-16

LOGISTICS MANAGEMENT PLAN

105

105

18-Oct-15 A

16-Jan-16

C-CP-LIS02-G010

Submission of Preliminary Consents Plan to QCE

42

42

18-Oct-15 A

14-Nov-15

C-CP-LIS02-H010

Review of Consents plan by QCE and obtaining approval

30

30

15-Nov-15

19-Dec-15

C-CP-LIS02-J010

QCE Submission Preliminary Consents Plan to the Engineer and obtaining


no-objection

28

28

20-Dec-15

16-Jan-16

CONSENTS PLAN

Remaining Level of Effort

Critical Remaining ...

Actual Work

Milestone

Remaining Work

Baseline Milestone

PAGE 9 OF 9

Submission of Occupational Health and Safety plan to QCE


Review of Occupational

Submission of Logistics Mana

Submission of Preliminary Consents Plan to QCE


Review o