Title:
Module Name
Overview:
Business Process Procedure Overview
For BSNL actual cost collected in cost centres within circle and business area will be allocated
within business area either if required through actual period end allocation processing or through
manual allocation process. At the month end these actual cost will be copied to planning version
1. Based on the plan cost copied from actual allocation, assessment cycle for plan cost will be
run. This will post the plan cost to different cost centre at circle level from where same will be
allocated to COPA segment.
Flow of cost will be as under:
Copy Actual Cost to Plan Version Cost.
From Cost centre at SSAs to Cost centre at Circle.
From Cost centre at Non-territorial circle to Cost Centre at Circles.
From Cost centre at Corporate Office to Cost centre at Circles.
From Cost Centre at Territorial Circle to COPA segments.
Period
Allocation Cycle
Output Results
Comments
Version: 1.0
Release: ECC 6.0
Page:
1 of 12
Procedural Steps
FI10.02.01 - Access to copy actual cost to plan by:
Via Menus
From the SAP R/3 Easy Access Screen, access as shown below
On screen Copy Actual to Plan: Initial Screen, enter information in the fields
as specified in the table below:
Version: 1.0
Release: ECC 6.0
Page:
2 of 12
Field Name
Cost Centre Group
Template (Actual)
Period
Fiscal Year
Target (Plan) Version
Plan Period
Fiscal Year
Actual Data
Actual Data
Existing Plan Data
Test Run
Detail List
Description
Cost Centre Group Code
Enter Period
Fiscal Year
Plan Version
Enter Period
Fiscal Year
All Actual Data
Structure with values
Reset and overwrite
Tick for the first time
Detail information
R/O/C
R
R
R
R
R
R
O
O
O
O
O
Execute
Version: 1.0
Release: ECC 6.0
Page:
3 of 12
Comments
Version: 1.0
Release: ECC 6.0
Page:
4 of 12
Procedural Steps
FI10.02.02 - Access to create plan distribution of cost by:
Via Menus
From the SAP R/3 Easy Access Screen, access as shown below
Version: 1.0
Release: ECC 6.0
Page:
5 of 12
Field Name
Period
Cycle
Description
Distribution Period (month)
Distribution Cycle Name
R/O/C
R
R
Start Date
Test Run
R
O
Detail List
EXECUTE
Comments
Version: 1.0
Release: ECC 6.0
Page:
6 of 12
On screen Display CCA: Plan Distribution Basic List, enter information in the
fields as specified in the table below:
Version: 1.0
Release: ECC 6.0
Page:
7 of 12
Procedural Steps
FI10.02.03 - Access to create plan assessment of cost by:
Via Menus
From the SAP R/3 Easy Access Screen, access as shown below
Version: 1.0
Release: ECC 6.0
Page:
8 of 12
Field Name
Period
Cycle
Description
Assessment Period (month)
Assessment Cycle Name
R/O/C
R
R
Start Date
Test Run
R
O
Detail List
Comments
These cycle will be
pre-configured to
be available to the
user
Tick test run for
first time executing
the transaction, if
output is desired
one un-tick the
same and execute
EXECUTE
Version: 1.0
Release: ECC 6.0
Page:
9 of 12
Version: 1.0
Release: ECC 6.0
Page:
10 of 12
Procedural Steps
FI10.02.04 - Access to create Assessment of plan cost to COPA by:
Via Menus
From the SAP R/3 Easy Access Screen, access as shown below
Version: 1.0
Release: ECC 6.0
Page:
11 of 12
Field Name
Period
Cycle
Description
Assessment Period (month)
Assessment Cycle Name
R/O/C
R
R
Start Date
Test Run
R
O
Detail List
Comments
These cycle will be
pre-configured to
be available to the
user
Tick test run for
first time executing
the transaction, if
output is desired
one un-tick the
same and execute
Version: 1.0
Release: ECC 6.0
Page:
12 of 12