Académique Documents
Professionnel Documents
Culture Documents
October 2011
Useful Links
Manitoba Conservations Petroleum Storage Program web page:
http://www.gov.mb.ca/conservation/envprograms/psp/index.html
Manitoba Conservation Emergency Response Program
http://www.gov.mb.ca/conservation/envprograms/env-emresp/index.html
Canadian Council of the Ministers of the Environment web page:
http://www.ccme.ca/publications/
Trudy M. Gilbertson
A/Petroleum Storage Program Specialist
Manitoba Conservation
1007 Century Street
Winnipeg, MB R3H 0W4
phone: (204) 945-2458
fax: (204) 948-2420
email: trudy.gilbertson@gov.mb.ca
______________________________________________________________________
Leak Detection and Monitoring Methods Abbreviation Descriptions .................................... 1
Aboveground Storage Tanks ..................................................................................................... 2
Single-Wall, Horizontal Tanks with Aboveground Piping...........................................................2
Single-Wall, Vertical Tanks with Aboveground Piping...............................................................2
Double-Wall (Horizontal or Vertical Tanks) with Aboveground Piping.....................................3
Single-Wall, Horizontal Tanks with Underground Piping...........................................................4
Single-Wall, Vertical Tanks with Underground Piping................................................................5
Double-wall (Horizontal or Vertical Tanks) with Underground Piping......................................6
API Standard 650-98 with Aboveground Piping..........................................................................7
API Standard 650-98 with Underground Piping..........................................................................8
Underground Storage Tanks ..................................................................................................... 9
Double-Wall Tanks with Underground Piping..............................................................................9
Existing Single-Wall Tanks with Underground Piping..............................................................10
CITLDS
ELLD
HPVLDT
HTSCM
IR
LPVLDT
MLLD
OWM
PLDT
PLMLDT
SIR
SLMLDT
SVCV
VLD
1
A Licensed Petroleum Technician must be used for this type of test. A list of licensed Precision Leak
Detection Testers is available from the Manitoba Conservation website or by contacting your local
Environment Officer.
Final installation
Leak Detection
In-service
Monitoring
Periodic
Leak Detection
Leak Suspected
Horizontal tanks
VLD
IR or VLD
Not Required
VLD1; or PLDT
Aboveground
piping (all types)
PLMLDT; or
HPVLDT
VLD
Not Required
PLMLDT; or
HPVLDT
Final installation
Leak Detection
VLD
(within approved
secondary
containment)
Vertical tanks
In-service
Monitoring
PLMLDT; or
HPVLDT
Leak Suspected
IR and VLD; or
HTSCM
IR and VLD
VLD
Not Required
PLMLDT; or
HPVLDT
(within nonapproved
secondary
containment)
Aboveground
piping (all types)
Periodic
Leak Detection
Final installation
Leak Detection
In-service
Monitoring
Periodic
Leak Detection
Leak Suspected
Double-walled
tanks
VLD
HTSCM; or
VLD
Not required
VLD1; or PLDT;
or LPVLDT1
Aboveground
piping (all types)
PLMLDT; or
HPVLDT
VLD
Not Required
PLMLDT; or
HPVLDT
Final installation
Leak Detection
In-service
Monitoring
IR and VLD
Not Required
VLD1; or PLDT
PLMLDT; or
HPVLDT
OWM
PLMLDT; or
HPVLDT (every
year)
Not Required
PLMLDT; or
HPVLDT
ELLD;
Sensor;
CITLDS; or
SVCV2
Not Required
PLMLDT; or
HPVLDT
IR and OWM;
or SIR
PLMDT; or
HPVLDT (annually)
PLMDT; or
HPVLDT
IR and OWM;
or SIR
PLMDT; or
HPVLDT (every 2
PLMDT; or
HPVLDT
PLMLDT; or
HPVLDT and
LPVLDT
years)
CITLDS; or
OWM and
SIR
SVCV2; or
ELLD5
Turbine and
Transition
Sumps
SLMLDT
Dispenser
Sumps
SLMLDT
1
2
3
4
5
6
Leak Suspected
VLD
CITLDS or
ELLD
Double-wall
Periodic Leak
Detection
HTSCM; or
VLD
Not required
Not required
VLD (annually)6
SLMLDT
Not required
SLMLDT
Final installation
Leak Detection
VLD
(within approved
secondary
containment)
Vertical tanks
In-service
Monitoring
(Greater than
75mm)
Double-wall
PLMLDT; or
HPVLDT
Leak Suspected
IR and VLD;
or HTSCM
IR and VLD
OWM
PLMLDT; or
HPVLDT (every
PLMLDT; or
HPVLDT
(within nonapproved
secondary
containment)
Piping:
Single Wall
Periodic Leak
Detection
year)
PLMLDT; or
HPVLDT and
LPVLDT
CITLDS or
ELLD
Not Required
ELLD;
Sensor;
CITLDS; or
SVCV1
Not Required
PLMLDT; or
HPVLDT
IR and OWM;
or SIR
PLMDT; or
HPVLDT (annually)
PLMDT; or
HPVLDT
IR and OWM;
or SIR
PLMDT; or
HPVLDT (every 2
PLMDT; or
HPVLDT
years)
CITLDS; or
OWM and
SIR
SVCV1; or
ELLD4
Turbine and
Transition
Sumps
SLMLDT
Dispenser
Sumps
SLMLDT
HTSCM; or
VLD
Not required
Not required
VLD (annually)6
SLMLDT
Not required
SLMLDT
4 Pressure piping
5 Inspections and performance testing in conformance with the
manufacturers requirements and procedures
Double-wall
Final installation
Leak Detection
In-service
Monitoring
HTSCM; or
VLD
Not required
VLD1; or PLDT;
or LPVLDT1
PLMLDT; or
HPVLDT
OWM
PLMLDT; or
HPVLDT (every
PLMLDT; or
HPVLDT
year)
PLMLDT; or
HPVLDT
and LPVLDT
Steel with
CP4; plastic; or
FRP5
CITLDS or
ELLD
Not Required
ELLD;
Sensor;
CITLDS;
or SVCV2
Not Required
PLMLDT; or
HPVLDT
IR and OWM;
or SIR
PLMDT; or
HPVLDT (annually)
PLMDT; or
HPVLDT
IR and OWM;
or SIR
PLMDT; or
HPVLDT (every 2
PLMDT; or
HPVLDT
years)
CITLDS; or
OWM and
SIR
SVCV2; or
ELLD6
Turbine and
Transition
Sumps
SLMLDT
Dispenser
Sumps
SLMLDT
2
3
4
5
6
Leak Suspected
VLD
Periodic Leak
Detection
HTSCM; or
VLD
Not required
Not required
VLD (annually)3
SLMLDT
Not required
SLMLDT
Final installation
Leak Detection
API 650 standard
(within approved
secondary
containment)
In-service
Monitoring
PLMLDT; or
HPVLDT
Leak Suspected
IR and VLD;
or HTSCM
API 653
PLDT; or API
653
IR and VLD
VLD
Not Required
PLMLDT; or
HPVLDT
(within nonapproved
secondary
containment)
Aboveground
piping (all types)
Periodic Leak
Detection
Final installation
Leak Detection
As per API 650
standard
In-service
Monitoring
(Greater than 75
mm)
Double-wall
PLMLDT; or
HPVLDT
API 653
PLDT; or API
653
IR and VLD
OWM
PLMLDT; or
HPVLDT (every
PLMLDT; or
HPVLDT
year)
PLMLDT; or
HPVLDT
and LPVLDT
CITLDS; or
ELLD
Not Required
ELLD;
Sensor;
CITLDS;
or SVCV1
Not Required
PLMLDT; or
HPVLDT
IR and OWM;
or SIR
PLMDT; or
HPVLDT (annually)
PLMDT; or
HPVLDT
IR and OWM;
or SIR
PLMDT; or
HPVLDT (every 2
PLMDT; or
HPVLDT
years)
CITLDS; or
OWM and
SIR
SVCV1; or
ELLD4
1
2
3
4
Leak Suspected
IR and VLD;
or HTSCM
(within nonapproved
secondary
containment)
Piping:
Single Wall
Periodic Leak
Detection
Not required
Not required
Piping:
Single Wall
(Greater than 75
mm)
Double-wall
Final installation
Leak Detection
In-service
Monitoring
Periodic Leak
Detection
Leak Suspected
PLDT
SIR; VLD;
ATG;
HTSCM;
CITLDS; or
CITLD
Not required
PLDT
PLMLDT; or
HPVLDT
OWM
PLMLDT; or
HPVLDT (every
PLMLDT; or
HPVLDT
year)
PLMLDT; or
HPVLDT
and LPVLDT
CITLDS or
ELLD
Not Required
ELLD;
Sensor;
CITLDS;
or SVCV1
Not Required
PLMLDT; or
HPVLDT
IR and OWM;
or SIR
IR and OWM;
or SIR
PLMDT; or
HPVLDT (annually)
PLMDT; or
HPVLDT (every 2
PLMDT; or
HPVLDT
PLMDT; or
HPVLDT
years)
CITLDS; or
OWM and
SIR
SVCV1; or
ELLD4
Turbine and
Transition
Sumps
SLMLDT
Dispenser
Sumps
SLMLDT
HTSCM; or
VLD
Not required
Not required
VLD (annually)5
SLMLDT
Not required
SLMLDT
4 Pressure piping
5 Inspection and performance testing in conformance with the
manufacturers requirements and procedures
10
Final installation
Leak Detection
IR and OWM;
or SIR
IR
Steel tank
without CP1
Steel tank with
CP1;
or FRP2
Piping:
Single Wall
(Greater than
75mm)
Double-wall
In-service
Monitoring
PLMLDT; or
HPVLDT
PLDT
PLDT (every 2
PLDT
PLDT (every 5
OWM
PLMLDT; or
HPVLDT (every
years)
Not required
Not required
PLMLDT; or
HPVLDT
year)
PLMDT; or
HPVLDT and
LPVLDT
CITLDS or
ELLD
ELLD;
Sensor;
CITLDS; or
SVCV3
Not Required
IR and OWM;
or SIR
IR and OWM;
or SIR
PLMDT; or
HDPLDT (annually)
PLMDT; or
HDPLDT (every 2
PLMDT; or
HPVLDT
PLMDT; or
HPVLDT
years)
Turbine and
Transition
Sumps
SLMLDT
Dispenser
Sumps
SLMLDT
PLDT (annually)
IR and OWM;
or SIR
ATG; or
CITLDS
OWM and
SIR
CITLDS; or
OWM and
SIR
SVCV3; or
ELLD5
Leak Suspected
years)
Periodic Leak
Detection
CP - Cathodic protection
FRP Fibreglass reinforced plastic
Suction style system only
HTSCM; or
VLD
4
Not required
Not Required
VLD (annually)4
SLMLDT
Not required
SLMLDT