Hydrology

and Floodplain Analysis


Fifth Edition
Supplemental Materials

Jones Creek

Subbasins of Jones Creek

Example 1: Calculate volume of the Direct Runo of Subbasin A


and plot the net rainfall on the resul@ng hydrograph
Rainfall hyetograph
(Subbasin A)

Storm Hydrograph for Subbasin A


Intensity (in/hr)

700
600

Q (cfs)

500
400

3.5
3
2.5
2
1.5
1
0.5
0
1

300

Time (hr)

200
100

Baseflow for Subbasins A = 100 cfs


Initial infiltration for the first hr = 0.5 in

0
0

Time (hr)

10

12

14

Constant infiltration = 0.25 in

Solu@on to Example 1
Separate out the base ow

Solu@on to Example 1

Calculate the volume of Direct Runo


DRO = Total Runoff Base Flow

Total Runoff = 12 hr * 600 cfs * * (3600 s/ hr) * (1 ac-ft/ 43,560 ft3)


= 297.5 ac-ft
Base Flow = (12 hr + 10 hr)/2 * 100 cfs * (3600 s/ hr) * (1 ac-ft/ 43,560 ft3)
= 90.9 ac-ft
DRO = 297.5 ac-ft 90.9 ac-ft
DRO = 206.6 ac-ft

Solu@on to Example 1

Resulting hydrograph after removing Baseow

Solu@on to Example 1
Separate out the inltration from the hyetograph

Solu@on to Example 1
Place the rainfall in the upper left corner of the

resulting hydrograph
600

500

0.5

400

300

1.5

200

100

2.5

3
0

6
Time (hr)

10

12

Rainfall (in)

Q (cfs)

Storm Hydrograph for Subbasin A: No Baseow

Problem 1: Calculate volume of the Direct Runo of Subbasin C


and plot the net rainfall on the resul@ng hydrograph

Use the process in Example 1


Rainfall hyetograph
(Subbasin C)

Intensity (in/hr)

3
2.5
2
1.5
1
0.5
0
1

Time (hr)

Base flow for Subbasin C = 200 cfs


Initial infiltration for the first hr = 1 in
Constant infiltration = 0.5 in

Example 2: a) Make sure the Unit hydrograph of Subbasin A is a


unit hydrograph

Area of

Subbasin A =
550 ac
Assume no
baseow
Qp = 220 cfs

Solu@on to Example 2, Part a


DRO = area under the hydrograph
DRO = 220 cfs * 5 hr *
DRO = 550 cfs-hr = 550 ac-in
550 ac-in / 550 ac = 1 in

Example 2: b) Given a 4-period storm (1 period =30 minutes) and the previous unit
hydrograph for Subbasin A, create the storm hydrograph using the add and lag method
Area of A = 550 ac
Assume no baseow or

inltration
Qp = 220 cfs

1.5 in
0.5 in

1 in

0.5 in

Time
(0.5
hr)

Q
(cfs)

55

110

165

220

183.333

146.667

110

73.333

36.667

10

Solu@on to Example 2, Part b


Unit Hydrograph
Time
(0.5
hr)

Q
(cfs)

Time (0.5 hr)

P1*Un

27.5

55

55

55

110

82.5

110

82.5

275

165

110

165

165

27.5

467.5

220

91.6665

220

247.5

55

614.2

73.3335

183.333

330

82.5

669.2

183.333

55

146.667

274.9995

110

586.7

146.667

36.6665

110

220.0005

91.6665

458.3

110

18.3335

73.333

165

73.3335

330

73.333

10

36.667

109.9995

55

201.7

36.667

11

55.0005

36.6665

91.7

10

18.3335

18.3

12
13

P2*Un

P3*Un

P4*Un

Qn
0
27.5
110

Solu@on to Example 2, Part b


Time
(0.5 hr)

Qn
(cfs)

27.5

110

275

467.5

614.2

669.2

586.7

458.3

330

10

201.7

11

91.7

12

18.3

13

Problem 2 (informa@on on next slide)


a) Make sure the Unit hydrograph of Subbasin C is a unit

hydrograph (Subbasin C area = 770 ac)


b) Given a 4-period storm (1 period =30 minutes) and the
unit hydrograph for Subbasin C, create the storm
hydrograph using the add and lag method

Unit Hydrograph and 4-period storm for Subbasin C


Time
(0.5 hr)

Q
(cfs)

0.0

70.0

140.0

210.0

280.0

240.0

200.0

160.0

120.0

80.0

10

40.0

11

Storm Hydrograph Worksheet


UH for C

Time
(0.5 hr)

0.0

70.0

140.0

210.0

280.0

240.0

200.0

160.0

120.0

80.0

40.0

10

11
12
13
14

Qn

Example 3: Find the @me to peak (tp) and the maximum ow (Qp) by the SCS
triangular unit hydrograph method for Subbasin A (550 ac). Use L = 1 mi, average
slope = 25[/mi, D = 0.5 hr and CN = 71.

tp = [L0.8(S + 1)0.7]/1900y0.5

L = length to divide (ft)


y = average watershed slope (%)
S = (1000/CN) 10 in
CN = Curve Number for various soil/land use

Qp = [484 * (Area in sq. mi)]/TR


TR = D/2 + tp = rise time of the hydrograph

D = rainfall duration

Solu@on to Example 3
L = 5280 ft
S = (1000/71) 10 = 4.085
y = 25ft/5280ft = 0.474 %
tp = [5280.8*(5.085)0.7]/1900(.474)0.5


tp = 2.27 hr

Solu@on to Example 3
D = 1/2 hr
TR = D/2 + tp

TR = 1/4 hr + 2.27 hr = 2.52 hr


550 ac(43,560 ft2/ ac)(mi/5280 ft)2 = 0.859 sq. mi

Qp = [484 * (.859)]/2.52 hr
Qp = 165.0 cfs

Solu@on to Example 3
TB = time base
DRO = * Qp * TB hr
550 ac-in = * 165 cfs * TB hr
TB = 6.67 hr
Note: B = TB + TR

Solu@on to Example 3

Problem 3
Find the time to peak (tp) and the maximum ow

(Qp) by the SCS triangular unit hydrograph


method for Subbasin C (770 ac). Use L = 1.5 mi,
average slope = 30ft/mi, D = 0.5 hr and CN = 75.