Presentation Outline
1. Recent Incident in Pipeline
2. Regulations
3. About OISD
4. OISD Standard 117 /116
PLHO,HSE
5.
6.
18.4.2015
PLHO,HSE
18.4.2015
PLHO,HSE
18.4.2015
Pipelines:
PLHO,HSE
18.4.2015
MoP& NG assisted
by Director General
Hydrocarbons (DGH).
PLHO,HSE
OISD
18.4.2015
3.
4.
PLHO,HSE
18.4.2015
PLHO,HSE
Factories Act1948.
DG, Factory Advisory & Labour Institute
Chief Inspector of Factories
Contract Labour Act1970.
State Lab. Commissioner
The Environment (Protection) Act, 1986
The Environment (Protection) Rules, 1986
Manufacturing, Storage & Import of Hazardous Chemical
Rules(MSIHC), 1989
Hazardous Waste (Management and Handling) Rules,
1989
The Chemical Accidents (Emergency Planning,
Preparedness and Response) Rules, 1996
Respective State Pollution Control Boards are empowered
to ensure compliance with the provisions of these Rules.
8
18.4.2015
PLHO,HSE
18.4.2015
OISD Standards
PLHO,HSE
18.4.2015
OISD Standards
116 : Fire protections facilities for Petroleum Refineries
and Gas Processing Plants.
117: Fire protections facilities for Petroleum Depots,
Terminal, Pipeline Installations and Lube Oil
Insulations
118 : Layout for Oil and Gas Installation.
141 : Design & Const. & Inspection requirements for liquid
hydrocarbon pipelines .
156 : Fire protection for Port Terminals
192 : Safety Practices during construction
207 : Contractor Safety
214 : LPG Pipelines
226 : Natural Gas Transmission Pipelines and City
Gas Distribution Networks.
PLHO,HSE
11
18.4.2015
OISD Standards
105
: Work Permit system
119-122: Pumps, compressors, prime movers
129
: Inspection of Storage Tanks
130
: Inspection of Pipes, valves and fittings
135
: Inspection of loading and unloading Hoses.
139
: Offshore Pipelines & SPMs
140
: Inspection of Jetty Pipelines.
144
: LPG Installations
149
: Safety In Electrical System.
150
:Design & Safety Requirement for LPG mounded
storage
169
PLHO,HSE
18.4.2015
OISD Standards
179 : Safety requirement on compression, storage,
handling and refueling of Natural Gas for
use in automotive sector.
188 : Corrosion Monitoring of offshore & onshore
pipelines
195 : Gas Compressor stations & Terminal.
210 : Storage, handling and refueling of LPG for
automotive use.
233 : Non Piggable Pipeline
244 : Storage and handling of Petroleum products
at Depots and terminals including standalone
crude oil storage facilities.
PLHO,HSE
13
18.4.2015
OISD STD-116 :
Fire protections facilities for Petroleum
Refineries and Gas Processing Plants.
OISD STD-117 :
Fire protections facilities for Petroleum
Depots, Terminal, Pipeline Installations
and Lube Oil Installations.
PLHO,HSE
14
18.4.2015
OISD-Std-117
Latest revised in July 2012
Minimum requirement of fire protection facilities
Fire water system, foam system, clean agent system,
first aid, CO2, DCP, fire detection, alarm and
communication
Fire water system design- 2 major fire in case storage
is more than 30,000 kl(A+B+C), no requirement if
storage is less than 1000 kl except AFS and Pipeline
installation
Fixed water spray system not required in case total
storage is less than 5000 kl and tank dia is upto 9 m
Rim seal fire protection system for all class A floating
roof tanks
Cooling rate is 3 LPM / 1 LPM / m2 of tank shell area.
Pipeline pump station 10.2 LPM / m2 plus 144 kl/hr
PLHO,HSE
15
18.4.2015
OISD STD-118
Layout for Oil & Gas Installation
PLHO,HSE
16
18.4.2015
OISD-Std-118
Latest revised in July 2008
Minimum requirement of layout within the plant
boundary for refineries, Oil & gas production and
processing plants, LPG facilities, Petroleum storage,
pipeline installation, Marketing depots and terminals,
Aviation storage facilities
Control room should be located in non hazardous area
Minimum separation distance specified and given in
Table form
In a dyke aggregate capacity for group of tanks (fixed
roof) should not be more than 60,000 KL
In a dyke aggregate capacity for group of tanks
(floating roof) should not be more than 1,20,000 KL
PLHO,HSE
17
18.4.2015
OISD STD-141 :
Design,
Construction
and
inspection
requirements for Cross country Liquid
Hydrocarbon Pipelines.
Standard is Statutory as per Petroleum Rule 2002.
PLHO,HSE
18
18.4.2015
19
18.4.2015
Design Factor
(i)
(ii)
Main Pipelines:
: 0.72
Road Xing Crossings : 0.72 #
without casing
(iii) Rail
: 0.60
: 0.50
: 0.72
: 0.72
PLHO,HSE
20
18.4.2015
S. No
From / To
10
11
12
13
14
16
16
30
30
30
16
30
30
2
3
SL / SR Receiver
Filtrs / Meter / Sampling
point / Sump Tanks
CRoom UPS / SCADATelecom/ Office building
Fire Pump House/ Fire
water storage tanks.
Compound wall
Elect Substation,/ Switch
Yard / Transformers
MC / PC Centre/VFD
16
16
30
16
16
16
30
16
16
30
16
30
16
30
16
16
16
16
16
16
30
16
16
16
16
30
30
30
16
12
16
60
30
30
30
30
16
16
16
12
16
16
16
16
30
16
30
16
30
30
30
16
16
16
16
16
16
30
30
30
30
30
30
60
16
30
30
30
16
16
16
16
16
16
x
x
x
x
x
x
x
x
x
x
x
x
16
16
16
16
x
30
30
30
5
16
16
16
16
30
30
30
16
16
30
30
x
30
30
x
16
16
16
16
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
4
5
6
7
8
9
10
11
12
13
14
For other station facilities not covered in the above shall be governed by
OISD- STD- 118.
X - Any distance suitable for constructional and operation convenience.
- At pipelines loop line terminal location, distance between scraper barrel
and compound wall shall not be less than 5 meter.
PLHO,HSE
21
18.4.2015
22
18.4.2015
PLHO,HSE
23
18.4.2015
PLHO,HSE
24
18.4.2015
PLHO,HSE
25
18.4.2015
S.N.
Locations
Minimum
Cover (m)
i)
1.2
1.0(Rocky)
ii)
iii)
2.5
iv)
4.0
v)
2.5
vi)
1.0
vii)
1.5
viii)
1.2
ix)
Railway crossing
1.7
1.5
1.0 (Rocky)
PLHO,HSE
27
18.4.2015
IPS 1 in 10 Years.
PLHO,HSE
28
18.4.2015
THANK
YOU
PLHO,HSE
29
18.4.2015