Material/Service Description
Unit Rate
658.85 INR/EA
PM
of
Reciprocating /Metering/Diaph Pump:Job include
1.Check gland leakage. Rectify if any 2.Check piping spring
supports. 3.Ensure stuffing box drain outlet in waste
drum.4.Remove coupling guard 5.General visual check: wear:
damage: rust: paint 6.Check coupling condition for any
crack: Holes: Bolts: Others.Motor to GB: & GB to pump
7.Check nitrogen pressure in discharge dampener.Recharge if
required
8.Visual Check the oil quality of gearbox:
packing: & pump.9.Clean packing oil drain line & drain
chamber 10.Grease: all M.S. fasteners 11.Clean suction
strainer 12.Clean lube oil filters & breathers 13.Check for
cleaniness & house keeping around the equipment
473.02 INR/EA
"PM
of
Screw / Gear Pump:Job include 1.Check
tightness of foundation bolts 2.Check coupling general
condition
for
crack:
holes:
bolts:others
(without
dismantling) 3.Check pump seal for any leakage 4.Check free
rotation of the pump 5.Check pipe line for any leakage
6.Check
piping
supports for proper clamping 7.Check
pressure regulation valve, reset if required 8.Check /
clean
suction strainer 9.Tighten and grease all m.s
fasteners
10.Visual
check wear: damage: rust: paint
condition: etc 11.Ensure fixing of safety guards 12.Check
for cleaniness & house keeping around the equipment"
1,013.62
INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 2
Material/Service Description
Unit Rate
send
for
analysis
if
required
by
EIC.Replace
if
reqd synchronised
with
lube-test
sched
2.Inspect
couplings condition
for
crack:
holes:
bolts: others
3.Check blade angle
/
tracking
of
blade.
4.Check
foundation bolts tightness of motor & gearbox:5.Check
freeness of fan by rotating motor shaft 6.Open gear box
inspection window & inspect
the
internals.7.Check
hub
bolts
tightness, use torque wrench 8.Check transmission
shaft condition & report
9.Check
oil level of gear box & top up if required,
attend oil
leak if any. 10.Clean breather 11.Check /
Tighten gear box
foundation bolts.12.Grease all m.s.
fasteners 13.Check for any general crack: wear: damage:
rust: paint 14. Ensure fixing of safety guards 15.Check fan
hood condition
591.28 INR/EA
503.42 INR/EA
"PM
of Rotary Soot Blowers:Job include 1.Check
lubrication condition, replace / top up as required 2.Check
valve & flange leakage if any & rectify 3.Check the valve
opening
linkages free for operation.4.Replace missing
cotter pins & springs.5.Check the mountings & hanger
supports of the blower.6.Check the valve for steam leakage
through packing & valve seat & rectify if required 7.Check
coupling condition for any crack, wear, damage, rust &
paint., repair/rectify as required.8.Clean the area.
PM
of
Steam
Turbine:Job include 1.Check free rotation
of the steam turbine.2.Check foundation bolt tightness of
the turbine & gearbox.3.Visually check for any leakage of
lube oil & steam.4.Check trip system.5.Flush governer &
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
1,846.48
INR/EA
check for
any leakage.6.Check Governing system arms
linkages for freeness 7.Check oil ring for its rotation
from top port.
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 3
Number : CCM/
Date
: 25.05.2015
Page No. : 4
Material/Service Description
Unit Rate
8.Check
control
valve
spindle
for
its freeness
9.Check coupling
condition
for
any
crack,
wear,
damage, rust, paints etc.(Turbine to gb & gb to pump)
10.Check cold setting
of the spring hanger. 11.Check
auxillary l.o. pump coupling.
12.Check
stop valve for
gland leakage. 13.Clean base
plate
area
14.Clean
&
check bearing cooling water lines
&
flow
meter
15.Cleaning of equipment & it surrounding
506.81 INR/EA
PM
of
Diaphragm Compressor:Job Include, 1.Remove
coupling guard.2.Check
coupling
condition for crack:
holes: bolts: other: if
it
is
belt
drive,
check belt condition: tightness: pulley
condition:
and
alignment:
3.Check freeness
of blower by
rotating motor shaft by hand 4.Check and grease the
bearings 5.Check tightness of motor: blower: foundation
bolts
6.Inspect
and
clean suction: discharge filters
7.Check
fan condition and clean it if required by
EIC.8.Perform checks on lube oil circuit, clean it filter,
if require replace the diaphragm (oil/gas site) as adviced
by EIC.9.Ensure proper fixing of the casing drain 10.Check
casing for any internal corrosion / damage 11.Check inlet
dampner/vanes/linkage functioning & Grease if reqd. for
passing: proper operation 12.Check spring: sliding: clamp:
supports:13.Check condition of expansion joint / bellow in
discharge line & report condition replace / top up.
14.Grease
all
M.S. fasteners 15.Visual check: wear:
damages: paint:16. Ensure fixing of all safety guards
PM
of Centrifugal Fan/Blower:Steps Activites 1.Remove
coupling guard.2.Check coupling condition for crack: holes:
bolts: other: if it is belt drive, check belt condition:
tightness: pulley condition: and alignment:3.Check freeness
of blower by rotating motor shaft by hand 4. Check and
grease the bearings 5.Check tightness of motor: blower:
foundation bolts 6.Inspect and clean suction: discharge
filters 7.Check fan condition and clean it.8. Ensure proper
fixing of the casing drain 9.Check casing for any internal
corrosion / damage 10.Check inlet dampner/vanes/linkage
functioning & Grease if reqd.for passing: proper operation
11.Check
spring:
sliding:
clamp: supports: 12.Check
condition of expansion joint / bellow in discharge line &
report condition replace / top up. 13.Grease all M.S.
fasteners 14.Visual check: wear: damages: paint:15. Ensure
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
633.53 INR/EA
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 5
Number : CCM/
Date
: 25.05.2015
Page No. : 6
Material/Service Description
Unit Rate
413.90 INR/EA
413.90 INR/EA
PM
of
Oil
Centrifuge:1.Clean Bowl Assembly
2.Check for any leakages 3.Check oil level in eqpt.
4.Check Motor-centrifuge
coupling
5.Check
gears
for
wear & tear
6.Check
water
seal 7.Clean eqpt. / frame & surrounding
8. Check trolley wheels & grease on while centrifuge
is mounted (if applicable)
1,307.58
INR/EA
371.66 INR/EA
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 7
Number : CCM/
Date
: 25.05.2015
Page No. : 8
Material/Service Description
visually
5.Cleaning
of
equipments,drain
etc.breather cap
6.Check
oil
piping
&
oil
7.Check backlash if required and as advised by EIC.
Unit Rate
pipes
flow
1,182.55
INR/EA
PM
of Rotary valve (CMI):Job include 1.Carry out all
4 points greasing of knuckle, pawl, upeer brg housing
& Rachet arms.2.Chech & Record lignment at feed input
position no 8 & record below.3.Check pawl drop distance and
record below. 4.Ball valve provided with sight glass
assembly for allignment checking and to be closed after
inspection 5.Check Seal pot level (Top up/ Drain if
necessary).
6.Check
leakeage
of Seal at Tell Tale
tubing.7.Check knuckle eye bolt for looseness. 8.Check
stroke cycle time (Extend & Retard.).9.Check Extend stroke
time.10.Check for any abnormality on hydralic pump.11.Check
the suction & Discharge filters visual indicator as clean
or nedds cleaning.12.Check for any U clamp bolts looseness
&
rubber
packing
provided on the Hydraulic System
piping.13.Check Hydraulic Pump discharge pressure, to be
around 80Kg/cm2 before indexing.14.Check any oil leakage at
Hydraulic pipings & hoses
633.53 INR/EA
PM
of
Rack & Pinion Lifts:1. Wall tie bolts
tightening.2.Mast bolt tightening.3. Changing D - Shackle
of
Counter
weight.4.Cabin Bolts tightening and cabin
alignment 5.Checking of Wire rope
condition.6.Checking
flappers if required.7.Lubrication of all moving parts.
3,284.14
INR/EA
675.76 INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 9
Material/Service Description
Unit Rate
10.Check
the
oil
quality, replace if required, check
oil inlet tube for choking
11.Check,
adjust, replace gland (pumps with gland
packing)
12.Check
quantity
of
sealing oil in the seal oil pot
for API plan 52/53 wherever applicable. Drain oil from
the drain plug. Clean gauge glass if found dirty. Replace /
top up as reqd.
13.Clean
strainer
in
the
seal
flushing
line
&
check flushing line for any choking
14.Check
cooling
water flow & attend leak if any.
Clean/flush cooler & cooling water lines
15.Check
for
cleanliness & House keeping around the
pump.
16.Check shaft deflection / play.
17.Check
alignment
with
Laser
(without
coupling
dismantling)
473.02 INR/EA
549.05 INR/EA
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 10
Number : CCM/
Date
: 25.05.2015
Page No. : 11
Material/Service Description
Unit Rate
976.45 INR/EA
"PM
of
Rotary Valves / Feeders:Job Include
1.Visual
check:
wear:
damage:
and
paint
condition:2.Check chain condition:
tension:
sprocketcondition:alignment:
chain
lubrication.3.Check free rotation of rotary valve 4.Check
tightness of motor: gear box: rotary valve:foundation
bolts.5.Check quality of lube oil and replace if required
6.Check
and
clean
breather
7.Check seal/packing for
any leakage, replace if required 8. Check air lines for
any leakage
/
blockage
9.Check
piping
spring:
sliding: supports:10.Ensure fixing of all safety
guards"
1,981.63
INR/EA
"PM
of Diesel Engine:1. Throuhly clean equipment
[ ] base
[ ] etc.From oil and 2. Check tightness of
foundation bolts
[
]
exhaust
manifold
[ ] & turbo
charger bearing housing bolts [ ] grease all m.s.fastners
[ ].3. Check lub oil system for level [ ] and leakage if
any[ ]. 4. Check inlet air flow filter [ ] by-pass
filter [ ] and fuel filter [ ] l.O. Filter [ ] if required
replaced it.5. Check and clean jacket cooling water inlet
strainer []. 6. Check radiator for any leakage and damage
[ ]. 7. Check cooling system for any leak [ ] hose
condition[ ] coolant level [ ] and coolant pump [ ]. 8.
Check air intake system for any leak
[
]
piping
and
it's connection [ ] and piping supports/clamps [ ] 9.
Check fuel system for leak [ ] fuel level [ ] governor
linkage [ ] fuel lines & its connections [ ] and fuel
transfer pump [ ].10. Check exhaust system for leak [ ]
exhaust restrictions [ ] and drain condensate trap [ ].11.
Check coupling condition [ ] coupling bolts [ ] 12. Clean
breather. 13. Check for any general crack [ ] wear[ ]
damage [ ] rust [ ] paint condition [ ] etc. 14. Ensure
fixing of safety guards. 15. Battery condition : battery
fluid
level,
check voltage,apply petroleum jelly at
terminals"
* 20
** 20.1
185.82 INR/EA
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 12
280.44 INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 13
Material/Service Description
Unit Rate
562.57 INR/EA
788.93 INR/EA
**
1,098.09
INR/EA
20.2
Alignment
844.68 INR/EA
Cold Allignment Up to 30 KW
Job
includes-1.Removal and reinstallation of coupling
guard(s)2.Checking
tightness of coupling bolts3.Spacer
removal
reinstallation/replacement,
alignment Checking
andCorrection
1,182.55
INR/EA
2,365.12
INR/EA
3,316.22
INR/EA
3,547.66
INR/EA
**
20.3
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 14
Material/Service Description
Unit Rate
1,267.03
INR/EA
1,689.37
INR/EA
2,111.71
INR/EA
3,696.33
INR/EA
4,434.60
INR/EA
Coupling
Hub Removal (Driver / Driven) Above 30 KW and
up to 100 KW.
Job
includes-1.Removal and reinstallation of coupling
guard(s)2.Spacer
removal
&
installation/replacement3.Removal
&
reinstallation
of
coupling Hub4.Alignment checking and correction to be added
in the activity.
Coupling
Hub Removal (Driver / Driven) Above 100 KW and
up to 250 KW.
Job
includes-1.Removal and reinstallation of coupling
guard(s)2.Spacer
removal
&
installation/replacement3.Removal
&
reinstallation
of
coupling Hub4.Alignment checking and correction to be added
in the activity.
Coupling
Hub Removal (Driver / Driven) Above 250 KW and
up to 1000 KW.
Job
includes-1.Removal and reinstallation of coupling
guard(s)2.Spacer
removal
&
installation/replacement3.Removal
&
reinstallation
of
coupling Hub4.Alignment checking and correction to be added
in the activity.
**
20.4
275.36 INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 15
Material/Service Description
Unit Rate
369.97 INR/EA
528.77 INR/EA
1,013.62
INR/EA
1,216.35
INR/EA
1,182.55
INR/EA
1,689.37
INR/EA
2,111.71
INR/EA
**
20.5
pulleys.
Adjustment
of
belt
tension.
reinstallation /replacement of pulley(s)
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 16
Removal
&
Number : CCM/
Date
: 25.05.2015
Page No. : 17
Material/Service Description
Unit Rate
**
3,696.33
INR/EA
1,689.37
INR/EA
2,534.05
INR/EA
3,547.66
INR/EA
4,730.24
INR/EA
20.6
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 18
Number : CCM/
Date
: 25.05.2015
Page No. : 19
**
20.7
Material/Service Description
Unit Rate
844.68 INR/EA
1,267.03
INR/EA
1,689.37
INR/EA
2,027.25
INR/EA
1,013.62
INR/EA
1,267.03
INR/EA
**
20.8
Number : CCM/
Date
: 25.05.2015
Page No. : 20
Material/Service Description
Unit Rate
1,520.44
INR/EA
1,858.31
INR/EA
2,365.12
INR/EA
1,520.44
INR/EA
2,280.64
INR/EA
* 30
PUMPS
** 30.01 CENTRIFUGAL PUMP-SINGLE STAGE OVERHUNG(H
*** 30.01.01Replacement of Casing Gasket
3159181 RCG CP-SSO (HRZNTL)-UPTO30KW
Valid from: 25.05.2015 Valid to: 31.07.2016
Replacement
of Casing Gasket CENTRIFUGAL PUMP-SINGLE
STAGE OVERHUNG (Horizontal) - Up to 30 KW
Job Includes1.
Removal
&
Re-installation
of pump assembly from
pump casing
including lifting / shifting to worksite /
workshop and back.
2. Replacement of casing gasket
3. Removal and re-installation of coupling guard.
4. Removal and re-installation of spacer.
5. Alignment checking and correction after assembly.
Replacement
of Casing Gasket CENTRIFUGAL PUMP-SINGLE
STAGE OVERHUNG (Horizontal) - Above 30 and up to 100 KW.
Job Includes1.
Removal
&
Re-installation
of pump assembly from
pump casing
including lifting / shifting to worksite /
workshop and back.
2. Replacement of casing gasket
3. Removal and re-installation of coupling guard.
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 21
Material/Service Description
Unit Rate
4,223.43
INR/EA
5,912.79
INR/EA
2,745.22
INR/EA
3,801.08
INR/EA
Replacement
of Casing Gasket CENTRIFUGAL PUMP-SINGLE
STAGE OVERHUNG (Horizontal) - Above 100 and up to 250 KW.
Job Includes1.
Removal
&
Re-installation
of pump assembly from
pump casing
including lifting / shifting to worksite /
workshop and back.
2. Replacement of casing gasket
3. Removal and re-installation of coupling guard.
4. Removal and re-installation of spacer.
5. Alignment checking and correction after assembly.
Replacement
of Casing Gasket CENTRIFUGAL PUMP-SINGLE
STAGE OVERHUNG (Horizontal) - Above 250 and up to 1000 KW.
Job Includes1.
Removal
&
Re-installation
of pump assembly from
pump casing
including lifting / shifting to worksite /
workshop and back.
2. Replacement of casing gasket
3. Removal and re-installation of coupling guard.
4. Removal and re-installation of spacer.
5. Alignment checking and correction after assembly.
Impeller
assembly
job. CENTRIFUGAL PUMP-SINGLE STAGE
OVERHUNG (Horizontal) -Up to 30 KW
Job includes1.
Removal & Re-installation of pump assembly from
pump casing.
2. Replacement of casing gasket.
3.
Dismantling & Reassembly of impeller assembly
including
cleaning,
inspection,
removal
&
reinstallation/replacement of components with necessary
measurement
&
checks for dimension, clearance, run out
etc
4. Removal and re-installation of coupling guard.
5. Removal and re-installation of spacer.
6. Alignment checking and correction after assembly.
Impeller
assembly
job.CENTRIFUGAL
PUMP-SINGLE
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
STAGE
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 22
Number : CCM/
Date
: 25.05.2015
Page No. : 23
Material/Service Description
Unit Rate
Job includes1.
Removal & Re-installation of pump assembly from
pump casing.
2. Replacement of casing gasket.
3.
Dismantling & Reassembly of impeller assembly
including
cleaning,
inspection,
removal
&
reinstallation/replacement of components with necessary
measurement
&
checks for dimension, clearance, run out
etc
4. Removal and re-installation of coupling guard.
5. Removal and re-installation of spacer.
6. Alignment checking and correction after assembly.
5,405.98
INR/EA
6,757.47
INR/EA
Impeller
assembly
job. CENTRIFUGAL PUMP-SINGLE STAGE
OVERHUNG (Horizontal) -Above 100 and up to 250 KW.
Job includes1.
Removal & Re-installation of pump assembly from
pump casing.
2. Replacement of casing gasket.
3.
Dismantling & Reassembly of impeller assembly
including
cleaning,
inspection,
removal
&
reinstallation/replacement of components with necessary
measurement
&
checks for dimension, clearance, run out
etc
4. Removal and re-installation of coupling guard.
5. Removal and re-installation of spacer.
6. Alignment checking and correction after assembly.
Impeller
assembly
job. CENTRIFUGAL PUMP-SINGLE STAGE
OVERHUNG (Horizontal) -Above 250 KW and up to 1000 KW.
Job includes1.
Removal & Re-installation of pump assembly from
pump casing.
2. Replacement of casing gasket.
3.
Dismantling & Reassembly of impeller assembly
including
cleaning,
inspection,
removal
&
reinstallation/replacement of components with necessary
measurement
&
checks for dimension, clearance, run out
etc
4. Removal and re-installation of coupling guard.
5. Removal and re-installation of spacer.
6. Alignment checking and correction after assembly.
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 24
4,054.49
Seal
replacement
job.
CENTRIFUGAL
OVERHUNG (Horizontal) -Up to 30 KW
PUMP-SINGLE
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
STAGE
INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 25
Material/Service Description
Unit Rate
Job includes1.
Removal
&
Re-installation
of pump assembly from
pump casing.
2. Replacement of casing gasket.
3.
Dismantling & Reassembly of impeller assembly
including cleaning, inspection, removal & reinstallation/
replacement of
components
with
necessary
measurement
and checks for dimension, clearance, run out etc.
4.
Replacement
of
seal
cartridge
or
removal
&
reinstallation including reconditioning of seal assembly in
case of non cartridge seals.
5. Removal and re-installation of coupling guard.
6. Removal and re-installation of spacer.
7. Alignment checking and correction after assembly.
7,602.15
INR/EA
9,629.41
INR/EA
Seal
replacement
job.
CENTRIFUGAL PUMP-SINGLE STAGE
OVERHUNG (Horizontal) -Above 30 and up to 100 KW.
Job includes1.
Removal
&
Re-installation
of pump assembly from
pump casing.
2. Replacement of casing gasket.
3.
Dismantling & Reassembly of impeller assembly
including cleaning, inspection, removal & reinstallation/
replacement of
components
with
necessary
measurement
and checks for dimension, clearance, run out etc.
4.
Replacement
of
seal
cartridge
or
removal
&
reinstallation including reconditioning of seal assembly in
case of non cartridge seals.
5. Removal and re-installation of coupling guard.
6. Removal and re-installation of spacer.
7. Alignment checking and correction after assembly.
Seal
replacement
job.
CENTRIFUGAL PUMP-SINGLE STAGE
OVERHUNG (Horizontal) -Above 100 and up to 250 KW.
Job includes1.
Removal
&
Re-installation
of pump assembly from
pump casing.
2. Replacement of casing gasket.
3.
Dismantling & Reassembly of impeller assembly
including cleaning, inspection, removal & reinstallation/
replacement of
components
with
necessary
measurement
and checks for dimension, clearance, run out etc.
4.
Replacement
of
seal
cartridge
or
removal
&
reinstallation including reconditioning of seal assembly in
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 26
Material/Service Description
Unit Rate
11,487.71 INR/EA
Seal
replacement
job.
CENTRIFUGAL PUMP-SINGLE STAGE
OVERHUNG (Horizontal) -Above 250 and up to 1000 KW.
Job includes1.
Removal
&
Re-installation
of pump assembly from
pump casing.
2. Replacement of casing gasket.
3.
Dismantling & Reassembly of impeller assembly
including cleaning, inspection, removal & reinstallation/
replacement of
components
with
necessary
measurement
and checks for dimension, clearance, run out etc.
4.
Replacement
of
seal
cartridge
or
removal
&
reinstallation including reconditioning of seal assembly in
case of non cartridge seals.
5. Removal and re-installation of coupling guard.
6. Removal and re-installation of spacer.
7. Alignment checking and correction after assembly.
5,068.10
INR/EA
7,095.35
INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 27
Material/Service Description
seal.Removal,
inspection
with all checks.
and
replacement
of
Unit Rate
Bearings
11,149.84 INR/EA
15,204.32 INR/EA
675.76 INR/EA
Mechanical
Seal replacement. CENTRIFUGAL PUMP-SINGLE
STAGE OVERHUNG (Horizontal) -Up to 30 KW
Bearing
Seal
replacement
(DE):Job
includes:Removal,
inspection & replacementof housing seal.
1,013.62
INR/EA
1,351.49
INR/EA
Mechanical
Seal
replacement.CENTRIFUGAL PUMP-SINGLE
STAGE OVERHUNG (Horizontal) - Above 30 and up to 100 KW.
Bearing
Seal
replacement
(DE):Job
includes:Removal,
inspection & replacementof housing seal.
Mechanical
Seal replacement. CENTRIFUGAL PUMP-SINGLE
STAGE OVERHUNG (Horizontal) -Above 100 and up to 250 KW.
Bearing
Seal
replacement
(DE):Job
includes:Removal,
inspection & replacementof housing seal.
Number : CCM/
Date
: 25.05.2015
Page No. : 28
Material/Service Description
Unit Rate
2,027.25
INR/EA
5,912.79
INR/EA
8,446.84
INR/EA
Mechanical
Seal replacement. CENTRIFUGAL PUMP-SINGLE
STAGE OVERHUNG (Horizontal) -Above 250 and up to 1000 KW.
Bearing
Seal
replacement
(DE):Job
includes:Removal,
inspection & replacementof housing seal.
Pump
capital repair CENTRIFUGAL PUMP-SINGLE STAGE
OVERHUNG (Horizontal) -Up to 30 KW
Pump
Capital
repair:Job
includes:
1)
Removal
and
reinstallation of coupling guard(s), Spacer removal and
reinstallation/replacement,
alignment
checking
and
correction including hot alignment wherever applicable. 2)
Removal & Re-installation of pump assembly from pump casing
including lifting / shifting to worksite / workshop and
back. 3) Replacement of casing gasket. Dismantling &
Reassembly
of
impeller
assembly including cleaning,
inspection,
removal
&
reinstallation/replacement
of
components
with necessary measurement and checks for
dimension, clearance, run out etc. 4) Replacement of seal
cartridge
or
removal
&
reinstallation
including
reconditioning of Seal assembly in case of non cartridge
seals.
Pump
capital repair CENTRIFUGAL PUMP-SINGLE STAGE
OVERHUNG (Horizontal) -Above 30 and up to 100 KW.
Pump
Capital
repair:Job
includes:
1)
Removal
and
reinstallation of coupling guard(s), Spacer removal and
reinstallation/replacement,
alignment
checking
and
correction including hot alignment wherever applicable. 2)
Removal & Re-installation of pump assembly from pump casing
including lifting / shifting to worksite / workshop and
back. 3) Replacement of casing gasket. Dismantling &
Reassembly
of
impeller
assembly including cleaning,
inspection,
removal
&
reinstallation/replacement
of
components
with necessary measurement and checks for
dimension, clearance, run out etc. 4) Replacement of seal
cartridge
or
removal
&
reinstallation
including
reconditioning of Seal assembly in case of non cartridge
seals.
Pump
capital repair CENTRIFUGAL PUMP-SINGLE
OVERHUNG
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
STAGE
Number : CCM/
Date
: 25.05.2015
Page No. : 29
Material/Service Description
Unit Rate
15,204.32 INR/EA
Pump
capital repair CENTRIFUGAL PUMP-SINGLE STAGE
OVERHUNG (Horizontal) -Above 250 and up to 1000 KW.
Pump
Capital
repair:Job
includes:
1)
Removal
and
reinstallation of coupling guard(s), Spacer removal and
reinstallation/replacement,
alignment
checking
and
correction including hot alignment wherever applicable. 2)
Removal & Re-installation of pump assembly from pump casing
including lifting / shifting to worksite / workshop and
back. 3) Replacement of casing gasket. Dismantling &
Reassembly
of
impeller
assembly including cleaning,
inspection,
removal
&
reinstallation/replacement
of
components
with necessary measurement and checks for
dimension, clearance, run out etc. 4) Replacement of seal
cartridge
or
removal
&
reinstallation
including
reconditioning of Seal assembly in case of non cartridge
seals.
DE
Bearing
replacement.CENT.
PUMP-SINGLE/TWO
STAGE
BETWEEN BRG (Horizontal).- Up to 30 KW
Job includes-1.Removal, Inspection & replacement of housing
seal(s).2.Removal,
Inspection
&
replacement
of
bearing(s)3.Removal
and
re-installation
of
coupling
guard.4.Removal and re-installation of spacer.5.Driver side
Coupling
hub
removal
and re-installation.6.Alignment
checking and correction after assembly.
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
1,689.37
INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 30
Material/Service Description
Unit Rate
2,365.12
INR/EA
3,040.86
INR/EA
4,054.49
INR/EA
5,405.98
INR/EA
2,294.16
INR/EA
Bearing
replacement.
CENT.
PUMP-SINGLE/TWO STAGE
BETWEEN BRG (Horizontal).- Above 1000 KW.
Job includes-1.Removal, Inspection & replacement of housing
seal(s).2.Removal,
Inspection
&
replacement
of
bearing(s)3.Removal
and
re-installation
of
coupling
guard.4.Removal and re-installation of spacer.5.Driver side
Coupling
hub
removal
and re-installation.6.Alignment
checking and correction after assembly.
DE
Seal
replacement.
CENT. PUMP-SINGLE/TWO STAGE
BETWEEN BRG (Horizontal).- Up to 30 KW
Job includes-1.Removal, Inspection & replacement of housing
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 31
Material/Service Description
Unit Rate
seal(s).2.Removal,
Inspection
&
replacement
of
bearing(s).3.Removal
and
re-installation
of coupling
guard.4.Removal and re-installation of spacer.5.Driver side
Coupling
hub
removal
and re-installation.6.Alignment
checking and correction after assembly.
3,378.75
INR/EA
6,757.47
INR/EA
8,446.84
INR/EA
9,967.28
INR/EA
DE
Seal
replacement.
CENT. PUMP-SINGLE/TWO STAGE
BETWEEN BRG (Horizontal).- Above 30 and up to 100 KW.
Job includes-1.Removal, Inspection & replacement of housing
seal(s).2.Removal,
Inspection
&
replacement
of
bearing(s).3.Removal
and
re-installation
of coupling
guard.4.Removal and re-installation of spacer.5.Driver side
Coupling
hub
removal
and re-installation.6.Alignment
checking and correction after assembly.
DE
Seal
replacement.
CENT. PUMP-SINGLE/TWO STAGE
BETWEEN BRG (Horizontal).- Above 100 and up to 250 KW.
Job includes-1.Removal, Inspection & replacement of housing
seal(s).2.Removal,
Inspection
&
replacement
of
bearing(s).3.Removal
and
re-installation
of coupling
guard.4.Removal and re-installation of spacer.5.Driver side
Coupling
hub
removal
and re-installation.6.Alignment
checking and correction after assembly.
DE
Seal
replacement.
CENT. PUMP-SINGLE/TWO STAGE
BETWEEN BRG (Horizontal).- Above 250 and up to 1000 KW.
Job includes-1.Removal, Inspection & replacement of housing
seal(s).2.Removal,
Inspection
&
replacement
of
bearing(s).3.Removal
and
re-installation
of coupling
guard.4.Removal and re-installation of spacer.5.Driver side
Coupling
hub
removal
and re-installation.6.Alignment
checking and correction after assembly.
Number : CCM/
Date
: 25.05.2015
Page No. : 32
Material/Service Description
Unit Rate
1,351.49
INR/EA
2,027.25
INR/EA
2,702.99
INR/EA
4,054.49
INR/EA
5,405.98
INR/EA
2,294.16
INR/EA
NDE
Bearing
replacement. CENT. PUMP-SINGLE/TWO STAGE
BETWEEN BRG (Horizontal).- Up to 30 KW
NDE
Bearing
replacement:
Job
includes:
Removal,
Inspection
&
replacement of housing seal(s). Removal, Inspection
&
replacement of bearing(s)
NDE
Bearing
replacement. CENT. PUMP-SINGLE/TWO STAGE
BETWEEN BRG (Horizontal).- Above 30 and up to 100 KW.
NDE
Bearing
replacement:
Job
includes:
Removal,
Inspection
&
replacement of housing seal(s). Removal, Inspection
&
replacement of bearing(s)
NDE
Bearing
replacement. CENT. PUMP-SINGLE/TWO STAGE
BETWEEN BRG (Horizontal).- Above 250 and up to 1000 KW.
NDE
Bearing
replacement:
Job
includes:
Removal,
Inspection
&
replacement of housing seal(s). Removal, Inspection
&
replacement of bearing(s)
NDE
Bearing
replacement. CENT. PUMP-SINGLE/TWO STAGE
BETWEEN BRG (Horizontal).- Above 1000 KW.
NDE
Bearing
replacement:
Job
includes:
Removal,
Inspection
&
replacement of housing seal(s). Removal, Inspection
&
replacement of bearing(s)
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 33
NDE
Seal replacement. CENT. PUMP-SINGLE/TWO STAGE
BETWEEN BRG (Horizontal). Up to 30 KW
NDE seal replacement: Job includes: Removal, Inspection and
replacement of housing seal(s). Removal, Inspection and
replacement of bearing (s).
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
3,441.25
INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 34
Material/Service Description
Unit Rate
NDE
Seal
replacement.CENT.
PUMP-SINGLE/TWO STAGE
BETWEEN BRG (Horizontal).- Above 30 and up to 100 KW
NDE seal replacement: Job includes: Removal, Inspection and
replacement of housing seal(s). Removal, Inspection and
replacement of bearing (s).
6,757.47
INR/EA
8,446.84
INR/EA
9,967.28
INR/EA
NDE
Seal
replacement.CENT.
PUMP-SINGLE/TWO STAGE
BETWEEN BRG (Horizontal).- Above 100 and up to 250 KW.
NDE seal replacement: Job includes: Removal, Inspection and
replacement of housing seal(s). Removal, Inspection and
replacement of bearing (s).
NDE
Seal
replacement.CENT.
PUMP-SINGLE/TWO STAGE
BETWEEN BRG (Horizontal).- Above 250 and up to 1000 KW.
NDE seal replacement: Job includes: Removal, Inspection and
replacement of housing seal(s). Removal, Inspection and
replacement of bearing (s).
NDE
Seal
replacement.CENT.
PUMP-SINGLE/TWO STAGE
BETWEEN BRG (Horizontal).- Above 1000 KW.
NDE seal replacement: Job includes: Removal, Inspection and
replacement of housing seal(s). Removal, Inspection and
replacement of bearing (s).
449.37 INR/EA
Repl
of
casing
gasket
(Hor Split) CENT. PUMPSINGLE/TWO STAGE BETWEEN BRG (Horizontal).- Up to 30 KW
Replace
casing gasket (Horizon Split pump): Jobs
includes: Removal
& reinstallation of Horizontal split
casing cover. Replacement of casing gasket
675.76 INR/EA
Repl
of
casing
gasket
(Hor Split) CENT. PUMPSINGLE/TWO STAGE BETWEEN BRG (Horizontal).- Above 30 and up
to 100 KW. Replace
casing gasket (Horizon Split pump):
Jobs includes: Removal
& reinstallation of Horizontal
split casing cover. Replacement of casing gasket
Repl
of
casing
gasket
SINGLE/TWO STAGE
BETWEEN
BRG
and up to 250
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
1,353.18
INR/EA
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 35
Number : CCM/
Date
: 25.05.2015
Page No. : 36
Material/Service Description
Unit Rate
Replace
casing gasket (Horizon Split pump): Jobs
includes: Removal
& reinstallation of Horizontal split
casing cover. Replacement of casing gasket
1,773.84
INR/EA
2,111.71
INR/EA
3,547.66
INR/EA
5,068.10
INR/EA
Repl
of
casing
gasket
(Hor Split) CENT. PUMPSINGLE/TWO STAGE BETWEEN BRG (Horizontal).- Above 250 and
up to 1000
KW.
Replace
casing gasket (Horizon Split pump): Jobs
includes: Removal
& reinstallation of Horizontal split
casing cover. Replacement of casing gasket
Repl
of
casing
gasket (Hor Split)
CENT. PUMPSINGLE/TWO STAGE BETWEEN BRG (Horizontal).- Above 1000 KW.
Replace
casing gasket (Horizon Split pump): Jobs
includes: Removal
& reinstallation of Horizontal split
casing cover. Replacement of casing gasket
Repl
of
casing
gasket(Ver
Split),DE
Side
CENT.
PUMP-SINGLE/TWO STAGE BETWEEN BRG (Horizontal).- Up to 30
KW.
Replace
casing
gasket
(Vert
Split)
- DE: Job
includes: Removal, inspection & replacement of housing
seal (s). Removal,
inspection
& replacement of
Bearing(s). Removal, inspection & repair/replacement of
DE
Mechanical
seal
cartridge
or
removal,
reinstallation of seal assembly in case of
non-cartridge
mechanical
seals.
Removal
&
reinstallation of DE casing cover with new gasket
Repl
of
casing
gasket(Ver
Split),DE
Side
CENT.
PUMP-SINGLE/TWO STAGE BETWEEN BRG (Horizontal).- Above 30
and up to 100 KW.
Replace
casing
gasket
(Vert
Split)
- DE: Job
includes: Removal, inspection & replacement of housing
seal (s). Removal,
inspection
& replacement of
Bearing(s). Removal, inspection & repair/replacement of
DE
Mechanical
seal
cartridge
or
removal,
reinstallation of seal assembly in case of
non-cartridge
mechanical
seals.
Removal
&
reinstallation of DE casing cover with new gasket
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
8,108.97
Repl
of
casing
gasket(Ver
Split),DE
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 37
Side
CENT.
INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 38
Material/Service Description
Unit Rate
PUMP-SINGLE/TWO
STAGE BETWEEN BRG (Horizontal).- Above
100 and up to 250 KW.
Replace
casing
gasket
(Vert
Split)
- DE: Job
includes: Removal, inspection & replacement of housing
seal (s). Removal,
inspection
& replacement of
Bearing(s). Removal, inspection & repair/replacement of
DE
Mechanical
seal
cartridge
or
removal,
reinstallation of seal assembly in case of
non-cartridge
mechanical
seals.
Removal
&
reinstallation of DE casing cover with new gasket
3159233
W
11,318.77 INR/EA
Repl
of
casing
gasket(Ver
Split),DE
Side
CENT.
PUMP-SINGLE/TWO STAGE BETWEEN BRG (Horizontal).- Above 250
and up to 1000 KW.
Replace
casing
gasket
(Vert
Split)
- DE: Job
includes: Removal, inspection & replacement of housing
seal (s). Removal,
inspection
& replacement of
Bearing(s). Removal, inspection & repair/replacement of
DE
Mechanical
seal
cartridge
or
removal,
reinstallation of seal assembly in case of
non-cartridge
mechanical
seals.
Removal
&
reinstallation of DE casing cover with new gasket
15,204.32 INR/EA
Repl
of
casing
gasket(Ver
Split),DE
Side
CENT.
PUMP-SINGLE/TWO STAGE BETWEEN BRG (Horizontal).- Above 1000
KW.
Replace
casing
gasket
(Vert
Split)
- DE: Job
includes: Removal, inspection & replacement of housing
seal (s). Removal,
inspection
& replacement of
Bearing(s). Removal, inspection & repair/replacement of
DE
Mechanical
seal
cartridge
or
removal,
reinstallation of seal assembly in case of
non-cartridge
mechanical
seals.
Removal
&
reinstallation of DE casing cover with new gasket
Repl
of
PUMP-SINGLE/TWO
KW.
2,838.15
INR/EA
4,054.49
INR/EA
Repl
of
casing
PUMP-SINGLE/TWO STAGE
gaske(Ver
Split),NDE
SideCENT.
BETWEEN BRG (Horizontal).- Above 30
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 39
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
6,487.17
INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 40
Material/Service Description
Unit Rate
Repl
of
casing
gaske(Ver
Split),NDE
Side
CENT.
PUMP-SINGLE/TWO STAGE BETWEEN BRG (Horizontal).- Above 100
and up to 250 KW.
3159238
W
9,055.03
INR/EA
Repl
of casing gaske(Ver Split),NDE Side CENT.
PUMP-SINGLE/TWO STAGE BETWEEN BRG (Horizontal).- Above 250
and up to 1000 KW.
12,163.45 INR/EA
Repl
of casing gaske(Ver Split),NDE Side CENT.
PUMP-SINGLE/TWO STAGE BETWEEN BRG (Horizontal).- Above 1000
KW.
8,446.84
INR/EA
12,670.27 INR/EA
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
20,062.93 INR/EA
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 41
Number : CCM/
Date
: 25.05.2015
Page No. : 42
Material/Service Description
Unit Rate
coupling
guard(s),Spacer
removal
&
reinstallation/replacement,Alignment
Checking
and
Correction(including
hot
allignment
wherever
applicable).Removal
and
Replacement/Reinstallation
of
Coupling
hubs
Inspection
&
replacement
of
DE
housingseal(s).Inspection
&
replacement
of
DE
bearing(s).Inspection, repair /replacement of DE Mechanical
seal cartridge or non cartidge.
21,961.80 INR/EA
24,495.84 INR/EA
1,351.49
INR/EA
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 43
Number : CCM/
Date
: 25.05.2015
Page No. : 44
Material/Service Description
Unit Rate
2,027.25
INR/EA
2,702.99
INR/EA
4,054.49
INR/EA
5,405.98
INR/EA
NDE-Bearing
&
Housing
Seal.
CENTRIFUGAL PUMP
MULTISTAGE HORIZONTAL- Above 30 and up to 100 KW.
CENTRIFUGAL
PUMP MULTISTAGE HORIZONTAL - NDE-Bearing
& Housing
Seal.;JobIncludes:Removal
and
reinstallation
of (NDE)
bearing
housing
assemblyInspection
of
bearing(s), adjustment
of
thrust bearings including
anyreplacement if required.Inspection of
housing
seal(s)
and
seat
on
shaft,correctiv repair if any and replacement of seals
NDE-Bearing
&
Housing
Seal.
CENTRIFUGAL PUMP
MULTISTAGE HORIZONTAL- Above 250 and up to 1000 KW.
CENTRIFUGAL
PUMP MULTISTAGE HORIZONTAL - NDE-Bearing
& Housing
Seal.;JobIncludes:Removal
and
reinstallation
of (NDE)
bearing
housing
assemblyInspection
of
bearing(s), adjustment
of
thrust bearings including
anyreplacement if required.Inspection of
housing
seal(s)
and
seat
on
shaft,correctiv repair if any and replacement of seals
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 45
NDE
Mech
Up to 30 KW
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
2,534.05
INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 46
Material/Service Description
Unit Rate
NDE
Mech seal: Job includes: Removal and reinstallation
of (NDE)
bearing
housing assembly. Inspection of
bearing(s), adjustment
of thrust bearings including any
replacement if required. Inspection of housing seal(s) and
seat on shaft, correct
repair if any & replacement of
Seal(s) Replacement of seal cartridge and shaft sleeve.
3,378.75
INR/EA
6,757.47
INR/EA
8,446.84
INR/EA
9,967.28
INR/EA
NDE Mech seal. CENTRIFUGAL PUMP MULTISTAGE HORIZONTALAbove 30 and up to 100 KW.
NDE
Mech seal: Job includes: Removal and reinstallation
of (NDE)
bearing
housing assembly. Inspection of
bearing(s), adjustment
of thrust bearings including any
replacement if required. Inspection of housing seal(s) and
seat on shaft, correct
repair if any & replacement of
Seal(s) Replacement of seal cartridge and shaft sleeve.
NDE Mech seal. CENTRIFUGAL PUMP MULTISTAGE HORIZONTALAbove 100 and up to 250 KW.
NDE
Mech seal: Job includes: Removal and reinstallation
of (NDE)
bearing
housing assembly. Inspection of
bearing(s), adjustment
of thrust bearings including any
replacement if required. Inspection of housing seal(s) and
seat on shaft, correct
repair if any & replacement of
Seal(s) Replacement of seal cartridge and shaft sleeve.
Number : CCM/
Date
: 25.05.2015
Page No. : 47
Material/Service Description
Unit Rate
2,534.05
INR/EA
3,885.54
INR/EA
5,912.79
INR/EA
8,446.84
INR/EA
Repl
of
casing
gasket
(Vert split)-NDE CENTRIFUGAL
PUMP MULTISTAGE HORIZONTAL- Up to 30 KW
Replace
casing gasket (Vertically Split) - NDE: Job
Includes: Removal, inspection & replacement of housing seal
(s). Removal, inspection & replacement of Bearing(s),
Balance
drum
(if applicable). Removal, inspection &
repair/replacement of NDE Mechanical seal cartridge or
removal,
reinstallation of seal assembly in case of
non-cartridge mechanical seals. Removal & reinstallation of
NDE casing cover with new gasket
Repl
of
casing
gasket
(Vert split)-NDE CENTRIFUGAL
PUMP MULTISTAGE HORIZONTAL- Above 30 and up to 100 KW.
Replace
casing gasket (Vertically Split) - NDE: Job
Includes: Removal, inspection & replacement of housing seal
(s). Removal, inspection & replacement of Bearing(s),
Balance
drum
(if applicable). Removal, inspection &
repair/replacement of NDE Mechanical seal cartridge or
removal,
reinstallation of seal assembly in case of
non-cartridge mechanical seals. Removal & reinstallation of
NDE casing cover with new gasket
Repl
of
casing
gasket
(Vert split)-NDE CENTRIFUGAL
PUMP MULTISTAGE HORIZONTAL- Above 100 and up to 250 KW.
Replace
casing gasket (Vertically Split) - NDE: Job
Includes: Removal, inspection & replacement of housing seal
(s). Removal, inspection & replacement of Bearing(s),
Balance
drum
(if applicable). Removal, inspection &
repair/replacement of NDE Mechanical seal cartridge or
removal,
reinstallation of seal assembly in case of
non-cartridge mechanical seals. Removal & reinstallation of
NDE casing cover with new gasket
Repl
of
casing
gasket
(Vert split)-NDE CENTRIFUGAL
PUMP MULTISTAGE HORIZONTAL- Above 250 and up to 1000 KW.
Replace
casing gasket (Vertically Split) - NDE: Job
Includes: Removal, inspection & replacement of housing seal
(s). Removal, inspection & replacement of Bearing(s),
Balance
drum
(if applicable). Removal, inspection &
repair/replacement of NDE Mechanical seal cartridge or
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 48
Material/Service Description
Unit Rate
removal,
reinstallation of seal assembly in case of
non-cartridge mechanical seals. Removal & reinstallation of
NDE casing cover with new gasket
11,825.58 INR/EA
Repl
of
casing
gasket (Vert split)-NDE
CENTRIFUGAL
PUMP MULTISTAGE HORIZONTAL- Above 1000KW.
Replace
casing gasket (Vertically Split) - NDE: Job
Includes: Removal, inspection & replacement of housing seal
(s). Removal, inspection & replacement of Bearing(s),
Balance
drum
(if applicable). Removal, inspection &
repair/replacement of NDE Mechanical seal cartridge or
removal,
reinstallation of seal assembly in case of
non-cartridge mechanical seals. Removal & reinstallation of
NDE casing cover with new gasket
1,351.49
INR/EA
2,027.25
INR/EA
2,702.99
INR/EA
4,054.49
INR/EA
DE
bearing
&
Housing
seal.
CENTRIFUGAL PUMP
MULTISTAGE HORIZONTAL- Up to 30 KW
DE
bearing & Housing seal;Job includes :Removal and
reinstallation of bearinghousing assembly inspection of
bearing(s) including replacement if requiredInspection of
housing seal(s) and seat on shaft, with corrective repair
if anyand replacement
DE
bearing
&
Housing
seal.
CENTRIFUGAL PUMP
MULTISTAGE HORIZONTAL- Above 30 and up to 100 KW.
DE
bearing & Housing seal;Job includes :Removal and
reinstallation of bearinghousing assembly inspection of
bearing(s) including replacement if requiredInspection of
housing seal(s) and seat on shaft, with corrective repair
if anyand replacement
DE
bearing
&
Housing
seal.
CENTRIFUGAL PUMP
MULTISTAGE HORIZONTAL- Above 100 andup to 250 KW.
DE
bearing & Housing seal;Job includes :Removal and
reinstallation of bearinghousing assembly inspection of
bearing(s) including replacement if requiredInspection of
housing seal(s) and seat on shaft, with corrective repair
if anyand replacement
Number : CCM/
Date
: 25.05.2015
Page No. : 49
Material/Service Description
Unit Rate
DE
bearing
&
Housing
seal.
CENTRIFUGAL PUMP
MULTISTAGE HORIZONTAL- Above 250 and up to 1000 KW.
DE
bearing & Housing seal;Job includes :Removal and
reinstallation of bearinghousing assembly inspection of
bearing(s) including replacement if requiredInspection of
housing seal(s) and seat on shaft, with corrective repair
if anyand replacement
5,405.98
INR/EA
DE
bearing
&
Housing
seal.
CENTRIFUGAL PUMP
MULTISTAGE HORIZONTAL- Above 1000KW.
DE
bearing & Housing seal;Job includes :Removal and
reinstallation of bearinghousing assembly inspection of
bearing(s) including replacement if requiredInspection of
housing seal(s) and seat on shaft, with corrective repair
if anyand replacement
540.61 INR/EA
Repl
of casing gasket (Hori Split) CENTRIFUGAL PUMP
MULTISTAGE HORIZONTAL- Up to 30 KW.
Replace
casing
gasket
(Horizontal Split): Jobs
includes: Removal
& reinstallation of Horizontal split
casing cover. Replacement of casing gasket
810.90 INR/EA
Repl
of casing gasket (Hori Split) CENTRIFUGAL PUMP
MULTISTAGE HORIZONTAL- Above 30 and up to 100 KW.
Replace
casing
gasket
(Horizontal Split): Jobs
includes: Removal
& reinstallation of Horizontal split
casing cover. Replacement of casing gasket
1,623.48
INR/EA
2,128.62
INR/EA
Repl
of casing gasket (Hori Split) CENTRIFUGAL PUMP
MULTISTAGE HORIZONTAL- Above 100 and up to 250 KW.
Replace
casing
gasket
(Horizontal Split): Jobs
includes: Removal
& reinstallation of Horizontal split
casing cover. Replacement of casing gasket
Repl
of casing gasket (Hori Split) CENTRIFUGAL PUMP
MULTISTAGE HORIZONTAL- Above 250 and up to 1000 KW.
Replace
casing
gasket
(Horizontal Split): Jobs
includes: Removal
& reinstallation of Horizontal split
casing cover. Replacement of casing gasket
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 50
Material/Service Description
Unit Rate
2,534.05
INR/EA
2,787.46
INR/EA
4,561.30
INR/EA
6,588.54
INR/EA
8,615.78
INR/EA
Repl
of casing gasket (Hori Split) CENTRIFUGAL PUMP
MULTISTAGE HORIZONTAL- Above 1000KW.
Replace
casing
gasket
(Horizontal Split): Jobs
includes: Removal
& reinstallation of Horizontal split
casing cover. Replacement of casing gasket
Repl
of
casing gasket (Verti split)- DE. CENTRIFUGAL
PUMP MULTISTAGE HORIZONTAL- Up to 30 KW
Replace casing gasket (Verti Split) DE side: Jobs includes:
Removal, inspection & replacement of housing seal (s).
Removal, inspection & replacement of Bearing(s). Removal,
inspection & repair/replacement of DE Mechanical seal
cartridge or removal, reinstallation of seal assembly in
case
of
non-cartridge
mechanical
seals. Removal &
reinstallation of DE casing cover with new gasket
Repl
of
casing gasket (Verti split)- DE. CENTRIFUGAL
PUMP MULTISTAGE HORIZONTAL- Above 30 and up to 100 KW.
Replace casing gasket (Verti Split) DE side: Jobs includes:
Removal, inspection & replacement of housing seal (s).
Removal, inspection & replacement of Bearing(s). Removal,
inspection & repair/replacement of DE Mechanical seal
cartridge or removal, reinstallation of seal assembly in
case
of
non-cartridge
mechanical
seals. Removal &
reinstallation of DE casing cover with new gasket
Repl
of
casing gasket (Verti split)- DE. CENTRIFUGAL
PUMP MULTISTAGE HORIZONTAL- Above 100 and up to 250 KW.
Replace casing gasket (Verti Split) DE side: Jobs includes:
Removal, inspection & replacement of housing seal (s).
Removal, inspection & replacement of Bearing(s). Removal,
inspection & repair/replacement of DE Mechanical seal
cartridge or removal, reinstallation of seal assembly in
case
of
non-cartridge
mechanical
seals. Removal &
reinstallation of DE casing cover with new gasket
Repl
of
casing gasket (Verti split)- DE. CENTRIFUGAL
PUMP MULTISTAGE HORIZONTAL- Above 250 and up to 1000 KW.
Replace casing gasket (Verti Split) DE side: Jobs includes:
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 51
Material/Service Description
Unit Rate
Removal,
inspection
&
replacement
of
housing seal
(s). Removal,
inspection
& replacement of Bearing(s).
Removal, inspection & repair/replacement of DE Mechanical
seal cartridge
or
removal,
reinstallation of seal
assembly in case
of
non-cartridge
mechanical
seals.
Removal
&
reinstallation of DE casing cover with new gasket
10,305.14 INR/EA
Repl
of
casing gasket (Verti split)- DE. CENTRIFUGAL
PUMP MULTISTAGE HORIZONTAL- Above 1000KW.
Replace casing gasket (Verti Split) DE side: Jobs includes:
Removal, inspection & replacement of housing seal (s).
Removal, inspection & replacement of Bearing(s). Removal,
inspection & repair/replacement of DE Mechanical seal
cartridge or removal, reinstallation of seal assembly in
case
of
non-cartridge
mechanical
seals. Removal &
reinstallation of DE casing cover with new gasket
2,534.05
INR/EA
3,378.75
INR/EA
6,757.47
INR/EA
8,446.84
INR/EA
DE
Mech
Seal . CENTRIFUGAL PUMP MULTISTAGE HORIZONTALUp to 30 KW
DE
Mech
Seal:Job
includes :Removal and reinstallation
of bearing
housingassembly.Inspection of bearing(s)
including replacement if required.
DE
Mech
Seal
.
CENTRIFUGAL
PUMP MULTISTAGE
HORIZONTAL- Above 30 and up to 100 KW.
DE
Mech
Seal:Job
includes :Removal and reinstallation
of bearing
housingassembly.Inspection of bearing(s)
including replacement if required.
DE
Mech
Seal
.
CENTRIFUGAL
PUMP MULTISTAGE
HORIZONTAL- Above 100 and up to 250 KW.
DE
Mech
Seal:Job
includes :Removal and reinstallation
of bearing
housingassembly.Inspection of bearing(s)
including replacement if required.
DE
Mech
Seal
.
CENTRIFUGAL
PUMP MULTISTAGE
HORIZONTAL- Above 250 and up to 1000 KW.
DE
Mech
Seal:Job
includes :Removal and reinstallation
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
housingassembly.Inspection
Number : CCM/
Date
: 25.05.2015
Page No. : 52
of
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
bearing(s)
Number : CCM/
Date
: 25.05.2015
Page No. : 53
Material/Service Description
Unit Rate
replacement if required.
9,967.28
INR/EA
7,391.00
INR/EA
DE
Mech
Seal
.
CENTRIFUGAL
PUMP MULTISTAGE
HORIZONTAL- Above 1000KW.
DE
Mech
Seal:Job
includes :Removal and reinstallation
of bearing
housingassembly.Inspection of bearing(s)
including replacement if required.
Capital
repair. CENTRIFUGAL PUMP MULTISTAGE HORIZONTALUp to 30 KW
Capital Repair:Job Includes:Removal &
Reinstallation of
Couplinggaurd(s).Spacer
removal
and
installation/replacement.Alignment
checking
&correction.Removal
&
reinstallation/replacement
of
coupling hub.Removal andreinstallation of (NDE) bearing
housing assembly.Inspection of bearing(s),adjustment of
thrust
bearings
including
any
replacement
if
required.Inspectionof housing seal(s) and seat on shaft,
correctivve
repair if any
and
repalcementof
Seal(s).Replacement of seal cartridge and shaft sleeve,
balance
drum (ifapplicable).Replacement of NDE Casing
Gasket.
14,557.28 INR/EA
Capital
repair.CENTRIFUGAL PUMP MULTISTAGE HORIZONTALAbove 30 and up to 100 KW.
Capital Repair:Job Includes:Removal &
Reinstallation of
Couplinggaurd(s).Spacer
removal
and
installation/replacement.Alignment
checking
&correction.Removal
&
reinstallation/replacement
of
coupling hub.Removal andreinstallation of (NDE) bearing
housing assembly.Inspection of bearing(s),adjustment of
thrust
bearings
including
any
replacement
if
required.Inspectionof housing seal(s) and seat on shaft,
correctivve
repair if any
and
repalcementof
Seal(s).Replacement of seal cartridge and shaft sleeve,
balance
drum (ifapplicable).Replacement of NDE Casing
Gasket.
Capital
repair.CENTRIFUGAL PUMP MULTISTAGE HORIZONTALAbove 100 and up to 250 KW.
Capital Repair:Job Includes:Removal & Reinstallation of
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
20,272.43 INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 54
Material/Service Description
Couplinggaurd(s).Spacer
installation/replacement.Alignment
removal
Unit Rate
and
checking
&correction.Removal
&
reinstallation/replacement
of
coupling
hub.Removal
andreinstallation
of
(NDE)
bearing
housing
assembly.Inspection
of
bearing(s),adjustment of thrust
bearings
including
any
replacement if required.Inspectionof
housing
seal(s)
and seat on shaft, correctivve
repairif
any
andrepalcementof
Seal(s).Replacement of seal cartridge and shaft sleeve,
balance
drum (ifapplicable).Replacement of NDE Casing
Gasket.
22,806.47 INR/EA
Capital
repair.CENTRIFUGAL PUMP MULTISTAGE HORIZONTALAbove 250 and up to 1000 KW.
Capital Repair:Job Includes:Removal &
Reinstallation of
Couplinggaurd(s).Spacer
removal
and
installation/replacement.Alignment
checking
&correction.Removal
&
reinstallation/replacement
of
coupling hub.Removal andreinstallation of (NDE) bearing
housing assembly.Inspection of bearing(s),adjustment of
thrust
bearings
including
any
replacement
if
required.Inspectionof housing seal(s) and seat on shaft,
correctivve
repair if any
and
repalcementof
Seal(s).Replacement of seal cartridge and shaft sleeve,
balance
drum (ifapplicable).Replacement of NDE Casing
Gasket.
27,029.90 INR/EA
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 55
Number : CCM/
Date
: 25.05.2015
Page No. : 56
Material/Service Description
Unit Rate
1,540.70
INR/EA
2,312.76
INR/EA
4,627.18
INR/EA
5,490.44
INR/EA
6,757.47
INR/EA
2,111.71
INR/EA
Replacement
of casing Gasket CENTRIFUGAL PUMP-SINGLE
STAGE VERTICAL INLINE - Up to 30 KW
CENTRI PUMP-SINGLE STAGE VERTICAL INLINE Replacement of
casing Gasket:Jobincludes lifting of Pump Assembly and
refixing.
Replacement
of casing Gasket CENTRIFUGAL PUMP-SINGLE
STAGE VERTICAL INLINE - Above 30 and up to 100 KW.
CENTRI PUMP-SINGLE STAGE VERTICAL INLINE Replacement of
casing Gasket:Jobincludes lifting of Pump Assembly and
refixing.
Replacement
of casing Gasket CENTRIFUGAL PUMP-SINGLE
STAGE VERTICAL INLINE - Above 100 and up to 250 KW.
CENTRI PUMP-SINGLE STAGE VERTICAL INLINE Replacement of
casing Gasket:Jobincludes lifting of Pump Assembly and
refixing.
Replacement
of casing Gasket CENTRIFUGAL PUMP-SINGLE
STAGE VERTICAL INLINE - Above 250 and up to 1000 KW.
CENTRI PUMP-SINGLE STAGE VERTICAL INLINE Replacement of
casing Gasket:Jobincludes lifting of Pump Assembly and
refixing.
Replacement
of casing Gasket CENTRIFUGAL PUMP-SINGLE
STAGE VERTICAL INLINE - Above 1000 KW.
CENTRI PUMP-SINGLE STAGE VERTICAL INLINE Replacement of
casing Gasket:Jobincludes lifting of Pump Assembly and
refixing.
Number : CCM/
Date
: 25.05.2015
Page No. : 57
Material/Service Description
Unit Rate
3,209.81
INR/EA
4,899.17
INR/EA
5,912.79
INR/EA
7,095.35
INR/EA
Bearing
replacement.CENTRIFUGAL
PUMP-SINGLE
STAGE
VERTICAL INLINE - Above 1000 KW.
Bearing replacement:Job includes:Removal, reinstallation of
pump
assemblyfrompump
casing.Replacement of Casing
Gasket.Removal,
reinstallation
of
impellerassembly
includingcleaning, inspection, clearance checking.Removal
andinstallation of Seal Cartidge.Removal, inspection and
replacement
of
housingseal.Removal,
inspection
and
replacement of Bearings with all checks
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 58
Material/Service Description
Unit Rate
2,534.05
INR/EA
3,378.75
INR/EA
6,652.73
INR/EA
8,446.84
INR/EA
Impeller
Assembly
CENTRIFUGAL
PUMP-SINGLE STAGE
VERTICAL INLINE - Up to 30 KW
Impeller assembly job:Job includes:Removal & reinstallation
of pump assemblyfrom pump casing Replacement of casing
Gasket.Removal
&reinstallation/replacement
of impeller
and/or impeller bolt includinggasket/O-ring
Impeller
Assembly
CENTRIFUGAL
PUMP-SINGLE STAGE
VERTICAL INLINE - Above 30 and up to 100 KW.
Impeller assembly job:Job includes:Removal & reinstallation
of pump assemblyfrom pump casing Replacement of casing
Gasket.Removal
&reinstallation/replacement
of impeller
and/or impeller bolt includinggasket/O-ring
Impeller
Assembly
CENTRIFUGAL
PUMP-SINGLE STAGE
VERTICAL INLINE - Above 100 and up to 250 KW.
Impeller assembly job:Job includes:Removal & reinstallation
of pump assemblyfrom pump casing Replacement of casing
Gasket.Removal
&reinstallation/replacement
of impeller
and/or impeller bolt includinggasket/O-ring
Impeller
Assembly CENTRIFUGAL PUMP-SINGLE STAGE VERTICAL
INLINE - Above 250 and up to 1000 KW.
Impeller assembly job:Job includes:Removal & reinstallation
of pump assemblyfrom pump casing Replacement of casing
Gasket.Removal
&reinstallation/replacement
of impeller
and/or impeller bolt includinggasket/O-ring
12,839.20 INR/EA
Impeller
Assembly
CENTRIFUGAL
PUMP-SINGLE STAGE
VERTICAL INLINE - Above 1000 KW.
Impeller assembly job:Job includes:Removal & reinstallation
of pump assemblyfrom pump casing Replacement of casing
Gasket.Removal
&reinstallation/replacement
of impeller
and/or impeller bolt includinggasket/O-ring
Mechanical
seal.
CENTRIFUGAL
PUMP-SINGLE
STAGE
VERTICAL INLINE - Up to 30 KW
Mechanical seal:Job includes:Removal & reinstallation of
pump
assembly
frompump
casing.Replacement of casing
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
3,096.61
INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 59
Material/Service Description
Unit Rate
Gasket.Removal
&
reinstallation/replacementof
impeller
and/or
impeller
bolt
including gasket/O-ring.Removal
&reinstallation
of mechanical seal assembly including
complete
dismantling
&reassembly,
inspection
&
repair/replacement of components, inspection &replacement
(if reqd) of shaft sleeve, replace of all gaskets/O-rings
4,561.30
INR/EA
9,122.59
INR/EA
Mechanical
seal.CENTRIFUGAL PUMP-SINGLE STAGE VERTICAL
INLINE - Above 30 and up to 100 KW.
Mechanical seal:Job includes:Removal & reinstallation of
pump
assembly
frompump
casing.Replacement of casing
Gasket.Removal
&
reinstallation/replacementof
impeller
and/or
impeller
bolt
including gasket/O-ring.Removal
&reinstallation
of mechanical seal assembly including
complete
dismantling
&reassembly,
inspection
&
repair/replacement of components, inspection &replacement
(if reqd) of shaft sleeve, replace of all gaskets/O-rings
Mechanical
seal.CENTRIFUGAL PUMP-SINGLE STAGE VERTICAL
INLINE - Above 100 and up to 250 KW.
Mechanical seal:Job includes:Removal & reinstallation of
pump
assembly
frompump
casing.Replacement of casing
Gasket.Removal
&
reinstallation/replacementof
impeller
and/or
impeller
bolt
including gasket/O-ring.Removal
&reinstallation
of mechanical seal assembly including
complete
dismantling
&reassembly,
inspection
&
repair/replacement of components, inspection &replacement
(if reqd) of shaft sleeve, replace of all gaskets/O-rings
Mechanical
seal.
CENTRIFUGAL
PUMP-SINGLE
STAGE
VERTICAL INLINE - Above 250 and up to 1000 KW.
Mechanical seal:Job includes:Removal & reinstallation of
pump
assembly
frompump
casing.Replacement of casing
Gasket.Removal
&
reinstallation/replacementof
impeller
and/or
impeller
bolt
including gasket/O-ring.Removal
&reinstallation
of mechanical seal assembly including
complete
dismantling
&reassembly,
inspection
&
repair/replacement of components, inspection &replacement
(if reqd) of shaft sleeve, replace of all gaskets/O-rings
Mechanical
seal.
CENTRIFUGAL
VERTICAL INLINE - Above 1000 KW.
PUMP-SINGLE
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
STAGE
Number : CCM/
Date
: 25.05.2015
Page No. : 60
Material/Service Description
Unit Rate
4,223.43
INR/EA
6,588.54
INR/EA
Capital
repair.
CENTRIFUGAL
PUMP-SINGLE
STAGE
VERTICAL INLINE - Up to 30 KW
Capital Repair:Job includes:Removal &
Reinstallation of
Couplinggaurd(s).Removal & Reinstallation / Replacement of
coupling spacer.Checking &correction of alignment between
driver & Pump.Removal & reinstallation of pumpassembly from
pump
casing
Replacement
of
casing Gasket. Removal
&reinstallation/replacement of impeller and/orimpeller bolt
includinggasket/O-ring.Removal
&
reinstallation
of
mechanical seal assembly includingcomplete dismantling &
reassembly, inspection & repair/replacement ofcomponents,
inspection
&
replacement
(ifrequired)
of
shaft
sleeve,replacementof all gaskets/O-rings.Removal,inspection
&
replacement
of
housingseal(s).Removal,inspection &
replacement
of
Bearing(s)
with
all
checks.Completedismantling
of pump unit, inspection &
repair/replacement of bearing, oilseals, other internals as
required, reassembly and installation.
Capital
repair.
CENTRIFUGAL
PUMP-SINGLE
STAGE
VERTICAL INLINE - Above 30 and up to 100 KW.
Capital Repair:Job includes:Removal &
Reinstallation of
Couplinggaurd(s).Removal & Reinstallation / Replacement of
coupling spacer.Checking &correction of alignment between
driver & Pump.Removal & reinstallation of pumpassembly from
pump
casing
Replacement
of
casing Gasket. Removal
&reinstallation/replacement of impeller and/orimpeller bolt
includinggasket/O-ring.Removal
&
reinstallation
of
mechanical seal assembly includingcomplete dismantling &
reassembly, inspection & repair/replacement ofcomponents,
inspection
&
replacement
(ifrequired)
of
shaft
sleeve,replacementof all gaskets/O-rings.Removal,inspection
&
replacement
of
housingseal(s).Removal,inspection &
replacement
of
Bearing(s)
with
all
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 61
Material/Service Description
Unit Rate
checks.Completedismantling
of pump unit, inspection &
repair/replacement of bearing, oilseals, other internals as
required, reassembly and installation.
Capital
repair.CENTRIFUGAL
PUMP-SINGLE STAGE VERTICAL
INLINE - Above 100 and up to 250 KW.
Capital Repair:Job includes:Removal &
Reinstallation of
Couplinggaurd(s).Removal & Reinstallation / Replacement of
coupling spacer.Checking &correction of alignment between
driver & Pump.Removal & reinstallation of pumpassembly from
pump
casing
Replacement
of
casing Gasket. Removal
&reinstallation/replacement of impeller and/orimpeller bolt
includinggasket/O-ring.Removal
&
reinstallation
of
mechanical seal assembly includingcomplete dismantling &
reassembly, inspection & repair/replacement ofcomponents,
inspection
&
replacement
(ifrequired)
of
shaft
sleeve,replacementof all gaskets/O-rings.Removal,inspection
&
replacement
of
housingseal(s).Removal,inspection &
replacement
of
Bearing(s)
with
all
checks.Completedismantling
of pump unit, inspection &
repair/replacement of bearing, oilseals, other internals as
required, reassembly and installation.
Capital
repair.CENTRIFUGAL
PUMP-SINGLE STAGE VERTICAL
INLINE - Above 250 and up to 1000 KW.
Capital Repair:Job includes:Removal &
Reinstallation of
Couplinggaurd(s).Removal & Reinstallation / Replacement of
coupling spacer.Checking &correction of alignment between
driver & Pump.Removal & reinstallation of pumpassembly from
pump
casing
Replacement
of
casing Gasket. Removal
&reinstallation/replacement of impeller and/orimpeller bolt
includinggasket/O-ring.Removal
&
reinstallation
of
mechanical seal assembly includingcomplete dismantling &
reassembly, inspection & repair/replacement ofcomponents,
inspection
&
replacement
(ifrequired)
of
shaft
sleeve,replacementof all gaskets/O-rings.Removal,inspection
&
replacement
of
housingseal(s).Removal,inspection &
replacement
of
Bearing(s)
with
all
checks.Completedismantling
of pump unit, inspection &
repair/replacement of bearing, oilseals, other internals as
required, reassembly and installation.
Capital
repair.
CENTRIFUGAL
PUMP-SINGLE
VERTICAL
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
STAGE
Number : CCM
Date
: 25.05.2015
Page No. : 44
Material/Service Description
Unit Rate
2,027.25
INR/EA
3,209.81
INR/EA
5,912.79
INR/EA
Bearing
jobs.
CENT.
MULTI
STAGE VERTICAL SUMP /
TURBINE PUMP - Up to 30 KW
CENT.SING/MULTI
STG
VERT SUMP/TURB PUMP .Bearing
jobs:Job includes :Removal &reinstallation of driver
spool.Removal
&
einstallation/replacement
of
bearingincluding replacement of
gaskets/Orings/oil
seals.Vertical
lift
checking
andsetting
Bearing
jobs.
CENT.
MULTI
STAGE VERTICAL SUMP /
TURBINE PUMP - Above 30 and up to 100 KW.
CENT.SING/MULTI
STG
VERT SUMP/TURB PUMP .Bearing
jobs:Job includes :Removal &reinstallation of driver
spool.Removal
&
einstallation/replacement
of
bearingincluding replacement of
gaskets/Orings/oil
seals.Vertical
lift
checking
andsetting
Bearing
jobs.
CENT.
MULTI
STAGE VERTICAL SUMP /
TURBINE PUMP - Above 100 and up to 250 KW.
CENT.SING/MULTI
STG
VERT SUMP/TURB PUMP .Bearing
jobs:Job includes :Removal &reinstallation of driver
spool.Removal
&
einstallation/replacement
of
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM
Date
: 25.05.2015
Page No. : 45
gaskets/Olift
checking
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 45
Material/Service Description
Unit Rate
7,602.15
INR/EA
9,122.59
INR/EA
3,378.75
INR/EA
5,279.27
INR/EA
Bearing
jobs.
CENT.
MULTI
STAGE VERTICAL SUMP /
TURBINE PUMP - Above 250 and up to 1000 KW.
CENT.SING/MULTI
STG
VERT SUMP/TURB PUMP .Bearing
jobs:Job includes :Removal &reinstallation of driver
spool.Removal
&
einstallation/replacement
of
bearingincluding replacement of
gaskets/Orings/oil
seals.Vertical
lift
checking
andsetting
Bearing
jobs.
CENT.
MULTI
STAGE VERTICAL SUMP /
TURBINE PUMP -Above 1000 KW.
CENT.SING/MULTI
STG
VERT SUMP/TURB PUMP .Bearing
jobs:Job includes :Removal &reinstallation of driver
spool.Removal
&
einstallation/replacement
of
bearingincluding replacement of
gaskets/Orings/oil
seals.Vertical
lift
checking
andsetting
Seal jobs. CENT. MULTI STAGE VERTICAL SUMP / TURBINE PUMP Above 30 and up to 100 KW.
Seal
job:Job
includes :Removal & reinstallation of
driver spool.Removal &reinstallation/replacement
of
bearing including replacement ofgaskets/O-rings/oil
seals, Vertical lift checking,
adjustment
(ifrequired).Removal
& reinstallation
of
adapter
piece
(ifrequired).Repair/replacement of seal/cartridge seal and
sleeve
Seal jobs. CENT. MULTI STAGE VERTICAL SUMP / TURBINE PUMP Above 100 and up to 250 KW.
Seal
job:Job
includes :Removal & reinstallation of
driver
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 46
7,391.00 INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 47
Material/Service Description
Unit Rate
spool.Removal
&reinstallation/replacement
of
bearing
including replacement ofgaskets/O-rings/oil seals, Vertical
lift
checking,
adjustment
(ifrequired).Removal
&
reinstallation
of
adapter
piece
(ifrequired).Repair/replacement of seal/cartridge seal and
sleeve
9,502.69
INR/EA
Seal jobs. CENT. MULTI STAGE VERTICAL SUMP / TURBINE PUMP Above 250 and up to 1000 KW.
Seal
job:Job
includes :Removal & reinstallation of
driver spool.Removal &reinstallation/replacement
of
bearing including replacement ofgaskets/O-rings/oil
seals, Vertical lift checking,
adjustment
(ifrequired).Removal
& reinstallation
of
adapter
piece
(ifrequired).Repair/replacement of seal/cartridge seal and
sleeve
11,403.25 INR/EA
Seal jobs. CENT. MULTI STAGE VERTICAL SUMP / TURBINE PUMP Above 1000 KW.
Seal
job:Job
includes :Removal & reinstallation of
driver spool.Removal &reinstallation/replacement
of
bearing including replacement ofgaskets/O-rings/oil
seals, Vertical lift checking,
adjustment
(ifrequired).Removal
& reinstallation
of
adapter
piece
(ifrequired).Repair/replacement of seal/cartridge seal and
sleeve
6,335.13
INR/EA
8,869.18
INR/EA
Casing
Gasket
job.
CENT.
MULTI
STAGE
VERTICAL
SUMP / TURBINE PUMP - Upto 30 KW
Casing
Gasket
Job:Job
includes
:
Removal
&
reinstallation of
pump
asembly
fromvessel/pit incl
discharge pipe(where applicable).Replacement of casing
gasket
Casing
Gasket
job.
CENT.
MULTI
STAGE
VERTICAL
SUMP / TURBINE PUMP - Above 30 and up to 100 KW.
Casing
Gasket
Job:Job
includes
:
Removal
&
reinstallation of
pump
asembly
fromvessel/pit incl
discharge pipe(where applicable).Replacement of casing
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 48
Casing
SUMP /
Gasket
job.
CENT.
MULTI
STAGE
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
VERTICAL
Number : CCM/
Date
: 25.05.2015
Page No. : 49
Material/Service Description
Unit Rate
16,260.17 INR/EA
Casing
Gasket
job.
CENT.
MULTI
STAGE
VERTICAL
SUMP / TURBINE PUMP - Above 250 and up to 1000 KW.
Casing
Gasket
Job:Job
includes
:
Removal
&
reinstallation of
pump
asembly
fromvessel/pit incl
discharge pipe(where applicable).Replacement of casing
gasket
19,216.56 INR/EA
Casing
Gasket
job.
CENT.
MULTI
STAGE
VERTICAL
SUMP / TURBINE PUMP -Above 1000 KW.
Casing
Gasket
Job:Job
includes
:
Removal
&
reinstallation of
pump
asembly
fromvessel/pit incl
discharge pipe(where applicable).Replacement of casing
gasket
7,602.15
INR/EA
1st
Stage Impeller jobs. CENT. MULTI STAGE VERTICAL
SUMP / TURBINE PUMP - Up to 30 KW
1st
Stage
Impeller
jobs:Job
includes
:Removal
&
reinstallation of pump assemblyfrom vessel/pit including
discharge
pipe(where applicable). Replacement ofcasing
gasket.Removal & reinstallation/replacement of impeller
and/or fastenerswith all necessary checks for dimension &
clearances including replacement ofall gaskets/O-rings
11,041.71 INR/EA
1st
Stage
Impeller
jobs:Job
includes
:Removal
&
reinstallation of pump assemblyfrom vessel/pit including
discharge
pipe(where applicable). Replacement ofcasing
gasket.Removal & reinstallation/replacement of impeller
and/or fastenerswith all necessary checks for dimension &
clearances including replacement ofall gaskets/O-rings
1st
Stage Impeller jobs. CENT. MULTI STAGE VERTICAL
SUMP / TURBINE PUMP - Above 100 and up to 250 KW.
1st
Stage
Impeller
jobs:Job
includes
:Removal
&
reinstallation of pump assemblyfrom vessel/pit including
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
14,781.97 INR/EA
discharge
pipe(where applicable). Replacement ofcasing
gasket.Removal & reinstallation/replacement of impeller
and/or fastenerswith all necessary checks for dimension &
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 50
Number : CCM/
Date
: 25.05.2015
Page No. : 51
Material/Service Description
Unit Rate
16,260.17 INR/EA
1st
Stage Impeller jobs. CENT. MULTI STAGE VERTICAL
SUMP / TURBINE PUMP - Above 250 and up to 1000 KW.
1st
Stage
Impeller
jobs:Job
includes
:Removal
&
reinstallation of pump assemblyfrom vessel/pit including
discharge
pipe(where applicable). Replacement ofcasing
gasket.Removal & reinstallation/replacement of impeller
and/or fastenerswith all necessary checks for dimension &
clearances including replacement ofall gaskets/O-rings
19,216.56 INR/EA
1st
Stage Impeller jobs. CENT. MULTI STAGE VERTICAL
SUMP / TURBINE PUMP - Above 1000 KW.
1st
Stage
Impeller
jobs:Job
includes
:Removal
&
reinstallation of pump assemblyfrom vessel/pit including
discharge
pipe(where applicable). Replacement ofcasing
gasket.Removal & reinstallation/replacement of impeller
and/or fastenerswith all necessary checks for dimension &
clearances including replacement ofall gaskets/O-rings
12,670.27 INR/EA
16,260.17 INR/EA
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 52
Number : CCM/
Date
: 25.05.2015
Page No. : 53
Material/Service Description
Unit Rate
guards.Removal
&reinstallation/replacment
of
coupling
spacer Removal &reinstallation/replacment of coupling Hub
Removal
&
reinstallation
of
driverspool Removal &
reinstallation/replacement
of bearing incl replacement
ofgaskets/O-rings/oil seals. Removal & reinstalllation of
pump
assembly
fromvessel/pit
including
discharge
pipe.Removal & reinstallation of adapter pieceif installed
Repair/replacement
of
seal/cartridge seal and sleeve
Completedismentling of pump assembly, inspection of all
internals
withrepair/replacement
of
components,
all
necessary
checks
for dimension &clearances including
reassembly and reinstallation
23,651.16 INR/EA
27,029.90 INR/EA
inspection of all
components,
all
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 54
Number : CCM/
Date
: 25.05.2015
Page No. : 55
Material/Service Description
necessary
checks
for dimension
reassembly and reinstallation
&clearances
Unit Rate
including
30,408.64 INR/EA
15,204.32 INR/EA
Capital
repairs (Above 4 stage).CENT. MULTI STAGE
VERTICAL SUMP / TURBINE PUMP - Upto 30 KW
Capital
repairs (Above 4 stage):Job includes :Decoupling
& coupling jobsincluding Removal & reinstallation of
coupling guards.
Removal
&reinstallation/replacment
of coupling spacer Removal &reinstallation/replacment of
coupling Hub Removal
&
reinstallation
of
driverspool
Removal
&
reinstallation/replacement
of bearing incl replacement
ofgaskets/O-rings/oil seals. Removal & reinstalllation of
pump
assembly
fromvessel/pit including
discharge
pipe.Removal & reinstallation of adapter pieceif installed
Repair/replacement
of
seal/cartridge seal and sleeve
Completedismentling of pump assembly, inspection of all
internals
withrepair/replacement of components,
all
necessary
checksfor
dimension
&clearances
includingreassembly and reinstallation
18,583.05 INR/EA
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 56
of
of
Number : CCM/
Date
: 25.05.2015
Page No. : 57
Material/Service Description
Unit Rate
spacer
Removal
&reinstallation/replacment of coupling
Hub Removal
&
reinstallation
of
driverspool
Removal & reinstallation/replacement of
bearing
incl
replacement ofgaskets/O-rings/oil
seals.
Removal &
reinstalllation of pump
assemblyfromvessel/pit
including
discharge
pipe.Removal
&
reinstallation
of
adapter
pieceif
installed
Repair/replacement
of
seal/cartridge seal and sleeve
Completedismentling of pump assembly, inspection of all
internals
withrepair/replacement of components, all
necessary
checks
for dimension &clearances
includingreassembly and reinstallation
22,806.47 INR/EA
27,029.90 INR/EA
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 58
Number : CCM/
Date
: 25.05.2015
Page No. : 59
Material/Service Description
Unit Rate
32,098.00 INR/EA
2,534.05
INR/EA
3,885.54
INR/EA
7,771.09
INR/EA
&Reinstallation/replacement
of
bearings(s) including replacement of gaskets /O-rings / Oil
seals,shaft sleeve , adapter etc
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 60
Number : CCM/
Date
: 25.05.2015
Page No. : 61
Material/Service Description
Unit Rate
9,629.41
INR/EA
11,825.58 INR/EA
4,400.80
INR/EA
6,600.36
INR/EA
12,670.27 INR/EA
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 62
Number : CCM/
Date
: 25.05.2015
Page No. : 63
Material/Service Description
Unit Rate
installedReplacement
of
cartridge
/
non-cartridge
seal including
repair
/ reconditioningof components in
case of non-cartridge seal
16,049.00 INR/EA
18,583.05 INR/EA
15,204.32 INR/EA
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 64
Number : CCM/
Date
: 25.05.2015
Page No. : 65
Material/Service Description
Unit Rate
TURBINE/CAN -
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Capital
Repair:Job
includes : Removal & Reinstallation
of
Coupling gaurd(s).Removal & Reinstallation/replacement of
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 66
Number : CCM/
Date
: 25.05.2015
Page No. : 67
Material/Service Description
Unit Rate
coupling
spacer. Checking & correctionof alignment
between driver &
pump.Removal
&
Reinstallation/replacement ofcoupling
hub.Removal
&
Reinstallation/replacement
of
bearings(s) includingreplacement of gasket / O-rings / Oil
seals , shaft sleeve , adapter etcRemoval& reistallation of
adapter
piece
if
installed
Replacement
of
cartridge/non-cartridge
seal
including
repair
/
reconditioning of components in case ofnon-cartridge seal
Removal & reistallation of complete unit from sump /
vesselRemoval
& reistallation
of
barrel Removal &
reistallation/
replacement
of rotorassembly including
dismanttling
&
reassembly of all components ,repair
/replacement
of
parts
as
required,
replacement
of
all gaskets / O-rings
32,098.00 INR/EA
Capital
Repair.CENTRIFUGAL PUMP-VERTICAL TURBINE/CAN Above 1000KW.
Capital
Repair:Job
includes : Removal & Reinstallation
of Coupling gaurd(s).Removal & Reinstallation/replacement
of coupling
spacer. Checking & correctionof alignment
between driver &
pump.Removal
&
Reinstallation/replacement ofcoupling
hub.Removal
&
Reinstallation/replacement
of
bearings(s) includingreplacement of gasket / O-rings / Oil
seals , shaft sleeve , adapter etcRemoval& reistallation of
adapter
piece
if
installed
Replacement
of
cartridge/non-cartridge
seal
including
repair
/
reconditioning of components in case ofnon-cartridge seal
Removal & reistallation of complete unit from sump /
vesselRemoval
& reistallation
of
barrel Removal &
reistallation/
replacement
of rotorassembly including
dismanttling
&
reassembly of all components ,repair
/replacement
of
parts
as
required,
replacement
of
all gaskets / O-rings
Seal
leak attending(Process Side) CETRIFUGAL PUMPSUNDYNE.
- Up to 30 KW
CETRIFUGAL
PUMP-SUNDYNE.-Seal
leak attending (Process
Side):Jobs includes:Removal & reinstallation of Impeller
assembly Removal & reinstallation ofgearbox assembly from
pump
casingRemoval,
inspection,
reinstallation
with
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
4,730.24
INR/EA
leaktests of pump seal components after corrective action single/double/tandemseal whichever installed
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 68
Number : CCM/
Date
: 25.05.2015
Page No. : 69
Material/Service Description
Unit Rate
7,335.25
INR/EA
Seal
leak attending(Process Side) CETRIFUGAL PUMPSUNDYNE.
- Above 30 and up to 100 KW.
CETRIFUGAL
PUMP-SUNDYNE.-Seal
leak attending (Process
Side):Jobs includes:Removal & reinstallation of Impeller
assembly Removal & reinstallation ofgearbox assembly from
pump
casingRemoval,
inspection,
reinstallation
with
leaktests of pump seal components after corrective action single/double/tandemseal whichever installed
11,487.71 INR/EA
Seal
leak attending(Process Side) CETRIFUGAL PUMPSUNDYNE.
- Above 100 and up to 250KW.
CETRIFUGAL
PUMP-SUNDYNE.-Seal
leak attending (Process
Side):Jobs includes:Removal & reinstallation of Impeller
assembly Removal & reinstallation ofgearbox assembly from
pump
casingRemoval,
inspection,
reinstallation
with
leaktests of pump seal components after corrective action single/double/tandemseal whichever installed
13,852.83 INR/EA
Seal
leak attending(Process Side) CETRIFUGAL PUMPSUNDYNE.
- Above 250 and up to 500KW.
CETRIFUGAL
PUMP-SUNDYNE.-Seal
leak attending (Process
Side):Jobs includes:Removal & reinstallation of Impeller
assembly Removal & reinstallation ofgearbox assembly from
pump
casingRemoval,
inspection,
reinstallation
with
leaktests of pump seal components after corrective action single/double/tandemseal whichever installed
8,108.97
INR/EA
Gearbox
seal
job. CETRIFUGAL PUMP-SUNDYNE. - Above 30
and up to 100 KW.
Gearbox seal job:Jobs includes: Removal & reinstallation of
Impeller
assembly,Removal & reinstallation of gearbox
assembly from pump casing.
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
12,300.30 INR/EA
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 70
16,571.02 INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 71
Material/Service Description
Unit Rate
Gearbox
seal job. CETRIFUGAL PUMP-SUNDYNE. - Above 100
and up to 250KW.
Gearbox seal job:Jobs includes: Removal & reinstallation of
Impeller
assembly,Removal & reinstallation of gearbox
assembly from pump casing.
Gearbox
seal job. CETRIFUGAL PUMP-SUNDYNE. - Above 250
and up to 500KW.
Gearbox seal job:Jobs includes: Removal & reinstallation of
Impeller
assembly,Removal & reinstallation of gearbox
assembly from pump casing.
5,405.98
INR/EA
8,274.53
INR/EA
Replacement
of gear box assembly. CETRIFUGAL PUMPSUNDYNE.
- Up to 30 KW
Replacement
of
gear
box assembly:Job includes:Removal
of installedgearbox-seal housing
assembly
from
pump
casing,Installation of new gearbox-sealhousing assembly
(inclusive of impeller etc.) in pump casing including
leaktests of casing joint and mechanical seals
Replacement
of gear box assembly. CETRIFUGAL PUMPSUNDYNE.
- Above 100 and up to 250KW.
Replacement
of
gear
box assembly:Job includes:Removal
of installedgearbox-seal housing
assembly
from
pump
casing,Installation of new gearbox-sealhousing assembly
(inclusive of impeller etc.) in pump casing including
leaktests of casing joint and mechanical seals
Replacement
of gear box
SUNDYNE.
- Above 250 and up to 500KW.
assembly.
CETRIFUGAL
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
PUMP-
Replacement
of
gear
box assembly:Job includes:Removal
of installedgearbox-seal housing
assembly
from
pump
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 72
Number : CCM/
Date
: 25.05.2015
Page No. : 73
Material/Service Description
Unit Rate
3,709.86
INR/EA
5,568.15
INR/EA
11,134.64 INR/EA
Internal
lube
pump.
CETRIFUGAL PUMP-SUNDYNE. - Above
100 and up to 250KW.
Internal
lube
pump:Job
includes:Replacement
of
spacer,Removal
&reinstallation/replacement
of coupling
hub.Removal & reinstallation of gearboxhousing top half and
attending the internal pump including repair/replacement
&testing of pump and reassembly of gear box
14,359.62 INR/EA
Internal
lube
pump.
CETRIFUGAL PUMP-SUNDYNE. - Above
250 and up to 500KW.
Internal
lube
pump:Job
includes:Replacement
of
spacer,Removal
&reinstallation/replacement
of coupling
hub.Removal & reinstallation of gearboxhousing top half and
attending the internal pump including repair/replacement
&testing of pump and reassembly of gear box
2,632.04
INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 74
Material/Service Description
pump
casing.Removal of old gasket,cleaning
seat,installation
of
new gasket inclduing
ofcasing joint after reassembly
Unit Rate
of gasket
leak test
3,949.75
INR/EA
7,899.49
INR/EA
9,502.69
INR/EA
3,836.56
INR/EA
5,755.68
INR/EA
Impeller
/ diffuser Repair / Rep. CETRIFUGAL PUMPSUNDYNE.
- Up to 30 KW
Impeller
/diffuser
Repair
/
Replacement:Job
includes:Removal & reinstallationof pump casing cover with
Gear
Box
unit
from
pump
casing.Removal
of
old
gasket,cleaning of gasket seat, installation of new gasket
inclduing leak test ofcsing joint after reassembly,Removal
&
reinstallation of diffuser and/orimpeller including
repair/replacement
Impeller
SUNDYNE.
diffuser
Repair
Rep.
CETRIFUGAL
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
PUMP-
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 75
Number : CCM/
Date
: 25.05.2015
Page No. : 76
Material/Service Description
Unit Rate
Impeller
/diffuser
Repair
/
Replacement:Job
includes:Removal & reinstallationof pump casing cover with
Gear
Box
unit
from
pump
casing.Removal
of
old
gasket,cleaning of gasket seat, installation of new gasket
inclduing leak test ofcsing joint after reassembly,Removal
&
reinstallation of diffuser and/orimpeller including
repair/replacement
9,502.69
INR/EA
Impeller
/ diffuser Repair / Rep. CETRIFUGAL PUMPSUNDYNE.
- Above 100 and up to 250KW.
Impeller
/diffuser
Repair
/
Replacement:Job
includes:Removal & reinstallationof pump casing cover with
Gear
Box
unit
from
pump
casing.Removal
of
old
gasket,cleaning of gasket seat, installation of new gasket
inclduing leak test ofcsing joint after reassembly,Removal
&
reinstallation of diffuser and/orimpeller including
repair/replacement
13,514.95 INR/EA
Impeller
/ diffuser Repair / Rep. CETRIFUGAL PUMPSUNDYNE.
- Above 250 and up to 500KW.
Impeller
/diffuser
Repair
/
Replacement:Job
includes:Removal & reinstallationof pump casing cover with
Gear
Box
unit
from
pump
casing.Removal
of
old
gasket,cleaning of gasket seat, installation of new gasket
inclduing leak test ofcsing joint after reassembly,Removal
&
reinstallation of diffuser and/orimpeller including
repair/replacement
2,632.04
INR/EA
3,801.08
INR/EA
6,335.13
INR/EA
LSS
oil
seal job. CETRIFUGAL PUMP-SUNDYNE. - Above 30
and up to 100KW.
LSS
oil seal job:Job includes:Removal & replacement of
oil seal
LSS
oil seal job. CETRIFUGAL PUMP-SUNDYNE. - Above 100
and up to 250KW.
LSS
oil seal job:Job includes:Removal & replacement of
oil
REGISTEsReEaDlOFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 77
Material/Service Description
Unit Rate
9,291.53
INR/EA
5,574.92
INR/EA
9,291.53
INR/EA
LSS
oil seal job. CETRIFUGAL PUMP-SUNDYNE. - Above 250
and up to 500KW.
LSS
oil seal job:Job includes:Removal & replacement of
oil seal
O/H
of Gear Box assly(LMV - 311). CETRIFUGAL PUMP-SUNDYNE.
- Up to 30 KW
Overhauling
of Gear Box assly (LMV -311):Job includes
:Dismantling
of allshaft assemblies, check all
internals and assembly of all 3 shaft assemblieswith parts
O/H
of Gear Box assly(LMV - 311). CETRIFUGAL PUMP-SUNDYNE.
- Above 30 and up to 100KW.
Overhauling
of Gear Box assly (LMV -311):Job includes
:Dismantling
of allshaft assemblies, check all
internals and assembly of all 3 shaft assemblieswith parts
12,670.27 INR/EA
O/H
of Gear Box assly(LMV - 311). CETRIFUGAL PUMP-SUNDYNE.
- Above 100 and up to 250KW.
Overhauling
of Gear Box assly (LMV -311):Job includes
:Dismantling
of allshaft assemblies, check all
internals and assembly of all 3 shaft assemblieswith parts
16,893.69 INR/EA
O/H
of Gear Box assly(LMV - 311). CETRIFUGAL PUMP-SUNDYNE.
- Above 250 and up to 500KW.
Overhauling
of Gear Box assly (LMV -311):Job includes
:Dismantling
of allshaft assemblies, check all
internals and assembly of all 3 shaft assemblieswith parts
5,574.92
INR/EA
9,291.53
INR/EA
O/H
of Gear Box assly(LMV - 322). CETRIFUGAL PUMP-SUNDYNE.
- Up to 30 KW
Overhauling
of Gear Box assly (LMV -322):Job includes
:Dismantling
of allshaft assemblies, check all
internals and assembly of all shaft assemblies withparts
O/H
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 78
Material/Service Description
Unit Rate
O/H
of Gear Box assly(LMV - 322). CETRIFUGAL PUMPSUNDYNE.
- Above 100 and up to 250KW.
Overhauling
of
Gear
Box
assly
(LMV
-322):Job
includes
:Dismantling
of
allshaft
assemblies, check all
internals and assembly of all shaft assemblies withparts
Overhauling
of
Gear
Box
assly
(LMV
-322):Job
includes
:Dismantling
of
allshaft
assemblies, check all
internals and assembly of all shaft assemblies withparts
12,332.39 INR/EA
Capital
Repair (LMV-311). CETRIFUGAL PUMP-SUNDYNE. - Up
to
30 KW
Capital
repair
(LMV
- 311):Jobs includes:Removal &
reinstallation
of
couplingguard(s).Removal
&
reinstallation/ replacement of coupling spacer.
Capital
Repair (LMV-311). CETRIFUGAL PUMP-SUNDYNE. Above
30 and up to 100 KW.
Capital
repair
(LMV
- 311):Jobs includes:Removal &
reinstallation
of
couplingguard(s).Removal
&
reinstallation/ replacement of coupling spacer.
Capital
Repair (LMV-311). CETRIFUGAL PUMP-SUNDYNE. Above
100 and up to 250KW.
Capital
repair
(LMV
- 311):Jobs includes:Removal &
reinstallation
of
couplingguard(s).Removal
&
reinstallation/ replacement of coupling spacer.
Capital
Repair
(LMV-311).
CETRIFUGAL
PUMP-SUNDYNE.
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 79
Above
250 and up to 500KW.
Capital
repair
(LMV
- 311):Jobs includes:Removal
reinstallation
of
couplingguard(s).Removal
reinstallation/ replacement of coupling spacer.
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
&
&
Number : CCM/
Date
: 25.05.2015
Page No. : 80
Material/Service Description
Unit Rate
9,798.33
INR/EA
Capital
repair
(LMV - 322). CETRIFUGAL PUMP-SUNDYNE. Up to 30 KW
Capital
repair
(LMV
322):Job
includes:Spacer
removal including
lifting
&shifting
of driver as
required.Spacer
reinstallation
including
lifting
&shifting of driver as required.Checking and correction of
alignment betweendriver and driven
equipment.Removal &
reinstallation
of
gearbox-seal
housingassembly
from pump casing.Removal & reinstallation
of
Impellerassembly.Removal, inspection, reinstallation with
leak tests of pump sealcomponents after corrective
action
-single/double/tandem
seal
whicheverinstalled.Removal
&
reinstallation
of
seal
housing.Removal, inspectionreinstallation with leak tests
of
gearbox
seal
components
after
correctiveaction-Single/Double/Tendam
seal
whichever
installed.
Complete
dismantling
ofremoved/failed
gearbox-seal
housing
assembly
inspection
of
all
internalsincluding
repair/replacement
of
components,
reassembly and leak tests for allmechanical seals
14,746.51 INR/EA
Capital
repair (LMV - 322). CETRIFUGAL PUMP-SUNDYNE.
- Above 30 and up to 100KW.
Capital
repair
(LMV
322):Job
includes:Spacer
removal including
lifting
&shifting
of driver as
required.Spacer
reinstallation
including
lifting
&shifting of driver as required.Checking and correction of
alignment betweendriver and driven
equipment.Removal&
reinstallation
of
gearbox-seal
housingassembly
from pump casing.Removal & reinstallation
of
Impellerassembly.Removal, inspection, reinstallation with
leak tests of pump sealcomponents after corrective
action
-single/double/tandem
seal
whicheverinstalled.Removal
&
reinstallation
of
seal
housing.Removal, inspectionreinstallation with leak tests
of
gearbox
seal
components
after
correctiveaction-Single/Double/Tendam
seal
whichever
installed.
Complete
dismantling
ofremoved/failed
gearbox-seal
housing
assembly
inspection
of
all
internalsincluding
repair/replacement
of
components,
reassembly and leak tests for allmechanical seals
20,272.43 INR/EA
CETRIFUGAL PUMP-SUNDYNE.
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 81
Number : CCM/
Date
: 25.05.2015
Page No. : 82
Material/Service Description
Unit Rate
Capital
repair
(LMV
322):Job
includes:Spacer
removal including
lifting
&shifting
of driver as
required.Spacer
reinstallation
including
lifting
&shifting of driver as required.Checking and correction of
alignment betweendriver and driven
equipment.Removal &
reinstallation
of
gearbox-seal
housingassembly
from pump casing.Removal & reinstallation
of
Impellerassembly.Removal, inspection, reinstallation with
leak tests of pump sealcomponents after corrective
action
-single/double/tandem
seal
whicheverinstalled.Removal
&
reinstallation
of
seal
housing.Removal, inspectionreinstallation with leak tests
of
gearbox
seal
components
after
correctiveaction-Single/Double/Tendam
seal
whichever
installed.
Complete
dismantling
ofremoved/failed
gearbox-seal
housing
assembly
inspection
of
all
internalsincluding
repair/replacement
of
components,
reassembly and leak tests for allmechanical seals
27,029.90 INR/EA
1,390.35
INR/EA
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 83
Number : CCM/
Date
: 25.05.2015
Page No. : 84
Material/Service Description
Unit Rate
bolts
&
end
cover
Removal of old stator & fixing of
new stator fixing of tie bolts with end cover fixing of
dish. Spool
2,027.25
INR/EA
2,255.32
INR/EA
3,801.08
INR/EA
6,757.47
INR/EA
8,446.84
INR/EA
STATOR
REPLACEMENT. SCREW PUMP-SINGLE SCREW - Above 30
and up to 100 KW.
SCREW
PUMP-SINGLE
SCREW
- SCREW PUMP STATOR
REPLACEMENT: Job includes: Removal of disc. Spool Removal
of stator tie bolts & end cover Removal of old stator &
fixing of new stator fixing of tie bolts with end cover
fixing of dish. Spool
GEAR
BOX OIL SEAL REPLACEMENT.SCREW PUMP-SINGLE SCREW
- Above 30 and up to 100 KW.
SCREW
PUMP
GEAR
BOX
OIL
SEAL REPLACEMENT: Job
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 85
Number : CCM/
Date
: 25.05.2015
Page No. : 86
Material/Service Description
Unit Rate
--Removal
of
discharge
Spool Removal of pump from
foundation Removal of gear box Dismantling of gear box
Removal of old oil seal & fixing new oil seal Gear box
assembly & fix up with pump installation on foundation &
alignment Discharge spool fixing
6,757.47
INR/EA
8,446.84
INR/EA
1,267.03
INR/EA
1,900.55
INR/EA
Cover
gasket
to
30 KW.
Cover
gasket
reinstallation
gasket
/ O-ring
replacement:
Job
includes: Removal &
of end covers. Replacement of casing
Cover
gasket
replacement. SCREW PUMP-SINGLE SCREW Above
30 and up to 100 KW.
Cover
gasket
replacement:
Job
includes: Removal &
reinstallation
of end covers. Replacement of casing
gasket
/ O-ring
Number : CCM/
Date
: 25.05.2015
Page No. : 87
Bearing
to
30 KW
Bearing
replacement
replacement
jobs:
Job
includes:
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Removal
&
INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 88
Material/Service Description
reinstallation
of end covers.
repair
/ replacement of mechanical seal.
Removal,
inspection
Unit Rate
&
6,588.54
INR/EA
1,900.55
INR/EA
2,534.05
INR/EA
4,223.43
INR/EA
3,649.04
INR/EA
5,068.10
INR/EA
Bearing
replacement
jobs. SCREW PUMP-SINGLE SCREW Above
30 and up to 100 KW.
Bearing
replacement
jobs:
Job
includes: Removal &
reinstallation
of end covers. Removal, inspection &
repair
/ replacement of mechanical seal.
DE
cover gasket replacement job. SCREW PUMP-TWIN SCREW
- Above 30 and up to 100 KW.
SCREW
PUMP-TWIN
SCREW
- DE cover gasket replacement
job: Job includes: Removal & reinstallation of end
cover. Replacement of casing gasket
DE
cover gasket replacement job.SCREW PUMP-TWIN SCREW
- Above 100 KW.
SCREW
PUMP-TWIN
SCREW
- DE cover gasket replacement
job: Job includes: Removal & reinstallation of end
cover. Replacement of casing gasket
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 89
Number : CCM/
Date
: 25.05.2015
Page No. : 90
Material/Service Description
Unit Rate
8,446.84
INR/EA
2,027.25
INR/EA
2,871.93
INR/EA
4,223.43
INR/EA
2,871.93
INR/EA
4,223.43
INR/EA
Seal
replacement
job.SCREW PUMP-TWIN SCREW - Above 30
and up to 100 KW.
Seal
replacement
job:
Job
includes:
Removal
&
reinstallation of components. Replacement of casing gasket.
Removal & replacement of seal(s). Job is including bearing
REGISTEjRoEbD OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 91
Material/Service Description
Unit Rate
5,912.79
INR/EA
1,689.37
INR/EA
2,871.93
INR/EA
4,223.43
INR/EA
5,068.10
INR/EA
7,095.35
INR/EA
Capital
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
up to 100 KW.
Capital
repair job: Job includes Removal and refixing
of coupling guard(s) Spacer removal and reinstallation
/
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 92
Number : CCM/
Date
: 25.05.2015
Page No. : 93
Material/Service Description
Unit Rate
replacement.
Alignment
checking
and
correction.
Removal/replacement of coupling hub. Complete dismantling
and reassembly of pump unit. Inspection of all internals
components including repair/replacement as required
10,136.22 INR/EA
1,993.46
INR/EA
2,534.05
INR/EA
3,378.75
INR/EA
3,040.86
INR/EA
4,392.35
INR/EA
Cover
gasket job. SCREW PUMP- TRIPLE SCREW - Above 30
and up to 100 KW.
SCREW
PUMP- TRIPLE SCREW - Cover gasket job: Job
includes: Removal reinstallation of end cover. Replacement
of casing gasket
DE
Bearing / Oil Seal jobs. SCREW PUMP- TRIPLE SCREW Up to 30 KW.
DE
Bearing
/ Oil Seal jobs: Job includes: Removal
reinstallation of end cover. Replacement of casing gasket
Removal, inspection & pair/replacement of mechanical seal
Removal, reinstallation of bearing including inspection &
replacement of bearing
Number : CCM/
Date
: 25.05.2015
Page No. : 94
Material/Service Description
Unit Rate
DE
Bearing / Oil Seal jobs. SCREW PUMP- TRIPLE SCREW
- Above 30 and up to 100 KW.
DE
Bearing
/ Oil Seal jobs: Job includes: Removal
reinstallation of end cover. Replacement of casing gasket
Removal, inspection & pair/replacement of mechanical seal
Removal, reinstallation of bearing including inspection &
replacement of bearing
6,081.73
INR/EA
3,040.86
INR/EA
4,392.35
INR/EA
6,081.73
INR/EA
3,547.66
INR/EA
DE
Bearing / Oil Seal jobs. SCREW PUMP- TRIPLE SCREW
- Above 100 KW.
DE
Bearing
/ Oil Seal jobs: Job includes: Removal
reinstallation of end cover. Replacement of casing gasket
Removal, inspection & pair/replacement of mechanical seal
Removal, reinstallation of bearing including inspection &
replacement of bearing
NDE
Bearing job.SCREW PUMP- TRIPLE SCREW - Above 30 and
up to 100 KW.
NDE
Bearings
jobs:
Job
includes:
Removal
&
reinstallation of end cover. Replacement of gasket / Oring. Removal & reinstallation/replacement
of
bearing(s).
Removal
&
reinstallation of time gear (if applicable)
NDE Bearing job. SCREW PUMP- TRIPLE SCREW - Above 100 KW.
NDE Bearings jobs: Job includes: Removal & reinstallation
of end cover. Replacement of gasket / O-ring. Removal &
reinstallation/replacement
of
bearing(s).
Removal
&
reinstallation of time gear (if applicable)
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 95
Number : CCM/
Date
: 25.05.2015
Page No. : 96
Material/Service Description
Unit Rate
5,405.98
INR/EA
8,277.91
INR/EA
2,871.93
INR/EA
4,343.35
INR/EA
8,615.78
INR/EA
5,574.92
INR/EA
Timing
Gears (If applicable). SCREW PUMP- TRIPLE SCREW
- Above 30 and up to 100 KW.
Timing Gears (If applicable): Job includes:
Removal &
reinstallation of end cover. Replacement of casing gasket.
Removal & replacement of seal(s)
Timing
Gears (If applicable). SCREW PUMP- TRIPLE SCREW
- Above 100 KW.
Timing Gears (If applicable): Job includes:
Removal &
reinstallation of end cover. Replacement of casing gasket.
Removal & replacement of seal(s)
Mechanicl
seal job.SCREW PUMPand up to 100 KW.
Mechanical
seal
job:
reinstallation of
end
cover.
gasket.
Removal, inspection
mechanical seal
Mechanicl
seal
job.
SCREW PUMP- TRIPLE SCREW - Above
100
KW.
Mechanical
seal
job:
Job
includes:
Removal
reinstallation of
end
cover.
Replacement
of
casing
gasket.
Removal, inspection & repair/replacement of
mechanical seal
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 97
Number : CCM/
Date
: 25.05.2015
Page No. : 98
Material/Service Description
Unit Rate
8,406.30
INR/EA
Capital
repair. SCREW PUMP- TRIPLE SCREW - Above 30 and
up to 100 KW.
Capital
repair
job:
Job includes Removal and refixing
of coupling
guard(s).
Spacer
removal
and
reinstallation/replacement. Removal/replacement of coupling
hub(s). Removal reinstallation of end cover. Replacement of
casing gasket Removal, inspection & repair/replacement of
mechanical seal
16,814.29 INR/EA
1,540.70
INR/EA
2,312.76
INR/EA
1,540.70
INR/EA
2,312.76
INR/EA
2,444.52
INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 99
Material/Service Description
Unit Rate
Capital
repair
job:Job
includes
Removal and refixing
of coupling
guard(s)Spacer
removal
and
reinstallation/replacement
Alignment
checking
and
correctionRemoval/replacement of spacer Removal/replacement
of
coupling hub(s) Removal &replacement of oil seal
Complete dismantling & reassembly of pump unitincluding
inspection with repair/ replacement of shaft bushes
3,667.62
INR/EA
951.12 INR/EA
"Valve
Suction/Discharge
related job. DIAPHRAGM /
PLUNGER PUMP, DIAPHRAGM COMPRESSOR. - Upto 25 KW
DIAPHRAGM
/ PLUNGER PUMP, DIAPHRAGM COMP - Valve
Suction / Discharge
relatedjobs:Rate
is per
valve.
Removal,
inspection,
lapping,
assembling
and
testing ofSuction / Discharge
valves
1,267.03
INR/EA
1,858.31
INR/EA
"Valve
Suction/Discharge related job. DIAPHRAGM /
PLUNGER PUMP, DIAPHRAGM COMPRESSOR. -Above 25 KW and up to
50 KW DIAPHRAGM / PLUNGER PUMP, DIAPHRAGM COMP - Valve
Suction / Discharge
relatedjobs:Rate
is per
valve.
Removal, inspection,
lapping, assembling and testing ofSuction / Discharge
valves
"Valve
Suction/Discharge
related
job.DIAPHRAGM /
PLUNGER PUMP, DIAPHRAGM COMPRESSOR. -Above 50 KW
DIAPHRAGM
/ PLUNGER PUMP, DIAPHRAGM COMP - Valve
Suction / Discharge
relatedjobs:Rate
is per
valve.
Removal,
inspection,
lapping,
assembling
and
testing ofSuction / Discharge
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 100
Number : CCM/
Date
: 25.05.2015
Page No. : 101
Material/Service Description
Unit Rate
1,267.03
INR/EA
1,900.55
INR/EA
2,956.40
INR/EA
"Removal
of PRDs, Refill valves. DIAPHRAGM / PLUNGER
PUMP, DIAPHRAGM COMPRESSOR. - Upto 25 KW
Removal
of PRDs, Refill valves:Job includes :Removal
& reinstallation of
PRDs
including
dismantling
&
reassembly,inspection of all internal,repair /replacement
of components
3159457
Removal
of
PRDs, Refill valves. DIAPHRAGM / PLUNGER
PUMP, DIAPHRAGM COMPRESSOR. - Above 25KW and up to 50KW
Removal
of PRDs, Refill valves:Job includes :Removal
& reinstallation of
PRDs
including
dismantling
&
reassembly,inspection of all internal,repair /replacement
of components
"Removal
of PRDs, Refill valves. DIAPHRAGM / PLUNGER
PUMP, DIAPHRAGM COMPRESSOR. -Above 50KW"
Removal
of PRDs, Refill valves:Job includes :Removal
& reinstallation of
PRDs
including
dismantling
&
reassembly,inspection of all internal,repair /replacement
of components
633.53 INR/EA
Replacement
of Valve Gaskets. DIAPHRAGM /
PLUNGER PUMP, DIAPHRAGM COMPRESSOR. - Upto 25 KW
951.12 INR/EA
"Replacement
of
Valve
Gaskets. DIAPHRAGM / PLUNGER
PUMP, DIAPHRAGM COMPRESSOR. -Above 25KW and up to 50KW"
1,689.37
INR/EA
1,267.03
INR/EA
"Replacement
of
Valve
Gaskets. DIAPHRAGM / PLUNGER
PUMP, DIAPHRAGM COMPRESSOR. -Above 50KW
"Suction
/
Discharg
Dampner.DIAPHRAGM
/
PLUNGER
PUMP, DIAPHRAGM COMPRESSOR. - Upto 25 KW.
Suction / Discharg Dampner:Job includes
:Dismantling &
reassembly of dampner including inspection & replacement of
diaphragm if reqd itrogen/Gas charging and leak testin
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 102
1,584.63 INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 103
Material/Service Description
Unit Rate
Suction
/ Discharg Dampner.DIAPHRAGM / PLUNGER PUMP,
DIAPHRAGM COMPRESSOR. -Above 25 KW and up to 50 KW.
Suction / Discharg Dampner:Job includes
:Dismantling &
reassembly of dampner including inspection & replacement of
diaphragm if reqd itrogen/Gas charging and leak testin
2,534.05
INR/EA
3,040.86
INR/EA
3,378.75
INR/EA
4,223.43
INR/EA
"Suction
/
Discharg
Dampner.DIAPHRAGM
/
PLUNGER
PUMP, DIAPHRAGM COMPRESSOR. -Above 50 KW.
Suction / Discharg Dampner:Job includes
:Dismantling &
reassembly of dampner including inspection & replacement of
diaphragm if reqd itrogen/Gas charging and leak testin
Diaphram-Liq
Head.Applicable
for
Diaphragm Pump and
Compressors. - Above 25 KW and up to 50 KW.
Diaphram-Liquid
Head
(Applicable
for
Diaphragm Pump
and Compressors).Job includes :Removal & reinstallation
of liquid suction valve including complete dismantling
& reassembly,
inspection of all internals with
repair/ replacement
as
required.Removal &reinstallation
of liquid discharge valve
including complete
dismantling
&
reassembly,of
all
internals with repair/replacement as required. Removal &
reinstallation of liquid
Diaphram-Liq
Head.Applicable
for
Diaphragm Pump and
Compressors. - Above 25 KW and up to 50 KW.
Diaphram-Liquid
Head
(Applicable
for
Diaphragm Pump
and Compressors).Job includes :Removal & reinstallation
of liquid suction valve including complete dismantling
& reassembly,
inspection of all internals with
repair/ replacement
as
required.Removal &reinstallation
of liquid discharge valve
including complete
dismantling
&
reassembly,of
all
internals with repair/replacement as required. Removal &
reinstallation of liquid
Diaphram-Liq
Head.Applicable
for
Diaphragm Pump and
Compressors. - Above 50 KW.
Diaphram-Liquid
Head
(Applicable
for
Diaphragm Pump
and Compressors).Job includes :Removal & reinstallation
of liquid suction valve including complete dismantling
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 104
Number : CCM/
Date
: 25.05.2015
Page No. : 105
Material/Service Description
discharge
valve
including
complete
dismantling
reassembly,of all internals with
repair/replacement
required. Removal & reinstallation of liquid
Unit Rate
&
as
7,095.35
INR/EA
7,602.15
INR/EA
8,108.97
INR/EA
Cylinder & Plunger assembly.(Applicable for Plunger pump) Above 25KW to 50 KW.
Cylinder
& Plunger assembly:Job includes
: Removal
& reinstallation
of
gland
chamber
cover
(s)
including replacement
of
gasket.
All
necessary
measurement
checks
like
dimensions,
clearances,concentricity, rod runout etc. with correction
as required Removal & reinstallation of plunger assmbly
Removal & reinstallation/replacement of plunger
rings
Removal
&
reinstallation/replacement
of punger rider
rings Removal & reinstallation /replacement of plunger
Removal & reinstallation/replacement of plunger rod Removal
&
reinstallation/replacement
of plunger rod
packing/seats
including removal and reinstallation of
stuffing box/gland housing
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 106
Number : CCM/
Date
: 25.05.2015
Page No. : 107
Material/Service Description
Unit Rate
plunger
rings Removal & reinstallation/replacement of
punger rider rings Removal & reinstallation /replacement of
plunger Removal & reinstallation/replacement of plunger rod
Removal
&
reinstallation/replacement
of plunger rod
packing/seats
including removal and reinstallation of
stuffing box/gland housing
7,602.15
INR/EA
8,446.84
INR/EA
9,291.53
INR/EA
8,446.84
INR/EA
8,953.64
INR/EA
Oil
side
plunger
piston
related
jo.DIAPHRAGM /
PLUNGER PUMP, DIAPHRAGM COMPRESSOR. - Up to 25 KW.
Oil
side
plunger
piston
related jobs:Inspection &
replacement of piston, piston rings, piston rod including
clearance checking.Removal & reinstallation of oil chamber
cover including gasket
Oil
side plunger piston related jo.DIAPHRAGM /
PLUNGER PUMP, DIAPHRAGM COMPRESSOR. - Above 25 KW and up to
50 KW. Oil
side
plunger piston related
jobs:Inspection & replacement of piston, piston rings,
piston rod including clearance checking.Removal &
reinstallation of oil chamber cover including gasket
"Oil
side
plunger
piston
related jo.DIAPHRAGM /
PLUNGER PUMP, DIAPHRAGM COMPRESSOR. -Above 50 KW.
Oil
side
plunger
piston
related jobs:Inspection &
replacement of piston, piston rings, piston rod including
clearance checking.Removal & reinstallation of oil chamber
cover including gasket
"Oil
Chamber
jobs.
DIAPHRAGM
/
PLUNGER PUMP,
DIAPHRAGM COMPRESSOR. - Upto 25 KW.
Oil
Chamber
jobs:Job includes Removal & reinstallation
of
oil
chamber
cover(s)including
gaskets
Complete
dismentaling and
reassembly of
oil
chamber includingremoval and reassembly
with
repair/replacement
of
internalcomponents,piston/plunger unit etc. Inspection of
Cross
Head
bearings,
liner,bolt
tightness,clearances.Inspection of Connecting rod bearings
jobs.
DIAPHRAGM
Number : CCM/
Date
: 25.05.2015
Page No. : 108
PLUNGER
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
PUMP,
Number : CCM/
Date
: 25.05.2015
Page No. : 109
Material/Service Description
Unit Rate
9,629.41
INR/EA
6,757.47
INR/EA
7,602.15
INR/EA
8,446.84
INR/EA
"Oil
Chamber
jobs.
DIAPHRAGM
/
PLUNGER PUMP,
DIAPHRAGM COMPRESSOR. -Above 50 KW.
Oil
Chamber
jobs:Job includes Removal & reinstallation
of
oil
chamber
cover(s)including
gaskets
Complete
dismentaling and
reassembly of
oil
chamber includingremoval and reassembly
with
repair/replacement
of
internalcomponents,piston/plunger unit etc. Inspection of
Cross
Head
bearings,
liner,bolt
tightness,clearances.Inspection of Connecting rod bearings
Crankcase
jobs.DIAPHRAGM
/
PLUNGER
PUMP, DIAPHRAGM
COMPRESSOR. - Up to 25 KW.
Crankcase jobs:Job includes Removal & reinstallation of all
covers
necessaryto
access
the
internals
including
replacement of all gaskets/O-rings.
"Crankcase
jobs.DIAPHRAGM
/
PLUNGER PUMP, DIAPHRAGM
COMPRESSOR. -Above 25 KW and up to 50 KW.
Crankcase jobs:Job includes Removal & reinstallation of all
covers
necessaryto
access
the
internals
including
replacement of all gaskets/O-rings.
"Crankcase
jobs.DIAPHRAGM
/
PLUNGER PUMP, DIAPHRAGM
COMPRESSOR. -Above 50 KW.
Crankcase jobs:Job includes Removal & reinstallation of all
covers
necessaryto
access
the
internals
including
replacement of all gaskets/O-rings.
Number : CCM/
Date
: 25.05.2015
Page No. : 110
70.96 INR/H
Trble.shoot.of
diaph./dos.pumps
.Trouble
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
shooting
of
Number : CCM/
Date
: 25.05.2015
Page No. : 111
Material/Service Description
Unit Rate
* 40
FANS
** 40.01 ID/FD FAN, CENTRIFUGAL FANS / BLOWERS.
*** 40.01.01Bearing job (DE / NDE).
3159485 "BJ (DE/NDE)ID/FD FAN,CF/BLWR-BB<=30KW"
Valid from: 25.05.2015 Valid to: 31.07.2016
2,545.88
INR/EA
3,817.97
INR/EA
7,264.29
INR/EA
9,502.69
INR/EA
"Bearing
job (DE / NDE). ID/FD FAN, CENTRIFUGAL
FANS / BLOWERS (BETWEEN BEARINGS). - Up to 30 KW
Fans
ID/FD FAN, CENTRIFUGAL FANS / BLOWERS.-Bearing
job (DE
/
NDE):Jobincludes:Dismantling
and
reassembly
of
DE
Plummer
block
unit.Removal
&reinstallation/replacement of DE bearing including all
seals, circlips etc
"Bearing
job (DE / NDE).ID/FD FAN, CENTRIFUGAL
FANS / BLOWERS (BETWEEN BEARINGS). - Above 30 and up to 100
KW. Fans - ID/FD FAN, CENTRIFUGAL FANS / BLOWERS.-Bearing
job (DE / NDE):Jobincludes:Dismantling and reassembly
of DE Plummer block unit.Removal
&reinstallation/replacement of DE bearing including all
seals, circlips etc
"Bearing
job (DE / NDE). ID/FD FAN, CENTRIFUGAL
FANS / BLOWERS (BETWEEN BEARINGS). - Above 100 and up to
250 KW. Fans - ID/FD FAN, CENTRIFUGAL FANS / BLOWERS.Bearing job (DE / NDE):Jobincludes:Dismantling and
reassembly of DE Plummer block unit.Removal
&reinstallation/replacement of DE bearing including all
seals, circlips etc
"Bearing
job (DE / NDE).ID/FD FAN, CENTRIFUGAL
FANS / BLOWERS (BETWEEN BEARINGS). - Above 250 and up to
1000 KW. Fans - ID/FD FAN, CENTRIFUGAL FANS / BLOWERS.Bearing job (DE / NDE):Jobincludes:Dismantling and
reassembly of DE Plummer block unit.Removal
&reinstallation/replacement of DE bearing including all
seals, circlips etc
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 112
Removal
of
seal
chamber.
ID/FD
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
1,001.79
INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 113
Material/Service Description
Unit Rate
1,503.54
INR/EA
2,255.32
INR/EA
3,007.08
INR/EA
6,831.80
INR/EA
Removal
of seal chamber.ID/FD FAN, CENTRIFUGAL
FANS / BLOWERS (BETWEEN BEARINGS). - Above 30 and up to 100
KW. Removal
of seal chamber:Job includes
:Removal
&
reinstallation
of
seal
chamber
cover.Removal
&
reinstallation/replacement of seal including inspection and
measurement checks on shaft surface with correction if
required
Removal
of seal chamber.ID/FD FAN, CENTRIFUGAL
FANS / BLOWERS (BETWEEN BEARINGS). - Above 100 and up to
250 KW. Removal
of seal
chamber:Job
includes
:Removal
& reinstallation
of
seal chamber cover.Removal
&
reinstallation/replacement of seal including inspection and
measurement checks on shaft surface with correction if
required
Removal
of seal chamber.ID/FD FAN, CENTRIFUGAL
FANS / BLOWERS (BETWEEN BEARINGS). - Above 250 and up to
1000 KW. Removal of seal
chamber:Job
includes
:Removal
& reinstallation
of
seal chamber cover.Removal
&
reinstallation/replacement of seal including inspection and
measurement checks on shaft surface with correction if
required
Capital
repair job. ID/FD FAN, CENTRIFUGAL FANS /
BLOWERS (BETWEEN BEARINGS). - Up to 30 KW
Capital
Repair:Job includes : Removal and refixing
of coupling
guard
Decoupling
&
recoupling
jobs
Removal, inspection & einstallation
/replacement
as
required of bolt/pins/bushes
individually
or as a set
Alignemnt check and
corrction
between
driver & driven
equipment Removal, reinstallation/replacement of coupling
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 114
Number : CCM/
Date
: 25.05.2015
Page No. : 115
Material/Service Description
Unit Rate
seals,
circlips
etc.
Dismantling
and
reaseembly of
NDE
Plummer
block
unit
Removal
&
reinstallation/replacement of NDE bearing including all
seals, circlips etc. Removal & reinstallation
of
seal chambercover
Removal &
reinstallation/replacement of seal including
10,136.22 INR/EA
Capital
repair
job. ID/FD FAN, CENTRIFUGAL FANS /
BLOWERS (BETWEEN BEARINGS). - Above 30 and up to 100 KW.
Capital
Repair:Job includes : Removal and refixing
of coupling
guard
Decoupling
&
recoupling
jobs
Removal, inspection & einstallation
/replacement
as
required of bolt/pins/bushes
individually
or as a set
Alignemnt check and
corrction
between
driver & driven
equipment Removal, reinstallation/replacement of coupling
hub(s) Dismantling and reassembly
of
DE
Plummer block unit Removal & reinstallation/replacement of
DE bearing
including
all seals,
circlips
etc.
Dismantling
and
reaseembly of NDE Plummer
block unit
Removal & reinstallation/replacement of NDE
bearing
including
all
seals,
circlips
etc.
Removal
&
reinstallation
of
seal
chamber
cover
Removal
&
reinstallation/replacement of seal including
14,359.62 INR/EA
Capital
repair
job. ID/FD FAN, CENTRIFUGAL FANS /
BLOWERS (BETWEEN BEARINGS). - Above 100 and up to 250 KW.
Capital
Repair:Job includes : Removal and refixing
of coupling
guard
Decoupling
&
recoupling
jobs
Removal, inspection & einstallation
/replacement
as
required of bolt/pins/bushes
individually
or as a set
Alignemnt check and
corrction
between
driver & driven
equipment Removal, reinstallation/replacement of coupling
hub(s) Dismantling and reassembly
of
DE
Plummer block unit Removal & reinstallation/replacement of
DE bearing
including
all seals,
circlips
etc.
Dismantling
and
reaseembly of NDE Plummer
block unit
Removal & reinstallation/replacement of NDE
bearing
including
all
seals,
circlips
etc.
Removal
&
reinstallation
of
seal
chamber
cover
Removal
&
reinstallation/replacement of seal including
Capital
repair
job. ID/FD FAN, CENTRIFUGAL FANS /
BLOWERS (BETWEEN BEARINGS). - Above 250 and up to 1000 KW.
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
20,272.43 INR/EA
Capital
Repair:Job includes : Removal and refixing
of coupling
guard
Decoupling
&
recoupling
jobs
Removal, inspection & einstallation
/replacement
as
required of
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 116
Number : CCM/
Date
: 25.05.2015
Page No. : 117
Material/Service Description
Unit Rate
bolt/pins/bushes
individually
or as a set Alignemnt
check and
corrction
between
driver & driven equipment
Removal, reinstallation/replacement
of
coupling hub(s)
Dismantling and
reassembly
of
DE
Plummer
block unit Removal & reinstallation/replacement of DE
bearing including all seals, circlips etc. Dismantling
and
reaseembly of NDE Plummer
block unit Removal &
reinstallation/replacement of NDE bearing including all
seals, circlips etc. Removal & reinstallation
of
seal
chamber
cover
Removal &
reinstallation/replacement of seal including
Fan
CENTRIFUGAL
KW
844.68 INR/EA
damper
adjustment
/
repairs.ID/FD
FAN,
FANS / BLOWERS (BETWEEN BEARINGS). - Up to 30
1,098.09
INR/EA
1,351.49
INR/EA
1,689.37
INR/EA
Fan
damper
adjustment
/
repairs.ID/FD
FAN,
CENTRIFUGAL FANS / BLOWERS (BETWEEN BEARINGS). - Above 100
and up to 250 KW.
Remov
CENTRIFUGAL
KW
449.37 INR/EA
&
reinstallation
of actuator.ID/FD FAN,
FANS / BLOWERS (BETWEEN BEARINGS). - Up to 30
675.76 INR/EA
Remov
& reinstallation of actuator.ID/FD FAN,
CENTRIFUGAL
FANS / BLOWERS (BETWEEN BEARINGS). - Above
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
1,001.79
INR/EA
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 118
Number : CCM/
Date
: 25.05.2015
Page No. : 119
Material/Service Description
Unit Rate
INR/EA
Remov
& reinstallation of actuator.ID/FD FAN,
CENTRIFUGAL FANS / BLOWERS (BETWEEN BEARINGS). - Above
250 and up to
1000 KW.
Opening/box
up of inspection cover.ID/FD FAN,
CENTRIFUGAL FANS / BLOWERS (BETWEEN BEARINGS). - Up to 30
KW
"Opening/box
up of inspection cover.ID/FD FAN,
CENTRIFUGAL FANS / BLOWERS (BETWEEN BEARINGS). - Above 30
and up to 100
KW."
"Opening/box
up of inspection cover ID/FD FAN,
CENTRIFUGAL FANS / BLOWERS (BETWEEN BEARINGS). - Above
100 and up to
250 KW."
"Opening/box
up of inspection cover ID/FD FAN,
CENTRIFUGAL FANS / BLOWERS (BETWEEN BEARINGS). - Above
250 and up to
1000 KW."
1,202.83
INR/EA
1,753.56
INR/EA
Casing
/ inspection Door Gasket.ID/FD FANS, OVERHUNG
WITHOUT COUPLING - Up to 30 KW
ID/FD
FANS,
OVERHUNG
WITHOUT
COUPLING
-Casing
/
inspection
Door
Gasket:
Job
includes:
Removal
&
reinstallation of seal chamber cover and/or inspection
door. Removal, inspection & reinstallation/replacement of
seal including
all
measurement checks on shaft surface / seating face
Casing
inspection
Door
Gasket.ID/FD
FANS,
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
OVERHUNG
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 120
Number : CCM/
Date
: 25.05.2015
Page No. : 121
Material/Service Description
Unit Rate
500.05 INR/EA
"Fan
damper
adjustment
/
repairs.
OVERHUNG WITHOUT COUPLING - Up to 30 KW"
ID/FD
FANS,
751.77 INR/EA
"Fan
damper
adjustment
/
repairs.
ID/FD FANS,
OVERHUNG WITHOUT COUPLING - Above 30 and up to 100 KW."
466.27 INR/EA
675.76 INR/EA
Remov
&
reinstallation
of
actuator.ID/FD FANS,
OVERHUNG WITHOUT COUPLING - Above 30 and up to 100 KW.
Removal & reinstallation of actuators
2,702.99
INR/EA
3,642.27
INR/EA
Capital repair job. ID/FD FANS, OVERHUNG WITHOUT COUPLING Above 30 and up to 100 KW.
929.14 INR/EA
Fan
Blade Angle change job: FANS-FOR FINNED TUBE COOLERS
- Up to 30 KW
FANS-FOR
FINNED
TUBE
COOLERS
Fan
Blade Angle
change job::Jobincludes:Inspection
&
adjustment
of
fan
blade(s).Inspection
&
Adjustment
ofhub.Removal
&
Reinstallation / replacement of hub bolts.Check and adjust
bladetracking, gap between blade and skirt
Fan
Blade Angle change job: FANS-FOR FINNED TUBE COOLERS
- Above 30 and up to 50KW.
FANS-FOR
FINNED
TUBE
COOLERS
Fan
Blade Angle
change job::Jobincludes:Inspection
&
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
1,351.49
INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 122
adjustment
of
&
Adjustment
fan
ofhub.Removal
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
&
Number : CCM/
Date
: 25.05.2015
Page No. : 123
Material/Service Description
Reinstallation
/ replacement of hub bolts.Check
adjust bladetracking, gap between blade and skirt
Unit Rate
and
1,182.55
INR/EA
2,044.13
INR/EA
Replaceme
of
fan
blades
and/or hub.FANS-FOR FINNED
TUBE COOLERS - Up to 30 KW
Replacement
of
fan
blades
and/or
hubs:Job
includes : Removal
and
installationof Fan
Blade.Removal
and
installation/replacement of hub bolts.
Replaceme
of
fan
blades
and/or hub.FANS-FOR FINNED
TUBE COOLERS - Above 30 and up to 50KW.
Replacement
of
fan
blades
and/or
hubs:Job
includes : Removal
and
installationof Fan
Blade.Removal
and
installation/replacement of hub bolts.
844.68 INR/EA
FinFan
Stl.Struct.Bolt Tight. FANS-FOR FINNED TUBE
COOLERS
- Up to 30 KW.
FinFan
Stl.Struct.Bolt
Tight:Check
tightness
of
Plenum chamber and / orstructural bolts & tighten the same.
1,351.49
INR/EA
5,912.79
INR/EA
FinFan
Stl.Struct.Bolt Tight. FANS-FOR FINNED TUBE
COOLERS
- Above 30 and up to 50KW.
FinFan
Stl.Struct.Bolt
Tight:Check
tightness
of
Plenum chamber and / orstructural bolts & tighten the same.
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
of
fan assembly including
of components, bearings,seals
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 124
Number : CCM/
Date
: 25.05.2015
Page No. : 125
Material/Service Description
Unit Rate
8,446.84
INR/EA
3,167.57
INR/EA
4,223.43
INR/EA
1,520.44
INR/EA
2,702.99
INR/EA
Drive
shaft
/
Couplng. FANS-FOR COOLING TOWERS WITH
GEAR BOX - Up to 50 KW
FANS-FOR
COOLING
TOWERS
WITH
GEAR
BOX
- Drive
shaft / Couplng:Job
includes:Removal
&
reinstallation
of drive shaft assembly
Drive
shaft
/
Couplng. FANS-FOR COOLING TOWERS WITH
GEAR BOX - Above 50 andup to 100 KW.
FANS-FOR
COOLING
TOWERS
WITH
GEAR
BOX
- Drive
shaft / Couplng:Job
includes:Removal
&
reinstallation
of drive shaft assembly
Fan
Blade
angle change. FANS-FOR COOLING TOWERS WITH
GEAR BOX - Up to 50 KW.
Fan Blade angle change:Job includes:Inspection & adjustment
of fanblade(s).Inspection & Adjustment of hub.Removal &
Reinstallation / replacementof hub bolts.Check and adjust
blade tracking, gap between blade and skirt
Fan
Blade
angle change. FANS-FOR COOLING TOWERS WITH
GEAR BOX - Above 50 andup to 100 KW.
Fan Blade angle change:Job includes:Inspection & adjustment
of fanblade(s).Inspection & Adjustment of hub.Removal &
Reinstallation / replacementof hub bolts.Check and adjust
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 126
Number : CCM/
Date
: 25.05.2015
Page No. : 127
Material/Service Description
Unit Rate
1,689.37
INR/EA
3,040.86
INR/EA
6,335.13
INR/EA
7,602.15
INR/EA
2,534.05
INR/EA
Replace
of Fan Blades and / or hub.FANS-FOR COOLING
TOWERS WITH GEAR BOX - Up to 50 KW.
Replacement
of
Fan
Blades
and
/
or hub:Job
includes : Removal
& installationof Fan Blades.Removal &
installation of Hub
bolt
/
Hub.Check
&
adjust
bladeangle, blade tracking, gap between blade and skirt
Replace
of Fan Blades and / or hub.FANS-FOR COOLING
TOWERS WITH GEAR BOX - Above 50 andup to 100 KW.
Replacement
of
Fan
Blades
and
/
or hub:Job
includes : Removal
& installationof Fan Blades.Removal &
installation of Hub
bolt
/
Hub.Check
&
adjust
bladeangle, blade tracking, gap between blade and skirt
Capital repair(OH). FANS-FOR COOLING TOWERS WITH GEAR BOX Above 50 andup to 100 KW.
Capital
repair(OH):Job
includes
:Removal
&
reinstallation
of
drive
shaftassembly.Removal
&
reinstallation/replacement
of
hub(s).Inspection
&
adjustmentof fan blade(s) &/or clamp(s). Dismantling
&
reassembly
of
fan
unit
includingrepair/replacement of all components excluding
replacement of gearbox
Replacement
of
gearbox. FANS-FOR COOLING TOWERS WITH
GEAR BOX - Up to 50 KW
Replacement
GEAR
of
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 128
3,801.08 INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 129
Material/Service Description
Unit Rate
5,405.98
INR/EA
8,446.84
INR/EA
4,137.27
INR/EA
5,517.48
INR/EA
8,446.84
INR/EA
Capital repair job. FANS-FOR COOLING TOWERS WITH GEAR BOX Up to 50 KW.
Capital
Repair
of
Gear
box:Job includes :Complete
dismantling & reassembly ofgearbox including inspection of
all internal, bearings,shafts, gears, sealsetc. with all
applicable
&
necessary checks and repair/replacement
ofcomponents as required
Capital repair job. FANS-FOR COOLING TOWERS WITH GEAR BOX Above 50 andup to 100 KW.
Capital
Repair
of
Gear
box:Job includes :Complete
dismantling & reassembly ofgearbox including inspection of
all internal, bearings,shafts, gears, sealsetc. with all
applicable
&
necessary checks and repair/replacement
ofcomponents as required
Timing
Gears.BLOWER-TWIN
LOBE-BELT DRIVEN - Above 100
and up to 250 KW.
BLOWER-TWIN
LOBE-BELT
DRIVEN
Timing
Gears
(If
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 130
Material/Service Description
Unit Rate
applicable):Job
includes:Removal
&
reinstallation of
end cover.Replacement
of
casing
gasket
Removal
&replacement ofseal(s).
Removal
&
reinstallation/replacement
ofbearings(s).Removal & reinstallation of timing gears
includinginspection/replacement
11,825.58 INR/EA
Timing
Gears.BLOWER-TWIN
LOBE-BELT DRIVEN - Above 250
and up to 1000 KW.
BLOWER-TWIN
LOBE-BELT
DRIVEN
Timing
Gears
(If
applicable):Job includes:Removal & reinstallation of end
cover.Replacement of casing gasket Removal &replacement
ofseal(s).
Removal
&
reinstallation/replacement
ofbearings(s).Removal & reinstallation of timing gears
includinginspection/replacement
3,760.53
INR/EA
5,015.74
INR/EA
7,602.15
INR/EA
NDE
bearing
/
seal
replacement.
BLOWER-TWIN
LOBEBELT DRIVEN - Up to 30 KW.
NDE bearing / seal replacement:Job includes:Dismantling and
reassembling ofNDE bearing cover.Inspection, checking and
replacement of timing gears andbearings
including
all
measurement
checks
of
bearing
/
seal
seat
onshaft.Inspection and replacement of seal (s) including
all measurement checks
NDE
bearing
/
seal
replacement.
BLOWER-TWIN
LOBEBELT DRIVEN - Above 30 and up to 100KW.
NDE bearing / seal replacement:Job includes:Dismantling and
reassembling ofNDE bearing cover.Inspection, checking and
replacement of timing gears andbearings
including
all
measurement
checks
of
bearing
/
seal
seat
onshaft.Inspection and replacement of seal (s) including
all measurement checks
NDE
bearing
/
seal
replacement.
BLOWER-TWIN
LOBEBELT DRIVEN - Above 100 and up to 250 KW.
NDE bearing / seal replacement:Job includes:Dismantling and
reassembling ofNDE bearing cover.Inspection, checking and
replacement of timing gears andbearings
including
all
measurement
checks
of
bearing
/
seal
seat
onshaft.Inspection and replacement of seal (s) including
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 131
Number : CCM/
Date
: 25.05.2015
Page No. : 132
Material/Service Description
Unit Rate
10,643.02 INR/EA
NDE
bearing
/
seal
replacement.
BLOWER-TWIN
LOBEBELT DRIVEN - Above 250 and up to 1000 KW.
NDE bearing / seal replacement:Job includes:Dismantling and
reassembling ofNDE bearing cover.Inspection, checking and
replacement of timing gears andbearings
including
all
measurement
checks
of
bearing
/
seal
seat
onshaft.Inspection and replacement of seal (s) including
all measurement checks
3,801.08
INR/EA
6,335.13
INR/EA
9,502.69
INR/EA
DE bearing/seal replacement. BLOWER-TWIN LOBE-BELT DRIVEN Above 250 and up to 1000 KW.
DE bearing/seal replacement:Job
includes:Dismantling and
reassembling of DEbearing cover.Inspection, checking and
replacement of gears and bearingsincluding all measurement
checks
of
bearing
/ seal seat on shaft.Inspection
andreplacement of seal (s) including all measurement checks
DE
bearing/seal replacement.BLOWER-TWIN LOBE-BELT DRIVEN
- Above 100 and up to 250 KW.
DE bearing/seal replacement:Job
includes:Dismantling and
reassembling of DEbearing cover.Inspection, checking and
replacement of gears and bearingsincluding all measurement
checks
of
bearing
/ seal seat on shaft.Inspection
andreplacement of seal (s) including all measurement checks
DE bearing/seal replacement. BLOWER-TWIN LOBE-BELT DRIVEN Above 250 and up to 1000 KW.
DE bearing/seal replacement:Job
includes:Dismantling and
reassembling of DEbearing cover.Inspection, checking and
replacement of gears and bearingsincluding all measurement
checks
of
bearing
/ seal seat on shaft.Inspection
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
12,670.27 INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 133
Material/Service Description
Unit Rate
844.68 INR/EA
Checking
/
repair
of
RV-0-30
KW.BLOWER-TWIN
LOBEBELT DRIVEN - Up to 30 KW
Checking / repair of RV-0-30 KW:Job
includes:Checking
including
adjustment
ofRV.Removal,
dismantling
and
reassembling of RV after repairs
1,351.49
INR/EA
2,196.17
INR/EA
3,378.75
INR/EA
Checking
/
repair
of
RV-0-30
KW.BLOWER-TWIN
LOBEBELT DRIVEN - Above 30 and up to 100KW.
Checking / repair of RV-0-30 KW:Job
includes:Checking
including
adjustment
ofRV.Removal,
dismantling
and
reassembling of RV after repairs
Checking
/
repair
of
RV-0-30
KW.BLOWER-TWIN
LOBEBELT DRIVEN - Above 100 and up to 250 KW.
Checking / repair of RV-0-30 KW:Job
includes:Checking
including
adjustment
ofRV.Removal,
dismantling
and
reassembling of RV after repairs
Checking
/
repair
of
RV-0-30
KW.BLOWER-TWIN
LOBEBELT DRIVEN - Above 250 and up to1000 KW.
Checking
/
repair
of
RV-0-30
KW:Job
includes:Checking including
adjustment
ofRV.Removal,
dismantling
and
reassembling of RV after repairs
Capital
repair job.BLOWER-TWIN LOBE-BELT DRIVEN - Up to
30
KW
Capital
repair(OH):Job
includes:Dismantling
and
reassembling of NDE bearingcover.Inspection, checking and
replacement of gears and bearingsincluding allmeasurement
checks of bearing / seal seat on shaft.Inspection and
replacementof
seal
(s)
including
all
measurement
checks.Removal and refixing of couplingguards Removal and
refixing
of
Belts
Checking
and
correction
of
pulleyalignment
Inspection,
tension
adjustment
and
replacement of belts Inspectionand replacement of drive
pulley
Inspection
and
replacement
of
driven
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
14,021.76 INR/EA
andreassembling
of
DEbearing
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 134
Number : CCM/
Date
: 25.05.2015
Page No. : 135
Material/Service Description
Unit Rate
cover.Inspection,
checking
andreplacement
of
gears
and bearings
including all measurement checks of
bearing /seal seat on shaft.Inspection and replacement
of seal (s) including allmeasurement checks. Removal and
reinstallation of blower end cover (DE&NDE)Inspection of
lobes and lobe housing
including
all
measurement
checks, repair/replacement of
lobes/housing/ complete blower
17,738.37 INR/EA
Capital
repair
job.
BLOWER-TWIN LOBE-BELT DRIVEN Above
100 and up to 250 KW.
Capital
repair(OH):Job
includes:Dismantling
and
reassembling of NDE bearingcover.Inspection, checking and
replacement of gears and bearingsincluding allmeasurement
checks of bearing / seal seat on shaft.Inspection and
replacementof
seal
(s)
including
all
measurement
checks.Removal and refixing of couplingguards Removal and
refixing
of
Belts
Checking
and
correction
of
pulleyalignment
Inspection, tension
adjustment
and
replacement of belts Inspectionand replacement of drive
pulley
Inspection
and
replacement
of
driven
pulleyDismantling
and reassemblingof DEbearing
cover.Inspection, checking andreplacement of gears and
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
25,762.87 INR/EA
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 136
Number : CCM/
Date
: 25.05.2015
Page No. : 137
Material/Service Description
Unit Rate
seat
on
shaft.Inspection
and
replacement
of
seal
(s)
including
allmeasurement
checks.
Removal
and
reinstallation of blower end cover (DE&NDE)Inspection of
lobes and lobe housing
including
all
measurement
checks, repair/replacement of
lobes/housing/ complete blower
Capital
repair
job.
BLOWER-TWIN LOBE-BELT DRIVEN Above
250 and up to 1000 KW.
Capital
repair(OH):Job
includes:Dismantling
and
reassembling of NDE bearingcover.Inspection, checking and
replacement of gears and bearingsincluding allmeasurement
checks of bearing / seal seat on shaft.Inspection and
replacementof
seal
(s)
including
all
measurement
checks.Removal and refixing of couplingguards Removal and
refixing
of
Belts
Checking
and
correction
of
pulleyalignment
Inspection, tension
adjustment
and
replacement of belts Inspectionand replacement of drive
pulley
Inspection
and
replacement
of
driven
pulleyDismantling
and reassemblingof DEbearing
cover.Inspection, checking andreplacement of
gears
and
bearings including all measurement checks of bearing /seal
seat on shaft.Inspection and replacement of seal (s)
including allmeasurement checks. Removal and reinstallation
of blower end cover (DE&NDE)Inspection of lobes and lobe
housing
including
all
measurement checks,
repair/replacement of lobes/housing/ complete blower
Back
Seating
of
Rotor
Assembly.
FIXED ANGLE / SWIVEL ANGLE - Up to25 KW.
MIXER-SIDE ENTRY
1,267.03
INR/EA
1,689.37
INR/EA
4,730.24
INR/EA
Back
Seating
of
Rotor
Assembly.
MIXER-SIDE ENTRY
FIXED ANGLE / SWIVEL ANGLE - Above 25KW to 50 KW.
Back
Seating of Rotor Assembly. MIXER-SIDE
ENTRY FIXED ANGLE / SWIVEL ANGLE - Above 50 KW.
3159561 DE BJ MIXER-SEFA/SA-UPTO25KW
Valid from: 25.05.2015 Valid to: 31.07.2016
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 138
Number : CCM/
Date
: 25.05.2015
Page No. : 139
Material/Service Description
Unit Rate
- Up to25 KW.
DE
bearing
job:
Job
includes:
Removal
&
reinstallation/replacement
of
pulley
end
bearing(s)
including
dismantling
& reassembly of all necessary
component, inspection of seat on shaft & housing, all
necessary checks for dimension, clearance,
runout
etc
necessary
6,335.13
INR/EA
7,602.15
INR/EA
6,335.13
INR/EA
7,602.15
INR/EA
Impeller
End Bearing.MIXER-SIDE
SWIVEL ANGLE - Above 50 KW.
ENTRY
FIXED
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
ANGLE
Number : CCM/
Date
: 25.05.2015
Page No. : 140
Material/Service Description
Unit Rate
Impeller
End
Bearing:
Job
includes:
Removal
&
reinstallation of mixer assembly with driver, including
removal & reinstallation of hanger supports.
6,757.47
INR/EA
8,446.84
INR/EA
Mech.
seal
Jobs.
MIXER-SIDE
ENTRY
FIXED ANGLE /
SWIVEL ANGLE - Up to 25 KW.
Mech. seal Jobs: Job includes: Removal of DE & impeller end
Bearing. Removal & reinstallation of mixer mounting flange.
Removal & reinstallation of seal including dismantling &
reassembly
of
seal
unit,
inspection,
cleaning,
repair/replacement
of
components, replacement of all
gaskets/O-rings
10,136.22 INR/EA
Capital
repair
job. MIXER-SIDE ENTRY FIXED ANGLE /
SWIVEL ANGLE - Up to 25 KW.
Capital
Repairs: Job includes: Removal & reinstallation
of coupling guards(s). Removal & reinstallation/replacement
of belt(s).
Alignment
of
driver & driven pulleys.
Removal & reinstallation/replacement
of belt pulley(s).
Drive pulley including
removal/reinstallation
&
lifting/shifting
of
driver
as
required.
Driven
pulley.
Removal
&
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
13,041.93 INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 141
bearing(s)
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 142
Material/Service Description
Unit Rate
including
dismantling
& reassembly of all necessary
component, inspection of seat on shaft & housing, all
necessary checks for dimension, clearance, runout etc.
Removal & reinstallation of mixer assembly with driver,
including removal & reinstallation of hanger support(s).
Removal & reinstallation of impeller/propeller assembly
from shaft including dismantling & reassembly, inspection,
cleaning, repair/replacement of components, replacement of
all gaskets / O-rings. Removal & reinstallation of mixer
mounting flange. Removal & reinstallation of seal including
dismantling
&
reassembly
of seal unit, inspection,
cleaning, repair/replacement of components, replacement of
all gaskets/O-rings. Removal & reinstallation of Swivel
joint
(As
applicable).
Removal
&
reinstallation
/replacement
of
impeller
end
bearing(s)
including
dismantling
& reassembly of all necessary component,
inspection of seat on shaft & housing
Capital
repair
job. MIXER-SIDE ENTRY FIXED ANGLE /
SWIVEL ANGLE - Above 25KW to 50 KW.
Capital
Repairs: Job includes: Removal & reinstallation
of coupling guards(s). Removal & reinstallation/replacement
of belt(s).
Alignment
of
driver & driven pulleys.
Removal & reinstallation/replacement
of belt pulley(s).
Drive pulley including
removal/reinstallation
&
lifting/shifting of driver
as
required.
Driven pulley.
Removal
&
reinstallation/replacement of pulley DE end bearing(s)
including
dismantling
& reassembly of all necessary
component, inspection of seat on shaft & housing, all
necessary checks for dimension, clearance,
runout etc.
Removal & reinstallation of mixer assembly with driver,
including removal & reinstallation of hanger support(s).
Removal & reinstallation of impeller/propeller assembly
from shaft including dismantling & reassembly, inspection,
cleaning, repair/replacement of components, replacement of
all gaskets / O-rings. Removal & reinstallation of mixer
mounting flange. Removal & reinstallation of seal including
dismantling
&
reassembly
of seal unit, inspection,
cleaning, repair/replacement of components, replacement of
all gaskets/O-rings. Removal & reinstallation of Swivel
joint
(As
applicable).
Removal& reinstallation
/replacement
of
impeller
end
bearing(s)
including
dismantling
& reassembly of all necessary component,
inspection of seat on shaft & housing
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
17,738.37 INR/EA
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 143
Number : CCM/
Date
: 25.05.2015
Page No. : 144
Material/Service Description
Unit Rate
21,961.80 INR/EA
Capital
repair
job.MIXER-SIDE
ENTRY FIXED ANGLE /
SWIVEL ANGLE - Above 50 KW.
Capital
Repairs: Job includes: Removal & reinstallation
of coupling guards(s). Removal & reinstallation/replacement
of belt(s).
Alignment
of
driver & driven pulleys.
Removal & reinstallation/replacement
of belt pulley(s).
Drive pulley including
removal/reinstallation
&
lifting/shifting of driver
as
required.
Driven pulley.
Removal
&
reinstallation/replacement of pulley DE end bearing(s)
including
dismantling
& reassembly of all necessary
component, inspection of seat on shaft & housing, all
necessary checks for dimension, clearance,
runout etc.
Removal & reinstallation of mixer assembly with driver,
including removal & reinstallation of hanger support(s).
Removal & reinstallation of impeller/propeller assembly
from shaft including dismantling & reassembly, inspection,
cleaning, repair/replacement of components, replacement of
all gaskets / O-rings. Removal & reinstallation of mixer
mounting flange. Removal & reinstallation of seal including
dismantling
&
reassembly
of seal unit, inspection,
cleaning, repair/replacement of components, replacement of
all gaskets/O-rings. Removal & reinstallation of Swivel
joint
(As
applicable).
Removal& reinstallation
/replacement
of
impeller
end
bearing(s)
including
dismantling
& reassembly of all necessary component,
inspection of seat on shaft & housing
2,534.05
INR/EA
3,040.86
INR/EA
3,716.61
INR/EA
3,378.75
INR/EA
Replacement
of mixer assembly.MIXER-SIDE ENTRY
FIXED ANGLE / SWIVEL ANGLE - Up to25 KW.
Replacement
of mixer assembly.MIXER-SIDE ENTRY
FIXED ANGLE / SWIVEL ANGLE - Above 50 KW.
Shaft
&
Blade(Single Stage Overhung Top)
ENTRY FIXED ANGLE / SWIVEL ANGLE - Up to 25 KW.
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
MIXER-SIDE
Blade
(Single
Stage
OH
Number : CCM/
Date
: 25.05.2015
Page No. : 145
Top
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
entry):
Job
Number : CCM/
Date
: 25.05.2015
Page No. : 146
Material/Service Description
Removal
& Refixing of Rigid coupling.
assembly of shaft & Mixer blades.
Dismantling
Unit Rate
&
3,716.61
INR/EA
4,054.49
INR/EA
1,689.37
INR/EA
2,027.25
INR/EA
2,534.05
INR/EA
3,167.57
INR/EA
Shaft
&
Blade(Single Stage Overhung Top) MIXER-SIDE
ENTRY FIXED ANGLE / SWIVEL ANGLE - Above 25KW to 50 KW.
Shaft
&
Blade
(Single Stage OH Top entry): Job
includes: Removal
&
Refixing
of
Rigid
coupling.
Dismantling & assembly of shaft & Mixer blades.
Shaft
&
Blade(Single Stage Overhung Top) MIXER-SIDE
ENTRY FIXED ANGLE / SWIVEL ANGLE - Above 50 KW.
Shaft
&
Blade
(Single Stage OH Top entry): Job
includes: Removal
&
Refixing
of
Rigid
coupling.
Dismantling & assembly of shaft & Mixer blades.
Swivel
assembly.
MIXER-SIDE
ENTRY
FIXED
ANGLE /
SWIVEL ANGLE - Up to 25 KW.
Swivel Assembly job: Job includes: Removal & reinstallation
of DE Bearing, Impeller side bearing, Mechanical seal &
swivel assembly
Shifting
of
Mixer
FIXED ANGLE / SWIVEL
Driver inside Dyke wall
Shifting
of
Mixer
Mixer assembly / Driver
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 147
Material/Service Description
Unit Rate
3,547.66
INR/EA
4,054.49
INR/EA
Shifting
of
Mixer
assembly / Driv.MIXER-SIDE ENTRY
FIXED ANGLE / SWIVEL ANGLE -Shifting of Mixer assembly /
Driver inside Dyke wall Manually. Above 25KW to 50 KW.
Shifting
of Mixer assembly / Driver: Shifting of
Mixer assembly / Driver inside Dyke wall Manually
Shifting
of
Mixer
assembly / Driv.MIXER-SIDE ENTRY
FIXED ANGLE / SWIVEL ANGLE -Shifting of Mixer assembly /
Driver inside Dyke wall Manually. Above 50 KW.
Shifting
of Mixer assembly / Driver: Shifting of
Mixer assembly / Driver inside Dyke wall Manually
* 50
SOOT BLOWER
** 50.01 Rotary soot blower
Complete
Overhaul-Soot
Blower.
Soot
Blower.
Soot Blower -Rotary soot blower
INR/EA
Complete Overhaul of
D-Asm
Rep-Asm-Sealing-Air
NRV
Assembly of Sealing Air NRV.
Soot Blower -Rotary soot blower
-Disassembly
Repair
&
**
1,013.62
INR/EA
1,182.55
INR/EA
1,013.62
INR/EA
Poppet
V/v D-Assembly & Rep. Popet Valve Disassembly
&
REGISTERRaEpDaOiFrFI.CE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 148
Material/Service Description
Unit Rate
LSRB
Rtractabe
Lance
removal/Replacement.
Rmvl.Rep
LSRB
RECTBLE
2,108.33
INR/EA
1,182.55
INR/EA
4,162.60
INR/EA
3,378.75
INR/EA
lance
Wdrwal-LSRB
L-Jammed
drg
RECTBLE
when jammed during operation.
Op.
Withdrawal
of
LSRB
Comp.Overhauling-Soot
soot
Blower.
Blower
.Complete
Overhauling
of
* 60
STEAM TURBINE
** 60.01 SINGLE STG 2-BLADE, VERTI SPLIT(COPPUS)
*** 60.01.01Governor Job
3159626 "OTSGST-S/S 2-BLD,VS(CPUS)-ADJST O/S GOV
Valid from: 25.05.2015 Valid to: 31.07.2016
Overspeed
Trip
Setting
of Governor. STEAM TURBINESINGLE STAGE
2-BLADE,
VERTICALLY
SPLIT(COPPUS)
Adjustment of overspeed Governor.
929.14 INR/EA
Decoupling-Coupling
(govornor).STEAM
TURBINE-SINGLE
STAGE
2-BLADE,
VERTICALLYSPLIT(COPPUS)
Job includes : Removal
& reinstallation/replacement
of
guards and spacer on
output shaft.
Steam
TurbineSINGLE
STG
2-BLADE, VERTI SPLIT
(COPPUS) Governor Job
4,223.43
INR/EA
7,602.15
INR/EA
Casing
gasket.
STEAM
TURBINE-SINGLE
STAGE 2-BLADE,
VERTICALLY SPLIT(COPPUS) - Up to 20 KW
Casing
gasket
job:
Job
includes:
Removal
&
reinstallation/replacement of guards and spacer on output
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 149
Number : CCM/
Date
: 25.05.2015
Page No. : 150
Material/Service Description
Unit Rate
&
reinstallation
of governor end bearing housing &
components.
Inspection
removal & replacement bearing
including oil ring, oil ring sleeve, circlip and oil seals.
Removal & reinstallation of gland housing. Removal &
reinstallation
of
seal
ring
including
inspection,
repair/replacement and checks on seal seating area on
shaft. Including yoke removal & reinstallation if needed.
Removal & reinstallation of casing cover. Replacement of
casing gasket
INR/EA
Casing
gasket.
STEAM
TURBINE-SINGLE
STAGE 2-BLADE,
VERTICALLY SPLIT(COPPUS) - Above 20 and up to 50 KW.
Casing
gasket
job:
Job
includes:
Removal
&
reinstallation/replacement of guards and spacer on output
shaft. Removal & reinstallation of trip lever & latch set.
Removal & reinstallation of governor mounting yoke. Removal
&
reinstallation
of governor end bearing housing &
components.
Inspection
removal & replacement bearing
including oil ring, oil ring sleeve, circlip and oil seals.
Removal & reinstallation of gland housing. Removal &
reinstallation
of
seal
ring
including
inspection,
repair/replacement and checks on seal seating area on
shaft. Including yoke removal & reinstallation if needed.
Removal & reinstallation of casing cover. Replacement of
casing gasket
"Casing
gasket.
STEAM
TURBINE-SINGLE STAGE 2-BLADE,
VERTICALLY SPLIT(COPPUS) - Above 50 and up to 100 KW."
Casing
gasket
job:
Job
includes:
Removal
&
reinstallation/replacement of guards and spacer on output
shaft. Removal & reinstallation of trip lever & latch set.
Removal & reinstallation of governor mounting yoke. Removal
&
reinstallation
of governor end bearing housing &
components.
Inspection
removal & replacement bearing
including oil ring, oil ring sleeve, circlip and oil seals.
Removal & reinstallation of gland housing. Removal &
reinstallation
of
seal
ring
including
inspection,
repair/replacement and checks on seal seating area on
shaft. Including yoke removal & reinstallation if needed.
Removal & reinstallation of casing cover. Replacement of
casing gasket
"Casing
gasket.
STEAM
TURBINE-SINGLE
STAGE
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
2-BLADE,
Number : CCM/
Date
: 25.05.2015
Page No. : 151
Material/Service Description
Unit Rate
1,182.55
INR/EA
1,267.03
INR/EA
1,435.96
INR/EA
1,689.37
INR/EA
Sentinel/
Hand valves / Linkages. STEAM TURBINESINGLE STAGE 2-BLADE, VERTICALLY SPLIT (COPPUS) - Up to 20
KW. Attending job on Sentinel/ Hand valves /
Linkages.Job includes : Opening,cleaning, lubrication,
packing and box up
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 152
Number : CCM/
Date
: 25.05.2015
Page No. : 153
Material/Service Description
Unit Rate
1,182.55
INR/EA
1,267.03
INR/EA
1,435.96
INR/EA
1,689.37
INR/EA
1,182.55
INR/EA
1,267.03
INR/EA
1,435.96
INR/EA
"Repair
of
Throttle Valve.STEAM TURBINE-SINGLE STAGE
2-BLADE, VERTICALLY SPLIT(COPPUS) - Up to 20 KW"
Repair
of
Throttle
Valve:
Job includes: Repair /
replacement of Trip throttle valve
Repair
of
Throttle
Valve.STEAM TURBINE-SINGLE STAGE
2-BLADE,
VERTICALLY SPLIT (COPPUS) - Above 20 and up to
50
KW.
Repair
of
Throttle
Valve:
Job includes: Repair /
replacement of Trip throttle valve
"Repair
of
Throttle Valve.STEAM TURBINE-SINGLE STAGE
2-BLADE,
VERTICALLY SPLIT(COPPUS) - Above 50 and up to
100
KW."
Repair
of
Throttle
Valve:
Job includes: Repair /
replacement of Trip throttle valve
Repair
of
Throttle
Valve.STEAM TURBINE-SINGLE STAGE
2-BLADE, VERTICALLY SPLIT (COPPUS) - Above 100 KW.
Repair
of
Throttle
Valve:
Job includes: Repair /
replacement of Trip throttle valve
Repair
of Safety Trive Valve assem.STEAM TURBINESINGLE STAGE 2-BLADE, VERTICALLY SPLIT(COPPUS) - Up to 20
KW
Repair
of Safety Thrive Valve assembly: Job
includes: Removal of linkages, replacement of gaskets
Repair
of
Safety
Trive
Valve assem.STEAM TURBINESINGLE STAGE 2-BLADE, VERTICALLY SPLIT(COPPUS) - Above 20
and up to 50 KW.
Repair
of Safety Thrive Valve assembly: Job
includes: Removal of linkages, replacement of gaskets
"Repair
of
Safety
SINGLE STAGE 2-BLADE,
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 154
Thrive
Valve
assembly:
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Job
Number : CCM/
Date
: 25.05.2015
Page No. : 155
Material/Service Description
Unit Rate
1,689.37
INR/EA
5,777.64
INR/EA
7,602.15
INR/EA
9,882.81
INR/EA
"Repair
of Safety Trive Valve assem.STEAM TURBINESINGLE STAGE 2-BLADE, VERTICALLY SPLIT(COPPUS) - Above 100
KW." Repair of Safety Thrive Valve assembly: Job
includes: Removal of linkages, replacement of gaskets
DE
bearing
job. STEAM TURBINE-SINGLE STAGE 2-BLADE,
VERTICALLY SPLIT(COPPUS) - Up to 20 KW
DE
bearing
job: Job includes: Removal & reinstallation
of bearing
housing
cover. Removal & reinstallation of
output end
bearing
housing. Inspection, removal &
replacement of bearing including oil ring and oil seals
DE
bearing
job. STEAM TURBINE-SINGLE STAGE 2-BLADE,
VERTICALLY SPLIT(COPPUS) - Above 20 and up to 50 KW.
DE
bearing
job: Job includes: Removal & reinstallation
of bearing
housing
cover. Removal & reinstallation of
output end
bearing
housing. Inspection, removal &
replacement of bearing including oil ring and oil seals
"DE
bearing job. STEAM TURBINE-SINGLE STAGE 2-BLADE,
VERTICALLY SPLIT(COPPUS) - Above 50 and up to 100 KW."
DE
bearing
job: Job includes: Removal & reinstallation
of bearing
housing
cover. Removal & reinstallation of
output end
bearing
housing. Inspection, removal &
replacement of bearing including oil ring and oil seals
13,683.88 INR/EA
DE
bearing
job.STEAM
TURBINE-SINGLE
STAGE 2-BLADE,
VERTICALLY SPLIT(COPPUS) - Above 100 KW.
DE
bearing
job: Job includes: Removal & reinstallation
of bearing
housing
cover. Removal & reinstallation of
output end
bearing
housing. Inspection, removal &
replacement of bearing including oil ring and oil seals
NDE
bearing
replacement..STEAM
TURBINE-SINGLE
STAGE
2-BLADE, VERTICALLY SPLIT (COPPUS) - Up to 20 KW
NDE
bearing
replacement:
Job
includes:
Removal &
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
6,419.60
INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 156
Material/Service Description
Unit Rate
reinstallation
of
governor.
Removal
&
reinstallation/replacement of spider and/or coupling hub at
governor end. Removal & reinstallation of trip lever &
latch set. Removal & reinstallation of governor mounting
yoke. Removal & replacement of bearing including oil ring,
circlip and oil seals
INR/EA
"NDE
bearing
replacement..STEAM
TURBINE-SINGLE STAGE
2-BLADE,
VERTICALLY
SPLIT(COPPUS) - Above 20 and up to
50
KW."
NDE
bearing
replacement:
Job
includes:
Removal &
reinstallation
of
governor.
Removal
&
reinstallation/replacement of spider and/or coupling hub at
governor end. Removal & reinstallation of trip lever &
latch set. Removal & reinstallation of governor mounting
yoke. Removal & replacement of bearing including oil ring,
circlip and oil seals
NDE
bearing
replacement..STEAM
TURBINE-SINGLE
STAGE
2-BLADE, VERTICALLY SPLIT (COPPUS) - Above 50 and up to 100
KW.
NDE
bearing
replacement:
Job
includes:
Removal &
reinstallation
of
governor.
Removal
&
reinstallation/replacement of spider and/or coupling hub at
governor end. Removal & reinstallation of trip lever &
latch set. Removal & reinstallation of governor mounting
yoke. Removal & replacement of bearing including oil ring,
circlip and oil seals
NDE
bearing
replacement..STEAM
TURBINE-SINGLE
STAGE
2-BLADE, VERTICALLY SPLIT (COPPUS) - Above 100 KW.
NDE
bearing
replacement:
Job
includes:
Removal &
reinstallation
of
governor.
Removal
&
reinstallation/replacement of spider and/or coupling hub at
governor end. Removal & reinstallation of trip lever &
latch set. Removal & reinstallation of governor mounting
yoke. Removal & replacement of bearing including oil ring,
circlip and oil seals
3,801.08
"Replacement
STAGE
of
Carbon
packings.STEAM
TURBINE-SINGLE
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
INR/EA
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 157
Number : CCM/
Date
: 25.05.2015
Page No. : 158
Material/Service Description
Unit Rate
5,068.10
INR/EA
6,335.13
INR/EA
8,869.18
INR/EA
Replacement
of
Carbon packings STEAM TURBINESINGLE STAGE 2-BLADE, VERTICALLY SPLIT (COPPUS) - Above 20
and up to 50 KW.
"Replacement
STAGE
2-BLADE,
100
KW."
of
Carbon
packings
STEAM
TURBINE-SINGLE
Replacement
of
Carbon packings.STEAM TURBINESINGLE STAGE 2-BLADE, VERTICALLY SPLIT (COPPUS) - Above 100
KW.
16,893.69 INR/EA
"Capital
repair job.STEAM TURBINE-SINGLE STAGE 2BLADE, VERTICALLY SPLIT(COPPUS) - Up to 20 KW"
Capital
repairs:
Job
includes:
Removal
&
reinstallation/replacement of guards and spacer on output
shaft. Alignment check & correction of turbine with driven
machine Removal & reinstallation/replacement of coupling
hub at output end Removal & reinstallation of bearing
housing cover. Removal & reinstallation of output end
bearing housing Inspection, removal& replacement of bearing
including oil ring, oil ring sleeve, circlip and oil seals.
Removal
&
reinstallation of gland housing. Removal &
reinstallation of seal ring including inspection, repair/
replacement and checks on seal seating area on shaft.
Removal & reinstallation/replacement of guards and spacer
on output shaft. Removal & reinstallation of governor
Removal
& reinstallation /replacement of spider and/or
coupling hub at governor end Removal & reinstallation of
trip lever & latch set Removal & reinstallation of governor
mounting yoke inspection removal & replacement bearing
including oil ring, oil ring sleeve, circlip and oil seals
Removal & reinstallation of gland housing, nozzles. Removal
& reinstallation of seal ring including inspection, repair/
Removal & reinstallation of casing cover
Capital
repair job. STEAM TURBINE-SINGLE STAGE 2BLADE, VERTICALLY SPLIT(COPPUS) - Above 20 and up to 50 KW.
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
26,185.22 INR/EA
of
includes:
guards
Number : CCM/
Date
: 25.05.2015
Page No. : 159
Removal
and spacer
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
&
on
Number : CCM/
Date
: 25.05.2015
Page No. : 160
Material/Service Description
Unit Rate
shaft.
Alignment check & correction of turbine with
driven machine
Removal
&
reinstallation/replacement of
coupling hub at output end Removal & reinstallation
of bearing housing cover. Removal & reinstallation of
output end bearing housing Inspection, removal& replacement
of bearing including oil ring, oil ring sleeve, circlip and
oil seals. Removal & reinstallation of gland housing.
Removal
& reinstallation
of
seal ring including
inspection, repair/ replacement
and
checks
on
seal
seating
area
on
shaft.
Removal
&
reinstallation/replacement of guards and spacer on output
shaft.
Removal
&
reinstallation
of governor Removal
& reinstallation /replacement of spider and/or
coupling hub at governor end Removal & reinstallation of
trip lever & latch set Removal & reinstallation of governor
mounting yoke inspection removal & replacement bearing
including oil ring, oil ring sleeve, circlip and oil seals
Removal & reinstallation of gland housing, nozzles. Removal
& reinstallation of seal ring including inspection, repair/
Removal & reinstallation of casing cover
"Capital
repair job. STEAM TURBINE-SINGLE STAGE 2BLADE, VERTICALLY SPLIT(COPPUS) - Above 50 and up to 100
KW." Capital
repairs:
Job
includes:
Removal &
reinstallation/replacement of guards and spacer on output
shaft. Alignment check & correction of turbine with driven
machine Removal & reinstallation/replacement of coupling
hub at output end Removal & reinstallation of bearing
housing cover. Removal & reinstallation of output end
bearing housing Inspection, removal& replacement of bearing
including oil ring, oil ring sleeve, circlip and oil seals.
Removal & reinstallation of gland housing. Removal &
reinstallation of seal ring including inspection, repair/
replacement and checks on seal seating area on shaft.
Removal & reinstallation/replacement of guards and spacer
on output shaft. Removal & reinstallation of governor
Removal
& reinstallation /replacement of spider and/or
coupling hub at governor end Removal & reinstallation of
trip lever & latch set Removal & reinstallation of governor
mounting yoke inspection removal & replacement bearing
including oil ring, oil ring sleeve, circlip and oil seals
Removal & reinstallation of gland housing, nozzles. Removal
& reinstallation of seal ring including inspection, repair/
Removal & reinstallation of casing cover
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
37,166.11 INR/EA
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 161
47,302.32 INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 162
Material/Service Description
Unit Rate
"Capital
repair
job.
STEAM TURBINE-SINGLE STAGE 2BLADE, VERTICALLY SPLIT(COPPUS) - Above 100 KW.
Capital
repairs:
Job
includes:
Removal
&
reinstallation/replacement of guards and spacer on output
shaft. Alignment check & correction of turbine with driven
machine Removal & reinstallation/replacement of coupling
hub at output end Removal & reinstallation of bearing
housing cover. Removal & reinstallation of output end
bearing housing Inspection, removal& replacement of bearing
including oil ring, oil ring sleeve, circlip and oil seals.
Removal
&
reinstallation of gland housing. Removal &
reinstallation of seal ring including inspection, repair/
replacement and checks on seal seating area on shaft.
Removal & reinstallation/replacement of guards and spacer
on output shaft. Removal & reinstallation of governor
Removal
& reinstallation /replacement of spider and/or
coupling hub at governor end Removal & reinstallation of
trip lever & latch set Removal & reinstallation of governor
mounting yoke inspection removal & replacement bearing
including oil ring, oil ring sleeve, circlip and oil seals
Removal & reinstallation of gland housing, nozzles. Removal
& reinstallation of seal ring including inspection, repair/
Removal & reinstallation of casing cover
1,689.37
INR/EA
3,378.75
INR/EA
8,446.84
INR/EA
Decoupling
&
Copling of Governer. STEAM TUR.-SINGLE
STAGE
2-BL.
(Horizontally
split)-Job
includes
Removal
&
reinstallation/replacement
of
governor
Removal
&
reinstallation/replacement of spider and/or coupling hub at
governor / Turbine end.
Overspeed
Trip
Setting
of
Governor.STEAM
TURBINE-SINGLE STAGE 2-BLADE, VERTICALLY SPLIT(COPPUS) Adjustment of overspeed Governor.
Governor
End
bearing
replacement.STEAM TUR.-SINGLE
STAGE
2-BL. (Horizontally split) -Up to 100 KW
Governor
End bearing replacement: Job includes: Removal
& reinstallation/replacement of
governor.
Removal
&
reinstallation/replacement of spider and/or coupling hub at
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
end.
Removal
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 163
Number : CCM/
Date
: 25.05.2015
Page No. : 164
bolt
assembly.
housing cover
Material/Service Description
Removal
&
reinstallation
of
Unit Rate
bearing
13,514.95 INR/EA
Governor
End
bearing
replacement.STEAM TUR.-SINGLE
STAGE
2-BL. (Horizontally split) -Above 100 and up to 350 KW.
Governor End bearing replacement: Job includes: Removal &
reinstallation/replacement
of
governor.
Removal
&
reinstallation/replacement of spider and/or coupling hub at
governor end. Removal & reinstallation of overspeed trip
bolt assembly. Removal & reinstallation of bearing housing
cover
16,893.69 INR/EA
Governor
End
bearing
replacement.STEAM TUR.-SINGLE
STAGE
2-BL. (Horizontally split) -Above 350 KW.
Governor
End bearing replacement: Job includes: Removal
& reinstallation/replacement of
governor.
Removal
&
reinstallation/replacement of spider and/or coupling hub at
governor end. Removal & reinstallation of overspeed trip
bolt assembly. Removal & reinstallation of bearing housing
cover
6,757.47
INR/EA
Drive
end
bearing.
STEAM
TUR.-SINGLE
STAGE 2-BL.
(Horizontally split) -Up to 100 KW
Drive
end
bearing:
Job
includes:
Removal
&
reinstallation of
bearing
housing
cover.
Removal
&
reinstallation/replacement
of
journal bearing & oiling.
10,136.22 INR/EA
Drive
end
bearing.
STEAM
TUR.-SINGLE
STAGE 2-BL.
(Horizontally split) -Above 100 and up to 350 KW.
Drive
end
bearing:
Job
includes:
Removal
&
reinstallation of
bearing
housing
cover.
Removal
&
reinstallation/replacement
of
journal bearing & oiling.
Drive
end
bearing.STEAM
TUR.-SINGLE
STAGE
2-BL.
(Horizontally split) -Above 350 KW.
Drive
end
bearing:
Job
includes:
Removal
&
reinstallation of
bearing
housing
cover.
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
13,514.95 INR/EA
Removal
&
reinstallation/replacement
journal bearing & oiling.
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 165
of
Number : CCM/
Date
: 25.05.2015
Page No. : 166
Material/Service Description
Unit Rate
8,973.93
INR/EA
Turbine
Shaft
Seals.STEAM
TUR.-SINGLE
STAGE
2-BL.
(Horizontally split) - Up to 100 KW
Turbine Shaft Seals: Job includes: Removal & reinstallation
of seal rings including inspection, repair/replacement &
checks
on
seal
seating area on shaft. Removal and
reinstallation of casing top half
Turbine
Shaft
Seals.STEAM
TUR.-SINGLE
STAGE
2-BL.
(Horizontally split) -Above 100 and up to 350 KW.
Turbine Shaft Seals: Job includes: Removal & reinstallation
of seal rings including inspection, repair/replacement &
checks
on
seal
seating area on shaft. Removal and
reinstallation of casing top half
Turbine
Shaft
Seals
STEAM
TUR.-SINGLE STAGE 2-BL.
(Horizontally split) - Above 350 KW.
Turbine Shaft Seals: Job includes: Removal & reinstallation
of seal rings including inspection, repair/replacement &
checks
on
seal
seating area on shaft. Removal and
reinstallation of casing top half
INR/EA
Casing
gasket
job.
STEAM
TUR.-SINGLE
STAGE 2-BL.
(Horizontally split) - Up to 100 KW
Casing gasket job:Job includes: Removal & reinstallation of
turbine casing cover. Removal & reinstallation of seal
rings including inspection, repair/replacement and checks
on
seal
seating
area
on
shaft.
Yoke removal &
reinstallation (if required). Replacement of casing gasket
Casing
gasket
job.
STEAM
TUR.-SINGLE
STAGE 2-BL.
(Horizontally split) - Above 100 and up to 350 KW.
Casing gasket job:Job includes: Removal & reinstallation of
turbine casing cover. Removal & reinstallation of seal
rings including inspection, repair/replacement and checks
on
seal
seating
area
on
shaft.
Yoke removal &
reinstallation (if required). Replacement of casing gasket
Casing
gasket
job.STEAM
TUR.-SINGLE
(Horizontally split) - Above 350 KW.
STAGE
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
2-BL.
Number : CCM/
Date
: 25.05.2015
Page No. : 167
Material/Service Description
Unit Rate
21,961.80 INR/EA
Capital
repair.STEAM
TUR.-SINGLE
STAGE
2-BL.
(Horizontally split) - Up to 100 KW
Capital
repair:
Job
includes:
Removal
&
reinstallation/replacement
of
governor
Removal
&
reinstallation/replacement of guards and spacer Removal &
reinstallation/replacement of spider and/or coupling hub at
governor end Removal & reinstallation of overspeed trip
bolt assembly Removal & reinstallation of bearing housing
cover Removal & reinstallation of adapter & shim Inspection
removal & replacement of ball bearing including inner race
shim.
Removal & reinstallation/replacement of journal
bearing & oil ring Removal & reinstallation/replacement of
labyrinth seal & oil singer
32,098.00 INR/EA
42,234.21 INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 168
Material/Service Description
Unit Rate
1,182.55
INR/EA
1,267.03
INR/EA
1,435.96
INR/EA
1,182.55
INR/EA
1,267.03
INR/EA
1,435.96
INR/EA
1,182.55
INR/EA
Sentinel/
Hand valve/Linkages. STEAM TUR.-SINGLE STAGE
2-BL. (Horizontally split) - Above 100 and up to 350 KW.
Sentinel/ Hand valve / Linkages: Job includes: Opening,
cleaning, lubrication, packing and box up
Sentinel/
Hand valve/Linkages. STEAM TUR.-SINGLE
2-BL. (Horizontally split) - Above 350 KW.
Sentinel/
Hand valve / Linkages: Job includes:
Opening, cleaning, lubrication, packing and box up
STAGE
Repair
of Throttle Valve. STEAM TUR.-SINGLE STAGE 2BL. (Horizontally split) -Up to 100 KW
Repair/
replace of Trip throttle valve: Job
includes: Repair / Replacement of Trip Throttle Valve.
Repair
of Throttle Valve. STEAM TUR.-SINGLE STAGE 2BL. (Horizontally split) -Above 100 and up to 350 KW.
Repair/
replace of Trip throttle valve: Job
includes: Repair / Replacement of Trip Throttle Valve.
Repair
of Throttle Valve.STEAM TUR.-SINGLE STAGE 2BL. (Horizontally split) -Above 350 KW.
Repair/
replace of Trip throttle valve: Job
includes: Repair / Replacement of Trip Throttle Valve.
Number : CCM/
Date
: 25.05.2015
Page No. : 169
Material/Service Description
Unit Rate
Repair
of Safety Trive Valve asse.STEAM TUR.-SINGLE STAGE
2-BL. (Horizontally split) -Up to 100 KW
Repair
of
Safety Thrive Valve assembly: Removal of
linkages, replacement of gaskets
1,267.03
INR/EA
1,435.96
INR/EA
Repair
of Safety Trive Valve asse.STEAM TUR.-SINGLE STAGE
2-BL. (Horizontally split) - Above 100 and up to 350 KW.
Repair
of
Safety Thrive Valve assembly: Removal of
linkages, replacement of gaskets
Repair
of Safety Trive Valve asse.STEAM TUR.-SINGLE STAGE
2-BL. (Horizontally split) - Above 350 KW.
Repair
of
Safety Thrive Valve assembly: Removal of
linkages, replacement of gaskets
16,893.69 INR/EA
Front
Bearing
Jobs:STEAM
TURBINE JOBS (Multi Stage
Horizontally Split).-2500 KW to 5000 KW
STEAM
TURBINE (Multi Stage Horizontal).-Front Bearing
Jobs (NDE): Job includes: Examine all parts of Bearing,
Clean housing.
Examine all free bolts, nuts, adjusting
devices & guides
&
replace spherical washers. Clean
Bearing sealing rings, inspect & fit new sealing ring
if
required. Disassemble,
clean, measure clearance &
refit Journal bearing.
Disassemble,
Clean,
refit
Thrust bearings & measure axial clearance. Blue Matching
if required
Front
Bearing
Jobs:STEAM
TURBINE JOBS (Multi Stage
Horizontally Split).- Above 5,000 KW and up to 10,000 KW
STEAM TURBINE (Multi Stage Horizontal).-Front Bearing Jobs
(NDE): Job includes: Examine all parts of Bearing, Clean
housing. Examine all free bolts, nuts, adjusting devices &
guides & replace spherical washers. Clean Bearing sealing
rings,
inspect & fit new sealing ring if required.
Disassemble, clean, measure clearance & refit Journal
bearing.
Disassemble, Clean, refit Thrust bearings &
measure axial clearance. Blue Matching if required
Front
Bearing
Jobs:
STEAM
TURBINE
JOBS
(Multi
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Stage
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 170
Number : CCM/
Date
: 25.05.2015
Page No. : 171
Material/Service Description
Unit Rate
STEAM
TURBINE (Multi Stage Horizontal).-Front Bearing
Jobs (NDE): Job includes: Examine all parts of Bearing,
Clean housing.
Examine all free bolts, nuts, adjusting
devices & guides
&
replace spherical washers. Clean
Bearing sealing rings, inspect & fit new sealing ring
if
required. Disassemble,
clean, measure clearance &
refit Journal bearing.
Disassemble,
Clean,
refit
Thrust bearings & measure axial clearance. Blue Matching
if required
42,234.21 INR/EA
Front
Bearing
Jobs:STEAM
TURBINE JOBS (Multi Stage
Horizontally Split).- Above 15,000 KW and up to 20,000 KW
STEAM TURBINE (Multi Stage Horizontal).-Front Bearing Jobs
(NDE): Job includes: Examine all parts of Bearing, Clean
housing. Examine all free bolts, nuts, adjusting devices &
guides & replace spherical washers. Clean Bearing sealing
rings,
inspect & fit new sealing ring if required.
Disassemble, clean, measure clearance & refit Journal
bearing.
Disassemble, Clean, refit Thrust bearings &
measure axial clearance. Blue Matching if required
50,681.06 INR/EA
Front
Bearing
Jobs:STEAM
TURBINE JOBS (Multi Stage
Horizontally Split).-Above 20,000 KW
STEAM
TURBINE (Multi Stage Horizontal).-Front Bearing
Jobs (NDE): Job includes: Examine all parts of Bearing,
Clean housing.
Examine all free bolts, nuts, adjusting
devices & guides
&
replace spherical washers. Clean
Bearing sealing rings, inspect & fit new sealing ring
if
required. Disassemble,
clean, measure clearance &
refit Journal bearing.
Disassemble,
Clean,
refit
Thrust bearings & measure axial clearance. Blue Matching
if required
10,558.55 INR/EA
Front
Bearing Housing Jobs:STEAM TURBINE JOBS (Multi
Stage
Horizontally Split).-2500 KW to 5000 KW
Front
Bearing
Housing
Jobs:
Job includes: Mount &
align bearing
housing
on
Pedestals.
Visual
inspection of foundation, check condition of pedestals.
Check & replace spherical washers on bearing housing,
overhaul bearing housing guide
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
12,670.27 INR/EA
Front
Bearing Housing Jobs:STEAM TURBINE JOBS (Multi
Stage
Horizontally Split).-Above 5,000 KW and up to 10,000 KW
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 172
Number : CCM/
Date
: 25.05.2015
Page No. : 173
Material/Service Description
Unit Rate
Front
Bearing
Housing
Jobs:
Job includes: Mount &
align bearing
housing
on
Pedestals.
Visual
inspection of foundation, check condition of pedestals.
Check & replace spherical washers on bearing housing,
overhaul bearing housing guide
Front
Bearing Housing Jobs:STEAM TURBINE JOBS (Multi
Stage Horizontally Split).- Above 10,000 KW and up to
15,000 KW Front Bearing Housing Jobs: Job includes:
Mount & align bearing
housing
on
Pedestals.
Visual inspection of foundation, check condition of
pedestals. Check & replace spherical washers on bearing
housing, overhaul bearing housing guide
Front
Bearing Housing Jobs:STEAM TURBINE JOBS (Multi
Stage Horizontally Split).-Above 15,000 KW and up to 20,000
KW Front Bearing Housing Jobs: Job includes: Mount &
align bearing
housing
on
Pedestals. Visual
inspection of foundation, check condition of pedestals.
Check & replace spherical washers on bearing housing,
overhaul bearing housing guide
Front
Bearing Housing Jobs:STEAM TURBINE JOBS (Multi
Stage
Horizontally Split).-Above 20,000 KW
Front
Bearing
Housing
Jobs:
Job includes: Mount &
align bearing
housing
on
Pedestals.
Visual
inspection of foundation, check condition of pedestals.
Check & replace spherical washers on bearing housing,
overhaul bearing housing guide
Jobs.
Rear
(NDE)
Bearing
Jobs:STEAM
TURBINE JOBS (Multi
Stage
Horizontally Split).-2500 KW to 5000 KW
Rear
(DE)
Bearing Jobs: Job includes: Clean housing,
Free bolts
& nut, overhaul-adjusting devices, Replace
spherical washers. Clean,
measure clearances
&
refit
journal bearings. Clean check/replace oil seal rings,
inspection of mechanical
electrical
expansion
lubricators.
Bearing housing
top
cover
removal and checking. Blue Matching if reqd
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
12,670.27 INR/EA
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 174
16,893.69 INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 175
Material/Service Description
Unit Rate
Rear
(NDE) Bearing Jobs:STEAM TURBINE JOBS (Multi
Stage Horizontally Split).- Above 5,000 KW and up to 10,000
KW Rear (DE) Bearing Jobs: Job includes: Clean housing,
Free bolts & nut, overhaul-adjusting devices, Replace
spherical washers. Clean,
measure clearances & refit
journal bearings. Clean check/replace oil seal rings,
inspection of mechanical
electrical
expansion
lubricators. Bearing housing top cover
removal and checking. Blue Matching if reqd
Rear
(NDE) Bearing Jobs:STEAM TURBINE JOBS (Multi
Stage Horizontally Split).- Above 10,000 KW and up to
15,000 KW Rear (DE) Bearing Jobs: Job includes: Clean
housing, Free bolts & nut, overhaul-adjusting devices,
Replace spherical washers.
Clean, measure clearances
refit journal bearings. Clean check/replace oil seal
rings, inspection of mechanical
electrical
expansionlubricators. Bearing housing top
cover removal and checking. Blue Matching if reqd
&
27,029.90 INR/EA
Rear
(NDE) Bearing Jobs:STEAM TURBINE JOBS (Multi
Stage Horizontally Split).-Above 15,000 KW and up to 20,000
KW Rear (DE) Bearing Jobs: Job includes: Clean housing,
Free bolts & nut, overhaul-adjusting devices, Replace
spherical washers. Clean,measure
clearances & refit
journal bearings. Clean check/replace oil seal rings,
inspection of mechanical
electrical
expansion
lubricators. Bearing housing top cover
removal and checking. Blue Matching if reqd
33,787.37 INR/EA
Rear
(NDE) Bearing Jobs:STEAM TURBINE JOBS (Multi Stage
Horizontally Split).-Above 20,000 KW
Rear
(DE)
Bearing Jobs: Job includes: Clean housing,
Free bolts
& nut, overhaul-adjusting devices, Replace
spherical washers. Clean,measure
clearances
&
refit
journal bearings. Clean check/replace oil seal rings,
inspection of mechanical
electrical
expansion
lubricators.
Bearing housing
top
cover
removal and checking. Blue Matching if reqd
Rear
(DE)
Bearing
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
7,918.07
INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 176
Material/Service Description
Unit Rate
INR/EA
Rear
(DE)
Bearing
Housing Jobs:STEAM TURBINE JOBS
(Multi
Stage
Horizontally Split).-Above 5,000 KW and up to
10,000
KW
Rear
(DE)
Bearing
Housing
Jobs:
Job
includes:
Inspect pedestals
&
foundations.
Retighten
anchor
bolts. Free bearing housing, adjusting device.
Rear
(DE)
Bearing
Housing Jobs:STEAM TURBINE JOBS
(Multi
Stage
Horizontally Split).- Above 10,000 KW and up
to
15,000 KW
Rear
(DE)
Bearing
Housing
Jobs:
Job
includes:
Inspect pedestals
&
foundations.
Retighten
anchor
bolts. Free bearing housing, adjusting device.
Rear
(DE)
Bearing
Housing Jobs:STEAM TURBINE JOBS
(Multi
Stage Horizontally Split).-Above 15,000 KW and up to 20,000
KW
Rear
(DE)
Bearing
Housing
Jobs:
Job
includes:
Inspect pedestals
&
foundations.
Retighten
anchor
bolts. Free bearing housing, adjusting device.
Rear
(DE)
Bearing
Housing Jobs:STEAM TURBINE JOBS
(Multi
Stage Horizontally Split).-Above 20,000 KW
Rear
(DE)
Bearing
Housing
Jobs:
Job
includes:
Inspect pedestals
&
foundations.
Retighten
anchor
bolts. Free bearing housing, adjusting device.
Manual
(Multi
turning
Gear
Related
Jobs:STEAM
TURBINE
Manual
(Multi
4,223.43
INR/EA
7,602.15
INR/EA
JOBS
Number : CCM/
Date
: 25.05.2015
Page No. : 177
Manual
(Multi
7,602.15
INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 178
Material/Service Description
Unit Rate
11,825.58 INR/EA
18,583.05 INR/EA
Manual
turning Gear Related Jobs:STEAM TURBINE JOBS
(Multi
Stage Horizontally Split).-Above 15,000 KW and up to 20,000
KW
Manual
turning
Gear
Related
Jobs:
Job
includes:
Disassembly,
cleaning
of
components,
assembly
and
functional checks
25,340.52 INR/EA
Manual
turning Gear Related Jobs:STEAM TURBINE JOBS
(Multi
Stage Horizontally Split).-Above 20,000 KW
Manual
turning
Gear
Related
Jobs:
Job
includes:
Disassembly,
cleaning
of
components,
assembly
and
functional checks
3,801.08
INR/EA
5,912.79
INR/EA
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 179
Number : CCM/
Date
: 25.05.2015
Page No. : 180
Material/Service Description
Unit Rate
refitment
of
components,
Checking
and cleaning of
steam strainer,
checking
assembly
&
adjustment of
clearances. Checking
of
position indicator, renew if
necessary. Functional check after repair.
9,291.53
INR/EA
11,825.58 INR/EA
16,893.69 INR/EA
Control
Valve Related Jobs:STEAM TURBINE JOBS (Multi
Stage
Horizontally Split).-2500 KW to 5000 KW
Control
Valve Related Jobs: Job includes: Remove
actuators
&
linkages,
remove control valve from steam chest.
Resetting of clearances. Check & free linkages joints
control linkage, check all points of movements, reset
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
11,825.58 INR/EA
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 181
Number : CCM/
Date
: 25.05.2015
Page No. : 182
Material/Service Description
Unit Rate
16,893.69 INR/EA
Control
Valve Related Jobs:STEAM TURBINE JOBS (Multi
Stage Horizontally Split).- Above 5,000 KW and up to 10,000
KW Control Valve Related Jobs: Job includes: Remove
actuators
&
linkages,
remove control valve from steam chest.
Resetting of clearances. Check & free linkages joints
control linkage, check all points of movements, reset
clearances. Replacement of valve Stem and seat if reqd
23,651.16 INR/EA
Control
Valve Related Jobs:STEAM TURBINE JOBS (Multi
Stage Horizontally Split).-Above 10,000 KW and up to 15,000
KW Control Valve Related Jobs: Job includes: Remove
actuators
&
linkages,
remove control valve from steam chest.
Resetting of clearances. Check & free linkages joints
control linkage, check all points of movements, reset
clearances. Replacement of valve Stem and seat if reqd
28,719.27 INR/EA
Control
Valve Related Jobs:STEAM TURBINE JOBS (Multi
Stage Horizontally Split).-Above 15,000 KW and up to 20,000
KW Control Valve Related Jobs: Job includes: Remove
actuators
&
linkages,
remove control valve from steam chest.
Resetting of clearances. Check & free linkages joints
control linkage, check all points of movements, reset
clearances. Replacement of valve Stem and seat if reqd
33,787.37 INR/EA
Control
Valve Related Jobs:STEAM TURBINE JOBS (Multi
Stage
Horizontally Split).-Above 20,000 KW
Control
Valve Related Jobs: Job includes: Remove
actuators
&
linkages,
remove control valve from steam chest.
Resetting of clearances. Check & free linkages joints
control linkage, check all points of movements, reset
clearances. Replacement of valve Stem and seat if reqd
Servo
cylinder
related
jobs:
STEAM
TURBINE JOBS
(Multi
Stage Horizontally Split).- 2500 KW to 5000 KW
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
6,335.13
INR/EA
Servo
cylinder
related jobs: Job includes: Removal,
cleaning, lubrication of linkages, disassembly, assembly of
servo cylinder and components, renewal of piston packing,
functional checks after repair
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 183
Number : CCM/
Date
: 25.05.2015
Page No. : 184
Material/Service Description
Unit Rate
8,446.84
INR/EA
13,092.61 INR/EA
16,893.69 INR/EA
20,272.43 INR/EA
3,801.08
INR/EA
5,068.10
INR/EA
Pilot
Valve related jobs:STEAM TURBINE JOBS (Multi Stage
Horizontally Split).-2500 KW to 5000 KW
Pilot
Valve related jobs: Job includes: Removal,
cleaning, lubrication
of
linkages,
disassembly,
assembly of pilot valve and replacement of components
wherever required, functional checks after repair
Pilot
Valve related jobs:STEAM TURBINE JOBS (Multi
Stage Horizontally Split).-Above 5,000 KW and up to 10,000
KW Pilot Valve related jobs: Job includes: Removal,
cleaning, lubrication of linkages, disassembly,
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 185
Number : CCM/
Date
: 25.05.2015
Page No. : 186
Material/Service Description
Unit Rate
valve
and replacement of components wherever
required, functional checks after repair
6,757.47
INR/EA
8,446.84
INR/EA
Pilot
Valve related jobs: STEAM TURBINE JOBS (Multi
Stage Horizontally Split).-Above 10,000 KW and up to 15,000
KW Pilot Valve related jobs: Job includes: Removal,
cleaning, lubrication of linkages, disassembly,
assembly of pilot valve and replacement of components
wherever required, functional checks after repair
Pilot
Valve related jobs:STEAM TURBINE JOBS (Multi
Stage Horizontally Split).-Above 15,000 KW and up to 20,000
KW Pilot Valve related jobs: Job includes: Removal,
cleaning, lubrication of linkages, disassembly,
assembly of pilot valve and replacement of components
wherever required, functional checks after repair
10,136.22 INR/EA
Pilot
Valve related jobs: STEAM TURBINE JOBS (Multi Stage
Horizontally Split).-Above 20,000 KW
Pilot
Valve related jobs: Job includes: Removal,
cleaning, lubrication
of
linkages,
disassembly,
assembly of pilot valve and replacement of components
wherever required, functional checks after repair
3,801.08
INR/EA
4,645.77
INR/EA
5,912.79
INR/EA
Emergency
Trip Device :STEAM TURBINE JOBS (Multi Stage
Horizontally Split).- 2500 KW to 5000 KW
Emergency
Trip
Device:
Job
includes: Removal,
cleaning, lubrication of linkages, disassembly, cleaning,
replacement of components wherever required & assembly
Emergency
Trip Device :STEAM TURBINE JOBS (Multi
Stage Horizontally Split).-Above 10,000 KW and up to 15,000
KW Emergency Trip Device: Job includes: Removal,
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 187
Number : CCM/
Date
: 25.05.2015
Page No. : 188
Material/Service Description
Unit Rate
7,602.15
INR/EA
8,446.84
INR/EA
3,378.75
INR/EA
5,068.10
INR/EA
6,757.47
INR/EA
8,446.84
INR/EA
Emergency
Trip Device :STEAM TURBINE JOBS (Multi
Stage Horizontally Split).- Above 15,000 KW and up to
20,000 KW Emergency Trip Device: Job includes: Removal,
cleaning, lubrication of linkages, disassembly, cleaning,
replacement of components wherever required & assembly
Emergency
Trip Device :STEAM TURBINE JOBS (Multi Stage
Horizontally Split).-Above 20,000 KW
Emergency
Trip
Device:
Job
includes: Removal,
cleaning, lubrication of linkages, disassembly, cleaning,
replacement of components wherever required & assembly
Over
speed trip device :STEAM TURBINE JOBS (Multi Stage
Horizontally Split).- 2500 KW to 5000 KW
Over
speed
trip
device: Job includes: Disassembly,
cleaning, replacement of components wherever required &
assembly including testing
Over
speed trip device :STEAM TURBINE JOBS (Multi Stage
Horizontally Split).-Above 5,000 KW and up to 10,000 KW
Over
speed
trip
device: Job includes: Disassembly,
cleaning, replacement of components wherever required &
assembly including testing
Over
speed trip device :STEAM TURBINE JOBS (Multi
Stage Horizontally Split).- Above 10,000 KW and up to
15,000 KW Over speed trip
device: Job includes:
Disassembly, cleaning, replacement of components
wherever required & assembly including testing
Over
speed trip device :STEAM TURBINE JOBS (Multi
Stage Horizontally Split).- Above 15,000 KW and up to
20,000 KW Over speed trip
device: Job includes:
Disassembly, cleaning, replacement of components
wherever required & assembly including testing
Number : CCM/
Date
: 25.05.2015
Page No. : 189
Material/Service Description
Unit Rate
10,136.22 INR/EA
Over
speed
trip
device
:STEAM TURBINE JOBS (Multi
Stage
Horizontally Split).-Above 20,000 KW
Over
speed
trip
device: Job includes: Disassembly,
cleaning, replacement of components wherever required &
assembly including testing
380,107.91 INR/EA
Capital
repair.
STEAM
TURBINE
JOBS
(Multi
Stage
Horizontally Split).-2500 KW to 5000 KW
Capital
repair
of
Turbine: Job includes: A) Outer
casing
Jobs: Inspection of top & bottom halves of casing, cleaning
&
measuring.
Sealing
of
connecting
&
mating
surfaces, examination & refitting of Taper pins & holes,
alignment check of Rotor to casing. Fit & tighten outer
casing joints (60). B) Inner Casing: Examination of all
parts, blades, carriers
for
cracks.
Examination
of
blades & sealing strips.
Renewal
of
sealing surfaces
if
required.
Measurement of clearance & vertical alignment. C) L P Guide
Blade Carrier: Examine joints, faces. Overhaul & free
adjusting devices. Examine guide blades & sealing strips,
renewal of sealing strips measurement of Axial & radial
clearances.
D)
Gland Bushes; Examination of bushes,
cleaning & refitment of joint faces, renewal of sealing
strips. Check axial freedom of movement of all internals
when fitted. E) Rotor: Cleaning of rotor, measurement of
axial & radial runout. Inspection & smoothen bearing
journals, sealing ring areas. Inspection & measurement of
coupling flange, runout checks. Check & measure of internal
& external alignment. Fitting of main oil pump, coupling to
HP shaft. Alignment checks of LP shaft to gearbox. F)
Emergency stop valves related jobs: Removal, dismantling,
cleaning, inspection, replacement of O rings, refitment of
components,
check
assembly adjustment of clearances.
Checking
of
position indicator, renew if necessary.
Functional check after repair.
"Capital
repair.
STEAM
TURBINE
JOBS
(Multi Stage
Horizontally Split).-Above 5,000 KW and up to 10,000 KW"
Capital repair of Turbine: Job includes: A) Outer casing
Jobs: Inspection of top & bottom halves of casing, cleaning
&
measuring.
Sealing
of
connecting
&
mating
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
464,576.32 INR/EA
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 190
Number : CCM/
Date
: 25.05.2015
Page No. : 191
Material/Service Description
Unit Rate
(60).
B)
Inner
Casing: Examination of all parts,
blades, carriers for cracks. Examination of blades &
sealing strips.
Renewal
of
sealing
surfaces if required. Measurement of clearance &
vertical alignment. C) L P Guide Blade Carrier: Examine
joints,
faces.
Overhaul
& free adjusting
devices.
Examine guide blades & sealing strips, renewal of sealing
strips measurement of Axial & radial clearances.
D)
Gland Bushes; Examination of bushes, cleaning
& refitment of joint faces, renewal of sealing strips.
Check
axial
freedom of movement of all internals when
fitted. E) Rotor: Cleaning of rotor, measurement of axial
&
radial
runout.
Inspection
&
smoothen
bearing
journals, sealing ring areas. Inspection & measurement of
coupling flange, runout checks. Check & measure of internal
& external alignment. Fitting of main oil pump, coupling to
HP shaft. Alignment checks of LP shaft to gearbox. F)
Emergency stop valves related jobs: Removal, dismantling,
cleaning, inspection, replacement of O rings, refitment of
components,
check
assembly adjustment of clearances.
Checking
of
position indicator, renew if necessary.
Functional check after repair.
"Capital
repair.
STEAM
TURBINE
JOBS
(Multi Stage
Horizontally Split).-Above 10,000 KW and up to 15,000 KW"
Capital repair of Turbine: Job includes: A) Outer casing
Jobs: Inspection of top & bottom halves of casing, cleaning
&
measuring.
Sealing
of
connecting
&
mating
surfaces, examination & refitting of Taper pins & holes,
alignment check of Rotor to casing. Fit & tighten outer
casing joints (60). B) Inner Casing: Examination of all
parts, blades, carriers
for
cracks.
Examination
of
blades & sealing strips.
Renewal
of
sealing surfaces
if
required.
Measurement of clearance & vertical alignment. C) L P Guide
Blade Carrier: Examine joints, faces. Overhaul & free
adjusting devices. Examine guide blades & sealing strips,
renewal of sealing strips measurement of Axial & radial
clearances.
D)
Gland Bushes; Examination of bushes,
cleaning & refitment of joint faces, renewal of sealing
strips. Check axial freedom of movement of all internals
when fitted. E) Rotor: Cleaning of rotor, measurement of
axial & radial runout. Inspection & smoothen bearing
journals, sealing ring areas. Inspection & measurement of
coupling flange, runout checks. Check & measure of internal
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
574,385.27 INR/EA
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 192
Number : CCM/
Date
: 25.05.2015
Page No. : 193
Material/Service Description
Unit Rate
Emergency
stop
valves
related
jobs:
Removal,
dismantling, cleaning, inspection, replacement of O rings,
refitment of components,
check assembly
adjustment
of clearances. Checking
of
position
indicator,
renew
if
necessary. Functional check after
repair.
701,087.91 INR/EA
Capital
repair.
STEAM
TURBINE
JOBS
(Multi
Stage
Horizontally Split).-Above 15,000 KW and up to 20,000 KW
Capital repair of Turbine: Job includes: A) Outer casing
Jobs: Inspection of top & bottom halves of casing, cleaning
&
measuring.
Sealing
of
connecting
&
mating
surfaces, examination & refitting of Taper pins & holes,
alignment check of Rotor to casing. Fit & tighten outer
casing joints (60). B) Inner Casing: Examination of all
parts, blades, carriers
for
cracks.
Examination
of
blades & sealing strips.
Renewal
of
sealing surfaces
if
required.
Measurement of clearance & vertical alignment. C) L P Guide
Blade Carrier: Examine joints, faces. Overhaul & free
adjusting devices. Examine guide blades & sealing strips,
renewal of sealing strips measurement of Axial & radial
clearances.
D)
Gland Bushes; Examination of bushes,
cleaning & refitment of joint faces, renewal of sealing
strips. Check axial freedom of movement of all internals
when fitted. E) Rotor: Cleaning of rotor, measurement of
axial & radial runout. Inspection & smoothen bearing
journals, sealing ring areas. Inspection & measurement of
coupling flange, runout checks. Check & measure of internal
& external alignment. Fitting of main oil pump, coupling to
HP shaft. Alignment checks of LP shaft to gearbox. F)
Emergency stop valves related jobs: Removal, dismantling,
cleaning, inspection, replacement of O rings, refitment of
components,
check
assembly adjustment of clearances.
Checking
of
position indicator, renew if necessary.
Functional check after repair.
Capital
repair.
STEAM
TURBINE
JOBS
(Multi
Stage
Horizontally Split).-Above 20,000 KW
Capital
repair
of
Turbine: Job includes: A) Outer
casing
Jobs: Inspection of top & bottom halves of casing, cleaning
&
measuring.
Sealing
of
connecting
&
mating
surfaces, examination & refitting of Taper pins & holes,
alignment check of Rotor to casing. Fit & tighten outer
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
929,152.66 INR/EA
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 194
Number : CCM/
Date
: 25.05.2015
Page No. : 195
Material/Service Description
Unit Rate
strips.
Renewal
of
sealing
surfaces
if
required.
Measurement of clearance & vertical alignment. C) L P Guide
Blade Carrier: Examine joints, faces. Overhaul & free
adjusting devices. Examine guide blades & sealing strips,
renewal of sealing strips measurement of Axial & radial
clearances.
D)
Gland Bushes; Examination of bushes,
cleaning & refitment of joint faces, renewal of sealing
strips. Check axial freedom of movement of all internals
when fitted. E) Rotor: Cleaning of rotor, measurement of
axial & radial runout. Inspection & smoothen bearing
journals, sealing ring areas. Inspection & measurement of
coupling flange, runout checks. Check & measure of internal
& external alignment. Fitting of main oil pump, coupling to
HP shaft. Alignment checks of LP shaft to gearbox. F)
Emergency stop valves related jobs: Removal, dismantling,
cleaning, inspection, replacement of O rings, refitment of
components,
check
assembly adjustment of clearances.
Checking
of
position indicator, renew if necessary.
Functional check after repair.
"Alignment
5,000
KW."
checking
&
8,446.84
INR/EA
correction.2500 KW and up to
10,136.22 INR/EA
Alignment
checking & correction.Above 5000 KW and
up to 10,000 KW.
11,825.58 INR/EA
Alignment
checking & correction. Above 10,000 KW
and up to 15,000 KW.
"Alignment
to
20,000 KW."
13,514.95 INR/EA
15,204.32 INR/EA
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
361.51 INR/PC
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 196
915.63 INR/PC
Number : CCM/
Date
: 25.05.2015
Page No. : 197
Material/Service Description
D-Asm
Repl.& Asl of
& Assembly of Bladder.
Bladder-
Unit Rate
Disassembly Replacement
D-Asm
Rep-Asm-Cplg Guard T/half -Disassembly
& Assembly of Coupling Guard (Top Half).
Repair
1,268.72
INR/PC
4,755.57
INR/PC
4,755.57
INR/PC
1,268.72
INR/PC
D-Asm
Rep-Asm-Rmvl-Rep/Re/Cplg - Disassembly Repair &
Assembly Removal Repair & Refixing of Coupling Guard
(Bottom).
D-Asm-Asm-Turbine Gear Box Cplg & Assembly of Turbine to Gear Box Coupling.
Disassembly
Alimt
Chk.Betwen Gear
Between Turbine & Gear Box.
Box/Trbin
- Alignment Check
INR/NOS
Check
70.96 INR/H
* 70
COMPRESSOR
** 70.01 RECIPROCATING COMPRESSOR.
*** 70.01.01Guard removal
633.53 INR/EA
Guard
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
844.68 INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 198
Material/Service Description
Unit Rate
to 250KW.
Compressor
RECIPROCATING COMPRESSOR. Guard removal:
Job includes: Removal & reinstallation of coupling guard(s)
1,267.03
INR/EA
1,584.63
INR/EA
3,040.86
INR/EA
5,068.10
INR/EA
8,446.84
INR/EA
Guard
removal
- RECIPROCATING COMPRESSOR. - Above 250
and up to 1000KW.
Compressor
RECIPROCATING COMPRESSOR. Guard removal:
Job includes: Removal & reinstallation of coupling guard(s)
Alignmt driver & Gear Box. RECIPROCATING COMPRESSOR. Above 100 and up to 250KW.
Alignment
driver & Gear Box: Job includes: Removal
& reinstallation of coupling guard(s) Alignment check
and correction between driver and gearbox
Alignmt
driver & Gear Box. RECIPROCATING COMPRESSOR.
- Above 250 and up to 1000KW.
Alignment
driver & Gear Box: Job includes: Removal
& reinstallation of coupling guard(s) Alignment check
and correction between driver and gearbox
11,403.25 INR/EA
Alignmt driver & Gear Box. RECIPROCATING COMPRESSOR. Above 1000 KW.
Alignment
driver & Gear Box: Job includes: Removal
& reinstallation of coupling guard(s) Alignment check
and correction between driver and gearbox
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
1,689.37
INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 199
Material/Service Description
Unit Rate
2,702.99
INR/EA
3,885.54
INR/EA
5,068.10
INR/EA
Alignment
of GB & compressor.RECIPROCATING COMPRESSOR.
- Above 100 and up to 250KW.
Alignment
check and correction between gear box and
compressor
Alignment
of GB & compressor. RECIPROCATING COMPRESSOR.
- Above 250 and up to 1000KW.
Alignment
check and correction between gear box and
compressor
Alignment
of GB & compressor. RECIPROCATING COMPRESSOR.
- Above 1000 KW.
Alignment
check and correction between gear box and
compressor
Unloaders
337.88 INR/EA
Remvl/reinst
unloaders<4"
-Removal
reinstallation/replacement of suction unloaders
&
Remvl/reinst
unloaders
4"-6"Removal
reinstallation/replacement of suction unloaders
&
Remvl/reinst
unloaders
6"-8"
-Removal
reinstallation/replacement of suction unloaders
1,013.62
INR/EA
1,267.03
INR/EA
&
Remvl/reinst
unloaders
>8"
Removal
reinstallation/replacement of suction unloaders
&
"Remv/ins/repl
of suction/discharge valve
-RECIPROCATING COMPRESSOR. - Up to 4"
Job includes: Removal & reinstallation of valve cover(s) on
cylinder. Removal & reinstallation/replacement of suction /
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
500.05 INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 200
Material/Service Description
Unit Rate
Remv/ins/repl
of suction/discharge valve RECIPROCATING
COMPRESSOR. - Above 4" and up to 6".
Job includes: Removal & reinstallation of valve cover(s) on
cylinder. Removal & reinstallation/replacement of suction /
discharge valve assembly
1,267.03
INR/EA
1,584.63
INR/EA
"Remv/ins/repl
of
suction/discharge
valve
-RECIPROCATING COMPRESSOR. - Above 6"" and up to 8""."
Job includes: Removal & reinstallation of valve cover(s) on
cylinder. Removal & reinstallation/replacement of suction /
discharge valve assembly
Remv/ins/repl
of
suction/discharge
valve
-RECIPROCATING COMPRESSOR. - Above 8".
Job includes: Removal & reinstallation of valve cover(s) on
cylinder. Removal & reinstallation/replacement of suction /
discharge valve assembly
844.68 INR/EA
Recond
suc/dis
v/v
suction/discharge valves
<
4"
-Reconditioning
of
Recond
suc/dis v/v
suction/discharge valves
v/v-4"-6"
-Reconditioning
1,055.84
INR/EA
1,267.03
INR/EA
2,111.71
INR/EA
2,647.24
INR/EA
of
"Recond
suc/dis
v/v
suction/discharge valves"
v/v-6"-8"
-Reconditioning
of
"Recond
suc/dis
v/v v/v
suction/discharge valves"
>
8""
Reconditioning
of
Cylinder/piston
assembly.RECIPROCATING COMPRESSOR. - Up
to
150 mm
Cylinder/piston
assembly:
Job
includes: Removal and
reinstallation
of
cylinder
cover(s)
including replacement
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 201
Material/Service Description
Unit Rate
of
gasket.
Removal
and
reinstallation of distance
piece cover(s)
including
replacement
of
gasket. All
necessary measurement
checks like
dimensions,
clearances, concentricity,
run
out
etc
with correction as required. Removal and reinstallation /
replacement of piston / piston rod assembly. Removal &
reinstallation / replacement of piston rings. Removal &
reinstallation / replacement of piston
rider rings.
Removal & reinstallation / replacement of rod packing
/seals including removal / reinstallation of stuffing box
gland housing
4,054.49
INR/EA
5,933.06
INR/EA
Cylinder/piston
assembly.RECIPROCATING COMPRESSOR. Above
150 mm to 300 mm.
Cylinder/piston
assembly:
Job
includes: Removal and
reinstallation of cylinder cover(s) including replacement
of gasket. Removal and reinstallation of distance piece
cover(s) including replacement of gasket. All necessary
measurement
checks
like
dimensions,
clearances,
concentricity, run out etc with correction as required.
Removal and reinstallation / replacement of piston / piston
rod assembly. Removal & reinstallation / replacement of
piston rings. Removal & reinstallation / replacement of
piston rider rings. Removal & reinstallation / replacement
of rod packing /seals including removal / reinstallation of
stuffing box gland housing
Cylinder/piston
assembly.RECIPROCATING COMPRESSOR.
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 202
Number : CCM/
Date
: 25.05.2015
Page No. : 203
Material/Service Description
Unit Rate
Cylinder/piston
assembly:
Job
includes: Removal and
reinstallation of cylinder cover(s) including replacement
of gasket. Removal and reinstallation of distance piece
cover(s) including replacement of gasket. All necessary
measurement
checks
like
dimensions,
clearances,
concentricity, run out etc with correction as required.
Removal and reinstallation / replacement of piston / piston
rod assembly. Removal & reinstallation / replacement of
piston rings. Removal & reinstallation / replacement of
piston rider rings. Removal & reinstallation / replacement
of rod packing /seals including removal / reinstallation of
stuffing box gland housing
2,702.99
INR/EA
4,054.49
INR/EA
5,912.79
INR/EA
8,446.84
INR/EA
Cylinder
maintenance.RECIPROCATING COMPRESSOR. - Above
150 mm to 300 mm
Cylinder maintenance: Job includes: Checking all clearance.
Replacement of Oil Packing. Replacement of Intermediate
Packing.
Cover
opening and box up, replacement and
reconditioning of packing, replacement of piston rings &
rider rings (as required)
Cylinder
maintenance.RECIPROCATING COMPRESSOR. - Above
300 mm to 450 mm
Cylinder maintenance: Job includes: Checking all clearance.
Replacement of Oil Packing. Replacement of Intermediate
Packing.
Cover
opening and box up, replacement and
reconditioning of packing, replacement of piston rings &
rider rings (as required)
Number : CCM/
Date
: 25.05.2015
Page No. : 204
Material/Service Description
Unit Rate
Packing.
Cover
opening and box up, replacement and
reconditioning of packing, replacement of piston rings &
rider rings (as required)
2,365.12
INR/EA
2,702.99
INR/EA
3,040.86
INR/EA
3,378.75
INR/EA
3,716.61
INR/EA
Crankcase
common
job.(Per
Cylinde.
RECIPROCATING
COMPRESSOR. - Up to 200 KW
Crankcase
job:
Common jobs. Rate is per Cylinder.
Removal and
reinstallation
of
all covers necessary to
access the internals including replacement of gaskets.
Check web deflection. Clean internal LO strainer in crank
case. Check MOP
Crankcase
common
job.(Per
Cylinde.
RECIPROCATING
COMPRESSOR. - Above 200 KW and up to 500 KW.
Crankcase
job:
Common jobs. Rate is per Cylinder.
Removal and
reinstallation
of
all covers necessary to
access the internals including replacement of gaskets.
Check web deflection. Clean internal LO strainer in crank
case. Check MOP
Crankcase
common
job.(Per
Cylinde.
RECIPROCATING
COMPRESSOR. - Above 500 KW and up to 1000 KW.
Crankcase
job:
Common jobs. Rate is per Cylinder.
Removal and
reinstallation
of
all covers necessary to
access the internals including replacement of gaskets.
Check web deflection. Clean internal LO strainer in crank
case. Check MOP
Crankcase
common
job.(Per
Cylinde.
RECIPROCATING
COMPRESSOR. - Above 1000 KW and up to 2500 KW.
Crankcase
job:
Common jobs. Rate is per Cylinder.
Removal and
reinstallation
of
all covers necessary to
access the internals including replacement of gaskets.
Check web deflection. Clean internal LO strainer in crank
case. Check MOP
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 205
Number : CCM/
Date
: 25.05.2015
Page No. : 206
Material/Service Description
Unit Rate
internals
including
replacement
of
gaskets.
Check
web deflection. Clean internal LO strainer in crank case.
Check MOP
4,054.49
INR/EA
4,476.84
INR/EA
2,365.12
INR/EA
2,702.99
INR/EA
3,040.86
INR/EA
Crankcase
common
job.(Per
Cylinde
RECIPROCATING
COMPRESSOR. - Above 3500 KW and up to 5000 KW.
Crankcase
job:
Common jobs. Rate is per Cylinder.
Removal and
reinstallation
of
all covers necessary to
access the internals including replacement of gaskets.
Check web deflection. Clean internal LO strainer in crank
case. Check MOP
Crankcase
common
job.(Per
Cylinde
-RECIPROCATING
COMPRESSOR. - Above 5000 KW.
Crankcase
job:
Common jobs. Rate is per Cylinder.
Removal and
reinstallation
of
all covers necessary to
access the internals including replacement of gaskets.
Check web deflection. Clean internal LO strainer in crank
case. Check MOP
Main
Bearing job - Crankcase -RECIPROCATING COMPRESSOR.
- Up to 200 KW
Main
Bearing
job:
Removal
and
reinstallation
/
replacement of main
bearings including all necessary
checks
on dimensions, clearances etc with correction as
required
Main
Bearing job - Crankcase RECIPROCATING COMPRESSOR.
- Above 200 KW and up to 500 KW.
Main
Bearing
job:
Removal
and
reinstallation
/
replacement of main
bearings including all necessary
checks
on dimensions, clearances etc with correction as
required
Main
Bearing job - Crankcase RECIPROCATING COMPRESSOR.
- Above 500 KW and up to 1000 KW.
Main
Bearing
job:
Removal
and
reinstallation
/
replacement of main
bearings including all necessary
checks
on dimensions, clearances etc with correction as
required
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Main
-
Bearing
job - Crankcase
RECIPROCATING COMPRESSOR.
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 207
3,378.75
INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 208
Material/Service Description
Unit Rate
3,716.61
INR/EA
4,054.49
INR/EA
4,476.84
INR/EA
2,365.12
INR/EA
2,702.99
INR/EA
Main
Bearing job - Crankcase RECIPROCATING COMPRESSOR.
- Above 2500 KW and up to 3500 KW.
Main
Bearing
job:
Removal
and
reinstallation
/
replacement of main
bearings including all necessary
checks
on dimensions, clearances etc with correction as
required
Main
Bearing job - Crankcase RECIPROCATING COMPRESSOR.
- Above 3500 KW and up to 5000 KW.
Main
Bearing
job:
Removal
and
reinstallation
/
replacement of main
bearings including all necessary
checks
on dimensions, clearances etc with correction as
required
Main
Bearing job - Crankcase RECIPROCATING COMPRESSOR.
- Above 5000 KW.
Main
Bearing
job:
Removal
and
reinstallation
/
replacement of main
bearings including all necessary
checks
on dimensions, clearances etc with correction as
required
Crank
Shaft job - Crankcase RECIPROCATING COMPRESSOR. Up to 200 KW
Crank
Shaft
job: Removal and reinstallation /
replacement of
crank
shaft assembly including all
necessary checks on dimensions, clearances etc with
correction as required
Crank
Shaft job - Crankcase .RECIPROCATING COMPRESSOR.
- Above 200 KW and up to 500 KW.
Crank
Shaft
job: Removal and reinstallation /
replacement of
crank
shaft assembly including all
necessary checks on dimensions, clearances etc with
correction as required
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Crank
Shaft job - Crankcase .RECIPROCATING COMPRESSOR.
- Above 500 KW and up to 1000 KW.
Crank
Shaft
job: Removal and reinstallation /
replacement of
crank
shaft assembly including all
necessary checks on
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 209
3,040.86
INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 210
Material/Service Description
Unit Rate
3,378.75
INR/EA
3,716.61
INR/EA
4,054.49
INR/EA
4,476.84
INR/EA
2,365.12
INR/EA
2,702.99
INR/EA
Crank
Shaft job - Crankcase. RECIPROCATING COMPRESSOR.
- Above 1000 KW and up to 2500 KW.
Crank
Shaft
job: Removal and reinstallation /
replacement of
crank
shaft assembly including all
necessary checks on dimensions, clearances etc with
correction as required
Crank Shaft job - Crankcase.RECIPROCATING COMPRESSOR. Above 2500 KW and up to 3500 KW.
Crank
Shaft
job: Removal and reinstallation /
replacement of
crank
shaft assembly including all
necessary checks on dimensions, clearances etc with
correction as required
Crank
Shaft job - Crankcase. RECIPROCATING COMPRESSOR.
- Above 3500 KW and up to 5000 KW.
Crank
Shaft
job: Removal and reinstallation /
replacement of
crank
shaft assembly including all
necessary checks on dimensions, clearances etc with
correction as required
Crank
Shaft job - Crankcase. RECIPROCATING COMPRESSOR.
- Above 5000 KW.
Crank
Shaft
job: Removal and reinstallation /
replacement of
crank
shaft assembly including all
necessary checks on dimensions, clearances etc with
correction as required
Number : CCM/
Date
: 25.05.2015
Page No. : 211
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
3,040.86
INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 212
Material/Service Description
Unit Rate
3,378.75
INR/EA
3,716.61
INR/EA
4,054.49
INR/EA
4,476.84
INR/EA
2,365.12
INR/EA
2,702.99
INR/EA
Small
end
bearing
job
Crankcase .RECIPROCATING
COMPRESSOR. - Above 1000 KW and up to 2500 KW.
Small end bearing: Removal and reinstallation / replacement
of small-end bearing including all necessary checks on
dimensions, clearances etc with correction as required
Small
end
bearing
job
Crankcase .RECIPROCATING
COMPRESSOR. - Above 2500 KW and up to 3500 KW.
Small end bearing: Removal and reinstallation / replacement
of small-end bearing including all necessary checks on
dimensions, clearances etc with correction as required
Small
end
bearing
job
Crankcase .RECIPROCATING
COMPRESSOR. - Above 3500 KW and up to 5000 KW.
Small end bearing: Removal and reinstallation / replacement
of small-end bearing including all necessary checks on
dimensions, clearances etc with correction as required
Small
end
bearing
job - Crankcase . RECIPROCATING
COMPRESSOR. - Above 5000 KW.
Small end bearing: Removal and reinstallation / replacement
of small-end bearing including all necessary checks on
dimensions, clearances etc with correction as required
Big
end
bearing. RECIPROCATING COMPRESSOR. - Above 200
KW
and up to 500 KW.
Big
end
bearing: Removal and reinstallation /
replacement
of
big-end
bearing
(s) including all
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 213
Number : CCM/
Date
: 25.05.2015
Page No. : 214
Material/Service Description
Unit Rate
3,040.86
INR/EA
3,378.75
INR/EA
3,716.61
INR/EA
4,054.49
INR/EA
4,476.84
INR/EA
2,365.12
INR/EA
Big
end
bearing.RECIPROCATING
COMPRESSOR. - Above 500
KW
and up to 1000 KW.
Big
end
bearing: Removal and reinstallation /
replacement of
big-end
bearing
(s) including all
necessary checks on dimensions, clearances etc with
correction as required
Big
end bearing. RECIPROCATING COMPRESSOR. - Above 1000
KW
and up to 2500 KW.
Big
end
bearing: Removal and reinstallation /
replacement of
big-end
bearing
(s) including all
necessary checks on dimensions, clearances etc with
correction as required
Big
end bearing. RECIPROCATING COMPRESSOR. - Above 2500
KW
and up to 3500 KW.
Big
end
bearing: Removal and reinstallation /
replacement of
big-end
bearing
(s) including all
necessary checks on dimensions, clearances etc with
correction as required
Big
end bearing. RECIPROCATING COMPRESSOR. - Above 3500
KW
and up to 5000 KW.
Big
end
bearing: Removal and reinstallation /
replacement of
big-end
bearing
(s) including all
necessary checks on dimensions, clearances etc with
correction as required
Connecting Rod job.- Crankcase -RECIPROCATING COMPRESSOR. REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 215
Up to 200 KW
Connecting
Rod
job:
Removal
and
reinstallation /
replacement of connecting rod(s) including all necessary
checks on dimensions, clearances etc with correction as
required
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
2,702.99
INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 216
Material/Service Description
Unit Rate
Connecting
Rod job.- Crankcase RECIPROCATING COMPRESSOR.
- Above 200 KW and up to 500 KW.
Connecting
Rod
job:
Removal
and
reinstallation /
replacement of connecting rod(s) including all necessary
checks on dimensions, clearances etc with correction as
required
3,040.86
INR/EA
3,378.75
INR/EA
3,716.61
INR/EA
4,054.49
INR/EA
4,476.84
INR/EA
Connecting
Rod job.- Crankcase RECIPROCATING COMPRESSOR.
- Above 500 KW and up to 1000 KW.
Connecting
Rod
job:
Removal
and
reinstallation /
replacement of connecting rod(s) including all necessary
checks on dimensions, clearances etc with correction as
required
Connecting
Rod job.- Crankcase RECIPROCATING COMPRESSOR.
- Above 1000 KW and up to 2500 KW.
Connecting
Rod
job:
Removal
and
reinstallation /
replacement of connecting rod(s) including all necessary
checks on dimensions, clearances etc with correction as
required
Connecting Rod job.- Crankcase -RECIPROCATING COMPRESSOR. Above 2500 KW and up to 3500 KW.
Connecting
Rod
job:
Removal
and
reinstallation /
replacement of connecting rod(s) including all necessary
checks on dimensions, clearances etc with correction as
required
Connecting
Rod job.- Crankcase RECIPROCATING COMPRESSOR.
- Above 3500 KW and up to 5000 KW.
Connecting
Rod
job:
Removal
and
reinstallation /
replacement of connecting rod(s) including all necessary
checks on dimensions, clearances etc with correction as
required
Connecting
Rod job.- Crankcase RECIPROCATING COMPRESSOR.
- Above 5000 KW.
Connecting
Rod
job:
Removal
and
reinstallation /
replacement of connecting rod(s) including all necessary
checks on dimensions, clearances etc with correction as
required
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 217
Material/Service Description
Unit Rate
2,365.12
INR/EA
2,702.99
INR/EA
3,040.86
INR/EA
3,378.75
INR/EA
3,716.61
INR/EA
4,054.49
INR/EA
4,476.84
INR/EA
1,503.54
INR/EA
Cross
Head
Assly
job:
Removal
and
reinstallation/replacement of cross head assembly including
all necessary checks on dimensions, clearances etc with
correction as required
Cross
Head
Assly
job:
Removal
and
reinstallation/replacement of cross head assembly including
all necessary checks on dimensions, clearances etc with
correction as required
Cross
Head
Assly
job:
Removal
and
reinstallation/replacement of cross head assembly including
all necessary checks on dimensions, clearances etc with
correction as required
Cross
Head
Assly
job:
Removal
and
reinstallation/replacement of cross head assembly including
all necessary checks on dimensions, clearances etc with
correction as required
Cross
Head
Assly
job:
Removal
and
reinstallation/replacement of cross head assembly including
all necessary checks on dimensions, clearances etc with
correction as required
Cross
Head
Assly
job:
Removal
and
reinstallation/replacement of cross head assembly including
all necessary checks on dimensions, clearances etc with
correction as required
Cross
Head
Assly
job:
Removal
and
reinstallation/replacement of cross head assembly including
all necessary checks on dimensions, clearances etc with
correction as required
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 218
Material/Service Description
Unit Rate
2,517.16
INR/EA
2,534.05
INR/EA
3,801.08
INR/EA
6,757.47
INR/EA
CENTRIFUGAL
COMPRESSOR
-Drive
End
Bearing
Inspection:Job includes :a) Lube oilpiping connected to
coupling guard removal and refixing.
10,136.22 INR/EA
CENTRIFUGAL
COMPRESSOR
-Drive
End
Bearing
Inspection:Job includes :a) Lube oilpiping connected to
coupling guard removal and refixing.
12,670.27 INR/EA
CENTRIFUGAL
COMPRESSOR
-Drive
End
Bearing
Inspection:Job includes :a) Lube oilpiping connected to
coupling guard removal and refixing.
15,204.32 INR/EA
CENTRIFUGAL
COMPRESSOR
-Drive
End
Bearing
Inspection:Job includes :a) Lube oilpiping connected to
coupling guard removal and refixing.
6,757.47
INR/EA
10,136.22 INR/EA
12,670.27 INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 219
Material/Service Description
Unit Rate
15,204.32 INR/EA
15,204.32 INR/EA
19,005.40 INR/EA
27,874.58 INR/EA
32,942.69 INR/EA
Number : CCM
Date
: 25.05.2015
Page No. : 146
Material/Service Description
Unit Rate
oil
pipingconnected
to
coupling
guard
revoval b)
De-coupling - Spacer removal of GB-Motor,GB-Compressor &
reassembly
with Torque tightening c) Bearing housing
removald) Bearing removal, inspection,
replacement
(if
required)
&re-assembly.e)
DECoupling
Hub
removal
&
re-installation
f)
Dry
Gas
Seal
removal
&
new
sealreplacement
11,403.25 INR/EA
Non
Drive End - DRY GAS SEAL REPLACEMENT:Job includes :
a) Lube oil pipingconnected to coupling guard revoval
b) De-coupling - Spacer removal &Re-assembly with torque
tightening c) Bearing housing removal d) Bearingremoval,
inspection, replacement(if required) & re-assembly.
16,049.00 INR/EA
Non
Drive End - DRY GAS SEAL REPLACEMENT:Job includes :
a) Lube oil pipingconnected to coupling guard revoval
b) De-coupling - Spacer removal &Re-assembly with torque
tightening c) Bearing housing removal d) Bearingremoval,
inspection, replacement(if required) & re-assembly.
20,272.43 INR/EA
Non
Drive End - DRY GAS SEAL REPLACEMENT:Job includes :
a) Lube oil pipingconnected to coupling guard revoval
b) De-coupling - Spacer removal &Re-assembly with torque
tightening c) Bearing housing removal d) Bearingremoval,
inspection, replacement(if required) & re-assembly.
24,707.02 INR/EA
Non
Drive End - DRY GAS SEAL REPLACEMENT:Job includes :
a) Lube oil pipingconnected to coupling guard revoval
b) De-coupling - Spacer removal &Re-assembly with torque
tightening c) Bearing housing removal d) Bearingremoval,
inspection, replacement(if required) & re-assembly.
Capital
Repair:Job
includes : 1)Lube oil piping
connected to coupling guardrevoval 2)De-coupling - Spacer
removal of GB-Motor ,GB-Compressor &Re-assemblywith Torque
tightening
3)DE
&
NDE bearing removal & re-assembly 4)DE
CouplingHub removal
& re-installation5)DE & NDE dry gas
seal removal & re-assembly
6)Rotor removal
device
&
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
101,362.12 INR/EA
casing
Number : CCM
Date
: 25.05.2015
Page No. : 147
7)
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Compressor
Number : CCM/
Date
: 25.05.2015
Page No. : 147
8)Diaphragm
pack
assembly
9)Rotor
removal
&Re-assenmbly
Material/Service Description
removal,inspection
from
cleaning
Unit Rate
&Re-
barrel-Inspection,cleaning
118,255.81 INR/EA
Capital
Repair:Job
includes : 1)Lube oil piping
connected to coupling guardrevoval 2)De-coupling - Spacer
removal of GB-Motor ,GB-Compressor &Re-assemblywith Torque
tightening
3)DE
&
NDE bearing removal & re-assembly 4)DE
CouplingHub removal
& re-installation5)DE & NDE dry gas
seal removal & re-assembly
6)Rotor removal
device
&
alignment
with
Compressor
casing
7)
Compressor
barrelremoval & Re-assembly
8)Diaphragm
pack
removal,inspection cleaning &Reassembly
9)Rotor
removal
from
barrel-Inspection,cleaning
&Re-assenmbly
135,149.47 INR/EA
Capital
Repair:Job
includes : 1)Lube oil piping
connected to coupling guardrevoval 2)De-coupling - Spacer
removal of GB-Motor ,GB-Compressor &Re-assemblywith Torque
tightening
3)DE
&
NDE bearing removal & re-assembly 4)DE
CouplingHub removal
& re-installation5)DE & NDE dry gas
seal removal & re-assembly
6)Rotor removal
device
&
alignment
with
Compressor
casing
7)
Compressor
barrelremoval & Re-assembly
8)Diaphragm
pack
removal,inspection cleaning &Reassembly
9)Rotor
removal
from
barrel-Inspection,cleaning
&Re-assenmbly
Capital
Repair:Job
includes : 1)Lube oil piping
connected to coupling guardrevoval 2)De-coupling - Spacer
removal of GB-Motor ,GB-Compressor &Re-assemblywith Torque
tightening
3)DE
&
NDE bearing removal & re-assembly 4)DE
CouplingHub removal
& re-installation5)DE & NDE dry gas
seal removal & re-assembly
6)Rotor removal
device
&
alignment
with
Compressor
casing
7)
Compressor
barrelremoval & Re-assembly
8)Diaphragm
pack
removal,inspection cleaning &Reassembly
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
152,043.16 INR/EA
from
Number : CCM/
Date
: 25.05.2015
Page No. : 148
barrel-Inspection,cleaning
COMPRESSOR
GEAR
BOX
general inspection:Job includes :
1) Lube oil pipingconnected to coupling guard revoval
2) De-coupling - Spacer removal GB-Motor,GB-Compressor 3)
Gear box
housing removal
&
Re-assembly
4)
Complete Gear
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
23,651.16 INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 149
Material/Service Description
Unit Rate
boxInspection
as per SMP a) HS DE & NDE Bearing
Inspection
&
replacement
(ifrequired) b) LS DE & NDE Bearing
Inspection & replacement (if required) c) LSThrust bearing
Inspection,
replacement(if
required) d) Backlash,Gear
toothsurface
contact,labryinth
end
clearance,shaft
run-outs,axail play e) Lube oiljet cleaning at bearings 5)
Gear box HS shaft coupling hub bolts inspection &torque
checking
6) Gear box LS shaft coupling spacer bolt
inspection & torqueCHECKING
30,408.64 INR/EA
COMPRESSOR
GEAR
BOX
general inspection:Job includes :
1) Lube oil pipingconnected to coupling guard revoval
2) De-coupling - Spacer removal GB-Motor,GB-Compressor 3)
Gear box
housing removal
&
Re-assembly
4)
Complete
Gear boxInspection
as per SMP a) HS DE & NDE
Bearing Inspection
&
replacement
(ifrequired) b) LS DE & NDE Bearing
Inspection & replacement (if required) c) LSThrust bearing
Inspection,
replacement(if
required) d) Backlash,Gear
toothsurface
contact,labryinth
end
clearance,shaft
run-outs,axail play e) Lube oiljet cleaning at bearings 5)
Gear box HS shaft coupling hub bolts inspection &torque
checking
6) Gear box LS shaft coupling spacer bolt
inspection & torqueCHECKING
37,166.11 INR/EA
COMPRESSOR
GEAR
BOX
general inspection:Job includes :
1) Lube oil pipingconnected to coupling guard revoval
2) De-coupling - Spacer removal GB-Motor,GB-Compressor 3)
Gear box
housing removal
&
Re-assembly
4)
Complete
Gear boxInspection
as per SMP a) HS DE & NDE
Bearing Inspection
&
replacement
(ifrequired) b) LS DE & NDE Bearing
Inspection & replacement (if required) c) LSThrust bearing
Inspection,
replacement(if
required) d) Backlash,Gear
toothsurface
contact,labryinth
end
clearance,shaft
run-outs,axail play e) Lube oiljet cleaning at bearings 5)
Gear box HS shaft coupling hub bolts inspection &torque
checking
6) Gear box LS shaft coupling spacer bolt
inspection & torqueCHECKING
COMPRESSOR
GEAR
BOX
general inspection:Job includes :
1) Lube oil pipingconnected to coupling guard revoval
2) De-coupling - Spacer removal GB-Motor,GB-Compressor 3)
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
43,923.59 INR/EA
Gear box
housing removal
&
Re-assembly
4)
Complete
Gear boxInspection
as per SMP a) HS DE & NDE
Bearing Inspection
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 150
Number : CCM/
Date
: 25.05.2015
Page No. : 151
Material/Service Description
Unit Rate
&
replacement
(ifrequired) b) LS DE & NDE Bearing
Inspection & replacement (if required) c) LSThrust bearing
Inspection,
replacement(if
required) d) Backlash,Gear
toothsurface
contact,labryinth
end
clearance,shaft
run-outs,axail play e) Lube oiljet cleaning at bearings 5)
Gear box HS shaft coupling hub bolts inspection &torque
checking
6) Gear box LS shaft coupling spacer bolt
inspection & torqueCHECKING
27,029.90 INR/EA
COMP
GEARBOX
MAJOR
OVERHAULING:Job includes :1) Lube
oil piping
connected tocoupling guard revoval 2) Decoupling - Spacer removal GB-Motor ,GB-Compressor3) Gear
box housing removal
&
Re-assembly 4)
HS
Shaft
Hub removal
&re-installation
5)
HS
shaft-pinion
removal
&
replacement
6)
LS
Shaft-Bull
Gearremoval & replacement Complete
Gear box Inspection
as
per
SMP
--a)
HS
DE
&
NDEBearing Inspection & replacement (if required) b)
LS DE & NDE BearingInspection & replacement (if required)
c) LS Thrust bearingInspection,replacement(if required)
33,787.37 INR/EA
COMP
GEARBOX
MAJOR
OVERHAULING:Job includes :1) Lube
oil piping
connected tocoupling guard revoval 2) Decoupling - Spacer removal GB-Motor ,GB-Compressor3) Gear
box housing removal
&
Re-assembly 4)
HS
Shaft
Hub removal
&re-installation
5)
HS
shaft-pinion
removal
&
replacement
6)
LS
Shaft-Bull
Gearremoval & replacement Complete
Gear box Inspection
as
per
SMP
--a)
HS
DE
&
NDEBearing Inspection & replacement (if required) b)
LS DE & NDE BearingInspection & replacement (if required)
c) LS Thrust bearingInspection,replacement(if required)
COMP
GEARBOX
MAJOR
OVERHAULING:Job includes :1) Lube
oil piping
connected tocoupling guard revoval 2) Decoupling - Spacer removal GB-Motor ,GB-Compressor3) Gear
box housing removal
&
Re-assembly 4)
HS
Shaft
Hub removal
&re-installation
5)
HS
shaft-pinion
removal
&
replacement
6)
LS
Shaft-Bull
Gearremoval & replacement Complete
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
40,544.85 INR/EA
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 152
Number : CCM/
Date
: 25.05.2015
Page No. : 153
Material/Service Description
Unit Rate
47,302.32 INR/EA
COMP
GEARBOX
MAJOR
OVERHAULING:Job includes :1) Lube
oil piping
connected tocoupling guard revoval 2) Decoupling - Spacer removal GB-Motor ,GB-Compressor3) Gear
box housing removal
&
Re-assembly 4)
HS
Shaft
Hub removal
&re-installation
5)
HS
shaft-pinion
removal
&
replacement
6)
LS
Shaft-Bull
Gearremoval & replacement Complete
Gear box Inspection
as
per
SMP
--a)
HS
DE
&
NDEBearing Inspection & replacement (if required) b)
LS DE & NDE BearingInspection & replacement (if required)
c) LS Thrust bearingInspection,replacement(if required)
5,068.10
INR/EA
6,757.47
INR/EA
8,446.84
INR/EA
MOTOR
DE / NDE SLEEVE BEARING INSPECTION:Job includes :
1
Lube
oil pipingconnected to coupling guard removal 2
Motor DE
& NDE Bearing housing removal &Re-assembly 3
Motor DE & NDE
Sleeve Bearing Removal,inspection & Reassembly 4Check and adjustment of oil flow regulator to
individual bearing
MOTOR
DE / NDE SLEEVE BEARING INSPECTION:Job includes :
1
Lube
oil pipingconnected to coupling guard removal 2
Motor DE
& NDE Bearing housing removal &Re-assembly 3
Motor DE & NDE
Sleeve Bearing Removal,inspection & Reassembly 4Check and adjustment of oil flow regulator to
individual bearing
MOTOR
DE / NDE SLEEVE BEARING INSPECTION:Job includes :
1
Lube
oil pipingconnected to coupling guard removal 2
Motor DE
& NDE Bearing housing removal &Re-assembly 3
Motor DE & NDE
Sleeve Bearing Removal,inspection & Reassembly 4Check and adjustment of oil flow regulator to
individual bearing
MOTOR
DE / NDE SLEEVE BEARING INSPECTION:Job includes :
1
Lube
oil pipingconnected to coupling guard removal 2
Motor DE
& NDE Bearing housing removal &Re-assembly 3
Motor
DE
&
NDE
Sleeve Bearing Removal,inspection & ReREGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
10,558.55 INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 154
Gearbox
to Compressor - alignment:Gearbox to Compressor
- alignment
checking &correction
Job
includes
Removal, refixing
of Coupling guards,
piping,couplingspacer,
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
8,446.84
INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 155
Material/Service Description
Unit Rate
10,136.22 INR/EA
Gearbox
to Compressor - alignment:Gearbox to Compressor
- alignment
checking &correction
Job
includes
Removal, refixing
of Coupling guards,
piping,couplingspacer,
alignment
check
and
correction
3159971
W
11,825.58 INR/EA
Gearbox
to Compressor - alignment:Gearbox to Compressor
- alignment
checking &correction
Job
includes
Removal, refixing
of Coupling guards,
piping,couplingspacer,
alignment
check
and
correction
13,514.95 INR/EA
Gearbox
to Compr-alignment check & corre CENTRIFUGAL
COMPRESSOR - Above 10,000 KW.
Gearbox
to Compressor - alignment:Gearbox to Compressor
- alignment
checking &correction
Job
includes
Removal, refixing
of Coupling guards,
piping,couplingspacer,
alignment
check
and
correction
8,446.84
INR/EA
10,136.22 INR/EA
3159975
W
Motor
to Gearbox-alignm checking & corre CENTRIFUGAL
COMPRESSOR - Above 5,000 and up to 10,000KW.
Motor to Gearbox -alignment checking:Job includes :Motor to
Gearbox -alignment checking & correction. Removal, refixing
of Coupling guards, piping,coupling spacer, alignment check
and correction
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
11,825.58 INR/EA
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 156
13,514.95 INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 157
Material/Service Description
Unit Rate
6,419.60
INR/EA
7,391.00
INR/EA
8,446.84
INR/EA
Seal
Replacement. Screw compressor - Above 250 and up
to
1000 KW.
Screw
compressor-Seal
Replacement:
Job includes:
Removal Refixing
of
end
cover
plate.
Repair/Replacement
of mechanical
seal.
Removal
&
installation of coupling hub removal
11,656.64 INR/EA
Screw
compressor-Seal
Replacement:
Job includes:
Removal Refixing
of
end
cover
plate.
Repair/Replacement
of mechanical
seal.
Removal
&
installation of coupling hub removal
3,040.86
INR/EA
4,223.43
INR/EA
Slide
V/v
Assembly.Screw compressor - Above 100 and up
to
250 KW.
Slide V/v Assembly: Removal/Replacement of piston/slide
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 158
Number : CCM/
Date
: 25.05.2015
Page No. : 159
Material/Service Description
Unit Rate
6,335.13
INR/EA
7,391.00
INR/EA
20,272.43 INR/EA
Capital
Repair:
Job includes: Removal & Reinstallation
of Coupling Guard. Removal & Reinstallation / Replacement
of Coupling.
Alignment
check
&
correction
between
motor & compressor. Removal & Reinstallation of Coupling
Hub(s).
Removal
&
Reinstallation/Replacement
of
piston/slide valve assembly.
Removal & Reinstallation of
all covers necessary to
access
the
internals. Removal &
Reinstallation/Replacement
of Mechanical seal. Removal & Reinstallation/Replacement
of Rotor bearing(s).Inspection and Repair/Replacement of
compressor internals including male/female
rotor,
compressor, casing, bearings etc. completes with
correction required
30,408.64 INR/EA
Capital
Repair:
Job includes: Removal & Reinstallation
of Coupling Guard. Removal & Reinstallation / Replacement
of Coupling.
Alignment
check
&
correction
between
motor & compressor. Removal & Reinstallation of Coupling
Hub(s).
Removal
&
Reinstallation/Replacement
of
piston/slide valve assembly.
Removal & Reinstallation of
all covers necessary to
access
the
internals. Removal &
Reinstallation/Replacement
of Mechanical seal. Removal & Reinstallation/Replacement
of Rotor bearing(s).Inspection and Repair/Replacement of
compressor internals including male/female
rotor,
compressor, casing, bearings etc. completes with
correction required
Capital
Repair:
Job includes: Removal & Reinstallation
of Coupling Guard. Removal & Reinstallation / Replacement
of Coupling.
Alignment
check
&
correction
between
motor & compressor. Removal & Reinstallation of Coupling
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
69,686.45 INR/EA
Hub(s).
Removal
&
Reinstallation/Replacement
of
piston/slide valve assembly.
Removal & Reinstallation of
all covers necessary
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 160
Number : CCM/
Date
: 25.05.2015
Page No. : 161
Material/Service Description
Unit Rate
to
accessthe
internals.
Removal
&
Reinstallation/Replacement of Mechanical seal. Removal &
Reinstallation/Replacement of Rotor bearing(s).Inspection
and Repair/Replacement of compressor internals including
male/female
rotor,compressor,
casing,
bearings
etc.
completes with correction required
Capital
Repair:
Job includes: Removal & Reinstallation
of Coupling Guard. Removal & Reinstallation / Replacement
of Coupling.
Alignment
check
&
correction
between
motor & compressor. Removal & Reinstallation of Coupling
Hub(s).
Removal
&
Reinstallation/Replacement
of
piston/slide valve assembly.
Removal & Reinstallation of
all covers necessary to
access
the
internals. Removal &
Reinstallation/Replacement
of Mechanical seal. Removal & Reinstallation/Replacement
of Rotor bearing(s).Inspection and Repair/Replacement of
compressor internals including male/female
rotor,
compressor, casing, bearings etc. completes with
correction required
5,912.79
INR/EA
6,926.41
INR/EA
Compressor
Above
1000 KW.
to
Motor
Allignment.Screw
compressor -
1,267.03
INR/EA
1,584.63
INR/EA
Coupling
/
De-coupling
100
and
up
to
250
KW.
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV
De-coupling
job:
Coupling
Number : CCM/
Date
: 25.05.2015
Page No. : 162
/ De-coupling
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 163
Material/Service Description
Unit Rate
Coupling
/
250 and up to
Coupling
/
job including
2,111.71
INR/EA
2,640.49
INR/EA
**
Coupling
/ De-coupling job. Screw compressor - Above 1000
KW.
Coupling
/ De-coupling job: Coupling / De-coupling
job including removal of guards /Internal Piping.
22,806.47 INR/EA
COMPRESSORE
DRY
GAS
/
LABYRINTH
SEAL
REPIntegrally Geared
Centrifugal
Compressor. - (Rate is on
Each Stage.) COMPRESSORE
DRY
GAS
/
LABYRINTH
SEALREPLACEMENT.
Job includes
:
Removal of piping
spool,locking of bellows (if applicable), bellow & IGV
removal
COMPRESSOR
OVERHAULING
Integrally
Geared
Centrifugal Compressor. Job includes : 1st stage suction
spool, IGV, Interstage piping Removal & re-installation.
All
Stages
Bellow removal/re-installation, locking and
unlocking of bellows.Coupling guard, cou
COMPRESSOR
GEAR
INSPECTION - Integrally Geared
Centrifugal Compressor. Job includes : Coupling guard
removal/re-installation. Spacer removal. Gear box housing
removal & Re- assembly. Complete Gear box Inspection as per
SMP. a) HS - DE & NDE Bearing Inspect
GEARBOX
MAJOR
OVERHAULING
- Integrally Geared
Centrifugal
Compressor.
Job
includes
:
Decoupling/Coupling - Spacer removal Motor to Compressor,
coupling guard removal/re- installation. Gear box housing
removal & Re-assembly. HS Shaft - HS shaft removal
MOTOR
DE/NDE
SLEEVE
BEARING
INPECTION-Integrally
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 164
Number : CCM/
Date
: 25.05.2015
Page No. : 165
Material/Service Description
Unit Rate
removal&re-installation
Motor to Compressor coupling
guard removal & re-installation, De-coupling & coupling.
Motor DE
& NDE Bearing hous
3160002 ALIGNMENT
Valid from: 25.05.2015 Valid to: 31.07.2016
8,615.78
INR/EA
3,378.75
INR/EA
5,068.10
INR/EA
6,757.47
INR/EA
5,490.44
INR/EA
4,223.43
INR/EA
* 80
GEAR BOX / STACK DAMPERS
** 80.01 Valve GB / Stack dampers.
STACK
DAMPER BRG REPLT(SINGLE SHAFT - Job includes
:a)
De-coupling of shaft from actuator b) DE / NDE
plummer block
bearing
inspection,
cleaning,replacement
&
re-assembly
c)
Actuator to stack damper shaft alignment d) Actuator &
cylinder removal & re-ins
Stack
damp gearbox insp(Single stag-Job includes
:a) De-coupling
of
shaft
from actuatorb) Actuator &
cylinder removal
& re-installationc) Gearbox removal,
overhauling & re-installation
Stack
Damper Bearing Replace(Multi shaft - Valve GB
/
Stack dampers. Job includes -- Linkage removal &
re-assembly.DE/NDE
plumer
block
bearing
inspection,
cleaning, replacement & re- assembly.Actuator to stack
damper shaft alignment. Actuator & cylinder
Stack
damp gearbox insp(Multi shaft - Job includes
:a) De-coupling of shaft from actuator b)
Actuator &
cylinder removal & re-installation c) Gearbox removal,
overhauling & re-installation
Vlve/stack
dmpr GB insitu repir - Applicable for
all sizes.Opening
of
GB,
checking of internals,
cleaning, greasing,checking forjamming & making the same
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 166
free.
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
2,027.25
INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 167
Material/Service Description
Unit Rate
2,365.12
INR/EA
2,871.93
INR/EA
4,223.43
INR/EA
5,068.10
INR/EA
6,757.47
INR/EA
3,696.33
INR/EA
5,068.10
INR/EA
Valve/stack
dmpr GB repair.Removal & re-fixing of
GB including lifting & shifting to workshop & back. Valve
GB / Stack dampers.-Above 12" nb and up to 24" nb.
Valve/stack
dmpr GB repair.Removal & re-fixing of
GB including lifting & shifting to workshop & back. Valve
GB / Stack dampers.-Above 24" nb.
Valve
/
Gear
Box O/H. Opening, checking,
cleaning, replacement if required, greasing & re- assembly
of the GB. Valve GB / Stack dampers.-Up to 12" nb.
Valve
/
Gear
Box O/H. Opening, checking,
cleaning, replacement if required, greasing & re- assembly
of the GB. Valve GB / Stack dampers-Above 12" nb and up to
24" nb.
Valve
/
Gear
Box O/H.-Opening, checking,
cleaning, replacement if required, greasing & re- assembly
of the GB. Valve GB / Stack dampers-Above 24" nb.
Oil
seal leak attending.GEAR BOX-ALL EXCEPT SUNDYNES Up to 30 KW
GEAR BOX-ALL EXCEPT SUNDYNES - Oil seal leak attending.:Job
includes:Removal &reinstallation of housing top cover and
/or side covers.
Oil
seal leak attending.GEAR BOX-ALL EXCEPT SUNDYNES
- Above 30 and up to 100KW.
GEAR BOX-ALL EXCEPT SUNDYNES - Oil seal leak attending.:Job
includes:Removal &reinstallation of housing top cover and
/or side covers.
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 168
Number : CCM/
Date
: 25.05.2015
Page No. : 169
Material/Service Description
Unit Rate
6,335.13
INR/EA
Oil
seal leak attending. GEAR BOX-ALL EXCEPT SUNDYNES
- Above 100 and up to 250 KW
GEAR BOX-ALL EXCEPT SUNDYNES - Oil seal leak attending.:Job
includes:Removal &reinstallation of housing top cover and
/or side covers.
10,136.22 INR/EA
Oil
seal leak attending. GEAR BOX-ALL EXCEPT SUNDYNES
- Above 250 and up to 1000 KW.
GEAR BOX-ALL EXCEPT SUNDYNES - Oil seal leak attending.:Job
includes:Removal &reinstallation of housing top cover and
/or side covers.
16,893.69 INR/EA
Oil
seal leak attending. GEAR BOX-ALL EXCEPT SUNDYNES
- Above 1000 KW.
GEAR BOX-ALL EXCEPT SUNDYNES - Oil seal leak attending.:Job
includes:Removal &reinstallation of housing top cover and
/or side covers.
5,279.27
INR/EA
7,602.15
INR/EA
Antifriction
bearing replacement -GEAR BOX-ALL EXCEPT
SUNDYNES - Up to 30 KW
Antifriction bearing replacement:Job
includes:Removal
&
reinstallation
ofhousing
top
cover
and
/or
side
covers.Replacement of elastomeric seals /inspection, repair
or replacement of labyrinth seals.Removal & Reinstallation
/replacement of bearing(s)
Antifriction
bearing
replacement GEAR BOX-ALL EXCEPT
SUNDYNES - Above 30 and up to 100 KW.
Antifriction bearing replacement:Job
includes:Removal
&
reinstallation
ofhousing
top
cover
and
/or
side
covers.Replacement of elastomeric seals /inspection, repair
or replacement of labyrinth seals.Removal & Reinstallation
/replacement of bearing(s)
Antifriction
bearing
replacement GEAR BOX-ALL EXCEPT
SUNDYNES - Above 100 and up to 250 KW.
Antifriction bearing replacement:Job
includes:Removal
&
reinstallation
ofhousing
top
cover
and
/or
side
covers.Replacement of elastomeric seals /inspection, repair
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
10,136.22 INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 170
Material/Service Description
or
replacement
of
Reinstallation
/replacement of bearing(s)
labyrinth
seals.Removal
Unit Rate
&
15,204.32 INR/EA
Antifriction
bearing replacement GEAR BOX-ALL EXCEPT
SUNDYNES - Above 250 and up to 1000 KW.
Antifriction bearing replacement:Job
includes:Removal
&
reinstallation
ofhousing
top
cover
and
/or
side
covers.Replacement of elastomeric seals /inspection, repair
or replacement of labyrinth seals.Removal & Reinstallation
/replacement of bearing(s)
5,279.27
INR/EA
7,602.15
INR/EA
Babbit
bearings repair /replacem GEAR BOX-ALL EXCEPT
SUNDYNES - Up to 30 KW
Babbit
bearings repair /replacement:Job includes:Removal
& reinstallation ofcasing
cover.Removal,
inspection,
repair/replacement
of bearing(s) /bearingpad(s) thrust
collar and reassembly
Babbit
bearings repair /replacem GEAR BOX-ALL EXCEPT
SUNDYNES - Above 30 and up to 100 KW.
Babbit
bearings repair /replacement:Job includes:Removal
& reinstallation ofcasing
cover.Removal,
inspection,
repair/replacement
of bearing(s) /bearingpad(s) thrust
collar and reassembly
10,136.22 INR/EA
Babbit
bearings repair /replacem GEAR BOX-ALL EXCEPT
SUNDYNES - Above 100 and up to 250 KW.
Babbit
bearings repair /replacement:Job includes:Removal
& reinstallation ofcasing
cover.Removal,
inspection,
repair/replacement
of bearing(s) /bearingpad(s) thrust
collar and reassembly
13,514.95 INR/EA
Babbit
bearings repair /replacem GEAR BOX-ALL EXCEPT
SUNDYNES - Above 250 and up to 1000 KW.
Babbit
bearings repair /replacement:Job includes:Removal
& reinstallation ofcasing
cover.Removal,
inspection,
repair/replacement
of bearing(s) /bearingpad(s) thrust
collar and reassembly
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
16,893.69 INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 171
Material/Service Description
Unit Rate
Babbit
bearings repair /replacem GEAR BOX-ALL EXCEPT
SUNDYNES - Above 1000 KW.
Babbit
bearings repair /replacement:Job includes:Removal
& reinstallation ofcasing
cover.Removal,
inspection,
repair/replacement
of bearing(s) /bearingpad(s) thrust
collar and reassembly
12,143.19 INR/EA
Capital
Repair GEAR BOX-ALL EXCEPT SUNDYNES - Above 30
and up to 100 KW.
Capital repair(OH) job:Job includes:Removal and refixing of
coupling
guards
oninput
end.Spacer
removal
and
reinstallation replacement on input end Removaland refixing
of
coupling
gaurd(s)
on output end Spacer removal
andreinstalltion/replacement
on output end Checking &
correction of alignment atinput and output ends with
connected machines. Removal & reinstallation /replacement
of coupling hub.Removal & reinstallation of housing top
cover and/or side covers.Replacement of elastomeric seals /
inspection, repair orreplacement of labyrinth seals.Removal
&
Reinstallation / replacement ofbearing(s). Removal
& reinstallation
of
casing
cover.Removal,
inspection,repair/replacement of bearing(s)/ bearing pad(s)
thrust
collar
andreassembly.Complete
dismantling and
reassembly of gear box.Inspection &replacement as required
of gears, gear shafts,bearings, seals
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
16,471.34 INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 172
Material/Service Description
Unit Rate
17,554.23 INR/EA
18,807.74 INR/EA
2,111.71
INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 173
Material/Service Description
Gearbox
replacement GEAR
- Above 30 and up to 100 KW.
Unit Rate
2,640.49
INR/EA
3,167.57
INR/EA
5,068.10
INR/EA
Gearbox
replacement GEAR
- Above 100 and up to 250 KW.
Gearbox
replacement GEAR
- Above 250 and up to 1000 KW.
* 90
Plant specific and Miscellaneous
** 90.01 Plant specific - Aromatics
3163699 ROTARY VALVE BEARING REPLACEMENT
Valid from: 25.05.2015 Valid to: 31.07.2016
16,893.69 INR/EA
Job
includes:
1)
Sealpot
assembly removal &
re-assemble
2) Hydraulic cylinder assembly removal &
re-assembly. 3) Resolver assembly removal & re-assembly 4)
Top bearing removal, inspection, if required replacement &
re-assembly 5) Rachet wheel assembly removal & re-assembly
6)
Main
bearing
removal,
inspection,
if required
replacement & re-assembly
28,719.27 INR/EA
Job
includes:
1)
Sealpot
assembly removal &
re-assemble
2) Hydraulic cylinder assembly removal &
re-assembly. 3) Resolver assembly removal & re-assembly 4)
Top bearing removal, inspection, if required replacement &
re-assembly 5) Rachet wheel assembly removal & re-assembly
6)
Main
bearing
removal,
inspection,
if required
replacement & re-assembly 7) Mechanical non-catridge type
seal replacement & re-assembly
33,787.37 INR/EA
Job
includes:
1)
Sealpot
assembly removal &
re-assemble
2) Hydraulic cylinder assembly removal &
re-assembly. 3) Top head flange bolts removal/ torque
tightening, top head lifting with turn-buckle assembly &
re-installation 4) Rotor plate removal & installation of
new rotor plate after cleaning/de-greasing, also track
plate cleaning & inspection. 5) Final alignment after
completed assembly of top head with new rotor plate
Job
includes:
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
15,204.32 INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 174
**
Material/Service Description
Unit Rate
workbench
2) Holddown rings & washer removal, teflon
sheet removal 3) cleaning of rotor plate & re-assembly of
teflon sheet
&
holddown
rings & wahsers 4) Torque
tightening of holddwon rings & washer 5) Seal sheet to
holddown washer clearance measurement as per SMP
20,272.43 INR/EA
Plant
Specific
Coker
:
O/H of Decoking
control valve
with
6"
2500#
Inlet,
Outlet
and 3",
300# bypass ports, pneumatic actuator. Job includes :
Dismantle the pneumatic
acuator,
disassemblyof
valve
including
disassembly of subassemblies. Cleaning of all components,
blue match checking, shifting of components for lapping,
reconditioning / manual lapping of components if required.
Measurement of all dimensions and cutting / providing shims
if required, assembly, hydrotesting of valve in all three
modes (Bypass, Full flow & Full flow along with bypass port
pressurised), draining of water, drying with air,Protecting
the nozzles.
8,446.84
INR/EA
1,351.49
INR/EA
Plant
Specific
Coker : Overhauling of 6",
2500#, Drum isolation ball valves Job includes : Disassemby, replacement
/
reconditioning of components,
assembly, retesting
of the valve in all the three modes
Dis-assembly of
gear
box,
cleaning,
reconditioning,
replacement of components, assembly
Plant
Specific
Coker
: Overhauling of
Pneumatic wrenches
(CP
5000 & CP 640 models) Disassembly, cleaning of components, recondition / replacement
of parts, assembly and run test.
62,506.64 INR/EA
Plant
Specific - Coker : Overhauling of 12", 900#,
4 way Velan
make
ball
valves
JobIncludes
Dis-assembly,Removal & cleaning of components, Lapping of
components,Assembly & Testing Retesting of valve including
partial
disassembly,
re-placement
/
re-lapping
of
components, re-assembly (Per side) Dis-assembly, cleaning
of components, recondition / replacement of parts, assembly
and run test.
Valid from: 25.05.2015 Valid to: 31.07.2016
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
4,054.49
INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 175
4,054.49
INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 176
Material/Service Description
Unit Rate
Plant
Specific - Coker : Coke drum SP valves,
Switch valves
gear
box
dismantling & overhauling Job
includes : Clamping
and
arresting
the
accidental
movement of stem, dismantle actuator if required, remove
gear box from valve, disassemble,
cleaning,
reconditioning, replacement of components,
reinstall the gear box and actuator, remove the clamp.
INR/EA
Removal
and
Replacement
of
end.Removal/Replacement of Gear Box.
Motor
on
input
Removal
and
Replacement
of
Motor
on
end. Removal/Replacement
of
Gear
Box.
Removal
&
Reinstallation/Replacement of Bearing
input
1,601.52
INR/EA
2,001.90
INR/EA
1,000.95
INR/EA
Removal
of cover Replacement of Damaged mesh panel
Checking/Replacement of neoprene seals.
9,379.36
INR/EA
1,601.52
INR/EA
Complete
dismentling of Gear Box. Inspection &
Replacement as required of gears, gear shafts, bearings,
seals etc. Assembly of Gear Box.
Job
includes:Cleaning
dis assembly and assembly.
and
greasing
including
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 177
1,018.69 INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 178
Material/Service Description
Unit Rate
2,344.84
INR/EA
1,601.52
INR/EA
2,344.84
INR/EA
1,520.44
INR/EA
2,402.28
INR/EA
8,446.84
INR/EA
1,018.69
INR/EA
3163683 SPROCKET.
Valid from: 25.05.2015 Valid to: 31.07.2016
Replacement
of
Chain link/Complete chain. Removal
& Reinstallation/Replacement of chain Sprocket(s).
Replacement
of
Chain link/Complete chain. Removal
& Reinstallation/Replacement of chain Sprocket(s). Removal
& Reinstallation/Replacement of
Sprocket end bearing(s)
including
dismantling
& reassembly of all necessary
components, all necessary Checks for dimension, clearance,
runout etc.
Removal
& Reinstallation of coupling guard Removal
& Reinstallation/Replacement of
belt/chain Alignment of
driver and driven pulley and belt tensioning Replacement of
Pulley(s) Replcement of chain Link/Complete chain Removal &
Reinstallation/Replacement of chain Sprocket(s) Gear Box
Replacement.
Complete
Overhauling
of GB including replacement
of seals, bearings, gears, shafts etc. If needed.
Removal
of
Rope
Rope
679.13 INR/EA
Chain/Chain
link Replacement and
tensioning.Spocket alignment check and corrective.
Chain/Chain
Spocket alignment
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
508.50 INR/EA
of
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 179
Number : CCM/
Date
: 25.05.2015
Page No. : 180
Material/Service Description
Unit Rate
driver/driven sprocket(s).
508.50 INR/EA
1,358.24
INR/EA
1,018.69
INR/EA
4,223.43
INR/EA
1,358.24
INR/EA
Chain/Chain
link
Replacement
and
tensioning.
Spocket alignment
check and
corrective.
Replacement
of driver/driven sprocket(s).
Roller
Gap
adjustment
Chain tension adjustment.
Replacement of Roller(s).
Chain/Chain
link
Replacement
and
tensioning.
Spocket alignment
check and
corrective.
Replacement
of driver/driven sprocket(s).
Replacement of Motor Gear Box Replacement.
Complete
Overhauling
of
GB
including
Repair/Replacement of Seals, Bearings, Gears, Shafts etc.
599.72 INR/EA
84.46 INR/EA
16,893.69 INR/PC
440.93 INR/PC
4,116.98
INR/PC
1,525.49
INR/PC
403.75 INR/PC
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Number : CCM/
Date
: 25.05.2015
Page No. : 181
Number : CCM/
Date
: 25.05.2015
Page No. : 182
Material/Service Description
Unit Rate
Disassembly,
Inspection
&
Assembly
of
Fuel
Stop
Valve.
Disassembly
(moog).
Repair
&
Assembly
of
By
Pass
Valve
4,983.64
INR/PC
4,154.15
INR/PC
1,108.23
INR/PC
1,765.39
INR/PC
1,902.22
INR/PC
Gas Turbine & Accessory Gear Box Coupling Removal & Fixing.
Disassembly
N.D.E. Bearing.
Repair
&
Assembly
of
General D.E. or
15,888.51 INR/PC
883.53 INR/PC
662.24 INR/PC
662.24 INR/PC
662.24 INR/PC
1,324.46
INR/PC
522.02 INR/PC
Number : CCM/
Date
: 25.05.2015
Page No. : 183
Material/Service Description
Unit Rate
697.71 INR/PC
Disassembly
Roof.
INR/PC
Disassembly
Repair
Calibration
&
Assembly of Fuel
NRV.
Disassembly
(GT).
INR/NOS
INR/PC
Disassembly
Coupling.
&
Assembly
of
Generator
to
4,983.64
INR/IND
1,076.13
INR/PC
Gear Box
Disassembly
Repair
half.
Disassembly
Bottom Half.
Repair
&
Assembly
of
radial
1,267.03
INR/PC
1,371.76
INR/PC
bearing
Material/Service Description
2,985.11
Disassembly
Cooler.
Repair
&
Assembly
Unit Rate
of
INR/PC
Generator Water
440.93 INR/PC
633.53 INR/NOS
Alignment
& Gear Box.
check
&
3,804.46
INR/NOS
Disassmbly
Repair
271.99 INR/PC
Vlves.
Disassmbly
&
Assembly
180.76 INR/PC
Joint.
361.51 INR/PC
2,716.50
INR/EA
2,402.28
INR/EA
1,383.60
INR/EA
8.45
INR/M
9,379.36
INR/EA
2,402.28
INR/EA
3,689.57
INR/EA
229.75 INR/EA
Material/Service Description
Unit Rate
628.45 INR/MT
Check
628.45 INR/MT
KG)
915.63 INR/EA
3,659.17
INR/EA
4,649.15
INR/EA
Includes
Jobs: Removal & Refixing of coupling
guards Removal
&
refixing
of
chains
Checking
&
correction of sprocket
alignment between driver and
conveyor Inspection, tension
adjustment & replacement of
chains / links Removal
&
refixing of driven sprockets Inspection & replacement
of drive sprockets Inspection & replacement of driven
sprocket Dismantling,
insection
&
replacement of bearings,
dismantling
of
motor and gear box.
Includes
Jobs: Removal & Refixing of coupling
guards Removal
&
refixing
of
chains
Checking
&
correction of sprocket
alignment between driver and
conveyor Inspection, tension
adjustment & replacement of
chains / links Removal
&
refixing of driven sprockets Inspection & replacement
of drive sprockets Inspection & replacement of driven
sprocket Dismantling,
insection
&
replacement of bearings, dismantling
of
motor
&
gear box Dismantling / inspect / repair /
replacement of screw flight / shaft
Includes
Jobs: Removal & Refixing of coupling
guards Removal
&
refixing
of
chains
Checking
&
correction of sprocket
alignment between driver and
conveyor Inspection, tension
adjustment & replacement of
chains / links Removal
&
refixing of driven sprockets Inspection & replacement
of drive sprockets Inspection & replacement of driven
459.50 INR/EA
sprocket
Includes
Jobs: Removal & refixing of coupling guards
Removl
& refixing of belts Checking & correction of
pulley
114.89 INR/EA
Material/Service Description
Unit Rate
alignment
between
driver
and
screen
separator
Inspection, tension
adjustment
&
replacement
of
belts Removal & refixing of driven pulleys Inspection
& replacement of drive pulleys Inspection & replacement of
driven pulleys
1,870.12
INR/EA
3,486.86
INR/EA
1,743.44
INR/EA
1,378.53
INR/EA
6,571.65
INR/EA
1,743.44
INR/EA
Includes
Jobs:
Dismantling
of
top
cover/chute
of screen
box
Dismantling
of topmesh mesh,
inspect, replacement
&
box
up
including
replacement
of balls & springs if necessary Dismantling of topmesh &
bottom mesh, inspect, replacement including replacement of
springs/balls if
required
Dismantling
of topmesh &
bottom mesh, repair job
by
stitching etcc. Mech size
6mesh (159" X 59") and 8 mesh (143" X 59")
Includes
Jobs:
Lift
the
screen
mesh assembly
for accessing the slide bearing assembly & lower after the
job is
over
Dismantling
of
crank
pin
assembly,
inspection/repair/replacement
of
parts
Includes
Jobs:
Lift
the
screen
mesh assembly
for accessing the slide bearing assembly & lower after the
job
is
over
Dismantling
of
slide
bearing
assembly,inspection
/repair/replacement of parts
Includes
Jobs:
Dismantling
of
drag
assembly, inspection,repair/replacement of parts
link
Replacement
of
spring
clips / balls Includes
Jobs: Removal
& refixing of chute & top cover Removal &
refixing of top deck/bottom deck Replacement of spring
Clips/Balls
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Material/Service Description
Unit Rate
Includes
Jobs:
159" X 59" X Mesh
INR/EA
Removal
&
Refixing
of
Removal, Inspection/replacement of
belt to
loosened,Gear box to be removed
Includes
Jobs:Removal
&
block
unit,
Gear
box
inspection/replacement of bearings
Refixing
of Plummer
&
Motor.
Removal,
INR/EA
Includes
Jobs:Removal
of intermediate troughing
idlers Replacement of Conveyor belt Dismantling, inspection
& replacement of DE Bearings
Includes
Jobs:Removal,
inspection/replacement of
bearings, belt to be loosened, Gear box to be removed
Removal & Refixing of Plummer block unit, Gear box & Motor.
Removal,
inspection/replacement of bearings Check the
lagging on pulley, surface at bearing assembly, repair/
replacement
INR/EA
Removal
&
Refixing of Conveyor hood covers
Size:1.3 mtr X.63mtr X.95mtr including removal of idlers &
belts.
Loosening
30" wide.
&
Preparation
&
Replacement
of
skirt
Size ranging from 6" wide X 1 mtr to 10 mtr.
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
boards,
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
45.61 INR/EA
Material/Service Description
Unit Rate
1,689.37
INR/EA
3,167.57
INR/EA
Includes
Job:
Lift
& lower conveyor frame
Removal, check & replace the bearing if required including
removal & refixing of wheel
Includes
Jobs:
Motor
dismantling & assembly
Flange mounted
motor-Gear
box
dismantling & assembly
Removal of coupling hub & spider & refix back Alignment
of motor & Gear
Box
Oil
seal
removal
& assembly
Bearing removal & assembly
Worm
Shaft/worm
wheel/internal
parts
removal/repair/replacement
Job
includes: Rectification of misalignment
ropes size:1/6" To 3/8" dia X app 4 mtr long of spout.
of
422.35 INR/EA
Job
includes: Removal damaged ropes 1/6" To 3/8" dia
& rectification/replacement.
493.31 INR/EA
Job
includes:
Removal
of
Worn
out/damaged
spout assembly
and replacement with new one Size : App
700mm dia X 4 Mtr app. Long
1,584.63
INR/EA
Job
includes: Gate Cover opening & box up Remove
& box up of spout assembly & gate assembly Check & replace
if necessary the bearings
Removal
179.07 INR/EA
660mm
829.47 INR/EA
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
457.81 INR/ST
Material/Service Description
Unit Rate
Includes
Jobs
Nozzle (App 1000 KG)
INR/MT
Includes
Jobs : Preliminary Filter Pad Removal, Cleaning & Refixing, One set consisting of 16
nos, Size :
640mm X 640mm X 100mm thk each
Includes
Jobs : Preliminary Filter Pad - Removal
& Replacement, One set consisting of 16 nos. Size: 640mm
X
640mm X 100mm thk each.
1,229.85
INR/ST
1,229.85
INR/ST
Includes
Jobs : Removal of secondary filter
pads, cleaning & refixing. One set consisting of 16 no
Size :
595mm X 595mm X 290mm each.
Includes
Jobs : Removal of secondary Filter pads &
replacement.
One set consisting of 16 nos. Size : 595mm X
595mm X 290mm each.
Includes
Jobs : Attending lube oil leakages in
Oil circuit, pipe ranging from 1/2" to 2" NB.
*** 90.05.07Granulator
**
Venturi
access door packing App. size
10" replacement including opening & box-up.
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
10" X
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
2,534.05
INR/EA
Material/Service Description
Unit Rate
3,378.75
INR/EA
1,689.37
INR/EA
2,534.05
INR/EA
3,167.57
INR/EA
Job
includes:Pump
dismantling,
Suction &
discharge NRV cleaning, Piston removal & cleaning its air
tube, NRV box
up Ejector inlet filter cleaning, Oil
charging, Shifting to utility station & trial
Job
includes:Removal
of
coupling guard, Removal
of belt, Removal of pulley, Oil drain & bearing cover
removal, Oil
seal
removal
&
new oil seal fixing,
Bearing cover & pulley
fixing,
Belt
fixing
&
alignment, Oil filling & coupling guard fixing
844.68 INR/EA
Checking
condition of lub. Oil & replace if required
,
Checking
condition of turn buckle, Checking bolt
tightness of arm & condition of nozzle
3,547.66
INR/EA
1,942.78
INR/EA
Job
includes:Oil
drain & opening of drum bolts,
Arm with drum lifting & shifting on the top of aeration
tank, Bearing top cover removing, Removing old bearing
ball & cleaning
bearing
housing,
bearing
inner
&
outer race, Installing new ball & fitting bearing top
cover, Gasket cutting
for
drum,
Lifting & shifting of
arm with drum in biotower & fixing it on bearing top, Oil
charging
Job
includes:PM
OF
OILY
SLUDGE
THICKENER,
BIOLOGICAL SLUDGE
THICKENER,
CLARIFIER.
Job includes :
Checking lub oil condition of both gear box & replace if
required, Gear box pm activities like foundation bolt
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Inspection
of
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
main
gear
Material/Service Description
Unit Rate
inspection
cover & tightening of worm gear grub
screw, Chain alignment checking & chain greasing
1,013.62
INR/EA
1,267.03
INR/EA
5,405.98
INR/EA
8,108.97
INR/EA
REPLACEMENT
OF
RACK
ARM
BOTTOM
FLIGHTS
OF
OST,BST,CLARIFIER Job includes : Removing old flights,
Removing old pvc rubber & fixing new pvc rubber strip
Fixing flights, Checking tip clearance by rotating arm with
motor
Job
includes:To check leakage's from all hose joints
&
attend
if
any,
check oil quality & level in oil
tank, check oil quality & lein vacuum pump & replace if not
good, Check coolant level & vent from vacuum pump vent
plug, Hydraulic oil return filter cleaning & replacement
if not good,
Inspect
&
clean
oil dropper of vacuum
pump, Check belt
condition
of
coolant
pump & free
rotation of pump, Check
foundation & casing bolts of
vacuum pump, Check bolt tightness
of
universal coupling
of hydraulic pump Check & clean level glass
Removal
of vacuum pump guard, Removal of vacuum
pump suction & discharge line, disch 3way valve, dich
nrv, Removal
of
hydraulic
fitting,
hydraulic motor &
coolant pump,
Removal
of
pump (drive end) head cover,
Removal of old broken vanes & cleaning rotor, Fixing
of new vane blades, Gasket cutting of head cover, Head
fixing & coolant pump
fixing.
Hyd.
motor & its suc.
Disch
line
connection
fitting,
Vacuum
pump
suc,disch,3way
valve & nrv fixing, Vacuum pump guard
fitting Coolant filling & venting
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
5,912.79
INR/EA
Material/Service Description
Unit Rate
Job
includes:Removal of hydraulic pump from
vehicle, Dismantling of pump, Removal of bearing & oil
seal, Fitting of
new
bearing
&
oil
seals, Complete
assembly of pump, Fitting of pump on vehicle & coupling
546.73 INR/EA
Primary
Fiters Replacement in Centrifugal Compressor
:
1 set consisting of 5 nos elements. Removal,
cleaning, gap sealing & re-fixing same or new filter
elements
691.10 INR/EA
Secondary
Fiters
Replacement
in
Centrifugal
Compressor : 1 set consisting of 5 nos elements. Removal,
cleaning, gap sealing & re-fixing same or new filter
elements
998.27 INR/EA
Overhauling
of pump with Pump removal and refixing (
with quality checks )
998.27 INR/EA
Overhauling
of
drive gear unit with drive gear
unit removal and refixing ( with quality checks )
1,666.35
INR/EA
215.01 INR/EA
508.60 INR/EA
**
950.05 INR/EA
Belt Replacement.
228.06 INR/EA
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
675.76 INR/EA
Material/Service Description
Unit Rate
4,223.43
INR/EA
337.88 INR/EA
70.96 INR/H
760.21 INR/EA
304.07 INR/EA
380.11 INR/EA
380.11 INR/EA
380.11 INR/EA
*** 90.08.02Others
675.76 INR/EA
597.46 INR/H
Overhauling
of gearbox for fire water line valves,
fire water pit valves and tank body valves.
22.84 INR/EA
45.68 INR/EA
68.53 INR/EA
138.33 INR/EA
Material/Service Description
Unit Rate
all
owner
supplied
material from store, returning
unused material
to
store, PPE, tools and tackles
including chain blocks,
D
shackles,
wire
rope
slings, etc are in contractor's scope. Mobile P&M will
be provided by owner. Foundation
of bolt loosing &
tightening is in contractor's scope.
Gas
cylinder
shifting for calibration
location as per instruction of EIC.
to
designated
Gas
cylinder
shifting for calibration
location as per instruction of EIC.
to
designated
21.13 INR/IND
21.92 INR/IND
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Material/Service Description
Unit Rate
wherever
required
and
complete
leak
test
whever
requiredat all
elevations as per directions of EIC.
Transportation of allowner issued material from designated
storage locations, returningunused material and scrap to
designated locations, provision
of allPPE, tools and
tackles are in contractor#s scope.1.Scope
of torque
wrenches wherever required will be as per
DOR.2.Wherever
required,
contractor
shall
cut gaskets
from
owner
issuedgasket sheets.3.The job involves one
time
flange
opening and one time box up. 4.Ifboth the activity
is
performed (opening and box up) quantity payableshall
be two times of corressponding inch dia.
5.Scope
of
Scaffoldingwhere
ever required will be as
per
DOR.
23.79 INR/IND
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
25.61 INR/IND
/spectacle
blind and tightening of bolts withtorque
wrench wherever
required and complete leak test whever
requiredat all
elevations as per directions of EIC.
Transportation of allowner issued material from designated
storage locations, returningunused material and scrap to
designated locations,
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Material/Service Description
Unit Rate
provision
of
allPPE,
tools
and
tackles
are
in
contractor#s scope.1.Scope
of torque wrenches wherever
required will be as
per
DOR.2.Wherever
required,
contractor
shall
cut gaskets
from
owner issuedgasket
sheets.3.The job involves one time flange opening and one
time box up. 4.Ifboth the activity
is
performed
(opening
and
box
up)
quantity payableshall
be
two
times of corressponding inch dia.
5.Scope
of
Scaffoldingwhere
ever required will be as
per
DOR.
26.91 INR/IND
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
27.11 INR/IND
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Material/Service Description
Unit Rate
one
time
flange opening and one time box up. 4.Ifboth
the activity
is
performed
(opening
and
box
up)
quantity payableshall be two times of corressponding
inch dia.
5.Scope
of
Scaffoldingwhere
ever required will be as
per
DOR.
33.35 INR/IND
33.35 INR/IND
Material/Service Description
Unit Rate
36.17 INR/IND
27.03 INR/IND
VALVE
GLAND
REPLACEMENT:
Providing
resources
for
attending gland
leakage
in
all
types and ratings of
valves at all elevations
and completing the job as per
direction of EIC. Provision of all PPE, tools and tackles
are in contractor#s scope.
1.
Scaffolding
wherever
required shall be covered under
seperate
item code for
the same. 2. All consumables and gland packing material is
in company scope.
27.03 INR/IND
VALVE
GLAND
REPLACEMENT:
Providing
resources
for
attending gland
leakage
in
all
types and ratings of
valves at all elevations
and completing the job as per
direction of EIC. Provision of all PPE, tools and tackles
are in contractor#s scope.
1.
Scaffolding
wherever
required shall be covered under
seperate
item code for
the same. 2. All consumables and gland packing material is
in company scope.
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
27.30 INR/IDS
Attending
gland
leak by replacement of packing in
valaves upto 600# rating.
VALVE
GLAND
TIGHTENING
/
PACKING REPLACEMENT:
Attending gland
leakage
by
tightening
of
gland
/
replacement of
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Material/Service Description
Unit Rate
packing
in all types and ratings of valves at all
elevations and completing the job as per direction of EIC.
Provision of all PPE, tools and tackles are in contractor's
scope.
1.
Scaffolding
wherever
required
shall be covered
under seperate item code.
2.
All consumables and gland packing material are
in owner's scope.
Attending
gland
leak by replacement of packing in
valaves greater than 600# rating.
VALVE
GLAND
TIGHTENING
/
PACKING REPLACEMENT:
Attending gland
leakage
by
tightening
of
gland
/
replacement of packing in
all
types
and
ratings
of
valves at all elevations and completing the job as per
direction of EIC. Provision of all PPE, tools and tackles
are in contractor's scope.
1.
Scaffolding
wherever
required
shall be covered
under seperate item code.
2.
All consumables and gland packing material are
in owner's scope.
OPENING
/CLEANING
&
BOXUP
OF BURNER/STRAINER:
Providing resources
for
opening,
cleaning & box up of
burner guns, conical & basket filters,
strainers & soot
blowers and completing
the job as per direction of
Engineer In Charge. Transportation
of
all
FIM
from
designated
locations, returning unused material to
designated locations, 1. PPE's
,
tools and tackles etc are in contractor#s scope.
2. Provision of all consumables is in the scope of
the contractor.
Connection
of
(flange
joint
hoses including
in
case
of
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Flanged),
laying, decoupling
completing the job as per
&
returning
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
back
and
Material/Service Description
Unit Rate
direction
of
EIC.
Transportation
of
all owner
supplied material from designated
locations,
returning
unused material to designated locations.
1. PPE's, tools and tackles etc. are in contractor's scope.
2.
Provision
of all consumables like Teflon tape etc.
are in the scope of the contractor.
3.
For fixing the hose clamp, coupling hose clamp etc.
is in owner's scope.
44.29 INR/EA
57.75 INR/EA
422.35 INR/EA
Removal
empty Nitrogen Cylinders & Transportation of
refilled Cylinders & refixing of new nitrogen Cylinders for
Flushing plan 53
87.83 INR/EA
174.50 INR/EA
43.91 INR/EA
597.46 INR/EA
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Material/Service Description
Unit Rate
4,683.75
INR/EA
4,162.56
INR/EA
3,030.05
INR/EA
Dismantling,
inspection
and assembly of rotors for
single stage
centrifugal pumps - >250 Kw to <=1000 Kw
Pump
Capital
repair:Job
includes:
1)
Removal
and
reinstallation of coupling guard(s), Spacer removal and
reinstallation/replacement,
alignment
checking
and
correction including hot alignment wherever applicable. 2)
Removal & Re-installation of pump assembly from pump casing
including lifting / shifting to worksite / workshop and
back. 3) Replacement of casing gasket. Dismantling &
Reassembly
of
impeller
assembly including cleaning,
inspection,
removal
&
reinstallation/replacement
of
components
with necessary measurement and checks for
dimension, clearance, run out etc. 4) Replacement of seal
cartridge
or
removal
&
reinstallation
including
reconditioning of Seal assembly in case of non cartridge
seals.
Dismantling,
inspection
and assembly of rotors for
single stage centrifugal pumps - >100 Kw to <=250 Kw
Pump
Capital
repair:Job
includes:
1)
Removal
and
reinstallation of coupling guard(s), Spacer removal and
reinstallation/replacement,
alignment
checking
and
correction including hot alignment wherever applicable. 2)
Removal & Re-installation of pump assembly from pump casing
including lifting / shifting to worksite / workshop and
back. 3) Replacement of casing gasket. Dismantling &
Reassembly
of
impeller
assembly including cleaning,
inspection,
removal
&
reinstallation/replacement
of
components
with necessary measurement and checks for
dimension, clearance, run out etc. 4) Replacement of seal
cartridge
or
removal
&
reinstallation
including
reconditioning of Seal assembly in case of non cartridge
seals.
Dismantling,
inspection
and assembly of rotors for
single stage centrifugal pumps >30 KW upto 100 KW
Pump
Capital
repair:
Job includes: 1) Removal and
reinstallation of coupling guard(s), Spacer removal and
reinstallation/replacement,
alignment
checking
and
correction including hot alignment wherever applicable. 2)
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Material/Service Description
Unit Rate
2,879.82
INR/EA
Opening
the
for barring
manually
guard
of
385.98 INR/EA
Opening
the
guard
for barring with
motorized pump
of
192.99 INR/EA
298.15 INR/EA
Dismantling,
inspection
and assembly of rotors for
single stage centrifugal pumps.
Pump
Capital
repair:Job
includes:
1)
Removal
and
reinstallation of coupling guard(s), Spacer removal and
reinstallation/replacement,
alignment
checking
and
correction including hot alignment wherever applicable. 2)
Removal & Re-installation of pump assembly from pump casing
including lifting / shifting to worksite / workshop and
back. 3) Replacement of casing gasket. Dismantling &
Reassembly
of
impeller
assembly including cleaning,
inspection,
removal
&
reinstallation/replacement
of
components
with necessary measurement and checks for
dimension, clearance, run out etc. 4) Replacement of seal
cartridge
or
removal
&
reinstallation
including
reconditioning of Seal assembly in case of non cartridge
seals.
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
2,072.04
INR/EA
Material/Service Description
Unit Rate
149.08 INR/EA
Laser
alignment of Pump - upto 30 Kw. (Laser gun to
be provided by
owner)
Job
includes-1.Removal and reinstallation of coupling
guard(s)2.Checking
tightness of coupling bolts3.Spacer
removal
reinstallation/replacement,
alignment Checking
andCorrection
298.15 INR/EA
Laser
alignment of Pump - above 30 Kw & upto 100 Kw
(Laser gun to be
provided by owner)
Job
includes-1.Removal and reinstallation of coupling
guard(s)2.Checking
tightness of coupling bolts3.Spacer
removal
reinstallation/replacement,
alignment Checking
andCorrection
448.38 INR/EA
597.46 INR/EA
Laser
alignment of Pump - above 250 Kw & upto 1000
Kw
(Laser gun to be
provided by owner)
Job
includes-1.Removal and reinstallation of coupling
guard(s)2.Checking
tightness of coupling bolts3.Spacer
removal
reinstallation/replacement,
alignment Checking
andCorrection
524.65 INR/EA
HT
of
seal
oil coolers - Removal, cleaning,
hydro-testing
&
box-up
of seal oil cooler in case of water
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
755.14 INR/EA
Material/Service Description
Unit Rate
HT
of
brg./stuffing box jacket - Dismantling,
cleaning, hydro-testing & box-up of brg./stuffing box
jacket in case of water ingress in lube or seal oil.
Flushing
&
Oil
filling
(Pump). - Flushing and
Oil filling of bearing housing of rotary equipment at
all Height.(Rate is Each pump).
INR/L
Flushing
& Oil filling - Flushing and Oil filling
of bearing housing of rotary equipment at all Height.
This rate is for other than Pump.
CR
of
pneumatic hoist - Corrective Repair of
Pneumatic hoist:Jobs includes:Checking of pneumatic drive,
Cleaning of Air filters,Cleaning of oil filters,Lubrication
of parts,Attending leakages,Minor repair (if any),Checking
of hoist operation,Checking
Dechoking
8"NB.
jacketed
2.55
INR/M
3.38
INR/M
Opening
of
Cam
mechanism
of
pilot
burner
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
valve
and
Material/Service Description
Unit Rate
INR/EA
2,027.25
INR/EA
2,702.99
INR/EA
2,111.71
INR/EA
1,030.82
INR/EA
Motor
DE/NDE brg insp<= 3 MW(Sleeve Brg) Bearing inspection & clearance check / replace if required.
Motor
DE/NDE brg insp> 3 MW(Sleeve Brg) Bearing inspection & clearance check / replace if required.
Removal
and re-fixing of
Geared Centrifugal Compressor.
Providing
mechanical
job completion (for
jobs other than PM)
lock
and
1,545.08
INR/EA
1,099.00
INR/EA
2,548.16
INR/EA
To
make Hand Operated Terminal chain block rust free
by using diesel and
oil and preservation with grease
Job
scope includes: Isolation valve dropping, sight
glass assembly
removal,
cleaning, New sight glass assembly box
Isolation valve box
up, Leak checking.
Rate is inclusive of overhauling of old sight glass.
up,
JOb
scope inclues: Complete dismantling of
Cleaning,
Inspection,
dimension checking, soft packing
replacement, piston ring
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
cylinder,
Material/Service Description
Unit Rate
3,622.89
INR/EA
1,194.92
INR/EA
Job
includes: suction/ discharge valve check,PRV
check , dampnercheck/
primimg,diaphragm
check involves no parts
replacement- opening, cleaning
and box up
Oil
top up in plan 52/53 by hand pump after taking out
oil from oil
dispenser unit upto 20 ltrs
Job
scope includes: Drain the liquid by opening small
bore flanges,
remove & dismantle the bladder, replace oil seal/o ring/etc
internals as
per requirement, box up, charge with liquid.
Drain
the liquid by opening small bore flanges,
dismantle the hand pump,
replace
oil
seal/spring/plunger/etc internals
requirement, box
up, charge with liquid.
as
per
Minor
repairing/strainer cleaning
(CP10 / CP20 )
other than PM and capital repairs.
759.25 INR/EA
3,826.10
INR/EA
Material/Service Description
Unit Rate
3,023.41
INR/EA
1,814.04
INR/EA
3,827.43
INR/EA
2,208.75
INR/EA
2,313.73
INR/EA
#
Gas Turbine Boostr air compressor
#trTiaaklisng
of various drives.
kepp# tThoe manpower available for any
abnormality,
any
leakages
attending
during start up,
if need arises.
#
ColfeaLnGiBn,g
AGB
etc.
compartments for oil
leakages
etc.,
during
short
shutdowns or even in running machines.
LGB
&
ACCESSORY
COMPARTMENT
LUBE
OIL
CLEANING
(PLANT SPECIFIC):
#
Lube oil comartment of Load Gear Box leaky oil to
be cleaned.
#
oil of Accessory compartment of Gas Turbine to
be cleaned.
CLEAN
EQUIPMENT FROM OIL &
TIGCHHTENCEKSS OF
DIRT
FOUNDATION BOLTS,
FRECEHERCOKTATION OF COMPRESSOR
CHECK
BREATHER,
LO FILTER, REPL IF REQD
E&XPCOLSEEADN PISTON ROD
SSTURCATIINOENR IF PROVIDED
CHECK
TIGHTNING OF
CONNECTING
CHECK
CLEAN
VISUALLY
CCRHAENCKKSHAFT
OIL
CONTAMINATION, LEAK & SEND OIL SAMPLE FOR ANALYSIS,
IF REQUIRED.
CHECCKO/OCLLIENAGN WATER LINE/STRAINER
CHECK
INTER/AFTER COOLER FLANGE
BECLHTECK
LEAKAGE
CONDITION, TENSION, ALIGNMENT
CHECK
AFBONRORAMNAYLITIES IN SUCTION/DISCHARGE VALVES, REPLACE
IF REQUIRED. TIGHTEN PIPE
LINE
SUPPORT
BOLTS
#CHECK
UNLOADER ASSY FOR SMOOTH FUNCTIONING
CHECK
MTORIASPTSUR&E NRV IN DISCH LINE
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
1,472.50
INR/EA
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
736.25 INR/EA
Material/Service Description
Unit Rate
*Removal
of the broken/damaged guards *Drilling job
locations where required (M8)
*Repairiunsgingjob
rivets and rivetting machine
*Fixing bgaucakrd
oifn position
at
104.98 INR/EA
*Filling
up
of grease in cleaned grease guns
*Connection of grease gin hose with the grease gun *Filling
up of grease * *Disconnection of the grease gun from the
grease nipple
578.10 INR/EA
*Removal
of guard cage
*Removal
orfolglueirdefrom the Drum Rolling machine *Replacement of
the damaged roller with a new one
*Figxuianrgd ocfage
6,111.92
INR/EA
1,169.49
INR/EA
2,338.99
INR/EA
4,780.30
INR/EA
*Placement
of removed Die Plate on the burning
plate with pellets
*Placeomfentthe Die Plate in the
oven for burning *RemovalDioef
Ptlhaete from
the oven
*Loosening of ribe allen screws and removal of Die Ring
*Cleaning of Die
Plate
and Die Ring *Losse assembly of
Die Ring on Die Plate after cleaning *Packing for despatch
to Stuttgart for reconditioning
*Opening
up
jnoebw spares
*Removal
of suction filter assembly
*Roefmoval blower from air receiver
*Checkinrgecoarndding of clearances
before
disassembly
*Openingof upcovers
*Removal
of
timing gears
piston
*Removraoltaroyf
assembly,piston
rings,bearings etc
*Installationnew
of bearings,piston rings in side plates
*Assejmobblyof blower
*Installoaftiotniming gears and fixing
of clearances
*Checkinrgecoarndding of clearances
after
Material/Service Description
Unit Rate
assembly
*Removal
4,780.30
INR/EA
4,780.30
INR/EA
of
578.10 INR/EA
*Removal
of
upstream
and
downstream
bellows
*Loosening
of
bolts
and removal of discharge tube
*Decoupling
and
pulling
out of screw
Insoefrtion new/cleaned screw and coupling
*Bodxisucphaorfge tube
*Fixing of upstream and downstream bellows
578.10 INR/EA
*Removal
of
upstream
and
downstream
bellows
*Loosening
of
bolts
and removal of discahrge tube
*Decoupling
and
pulling
out of screw
Insoefrtion new/cleaned screw and coupling
*Bodxisucphaorfge tube
*Fixing of upstream and downstream bellows
578.10 INR/EA
REPLACEMENT
OF FLAPPER GASKET AT AGGLOMORATE
CATCHER OF
PELLET
DRIER:
*Loosening
and removal of
counter
sunk
screws
*Remdoavmaalgeodf
gasket
*Finxeiwnggaosfket in position
*Tightecnoiunngteorf sunk screws
REPLACEMENT
OF FLAPPER (AT ROTARY VALVE INLET):
*Removal
of bellow/distance piece above Rotary Valve
*Removal
of flapper from inlet side
*Fixingfloafppneerw
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
578.10 INR/EA
*Removal
of guard cage
*Removal of bbleoacrking
*Removal
of damaged roller from shaft after loosening grub
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
578.10 INR/EA
Material/Service Description
Unit Rate
screws
*Sliding and fixing ofnew roller and tightening of
grub screws *Installation of bearing block
*Figxuianrgd of cage
INR/EA
REPLACEMENT
OF FRICTION MEMBER OF DESCH CLUTCH AT
EXTRUDER: *Opening of acoustic hood at top of Main Drive
Gear Box
*Provisliiofntinogf arrangement
*Loosening of bolts of hub on the motor coupling side
*Looofsebnoilntgs of hub on the Gear
Box side
*Removal of fmreimcbteiron after locking
provision *Installation of new friction member with soft
parts Tightening of bolts on either side
CLEAN
EQUIPMENT
FROM
POWDER, DIRT ETC. CHECK
TIGHTENESS OF ALL M.S. FASTENERS
CHGEECNKERFAOLR
CRACKS [
],
WEAR [ ], DAMAGE [ ].
CHECK
CONDITIBOENAROIFNGS. REPLACE IF REQUIRED REPLACE GLAND
PACKING CHECK OIL LEVEL
IN
GEAR BOX. TOP UP IF REQUIRED
CHECK GEAR BOSXEAOLIL
LEAKAGE
IF ANY
COCUHPELCIKNG
SCCRHEEWCK
CONDITION
CONDITION
FOR ANY CRACK [ ], WEAR [ ], DAMAGE [ ].
(IF REQUIRED ) ENSURE PROPER MOUNTING OF ALL SAFETY
GUARDS CHECK GLAND PURGING LINE FOR ANY CHOKING AND CLEAN
IT CHECK GLAND PURGING FLUID FLOW
3164856 PM OF BLENDER/MIXER
Valid from: 25.05.2015 Valid to: 31.07.2016
1,330.30
INR/EA
1,064.51
INR/EA
CLEAN
EQUIPMENT
FROM
POWDER, DIRT ETC. CHECK
TIGHTENESS OF ALL M.S. FASTENERS
CHGEECNKERFAOLR
CRACKS [
],
WEAR [ ], DAMAGE [ ].
CHECK
CONDITIBOENAROIFNGS. REPLACE
IF
REQUIRED REPLACE GLAND
PACKING CHECK OIL LEVEL
IN
GEAR BOX. TOP UP IF REQUIRED
CHECK
GEAR
BOSXEAOLIL
LEAKAGE
IF ANY
COCUHPELCIKNG
SCCRHEEWCK
CONDITION
CONDITION
FOR ANY CRACK [ ], WEAR [ ], DAMAGE [ ]. (IF
REQUIRED
ENSURE PROPERMOUNTING OF ALL SAFETY GUARDS
CHECK
GLAND PURGING LINE FOR ANY CHOKING AND CLEAN IT
CGHLEACND
PURGING FLUID FLOW
CLEAN
EQUIPMENT
FROM
OIL
&
DIRT#####
CHECK
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
COUPLING
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Material/Service Description
Unit Rate
RECORD
CLEARANCE
BETWEEN THE PISTON & OUTER END COVER
[ ] AND PISTON & INNER END COVER [ ].##### CHECK AUX LUB
OIL PUMP [ ] AND CLEAN OIL STRAINER [ ] & IGHT GLASS [
].# CHECK
&
CLEAN
COOLING
WATER
JACKETS [ ], CLEAN
COOLING WATER
STRAINER
IF APPLICABLE [ ], CHECK INTER
COOLER [ ], AFTER COOLER [ ] FOR LEAKAGES.# CLEAN LUB
OIL COOLER IF REQUIRED [ ], CHECK FOR ANY LEAKS IN OIL
SYSTEM.# CLEAN LUB OIL
FILTER#####
CHECK
PACKINGS
REPLACE IF REQUIRED.##### CHECK AND
REPLACE
OF
OIL SCRAPPER RINGS##### CHECK CLEARANCE BETWEEN PISTON
ROD & GUIDE BEARING### CHECK FOR CRANK
SHAFT
DEFLECTION
AND
COMPARE
IT
WITH
PREVIOUS
READINGS.#####CYLINDER
BORE
CHECKING,
DISCHARGE
NRV
CLEANING AND ASSEMBLY, SUCTION LOADER OVERHAULING AND
SETTING IF REQUIRED AND AS ADVISED BY EIC.
1,064.51
INR/EA
CLEAN
EQUIPMENT OF OIL [], DIRT [], DUST []. CHECK FOR
ANY GENERAL CRACKS [], WEAR [] & DAMAGE []. CHEOCIKL QUALITY
OF GEAR BOX, REPLACE IF REQUIRED
CHECK FOUNDATION
BOLT TIGHTNESS FOR MOTOR [] & GEAR BOX [] PLUMBER BLOCK [].
CHECK CONDITION OF RUBBER ROLLERS.
TIGHTEN
&ALGLREASE
M.S. FASTENERS.
CONCDHIETCIKON OF ROLLER SHAFT BEARINGS .
GREASE
ROLLER SHAFT
OF SAFETY GUARDS.
* A
BEARINGS .
ENSURE MOUNATLILNG
CHCELCEKANANTDHE BREATHER OF GEAR BOX.
ADDITIONAL ITEMS
11,000.00 INR/EA
Material/Service Description
Unit Rate
27,000.00 INR/EA
FLO-TORK
ROTARY ACTUATOR OVER HAULING FOR TAPCO
BUTTERFLY
VALVES: Remove the Actuator unit from the
position, Place the unit on bottom with pinion shaft in
horizontal position, Remove the cylinder head tie rod,
remove the cylinder head, Remove the cylinder tube, and
Remove Pinion & front bearing from housing. Remove rack
bearing Remove piston / Rack assembly rack bearing, Remove
piston from racks, Remove the back pinion bearing, Remove
all O-rings & seals, thoroughly clean and inspect all parts
for wear of damage.
Installnew O-rings, back up rings &
seals in both Piston#s groove, Install cylinder tubes /
cylinder head & tie rods on both side of housing as per
SMP, snug bolts (Do not torque until re-assembly is
completed), Install back pinion bearing race, Attach piston
with piston bolt, Install piston plug or cushion nose,
Slide rack thru housing into cylinder tube, install the
rack bearing, Install back pinion bearing. Fill the Oil up
to the top of Rack Teeth. Torque cylinder head tie rods
evenly. Install front pinion bearing. Install bearing cap
and socket head cap screw. Torque socket head screws, clean
&
flush
hydraulic
piping.
Install the unit to
position, Installed the Hydraulic hoses back in position &
Bleed the actuator,
Check for smooth operation of
actuator. Job isto be executed as per SMP & guidelines in
O & M Manual & up to the satisfaction of EIC.
1)
2)
3)
4)
5)
6)
7)
860,000.00 INR/EA
8)
9)
10)
Material/Service Description
Unit Rate
473,000.00 INR/EA
Material/Service Description
Unit Rate
5Crankcase Jobs
1)
Web deflection initial reading
2)
Connecting rod big end bearing inspection
3)
Connecting rod inspection
4)
Connecting rod bolt UT Checking
5)
Small end bearing inspection
6)
Gudgeon pin inspection
7)
Main bearing inspection
8)
Intermediate bearing inspection
9)
Thrust bearing Inspection
10)
Counterweight bolt UT
6Crosshead Removal & inspection/replacement of shoes
7Rod Drop measurement before dismantling and after assembly
of Piston
8Gas Packing Inspection & Replacement if required
9Intermediate packing Inspection & Replacement if
required
10 Oil wiper packing Inspection& Replacement if required
11 Piston inspection
12 Piston rod cleaning/preparation for UT
13 Cylinder Liner inspection & Replacement if required
14 Suction /Discharge & Clearance pocket Valves
overhauling
15 Motor bearing inspection and vibration / temperature
probes
provision
16 Cylinder jackets cover opening ,cleaning and box up
17 Lub oil pump / Lubricator Pumps/Jacking oil pump PM
18 Removal of DE & NDE Motor Cover for Inspection of Fan &
Windings.
19 Servicing & Testing of Pneumatic Barring Device if any.
20 Lubricator points injection checking, Auxillary Oil Pump
PM &
Lube Oil Filter replacements
21 Suction Volume Bottles removal & Strainer Cleaning
22 Lube oil coolers inspection & hydro testing
23 Compressor PSV's Calibration
24 Suction / Discharge Volume Bottle cover opening / box up
for
inspection
25 Torque tightening of all the necessary Bolts connected
to
Compressor.
236,500.00 INR/EA
Number : CCM
Date
: 25.05.2015
Page No. : 200
Material/Service Description
Overhauling
of
reciprocating
compressor,
24000 hrs
overhauling for
capacity less than 1000 kW.
Jobs to be done as below:
1Lube oil draining from Crankcase
2Removal of lube oil tubing
3Main motor lube oil draining
4Removal & Cleaning of Coupling guard
5Crankcase Jobs
1)
Web deflection initial reading
2)
Connecting rod big end bearing inspection
3)
Connecting rod inspection
4)
Connecting rod bolt UT Checking
5)
Small end bearing inspection
6)
Gudgeon pin inspection
7)
Main bearing inspection
8)
Intermediate bearing inspection
9)
Thrust bearing Inspection
10)
Counterweight bolt UT
6Crosshead Removal & inspection/replacement of shoes
7Rod Drop measurement before dismantling and after assembly
of Piston
8Gas Packing Inspection & Replacement if required
9Intermediate packing Inspection & Replacement if
required
10 Oil wiper packing Inspection& Replacement if required
11 Piston inspection
12 Piston rod cleaning/preparation for UT
13 Cylinder Liner inspection & Replacement if required
14 Suction /Discharge & Clearance pocket Valves
overhauling
15 Motor bearing inspection and vibration / temperature
probes
provision
16 Cylinder jackets cover opening ,cleaning and box up
17 Lub oil pump / Lubricator Pumps/Jacking oil pump PM
18 Removal of DE & NDE Motor Cover for Inspection of Fan &
Windings.
19 Servicing & Testing of Pneumatic Barring Device if any.
20 Lubricator points injection checking, Auxillary Oil Pump
PM &
Lube Oil Filter replacements
21 Suction Volume Bottles removal & Strainer Cleaning
22 Lube oil coolers inspection & hydro testing
23 Compressor PSV's Calibration
24 Suction / Discharge Volume Bottle cover opening / box up
REGISTEfRoErD OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Unit Rate
Number : CCM/
Date
: 25.05.2015
Page No. : 201
Material/Service Description
Unit Rate
inspection
25 Torque tightening of all the necessary Bolts connected
to
Compressor.
698,750.00 INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 202
Material/Service Description
Unit Rate
inspection
23 Torque tightening of all the necessary Bolts connected
to
Compressor.
376,250.00 INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 203
Material/Service Description
Unit Rate
inspection
23 Torque tightening of all the necessary Bolts connected
to
Compressor.
172,000.00 INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 204
Material/Service Description
Unit Rate
inspection
23 Torque tightening of all the necessary Bolts connected
to
Compressor.
Job Scope
1.
All suction, discharge & clearance pocket valves
(46 nos.)
replacement with OEM refurbished valves
2.
All suction valves & clearance pocket unloaders
(24 nos.) stem length
checking & gasket replacement.
3.
All 6 cylinders head-end opening, piston pullout &
inspection
4. All cylinder O-rings & gaskets replacement
5.
All 6 cylinder Piston & rider rings inspection &
replacement if
required
6.
All 6 cylinder Piston rod inspection and replacement
if required
7.
All 6
if required.
8.
All 6
parts
replacement.
9.
All
6
12nos.)&
inspection
cylinder
Liner
inspection
cylinder
Stuffing
box
&
replacement
Number : CCM/
Date
: 25.05.2015
Page No. : 205
Material/Service Description
Unit Rate
483,750.00 INR/LS
Scope of Work:1.
All suction, discharge & clearance pocket valves
(46 nos.) removal,
refurbishment (in-house).
2.
All suction valves & clearance pocket unloaders
(24 nos.) stem length
checking & gasket replacement.
3.
All 6 cylinders head-end opening, piston pullout &
inspection
4. All cylinder O-rings & gaskets replacement
5.
All 6 cylinder Piston & rider rings inspection &
replacement if
required
6. All 6 cylinder Piston rod inspection and replacement if
required
7. All 6 cylinder Liner inspection & replacement if
required.
8. All 6 cylinder Stuffing box removal and soft parts
replacement.
9. All 6 cylinder intermediate seals (total 12nos.)
inspection & soft
parts replacement if required.
10.All 6 cylinder crosshead clearances & guide inspection.
Crosshead
shoe replacement if required.
11.All 6 cylinder liner roughness measurements
12.Web deflection measurements (Crank # 6)
13.Piston rod run-out & bumping clearances measurements
14.Lubricator sump cleaning, refilling and NRV testing at
all
lubricator points (22 nos.)
15.Main lube oil replacement if required (on condition
basis, OAR)
16.All foundation, frame & small-bore piping bolts
tightening check
as per list
17.Compressor cleaning (outside)
SITE SPECIFIC MAINTENANCE JOBS-JAMNAGAR
COMBUSTION INSPECTION:
A. DISASSEMBLY:
1Blind and de-blind Fuel, water wash, steam lines to
REGISTEtRuErDbOiFnFIeC.E : 3rd Floor, Maker Chambers IV 222, Nariman
PointMumbai -400021
412,800.00 INR/AU
Number : CCM/
Date
: 25.05.2015
Page No. : 206
Material/Service Description
Unit Rate
Number : CCM/
Date
: 25.05.2015
Page No. : 207
Material/Service Description
Unit Rate
Number : CCM/
Date
: 25.05.2015
Page No. : 208
Material/Service Description
Unit Rate
Number : CCM/
Date
: 25.05.2015
Page No. : 209
Material/Service Description
Unit Rate
258,000.00 INR/EA
Number : CCM/
Date
: 25.05.2015
Page No. : 210
Material/Service Description
Unit Rate
healthiness,
Cleaning of generator end covers internal
and internal and
Inspection and cleaning of generator coolers
1c.Assembly of PMG and Exciter, both end generator bearing
pedestals,
internal
and outer generator covers,Putting back the PMG
and exciter
frame in it's position, Coupling of generator with the gear
box and
checking
of final alignment, Coupling of Exciter with
the generator
rotor and checking of final alignment.
REPORT
to be submitted with all the actual clearances
and torque value
to be recorded and submission of final report including all
reading
Overhauling
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
of
INR/LS
Material/Service Description
gearbox
Removal of hub at the
input shaft of Gearbox
Removal of top housing
section (7)Weight: 6720
kg
Removal of shaft 100
Weight: 1020 kg
Removal of shaft 500
Weight:3000 kg
Removal of top housing
section (4)Weight:3690 kg
Removal of shaft 400
(Top)Weight:960 kg
Removal of centre
housing section (2)Weight:2750 kg
Removal of screw shaft
coupling sleeves at shafts 200 &
300
Removal of shaft 300
Weight:1400 kg
Removal of shaft 200
Weight:5200 kg
Removal of housing
section (3)Weight:2900 kg
Removal of shaft 400
(Bottom)
Removal of old bearings
& installation of new bearings on
all
the removed
expert
Bearings=29 Nos
shafts
under
supervision
of Coperion
Installation of Main
"Installation of lube
oil skid,piping and supports.Filling of
lube oil in the reservoir"
Installation of all
Unit Rate
Material/Service Description
Melt Pump
Removal of melt
"Removal of visco
seals,bearings and shafts from the melt pump
housing"
Removal of melt pump
housing and Diverter valve
"Assembly of melt pump
with new shafts,bearings and viscoseals"
Installation of melt
pump
3MF-PP551-Y7001
cutter hub
hoses
Removal of pelletizer
at melt pump
associated piping
Unit Rate
Number : CCM/
Date
: 25.05.2015
Page No. : 213
Material/Service Description
Unit Rate
screw
elements
per shaft)
Insertion of screw
shafts into the barrel section and fixing of
screw tips
Installation of Diverter
valve
"Installation of
connecting flange,screen pack changer and Die
plate housing"
Installation of die
plate and connected piping
Placing of pelletizer
Installation of
pelletizer hoses
the gearbox
gearbox"Gearbox input
shaft,intermediete and
& installation of new bearings on
all
the removed shafts under
expert
Bearings=7 Nos
of Coperion
Installation of all
shafts in the gearbox
Installation of top
REGISTEcRoEvDeOrFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Material/Service Description
Unit Rate
Installation of hub at
Installation of cardan
shaft
the gearboX.
All other details shall be as per scope attached and as per
directions
and specifications of EIC.
2,127,500.00
INR/LS
2,500,000.00
INR/LS
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
Material/Service Description
Unit Rate
Material/Service Description
Unit Rate
Material/Service Description
Unit Rate
1,490,000.00
INR/LSM
Material/Service Description
Unit Rate
Material/Service Description
Unit Rate
* B
LLF
Others
REGISTERED OFFICE : 3rd Floor, Maker Chambers IV 222, Nariman PointMumbai -400021
70.96 INR/H