7.0
7.01 INTRODUCTION
Auxiliary supply for electrical equipment of 175 KW and less is at 415 V
for the units of Neyveli Thermal Power Station II. 6.6KV/415V service
transformers provide power to the system. The HT supply is obviously from
the 6.6KV system of the station. Broadly the above service transformers
have got three ratings viz. 750KVA (used in CWP House), 1000KVA (used in
WT Plant) and 1600KVA (used in all other locations). The nameplate details of
these transformers are as under:
: HV 6600 Volts.
: LV 433 Volts.
Current.
: HV 140 Amps.
: LV 2133 Amps.
Vector group.
: DY 11.
Type of cooling.
: ONAN.
Tap Changer.
: HV 6600 Volts.
: LV 433 Volts.
Current.
: HV 87.5 Amps.
: LV 1334 Amps.
Vector group.
: DY 11.
Type of Cooling.
: ONAN.
Tap Changer.
: HV 6600 Volts.
: LV 433 Volts.
Current.
: HV 65.5 Amps.
: LV 1000 Amps.
Vector group.
: DY 11.
Type of Cooling.
: ONAN.
Tap Changer.
85
86
Service/Test/Isolated position Indicators are provided to indicate the status
and position of the breaker respectively.
In the three distinct positions of the breaker, the supply availability to
the main circuit and control circuit are as given below:
Breaker
Position
SERVICE
TEST
Electrical Connection
Main Circuit
Control Circuit
Connected
Connected
Disconnected
ISOLATED
Disconnected
Description
Normal service Position
Position for close/ open check
Connected
Disconnected
Test.
Breaker completely isolated.
7.08 LAYOUT
The 415V system (Fig-1) comprises 36 service transformers. The split
up details are as follows.
1. 2 Nos. Units Service Transformer (Total 2 X 4 = 8) 1600 KVA
2. 2 Nos. ESP Transformer each unit (Total 2 X 4 = 8) 2000 KVA
3. 4 Nos. Station Service Transformer 1600 KVA
4. 4 Nos. AC & Ventilation Transformer 2000KVA
5. 4 Nos. Lighting Transformer 315 KVA
6. 4 Nos. AHS Transformer - 2000KVA
7. 2 Nos. CWPH Transformer 1250 KVA
87
8. 2 Nos. DM Plant Transformer 1250 KVA
88
AHT-1 & 3 get their supply from 6.6 KV station bus-C5A through SF6
Breakers. The LT sides of these transformers are connected to PCC-1 through
ACBs.
AHT-2 & 4 get their supply from 6.6 KV station bus-C5B through SF6
Breakers. The LT sides of these transformers are connected to PCC-2 through
ACBs.
89
8. Steam Soot Blower MCC (SSBMCC).
9. Emergency MCC-1 & 2
10.
11.
12.
Main DCDB
13.
Ventilation MCC
b) Apart from the above MCCs the following MCCs are also available to
cater the needs of station facilities.
1. Station Service MCC 1&2
2. Fuel Oil Pump House MCC.
3. H2 Plant MCC.
4. DM plant MCC - 1 & 2
5. CW MCC 1 & 2
90
The Turbine valve MCC is getting supply through two feeders, one from
Bus-A and the other from Bus-B of Turbine Auxiliary MCC. Each feeder has
got an isolating switch and a fuse unit on the Turbine MCC side and at the
Turbine valve MCC side. The isolating switch units of the two feeders at the
Turbine valve MCC side are mechanically interlocked by a key in such a way
that only one can be closed at a time.
1,
2. 220 V,
3. 24 V,
a.c.
Control supply.
4. 240 V,
1,
a.c.
5. 415 V,
1 ,
a.c.
Test supply.
a.c.
Alarm supply.
6. 110 V,
1,
1 ,
This
supply
is
obtained
through
415/110V,
1,
control
transformer which is getting the 415V supply from power feeder of the same
auxiliary after the isolating switch and fuse units or from the 415V test bus
depending upon whether the module is in service or test position
respectively.
91
92
Operating instructions are such that it does not allow paralleling of two
or more transformers for a period more than 2.0 secs.
In the case of unit cum emergency switchgears, the normal incomers
will be in service. When one of the normal incomers trips the Bus Coupler-2
closes on auto.
In the case of station service switchgear, if any one incomer fails the
Bus coupler can be taken into service.
In the case Boiler and Turbine Auxiliaries, the normal incomers will be
in service. When one of the normal incomers trips the Bus Coupler closes on
auto.
In the case of CWPH switchgear, WTP switchgear when one of the
incomer breakers trip, the bus coupler breaker can be taken into service
manually.
In the case of ESP switchgear, auto closing of bus coupler breaker
when one of the incomer breakers trip is not available.
93
1. Rack in both HT and LT breakers of UST-A and effect their control
supplies.
2. Close the 6.6KV
the
transformer.
3. Switch on the synchronising switch of UST-A.
4. Check for equal readings in the double voltmeter and in the double
frequency meter.
5. Put the trip selector switch at GCD in Bus Coupler (B/C) position
6. Close the normal incomer of USS-A when the synchronising conditions
are satisfied.
7. Bus Coupler-2 breaker of UCES will trip immediately;
8. Switch off the synchronising switch.
9. Check the bus voltmeter of USS-A for normal readings.
*-*-*-*-*-*-*-*-*-*-*-*-*-*-*-*
*-*-*-*-*-*-*-*-*-*-*-*-*-*