Vous êtes sur la page 1sur 18

Q-CHEM I I

TECf1IR10fI T

Qatar Chemical Company II, LTD.


Ethylene Derivatives Complex
P roject Number: QC2-0009

LI

DAEWOO E&C
OWNER ID. COD E

II TRRCIIEMIC LCOMPANYLTD

QC2-00 -CSTR -MSP -00002 8

METHOD STATEMENT FO R
PIPING INSTALLATION
IN QCHEM I
Plants :
QChem1

CONTRACTOR ID . CODE
Job-EC-T-N
3412-XH-PM-201 6

Location : Mesaieed
City, Qatar

Client : Q-Chem . II

Issue 0

Page 1 of 18

METHOD STATEMENT
FOR PIPING INSTALLATIO N
IN QCHEM I

ATTRIBUTE TABL E
Unit No .
00

Equip. Cat .
N/A

Doc . Origin .
CON

Discipline
CSTR

Primary Doc Type

Area
N/A
Doc Typ e
(Secondary)

Turnover System

As Built Class

Issue Statu s

PR

MSP

N/A

LR

IF I

Tag Nos :

ISSUED FOR CONSTRUCTI ON ,*-

,tp EMBOM 7,;,k


'I
.*
-Y. T. Joung

Issue

Description

Prepared

J. I. Ko / J. H. Kang
Checked

G . Ivaldi
Approved

17-October-07
Date

Q-CHEM I I

O4
9

TECfIIfitOfl T

Qatar Chemical Company II, LTD .


Ethylene Derivatives Complex
Project Number: QC2-000 9

*U - lriso?*U ?k79

eo DAEWOO E&C
OWNER ID . CODE _

1'*

QATAR CHEMICAL COMPANY tTU .

METHOD STATEMENT FOR


PIPING INSTALLATION
IN QCHEM I
Plants :
QCheml

Client : Q-Chem . II

Location : Mesaiee d
City, Qatar

QC2-00-CSTR-MSP-00002 8
CONT Jo

bE

C-

COD E

INS

3412-XH-PM-201 6
Q

Pabc 2 of 18

Issue 0

CONTENT S
Para .

Description

Page

1 .0

PURPOSE

2.0

SCOPE

3 .0

REFERENCE DOCUMENTS

4.0

DEFINITION OF TERMS

5 .0

RESPONSIBILITIES

6.0

GENERAL

7 .0

PROCEDURE

8.0

ATTACHMENTS

10

Q-CHEM I I
Qatar Chemical Company II, LTD .
Ethylene Derivatives Complex
Project Number : QC2-000 9

4
a* '
OuMa r*
QATARCNEMICALGOMPAt1YlTG.

I; TECf11fI1Df1 T

V DAEWOO E& C
OWNER ID . COD E

METHOD STATEMENT FOR


PIPING INSTALLATION
IN QCHEM I
Plants :
QCheml

Client: Q-Chem . II

Location : Mesaiee d
City, Qatar

QC2-00-CSTR-MSP-00002 8
CONTR

COD E
ob-ECTI N
3412-XH-PM-201 6

Pag e 3 of 18

Issue 0

1 .0 PURPOS E
The purpose of this procedure is to establish the minimum requirement to be carried out lik e
work plan, handling of material, testing and examination requirements, storage an d
documentation, etc . with regards to piping installation for Q-CHEM II Ethylene Derivative s
Project at Q-Chem I Plant .
2 .0 SCOPE
This procedure covers the work plan, material handling, examination and test requirements ,
and documentation etc. with regards to Piping Installation at QCHEM I Plant for Q-CHEM I I
Project.
3 .0 REFERENCE DOCUMENT S
3. 1
3. 2
3. 3
3.4
3.5
3.6
3. 7
3. 8
3. 9
3 .1 0
3 .1 1
3 .1 2
3.1 3
3.1 4
3 .1 5
3.16

M6 .5
M7 .9
M7 .9. 1
M7 .9. 2
M10 . 0
M12 . 0
M3 . 7
QC2-00-GENE-DSS-00001 2
QC2-00-QAQC-CPP-00000 7
QC2-00-QAQC-CPP-00000 8
QC2-00-CSTR-PMP-000062
QC2-00-QAQC-MSP-00000 1
QC2-00-GENE-PMP-00010 1
QC2-00-QAQC-EPQ-000001
QC2-00-QAQC-MSP-00000 2
QC2-00-CSTR-MSP-000008

Materials of Constructio n
Pipin g
Piping Material Class Inde x
Metallic Piping Material Class (Piping Specs )
General Construction Requirements
Quality Managemen t
Health Safety Environmen t
Piping Welding General Specification s
Welder Qualification Procedure
Welding Material Control Procedur e
Site Material Management Procedure
Method Statement for Welding Contro l
Field Design Change Control Procedur e
Receiving Inspection Procedur e
Method Statement for NDE Contro l
Method Statement for PWH T

4.0 DEFINITION OF TERM S


4.1
MTR - Material traceability recor d
4.2
DWR - Daily Welding Report .
4.3
CS - Carbon Stee l
4 .4
ITCS - Impact Tested Carbon Stee l
4 .5
SS - Stainless Stee l
4 .6 PWHT - Post Weld Heat Treatmen t
4.7
NDE - Non-Destructive Examination
4.8
CTQ - Construction/Commissioning Technical Querie s
4 .9 DDCC - Drawing and Document Control Cente r

Q-CHEM I1
Qatar Chemical Company II, LTD .
Ethylene Derivatives Complex
Project Number : QC2-000 9

4
zl

y k:+

DAEWOO E& C
OWNER ID. COD E

r'

QATAR CREMICaLCOMPAtirMI

TECfII(ilOf1 T

METHOD STATEMENT FO R
PIPING INSTALLATION
IN QCHEM I
Plants :
QCheml

Client : Q-Chem . II

Location' Mesaieed
city, Qatar

QC2-00-CSTR-MSP-00002 8
CONT Jo

b E C- I

CODE

N 6
3412-XH-PM-201
Pabo e 4 of 18

Issue 0

4.10 DW - DAEWO O
4 .11 ITP - Inspection and test pla n
4 .12 RT - Radiographic Test
4 .13 MT/PT - Magnetic Particle Test / Dye Penetrate Tes t
4 .14 WPS - Welding Procedure Specificatio n
4.15 GTAW - Gas Tungsten Arc Weldin g
4.16 QC Assistant -A personnel who is in charge of QC Inspection assistance activities fo r
example, DWR, ND E
4.17 Piping material controller-A personnel who is in charge of controlling pipin g
material at fiel d
5.0 RESPONSIBILITIE S
5.1 Construction Manager is responsible for ;
Management & implementation of this work procedure
5 .2 Field Engineering Manager have the following responsibilities :
1) Coordination with engineering team (DW & TCM) for any engineering problems a t
site .
2) Preparation and issue of piping isometric and as-built drawings for construction .
3) Revision of piping isometric drawings to apply design changes .
5.3 Piping Construction Manager is responsible for ;
1) Implementation of work activity including preparation of work schedule, issue of pipin g
material, welding, storage, etc .
2) Control of welder and spool welding data .
3) Prepare daily welding report (DWR) and submission to Company .
4) Implementation of work activity incorporated in the latest revision drawing and desig n
change .
5) Requisition of NDE and maintenance of NDE report .
6) The implementation of PWHT and maintenance of report concerned .
7) Preparation of Material Requisition for field materials .
8) Control of storage, handling, and preservation of piping materials received from th e
Material Control Team for the process of installation .
9) Clearance of Pre-Test & Post-Test Punch Item(s) .
5 .4 QA/QC Team Manager is responsible for ;
1) Site inspection and test, operation of welding training center and NDE yard, NCR ,
backlog for repair work, etc .
2) Review of all request forms, reports of inspection and record of piping & welding an d
submission to Company for review .
3) Control of welder performance and tracer status and to inform the Construction Team o f
qualification status .
4) Control and maintenance of inspection record for piping and welding .
5) Control of welding consumable .
6) Review Test Pack and submission to Company for review .
5.5 QC Welding Inspector is responsible for ;
1) Visual inspection of fit-up joint .
2) 100% visual inspection of all completed welds .
3) Marking up defect area on weld joints for repair, and ensure that NDE shall be carried ou t

Q-C H EM I I

TECnIrnon T

Qatar Chemical Company II, LTD .

Ethylen e Derivatives Comple x


Project Number : QC2-000 9

[rj DAEWOO E& C


OWNER ID . COD E

QATAR CHEMICAL.COMPPHYLTD .

METHOD STATEMENT FOR


PIPING INSTALLATION
IN QCHEM I
Plants :
QCheml

Client : Q-Chem . II

Location : Mesaiee d
City , Qatar

QC2-00-CSTR-MSP-00002 8

CONT Jo EC-

INo

COD E

3412-XH-PM-201 6
p a on e 5 of 1 8

Issue 0

after the repairs .


Verify
whether correct WPS and welding consumables are being used by welder .
4)
5) Review and sign off on DWR, SIR, PWHT report s
5 .6 Material Control Team Manager is responsible for ;
1) Receipt of materials .
2) Control of material stock status and protection of material .
3) Issuance of material to site for installation .
6M

GENERA L

6 .1 This method statement shall be read in conjunction with reference procedures .


6 .2 Health, Safety and Environmen t
6 .2 .1 All workers shall wear required PPE as listed below as a minimum requirement in QCHEM 1
Fire Retardant Clothing (Cover All )
Safety Helmet
Safety Glasses (Mono Goggles )
- Leather Glove s
- Safety Shoe s
- Dust Mask (as required to prevent inhalation of dust and welding gas )
Ear Plug as required inside process uni t
6 .2 .2 When scaffold is needed for access, the scaffold shall be inspected by Certified Scaffoldin g
Inspector and appropriate Safety Tag shall be attached in accordance with applicable HSE S
procedures .
Control
and handling of materia l
6 .3
The
Piping
Construction Manager shall implement requisition and material handling i n
6 .3.1
accordance with Site Materials Management Procedure .
6 .3 .2 Color coding shall be applied in accordance with PFIES-22 if required .
6 .3 .3 Handling of SS material in contact with zinc, halogens or zinc containing part shall b e
prevented . Both materials shall be kept separately to prevent corrosion and rust .
6 .4 Control of welding material and welde r
6.4 .1 Welding consumables shall be controlled in accordance with Welding Material Contro l
Procedure.
6 .4 .2 The Welder shall be qualified in accordance with Welder Qualification Procedure .
Control of Pipe Spool(s)
6 .5
.1
Pipe
spool(s) shall be released from the pipe fabrication shop after all activities includin g
6 .5
primer painting (if required) are completed .
6 .5 .2 Pipe spool(s) shall be stocked in a Contractor designated lay-down area inside QCHEM I
after painting .
6 .5 .3 Before the pipe spool(s) are transported to field from QCHEM I lay-down area, th e
dimensions and orientation shall be checked against the isometric drawing(s) by the pipin g
spool controller.
6 .5 .4 Before pipes are erected, the pipe fitter shall ensure that pipe spool(s) orientation an d
material specification conform to relevant Isometric Drawings . And that the pipe spool(s) ar e
clearly identified with their respective isometric identification reference number . If th e
identification marking is unclear then it shall be re-marked .
6.6 Weld and Welder Identificatio n
6.6 .1 Weld number and welders unique identification number shall be marked on each joint .

Q-CHEM I I

Qatar Chemical Company II, LTD .


Ethylene Derivatives Comple x
Project Number: QC2-0009

(*

TECnIrilOfl T

**** DAEWOO E& C


OWNER ID . COD E

OURCHEMICAL COMPAttr LTD .

METHOD STATEMENT FOR


PIPING INSTALLATIO N
IN QCHEM I
Plants :
QCheml

Client : Q-Chem . II

Location : Mesaiee d
City , Qatar

QC2-00-CSTR-MSP-00002 8

CONT Jo EC-

INo COD E

3412-XH-PM-201 6

Page 6 of 18
Pan

Issue 0

Schedule for Piping installation on sit e


6.7
6.7 .1 Piping installation shall be scheduled on a per Test Pack basis .
6 .7 .2 Pipe spool(s) shall be delivered as per piping installation schedule .
6 .8
Rework / Re-welding of Shop weld join t
The cutting and re-welding of fabrication shop weld joint(s) shall be restricted .
If re-work of shop weld joint is required because of field condition, re-welding shall b e
6.8 .1
carried out and the iso drawing revised .
6.9 Welding of pipe attachments (reinforcement pads, trunnion(s), encirclement pads, etc .)
All welding of pipe attachments shall be carried out in the Pipe Fabrication Shop . Where
weld joints are labeled as with Field Joint, the requirement(s) stated on Method Statemen t
for Piping Fabrication applies .
6.10 Temporary Suppor t
6.10 .1 In cases where permanent supports are not yet available, temporary supports may be use d
during installation so that no bowing, over-hang or unbalanced deficiencies exist .
6 .10 .2 Temporary support(s) shall be of sufficient size and strength to support the weight of pipin g
until permanent support(s) are in place .
6 .11

Non-Conforming item(s) shall be reported and corrective action shall be taken .

7.0

PROCEDUR E

Receipt and change of Drawin g


7.1
7.1 .1 The Field Piping Engineer shall receive the latest revision of drawing from DDCC .
7.1 .2 If changes are required in the ISO drawing(s), the Drawing Change Request is submitted t o
Field Engineering in accordance with Field Design Change Control Procedure .
Cutting
and edge preparatio n
7 .2
All cutting shall be done by skilled personnel . Detail procedure of cutting and en d
7 .2 .1
preparation shall be followed in accordance with Method Statement for Welding Control an d
Piping Welding General Specifications .
Prior to cutting, heat number shall be transferred to each piece by metal marker or punch .
7 .2.2
.3
Before
end preparation, the CONTRACTOR Piping Inspector shall sign on the MTR form ,
7.2
(Attachment 1) of Method Statement for Piping Fabrication, for SS and LTCS material whic h
is prepared by Construction Team and reviewed by the QA/QC Team . This procedure wil l
be followed strictly in the case of small-bore fittings because the heat number may b e
removed during grinding work .
Fit-up
and tack welding
7 .3
The
root
gap and internal alignment shall be in accordance with the applicable Weldin g
7 .3.1
Procedure Specification (WPS) /ASME B31 .3 and Piping Welding General Specifications .
7 .3 .2 Fit-up shall be done by an experienced pipe fitter . Tack weld shall be done by a qualifie d
welder or welding operator .
7.3 .3 WPS shall be qualified before welding and fit-up commences and same filler metal used fo r
root pass shall be used for tack welding .
7.3 .4 In case the pipes have longitudinal weld seam, the longitudinal weld seam shall be at leas t
50 mm or 45 degree apart from the adjacent seam .
7 .3 .5 Temporary Tack welds shall not touch the root gap or the root face .
7 .3 .6 Detail procedure of fit-up & tack weld shall be followed in accordance with Metho d

Q-CHEM I I
Qatar Chemical Company II, LTD .
Ethylen e Derivatives Comple x
Project Number : QC2-000 9

4
a *9**oII -+1!91oi*

6 DAEWOO E& C
OWNER ID . COD E

1* *Yn

QATAR CHEMICAL COMPANY LTD .

TECfIIriIDfI T

METHOD STATEMENT FOR


PIPING INSTALLATION
IN QCHEM I
Plants :
QCheml

Client : C1-Chem . II

Location : Mesaieed
City , Qatar

QC2-00-CSTR-MSP-00002 8
CONTRACTO R INo COD E
ob EC T
3412-XH-PM-201 6
pane
b 7 of 1 8

Issue

Statement for Welding Control I Piping Welding General Specifications and ASME B31 . 3
para 328 .4.2 .
7.4
Weldin g
.1
The
approved WPS and qualified welder shall be applied to the welding work .
7.4
.2
The
QA/QC
Team Manager shall qualify welders in accordance with Welder Qualificatio n
7.4
Procedure .
7 .4 .3 For stainless steel piping without back welding of the internal side, the root pass shall b e
carried out by the GTAW process with an inert gas purge which shall be maintained until th e
completion of the second pass .
.4
Welder
shall receive welding electrode(s) everyday in the morning from Welding Materia l
7 .4
Control Center with Welding Material Issue Slip prepared by welding foreman and shal l
return the unused welding material upon completion of the day's activities to the Weldin g
Material Control Center .
.5
After
the welder receives electrode(s), he shall use calibrated and fully functioning quiver s
7.4
for coated electrode and only one type electrode shall be kept in the quiver at any give n
time . On no account shall there be SS and CS electrodes in one quiver .
7.4 .6 Fillet welds (including socket welds) may vary from convex to concave . The size of a fillet
weld is determined as shown in ASME B31 .3, Para 328 .5 .2, Fig . 328.5.2A, B and C .
.7
Austenitic
SS welding in accordance with ASME B31 .3 and WPS .
7.4
.8
The
dissimilar
joint shall be welded in accordance with ASME IX and WPS .
7.4
7.4 .9 Weld repair shall be implemented in accordance with the Method Statement for Weldin g
Control and ASME B31 .3 para 328 .6 and shall be approved by Welding Inspector befor e
commencing .
.10
Welding
Inspector shall check NDE criteria for branch or trunnion joint before weldin g
7 .4
reinforcing pads .
7 .4 .11 Detail procedure for back purging shall be followed in accordance with Method Statemen t
for Welding Control .
7.4 .12 QC Assistant shall prepare the request for inspection (AFI) to Piping and Welding Inspector ,
NDE request, Material Traceability Record (MTR), and Daily Welding Report (DWR) .
Post Weld Heat Treatment (PWHT )
7.5
7.5 .1 PWHT shall be implemented as per line specification .
7.5 .2 Detail requirements of PWHT shall be in accordance with Method Statement for Post Wel d
Heat Treatment .
7 .5 .3 Hardness test shall be in accordance with ASME B31 .3 para 331 .1 .7.
7 .6
Non-Destructive Examination (NDE )
7 .6 .1 NDE shall be carried out in accordance with the NDE Procedure for RT, MT, PT & UT .
7 .6 .2 For NDE request, use a form (attachment 1) from Method Statement for NDE Control .
Welding Inspector and NDE Controller shall review the request and send it to NDE Sub contractor.
7.6.3 Random examination selection will be as per Piping Welding General Specification an d
ASME B31 .3 ,
For supports welded directly on pipe in accordance with typical support drawing, RT is no t
7.6.4
required, but 100% PT shall be performed for welds . Welded joints used for fabrication o f
piping supports shall be examined by liquid penetrant test (PT) on 5% of joints unless note d
on support drawings and specifications .
RT & PT shall be applied on 100% of dissimilar welds .
7.6 .5
When welding joints require PWHT, all NDE shall be performed after PWHT as per Pipin g
7.6 .6

Q-CHEM I I
Qatar Chemical Company II, LTD .
Ethylene Derivatives Complex
Project Number : QC2-0009

TECf111T1Df1 T

0 DAEWOO E&C
OWNER ID . COD E

QATAR CHEMICAL COMFatIYLTO

METHOD STATEMENT FO R
PIPING INSTALLATION
IN QCHEM I
Plants :
QChem1

Client : Q Chem . II

Location : Mesaiee d
City, Qatar

QC2-00-CSTR-MSP-00002 8
CONTRACTOR ID . COD E
3412-XH-PM-201 6

Page 8 of 18

Issue 0

Welding General Specification para 14 .6.


QC Assistant shall arrange preparations required for NDE .
7 .6.7
7 .6 .8 Welds requiring NDE shall be tied with colored ribbon in accordance with Metho d
Statement for NDE Control .
.9
Original
NDE report shall be kept by the NDE subcontractor and a copy shall be submitte d
7.6
to the piping construction team and the QA/QC Team .
7.9
Temporary Welded Attachments and Their Remova l
7.9 .1 Temporary welded attachment shall be of the same material as Pipe .
7.9 .2 Temporary welded attachments (such as alignment lugs, straps, tie straps, etc) on pipe shal l
be removed without any reduction of pipe thickness and shall be ground smoothly . MT or PT .
shall be performed as per Method Statement for Welding Control para 5 .2 .4.
7.9 .3 Removal of the temporary welded attachments by chipping is not permitted .
7.10
Inspection & Testing,
7.10 .1 All inspection must be performed by QA/QC Team in accordance with ASME B 31 .3
Chapter VI .
7.10.2 QC Assistant shall notify QA/QC Team for inspection . QC shall then notify Company o f
Hold or Witness point inspection .
.3
Acceptance
criteria of welds are in accordance with ASME B 31 .3 Para . 341 .3.2 and Tabl e
7.10
A 341 .3.2 .
7 .10 .4 Prior to root pass weld, fit-up inspection shall be performed by QC Inspector . At that time ,
inspector shall check orientation, and dimension of piping line . In any case of inspection ,
all welding joints shall be inspected by CONTRACTOR welding inspector .
.5
Dissimilar
welds shall be inspected on fit-up, root pass and final weld by Contracto r
7 .10
welding inspector.
7.10 .6 The followings shall be checked for in-process inspection of piping installation .
- Joint preparation and cleanliness
- Fit-up, joint clearance and internal alignmen t
- WPS, electrode and welde r
- Temporary attachment and surface condition of weld join t
- Applied drawin g
7 .10 .7 Leak test for reinforcing pads shall be performed in accordance wih Method Statement fo r
Pneumatic Leak Test for Reinforcement Pad .
.10
.8
QC
inspector shall check the line slopes, plumbness, straightness and alignment based o n
7
IFC drawings . All deficiencies found shall be rectified before carrying out pressure testing .
7.10 .9 Orifice flanged joints internal welds shall be ground flush to sound metal . Penetrant test (PT )
shall be done to check any cracks & pin holes .
7.10 .10 Before bolting up, flange faces shall be aligned to the design plane within 1mm in 200m m
measured across any diameter ; flange bolt holes shall be aligned within 3mm maximu m
offset .
7 .10 .11 Flange Boltin g
. Particular
- Flange faces shall be thoroughly cleaned removing all rust and burrs
attention shall be paid to the sealing surfaces . Use like material tools if sealin g
surfaces are stainless .
- Sealing surfaces on flange faces shall be thoroughly inspected . Any damage shall b e
repaired by refacing . The QC Inspector shall accept or reject all flange surfaces prio r
bolting .

Q-CHEM I I
Qatar Chemical Company II, LTD .
Ethylene Derivatives Complex
Project Number : QC2-0009

TECnIfi10r1T

DAEWOO E&C
OWNER ID . COD E

QATAR CNEMICALCOMPAtlYLTD*

METHOD STATEMENT FOR


PIPING INSTALLATION
IN QCHEM I
Plants :
QCheml

Client : Q-Chem . II

Location : Mesaiee d
City, Qatar

QC2-00-CSTR-MSP-00002 8
CONTRACTOR ID . COD E
Job-EC-T-N
3412-XH-PM-201 6

Pa o e 9 of 18

Issue 0

Bolts shall be checked for proper size, length, conformance to specifications ,


cleanliness and absence of burrs .
- The surface of flanges where contact is made with the nuts or washers shall be wire o r
power brushed to remove any material that will affect the torque value .
- Gaskets shall be as per the applicable piping material class .
Spiral wound, metal gaskets, or sheet gaskets shall not be re-used .
Proper thread lubrication shall be applied to every friction surface of the bolt assembly .
This includes threads, and all bearing surfaces of the nut, washer and bolt head .
Lubrication on the bolt threads shall be applied prior to putting on the nuts .
Thread lubricants shall be suitable for the operating temperature of the system .
Thread lubricants shall not contain lead . Thread lubricants for austenitic stainles s
steel shall not contain chlorides .
Insert the gasket with care being taken ti insure proper centering of the gasket . A ligh t
coating gasket adhesive may be used to help keep gasket in place . Gaskets shall no t
be held in place with tape .
All flanged joints shall be snugged up squarely so that the entire flange face bear s
uniformly on the gasket .
Measurements of the gap between flange faces shall be taken around th e
circumference of the flange to ensure that the flanges are being drawn up evenly .
- Stud bolts and nuts shall be checked to ensure they are hand tight . The stud end s
shall extend one thread 3mm (1/8-inch) beyond the nut, except for use of tensionin g
device .
If a tensioning device is to be used, the stud shall protrude 1 bolt diameter beyond th e
nut to allow attachment of the tensioning device . The other end of the stud shal l
extend three threads 9mm (3/8-inch) past the nut .
- All stud bolt protrusions for the tensioning device shall be from the same side of th e
flanged joint . Protrusions may be alternated from one side to the other only i f
interference occurs with the tensioning device .
- Stud bolt tensioning shall be performed on all bolting 2 inch and larger .
7.10 .12 Flange connections shall be bolted to the required torque .
7 .10.13 All vents and drains shall be installed as per IFC drawings and situated at high and lo w
points during hydrotest .
7.10.14 All valves shall be checked for its flow direction . When required by-pass shall be als o
installed .
7.10.15 Bolt Tightening Procedur e
- The bolt should be torqued to provide compressive strains in the flange face thicknes s
establishing a residual compressive stress .
- Use new bolts and nuts . The thread should be clean and lubricated . There ar e
numerous conditions that can affect bolt torquing (i .e. bolt thread condition, dirt y
threads, re-used bolts, lubricant and weather) .
Install the bolts and nuts finger tight . Inspect to insure that the sealing faces contac t
each other and are parallel to each other all around the circumference .
- Using a torque wrench with 20% of the final torque, tighten the bolts in criss-cros s
sequence . Take care at all times to ensure that the sealing faces are in contact an d
parallel all around the circumference . Repeat this step each time increasing th e
torque by 20% of the final value .
After
reaching the final torque value, use rotational tightening until all the bolts ar e
-

Q-CHEM I I

TECf11fT10f1 T

Qatar Chemical Company II, LTD .


Ethylene Derivatives Complex
Project Number : QC2-0009

eiv DAEWOO E& C


OWNER ID . COD E

QATAR C H EMICAL COMPANY LTO .

METHOD STATEMENT FO R
PIPING INSTALLATION
IN QCHEM I
Plants :
QChem1

Client : Q-Chem . II

Location: Mesaiee d
City, Qatar

QC2-00-CSTR-MSP-00002 8
CONTRACTOR I

COD E
NS
3412-XH-PM-201 6

oe
Pas

10 of 18

Issue 0

stable at the final torque value .


If flange leaks occurs and the bolts on the leaking side have been properly torqued ,
further tightening shall be avoided so as not to damage the sealing faces . The bolts
on the opposite side should be loosened by a quarter turn at a time and then the bolt s
on the leakage side should be tightened by the same amount . If the leak persists, th e
bolts should be removed and the sealing faces examined for scratches or dents acros s
the entire face that could provide a leak path .
If leakage occurs after the system has been cycled to an elevated temperature an d
back to ambient temperature, the bolts should be removed after the cool down period .
No further tightening is necessary .
Torque value s

Nominal pipe size


2"
3-4"
6"
8"
10"
12"
18"
24"

Torque Ft-l b
35
40
55
85
95
11 0
16 0
220

7.11
Documentation of inspection and tes t
.1
The
QA/QC Team submits a copy of DWR to Company then inputs the data in the pipin g
7.11
data system after review.
7 .11 .2 Documents to be completed prior to testing are as follows .
- As-built Drawing s
MTR : for LTCS and S S
- NDE Report / PMl report : If require d
PWHT Report : If required
inforcing Pad leak test report : If require d
7 .11 .3 Above documents will form a part of the Test Pack which will be submitted to QA/QC Tea m
for review . Control of Test Pack shall be in accordance with Method Statement fo r
Pressure Test of Piping .
8.0 ATTACHMENT S
1.

Material Traceability Record (Field )

2.

Check sheet for flange fac e

3.

Piping Inspection Sheet

4.

Bolt Torque Sequenc e

5.

Job Safety Analysis

Q-CHEM I I

* Tecnimonr

Qatar Chemical Company II, LTD .


Ethylene Derivatives Complex
Project Number : QC2-000 9

410 4

Qja DAEWOO E& C


OWNER ID . COD E

aaeaa* *tyk
QATAR CHEMICAL COMPANY LTD .

?*T
FOR
METHOD STATEMENT
PIPING INSTALLATION
P:a^ts
NAO/PFJOFFSITES

QC2-00-CSTR-MSP-00002 6
CONTRACTOR ID . COD E
Job-EC-T-N
3412-XH-PM-201 6

Location: Mesaiee d
City, Qatar

Client : Q-Chem . II

Page] 1 of 18

Issue 0

MATERIAL TRACEABILITY RECORD (FIELD )

Attachment 1 .

(QCHEM II )

DAEWOO E&C

rIsometric No .

Sheet No .

(Drawing No . LSpool
_
No .

Mark

Componen t

Hea t

No .

Description

Number

Size

Sch .

Material

Rev . No .L

Remark s

Cu t

DAEWO O

Q-CHEMI I

Length

QC Sign

Sig n

FIEL D
The Field components have been verified against the erected piping and are complete and accurate .

Prepared By :
Name :

Signature :

Date :

Inspected By :
Name :

Form No . : 3412-X1I-PM-2004- 0 3 (I )

Signature :

Date :

Q-CHEM I I

TECf11f11011 T

Qatar Chemical Company II, LTD .


Ethylene Derivatives Comple x
Project Number: QC2-000 9
a*9*

OWNER ID . COD E

QATAR CHEMICAL COMPANY LTD .

QC2-00-CSTR-MSP-00002 6

METHOD STATEMENT FOR


PIPING INSTALLATIO N
Rants
NAOIPFIOFFSIIES

Client : Q-Chem . II

DAEWOO E&C
Drawing No.

Location : Mesaiee d
City, Qatar

o
Pa*e12
of 18

Description of Flange

Damage Check Points


A
B
C
D

Description of Damage
Min . Requirement(30 %, mm )
Size of damage(Radically, mm )
Damaged due to
(Handling or Corrosion)
Result of checkin g
Damaged by(DAEWOO

CONTRACTOR ID. COD E


Job-EC-T-N
3412-XH-PM-201 6

Issue 0

Check Sheet for Flange Fac e


( Q-CHEM II )

Attachment 2 .

Re-facing or no t
Result of re-facin g
(See Flange Inspection Sheet )

d by DW[Check
Form No . :

a DAEWOO E&C

3412-X11-PM-2004-04(1)

1 Verified by

Remarks

Remarks

Q-CHEM II
r

rf 4

b, ,,,,1
J
a*4 .o7I yl!91o:- J*..* Fyn
QATAR CHEMICAL COMPANY LTD .

;A
A;

Qatar Chemical Company II, LTD .


Ethylene Derivatives Complex
Project Number : QC2-000 9

TECf11fi1Df1 T

DAEWOO E&C
OWNER ID . COD E

METHOD STATEMENT FOR


PIPING INSTALLATION
Plants .
NAO/PE/oEFSHES

Client : Q-Chem . II

Location: Mesaiee d
City, Qatar

QC2-00-CSTR-M SP-00002 6
CONTRACTOR ID . COD E
Job-EC-T-N
3412-XH-PM-201 6
o
Pa*el3
of 18

Issue 0

Piping Inspection Shee t


Area

Dwg No .

Sht. No

Pipe Cls

Ins . Cls .

Materia l

Inspectio n
No

Item
Piping

Description
Installation of inline items as
per drawing
Installed valve
- Valve type :
. Valve tag no . :
Valve serial no . :
Flow direction :

Piping

Piping

Elevation & levelness of


Piping__ mpg line_

Piping

Plum bness of piping lin e

Piping

Flange alignment fo r
connection equipmen t

Piping

Support location & typ e

Flange

Verify flange specification a s


drawin g

Flange

Grease, tape, paint & rust has


been removed from flang e
fac e

10

Flang e

Flange face are undamage d


and free scratc h

11

Flang e

Orifice flange internal weld s


flush grindin g

12

Flang e

Use the correct gasket

13

Flange

Use the correct bolt with th e


correct type lubrican t

14

Flange

Ensure stress-free flang e


alignment and clearance

Location & orientation o f


piping lin e

Form No . : 3412-XH-PM-2004-05(1)

Verified By
- ---DAEWOO
COMPAN Y

Rev. N o

Date

Remar k

Q-C H EM I I

TECntmon T

Qatar Chemical Company II, LTD .


Ethylene Derivatives Complex
Project Number: QC2-000 9
t * t,i-SU
r*
a*e
QATAR CHEMICAL COMPANY LTD.

METHOD STATEMENT FOR


PIPING INSTALLATION
P :acts:
NAOIPE/OFFSfTES

Client : Q-Chem . II

Location : Mesaieed
City, Qatar

r l DAEWOO E& C
QC2

OWNER ID . COD E
ID
CONTRACTOR . COD E
Job-EC-T-N
3412-XH-PM-201 6

NC000026

v
Pase14
of 18

4 HOLE FLANGE
TIGHTENING SEQUENCE
BOLTS No .
1
3

OPP BOLTS No .
2
4

8 HOLE FLANGE

BOLTS No .
1
5
7

OPP BOLTS No .
2
4

Issue 0

Q-CHEM II

04
aa5

r-'*!9

TECnimon T

Qatar Chemical Company II, LTD .


Ethylene Derivatives Complex
Project Number : QC2-000 9

DAEWOO E&C
OWNER ID . COD E

D S1
QATAR CHEMICAL COMPANY LTD .

METHOD STATEMENT FOR


PIPING INSTALLATION
.

rants
NAOIPE/OFFSIrES

Client : Q-Chem . II

Location : Mesaieed
City, Qatar

QC2-00-CSTR-MS P-00002 6
CONTRACTOR ID . COD E
Job-EC-T-N
3412-XH-PM-201 6

p a*e15
of 1 8
a

Issue 0

12 HOLE FLANG E

20 HOLE FLANGE

TIGHTENING SEQUENCE

-BOLTS No .

OPPBOLTS NO .
2
-- 4
6

9
11
13
15
17
19

10
12
14
16
18
20

;I;

Q-CHEM I I
Qatar Chemical Company II, LTD .
Ethylene Derivatives Comple x
Project Number: QC2-000 9

TECfllMOn T

Ie DAEWOO E&C
OWNER ID . COD E

` Y*
aaeaxeLl *is*

QATAR CHEMICAL COMPANY LTD .

METHOD STATEMENT FOR


PIPING INSTALLATIO N
P:ar: s
NnO/PE/OFFSrTES

Client : Q-Chem . II

Location: Mesaiee d
City, Qatar

Q C 2-00-CST R-M S P-0 0 002 6


CONTRACTOR ID . COD E
Job-EC-1-N
3412-XH-PM-201 6
a

Page 16 of 18

Issue 0

28 HOLE FLANG E

TIGI-ITENING SEQUENCE

27

BOLTS No .
1
3
5

OPP BOLT S
NO .
2
4
6

9
11
13
15
17
19
21

10
12
14
16
18
20
22

7
_
3

26

28

--- 23 -

24

25

26

27

28

Q-CHEM II

TECIIImon T

Qatar Chemical Company II, LTD .


Ethylene Derivatives Comple x
Project Number: QC2-000 9

Q,

DAEWOO E&C
OWNER ID . COD E

*aed **i*,r*
QATAR CHEMICAL COMPANY LTD .

METHOD STATEMENT FOR


PIPING INSTALLATION
I' :a^is
NAOIPEIOFFSITES

Client : Q Chem . II

Location : Mesaiee d
City, Qatar

QC2-00-CSTR-MS P-00002 6
CONTRACTOR ID . COD E
Job-EC-T-N
3412-XH-PM-201 6
Q

Pa gel? of 18

Issue 0

JSA FOR PIPING INSTALLATIO N

SIN

ACTIVITY

PREVENTIVE ACTION S

HAZARDS

Scaffolding Danger o f
Access and
workers fallin g
Usage
from height .

Danger of fallin g
objects onto
personne l
working /
walking at th e
lower level .
Tripping / fallin g
hazard .
Personne l
injury .

STARRT required prior to start of task .


Wearing of PPE shall be mandatory i n
all aspects and areas of pipin g
installation .
Safety harness must be worn a s
required when working on hangin g
scaffolding .
All tools must be properly secured .
Tools equipment or material should no t
be thrown up or down from one workin g
level to another . They must b e
transferred by the use of a hand line o r
other safe method .
All unsafe condition of the scaffoldin g
must be reported immediately to th e
Scaffolding Inspector or Supervisor fo r
proper action .
Only qualified personnel shall b e
allowed to modify / construc t
scaffolding .
Pipe and other piping materials shall no t
be stored for a long time in the hangin g
scaffolding .
Only light materials shall be allowed t o
be placed on the scaffolding platform .
Smoking is not allowed on the projec t
site except in designated areas .
Proper housekeeping must b e
maintained at all times in order to avoi d
tripping / falling .

Q-CHEM II

10 4
.,I*

TECf11R10f1 T

Qatar Chemical Company II, LTD .


Ethylene Derivatives Complex
Project Number : QC2-000 9

av DAEWOO E& C
OWNER ID . COD E

441,11

QATAR CHEMICAL COMPANY LTD .

yXFTHOI) STATEMENT FOR

PIPING INSTALLATION
P:a^:s
NAO/PFJOFFSITES

Welding and
Cutting Works

Client : Q-Chem . II

Location: Mesaieed
City, Qatar

Fire, explosion ,
damage to lives
and properties .
Falling weldin g
sparks an d
slags from th e
hangin g
scaffolding .
Burning injuries .
Tripping an d
falling .

QC2-00-CSTR-MSP-00002 6
CONTRACTOR ID. COD E
Job-EC-1--N
3412-XH-PM-201 6

Page
g 18 of 1 8

Issue 0

Hot work permit shall be secured prio r


to start of any welding, and cuttin g
works .
Always check areas around and below
prior to commencing welding or cuttin g
operations . All combustible material s
under or near the area must be move d
to a safe distance away or covered wit h
a fire retardant material .

Fire blanket shall be place d


accordingly on the scaffoldin g
platform prior to start of hotwork .
This shall be sufficient enough t o
contain all sparks / slags produce d
from welding and cutting .

Dry powder fire extinguishers shal l


be available near hot work area at al l
times . Personnel involve on the jo b
shall be trained on the proper use of
fire extinguishers .
Welding leads and gas hoses shall no t
be placed where they will presen t
tripping hazards .
Good housekeeping shall always b e
maintained at all times inside and belo w
the platform . Accumulation oft too muc h
trash, or rubbish inside the platform is a
FIRE HAZARD .

Oxygen and acetylene cylinders shal l


be provided with flash back arresters .
Cutting torch and hoses shall b e
checked on daily basis for any leakag e
or damage .

Oxygen and acetylene cylinders shal l


always be left in vertical position an d
secured properly .
Empty/full gas cylinders shall be kep t
separately.
A dedicated fire watch shall be availabl e
at all time to monitor closely the ho t
work so as to avoid fire incident, wel d
drops and molten metal falling down .

Vous aimerez peut-être aussi