MARIM JALANI Contract No 214

As of PC 8
Description
Main Contract
Addendum 1
Addendum 2
Addendum 3
Addendum 5
Addendum 6
Addendum 8
Addendum 9
Addendum 10
Addendum 11

unit
Sr
Sr
Sr
Sr
Sr
Sr
Sr
Sr
Sr
Sr

SubTotal
Additional Works

Sr

TOTAL

Sr

Contract
1,350,240
831,000
480,000
560,000
300,000
569,000
325,000
200,000
270,000
499,500

To Date
#REF!

5,384,740

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

5,384,740

Diff
#REF!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!

Remarks
exceeded

exceeded
(4150 hrs)

no contract yet

NOTE:
Addendums 9 & 11 are both Manpower supply with 20 Sr/hr
Details

Contract

To Date

PC 7
Addendum 9

Sr

200,000

592,500

PC 8
Addendum 9
Addendum 11

Sr
Sr

200,000
499,500

200,000

Diff
(392,500)

exceeded

(4150 hrs)

Page 2 of 136

SAUDI BINLADIN GROUP - ABCD


Payment Certificate Department
Project

CORRECTIONAL FACILITIES P1182 Dammam

SubCon

MARIM M. JALANI TRADING EST., Contract No. 214 - Painting Works

Subject

Payment Certificate No. 5

Period

As of February 2016

No.

Description

Progress

Unit

Qty Per
Bldg

Prev

Current

To Date

Prev

ADDENDUM 15
1

BAR GRILL DOORS (BGD)

m2

7,420

49%

9%

58%

3,634.2

ACCESS DOORS

m2

493

50%

2%

52%

247.7

HOLLOW METAL DOORS

m2

7,349

43%

13%

56%

3,134.7

FULL PUTTY WORKS

m2

10,342

42%

6%

48%

4,345.0

ADDENDUM 16
1

Epoxy Coating System for Walls

m2

16,250

50%

10%

60%

8,105.1

Epoxy Coating System for Floors

m2

1,382

74%

18%

91%

1,018.3

Anti-Bacterial Paint for Ceiling

m2

Stone Shield Exterior Paint System

m2

4,512

36%

34%

70%

1,636.6

Extra Over Wall (Ht > 4.5m)

m2

526

57%

0%

57%

300.0

Extra Over Ceiling (Ht > 4.5m)

m2

4,629

39%

24%

63%

1,790.6

34,721

45%

7%

52%

15,718.3

1,639

73%

0%

73%

1,204.4

ADDENDUM 17
1

Emulsion Paint for Wall (Acrylic)

m2

Epoxy Coating Skirting

Lm

Bar Grill Window Paint

pcs

Page 3 of 136

SAUDI BINLADIN GROUP - ABCD


Payment Certificate Department
Project

CORRECTIONAL FACILITIES P1182 Dammam

SubCon

MARIM M. JALANI TRADING EST., Contract No. 214 - Painting Works

Subject

Payment Certificate No. 5

Period

As of February 2016

No.
4

Description

Unit

Louver Window Paint as per Consult pcs

Progress

Qty Per
Bldg

Prev

Current

To Date

Prev

46

65%

5%

70%

30.1

ADDENDUM 18
1

ELC Room Paint

ea

41%

29%

70%

3.7

LC Room Paint

ea

12

37%

29%

66%

4.4

Building Interior Electricity Room

ea

23

56%

10%

66%

12.9

7,523.0

ADDENDUM 19
1

Ceiling Repair (damaged areas)

m2

Paint for Ceiling

m2

15,304

49%

12%

62%

m2

9,000

0%

35%

35%

ADDENDUM 20
1

Internal Plastering

Page 4 of 136

Quantity
Current

To Date

646.8

4,281.0

10.1

257.8

982.2

4,116.9

576.0

4,921.0

1,575.0

9,680.1

243.6

1,261.9

1,521.8

3,158.4

0.0

300.0

1,128.4

2,919.0

2,285.6

18,004.0

0.0

1,204.4

Rem

Page 5 of 136

Quantity
Current

To Date

2.1

32.2

2.6

6.3

3.5

7.9

2.3

15.3

1,909.5

9,432.5

3,150.0

3,150.0

Rem

Page 6 of 136

SAUDI BINLADIN GROUP - ABCD


Payment Certificate Department
Project

CORRECTIONAL FACILITIES P1182 Dammam

SubCon

MARIM M. JALANI TRADING EST., Contract No. 214 - Painting Works

Subject

Payment Certificate No. 5

Period

As of February 2016

No.

Description

Unit

Qty Per
Bldg

ADDENDUM 15
1

BAR GRILL DOORS (BGD)

1st Coat
60%

2nd Coat
40%

60%

40%

B1201-6

m2

500

100%

60%

B1201-7

m2

500

100%

60%

B1201-10

m2

500

100%

60%

B1201-11

m2

500

60%

36%

B1201-13

m2

500

100%

60%

B1201-15

m2

500

100%

60%

B1201-17

m2

500

83%

50%

B1201-21

m2

500

100%

60%

B1201-22

m2

500

100%

60%

B1201-23

m2

500

100%

60%

B1201-24

m2

500

100%

60%

B1204-1

m2

480

100%

60%

B1204-2

m2

480

100%

60%

B1204-3

m2

480

100%

60%

B1204-4

m2

480

100%

60%

m2

7,420

Total (Bar Grill Doors)

To Date
Progress

PROGRESS Breakdown

ACCESS DOORS (exterior - shaft areas)

1st coat

2nd coat

B1001

m2

28

90%

54%

B1002

m2

10

80%

48%

B1201-2

m2

28

95%

57%

B1201-3

m2

28

95%

57%

B1201-4

m2

28

95%

57%

B1201-6

m2

28

95%

57%

Page 7 of 136

SAUDI BINLADIN GROUP - ABCD


Payment Certificate Department
Project

CORRECTIONAL FACILITIES P1182 Dammam

SubCon

MARIM M. JALANI TRADING EST., Contract No. 214 - Painting Works

Subject

Payment Certificate No. 5

Period

As of February 2016

Unit

Qty Per
Bldg

B1201-7

m2

28

95%

57%

B1201-9

m2

28

70%

42%

B1201-10

m2

28

70%

42%

B1201-11

m2

28

70%

42%

B1201-12

m2

28

70%

42%

B1201-13

m2

28

90%

54%

B1201-15

m2

28

90%

54%

B1201-21

m2

28

100%

60%

B1201-22

m2

28

100%

60%

B1201-23

m2

28

100%

60%

B1201-24

m2

28

100%

60%

B1204-2

m2

19

50%

30%

B1601-1

m2

95%

57%

B1601-3

m2

70%

42%

m2

493

No.

Description

Total (Access Doors)

To Date
Progress

PROGRESS Breakdown

1st coat
HOLLOW METAL DOORS (incl Interior & Exterior, Prison
toilets) 2nd coat

B100

m2

224

100%

60%

B201

m2

368

98%

59%

B202

m2

119

100%

60%

B400

m2

36

100%

60%

B500

m2

35

100%

60%

B700

m2

62

100%

60%

B800

m2

71

100%

60%

B901-1

m2

64

100%

60%

B901-2

m2

64

100%

60%

B901-3

m2

64

100%

60%

B901-4

m2

64

100%

60%

Page 8 of 136

SAUDI BINLADIN GROUP - ABCD


Payment Certificate Department
Project

CORRECTIONAL FACILITIES P1182 Dammam

SubCon

MARIM M. JALANI TRADING EST., Contract No. 214 - Painting Works

Subject

Payment Certificate No. 5

Period

As of February 2016

Unit

Qty Per
Bldg

B901-5

m2

64

100%

60%

B902

m2

66

100%

60%

B903-1

m2

63

100%

60%

B903-2

m2

63

100%

60%

B1201-2

m2

198

80%

48%

B1201-3

m2

198

90%

54%

B1201-4

m2

198

90%

54%

B1201-10

m2

198

100%

60%

B1201-11

m2

198

60%

36%

B1201-13

m2

198

100%

60%

B1201-15

m2

198

100%

60%

B1201-17

m2

198

100%

60%

B1201-18

m2

198

50%

30%

B1201-21

m2

198

100%

60%

B1201-22

m2

198

100%

60%

B1201-23

m2

198

100%

60%

B1201-24

m2

198

100%

60%

B1204-2

m2

168

90%

54%

B1204-3

m2

168

70%

42%

B1204-4

m2

168

90%

54%

B1601-1

m2

400

100%

60%

B1601-3

m2

400

100%

60%

B1601-4

m2

400

70%

42%

B1601-5

m2

400

100%

60%

B1602

m2

270

100%

60%

B2003

m2

130

90%

54%

B2006

m2

64

100%

60%

B2007-1

m2

50%

30%

No.

Description

To Date
Progress

PROGRESS Breakdown

Page 9 of 136

SAUDI BINLADIN GROUP - ABCD


Payment Certificate Department
Project

CORRECTIONAL FACILITIES P1182 Dammam

SubCon

MARIM M. JALANI TRADING EST., Contract No. 214 - Painting Works

Subject

Payment Certificate No. 5

Period

As of February 2016

Unit

Qty Per
Bldg

B2007-2

m2

100%

60%

B2007-3

m2

100%

60%

B2007-4

m2

100%

60%

B2008-1

m2

15

100%

60%

B2008-2

m2

15

100%

60%

B2301

m2

28

90%

54%

B2501-1

m2

100%

60%

B2501-2

m2

100%

60%

B2501-3

m2

100%

60%

B2501-4

m2

100%

60%

B2501-5

m2

100%

60%

B2501-6

m2

100%

60%

B2501-7

m2

100%

60%

B2501-8

m2

100%

60%

B2602-1

m2

100%

60%

B2602-2

m2

100%

60%

B2602-3

m2

100%

60%

B2602-4

m2

100%

60%

B2602-5

m2

100%

60%

B2602-6

m2

100%

60%

B2602-7

m2

100%

60%

B2602-8

m2

100%

60%

B2602-9

m2

100%

60%

B2602-10

m2

100%

60%

B2602-11

m2

100%

60%

B2602-12

m2

0%

B2602-13

m2

100%

60%

B2602-14

m2

100%

60%

No.

Description

To Date
Progress

PROGRESS Breakdown

Page 10 of 136

SAUDI BINLADIN GROUP - ABCD


Payment Certificate Department
Project

CORRECTIONAL FACILITIES P1182 Dammam

SubCon

MARIM M. JALANI TRADING EST., Contract No. 214 - Painting Works

Subject

Payment Certificate No. 5

Period

As of February 2016

Unit

Qty Per
Bldg

B3000

m2

86

100%

60%

B3100

m2

66

100%

60%

B3202A-1

m2

24

100%

60%

B3202A-2

m2

24

100%

60%

B3202A-3

m2

24

100%

60%

B3202A-4

m2

24

100%

60%

B3202A-5

m2

24

100%

60%

B3202A-6

m2

24

100%

60%

B3202A-7

m2

24

100%

60%

B3202A-8

m2

24

100%

60%

B3202A-9

m2

24

100%

60%

B3202A-10

m2

24

100%

60%

B3202A-11

m2

24

100%

60%

B3202A-12

m2

24

100%

60%

B3202A-13

m2

24

100%

60%

B3202B-1

m2

18

100%

60%

B3202B-2

m2

18

100%

60%

B3202B-3

m2

18

100%

60%

B3202B-4

m2

18

100%

60%

B3202B-5

m2

18

100%

60%

B3202B-6

m2

18

100%

60%

B3202B-7

m2

18

100%

60%

B3202B-8

m2

18

100%

60%

B3202B-9

m2

18

100%

60%

B3203

m2

27

100%

60%

B3208

m2

100%

60%

m2

7,349

No.

Description

Total (Hollow Metal Doors)

To Date
Progress

PROGRESS Breakdown

Page 11 of 136

SAUDI BINLADIN GROUP - ABCD


Payment Certificate Department
Project

CORRECTIONAL FACILITIES P1182 Dammam

SubCon

MARIM M. JALANI TRADING EST., Contract No. 214 - Painting Works

Subject

Payment Certificate No. 5

Period

As of February 2016

No.
4

Description

Unit

Qty Per
Bldg

To Date
Progress

PROGRESS Breakdown

1st coat
coat
FULL PUTTY WORKS for BGD (as requested & approved
by Site 2nd
Eng'rs)

B1001

m2

299

100%

50%

B1002

m2

123

100%

50%

B1201-6

m2

500

100%

50%

B1201-7

m2

500

100%

50%

B1201-9

m2

500

100%

50%

B1201-10

m2

500

100%

50%

B1201-11

m2

500

100%

50%

B1201-12

m2

500

50%

25%

B1201-13

m2

500

50%

25%

B1201-15

m2

500

100%

50%

B1201-17

m2

500

100%

50%

B1201-18

m2

500

100%

50%

B1201-19

m2

500

100%

50%

B1201-20

m2

500

100%

50%

B1201-21

m2

500

100%

50%

B1201-22

m2

500

100%

50%

B1201-23

m2

500

100%

50%

B1201-24

m2

500

100%

50%

B1204-1

m2

480

100%

50%

B1204-2

m2

480

100%

50%

B1204-3

m2

480

100%

50%

B1204-4

m2

480

100%

50%

m2

10,342

1st Coat
25%

2nd Coat
30%

Total (Putty Works)

ADDENDUM 16

Primer 20%

Putty
25%

Page 12 of 136

SAUDI BINLADIN GROUP - ABCD


Payment Certificate Department
Project

CORRECTIONAL FACILITIES P1182 Dammam

SubCon

MARIM M. JALANI TRADING EST., Contract No. 214 - Painting Works

Subject

Payment Certificate No. 5

Period

As of February 2016

Unit

Qty Per
Bldg

B201

m2

150

100%

100%

20%

50%

B901-1

m2

323

100%

100%

80%

65%

B901-3

m2

323

100%

100%

100%

70%

B901-4

m2

323

100%

100%

100%

70%

B902

m2

51

100%

100%

B903-1

m2

100

100%

100%

20%

50%

B1201-6

m2

3,000

100%

100%

80%

65%

B1201-13

m2

3,000

100%

90%

B1201-15

m2

3,000

100%

100%

100%

70%

B1201-18

m2

3,000

100%

100%

90%

68%

B1601-1

m2

2,830

100%

100%

20%

50%

B3209

m2

150

100%

100%

100%

70%

m2

16,250

Primer

Putty

1st Coat

No.
1

Description
Epoxy Coating System for Walls

Total (Epoxy Wall, interior)

To Date
Progress

PROGRESS Breakdown

Epoxy Coating System for Floors

45%

43%

2nd Coat

B3203

m2

145

100%

100%

100%

B3206

m2

239

100%

100%

100%

100%

100%

B3207

m2

445

100%

100%

100%

100%

100%

B3208

m2

298

100%

100%

100%

100%

100%

B3209

m2

256

100%

100%

100%

Primer

Putty

1st Coat

Total (Epoxy Floor, interior)

70%

70%

1,382

Anti-Bacterial Paint for Ceiling

Stone Shield Exterior Paint System

2nd Coat

B901-3

m2

838

100%

100%

100%

70%

B1601-1

m2

3,174

100%

100%

100%

70%

Page 13 of 136

SAUDI BINLADIN GROUP - ABCD


Payment Certificate Department
Project

CORRECTIONAL FACILITIES P1182 Dammam

SubCon

MARIM M. JALANI TRADING EST., Contract No. 214 - Painting Works

Subject

Payment Certificate No. 5

Period

As of February 2016

Unit

Qty Per
Bldg

B3202A-8

m2

250

100%

100%

100%

70%

B3202A-12

m2

250

100%

100%

100%

70%

m2

4,512

Primer

Putty

1st Coat

100%

No.

Description

Total (Stone Shield, exterior)

Extra Over Wall Height more than 4.5m


B100

m2

200

100%

100%

B1201-13 (Days Rms-2 nos)

m2

109

100%

50%

B1201-15 (Days Rms-2 nos)

m2

109

100%

100%

B1201-18 (Days Rms-2 nos)

m2

109

100%

100%

Primer

Putty

1st Coat

Total (Extra over Wall Ht)

To Date
Progress

2nd Coat

70%
33%

100%

70%
45%

526

Extra Over Ceiling Height more than 4.5m

2nd Coat

B1201-6 (HCS)

m2

492

100%

100%

20%

50%

B1201-5 (Day rooms-2 nos)

m2

806

100%

100%

100%

70%

B1201-6 (Days Rms-2 nos)

m2

806

100%

100%

100%

70%

B1201-13 (Day rooms-2 nos)

m2

806

100%

100%

B1201-15 (Days Rms-2 nos)

m2

806

100%

100%

100%

70%

B1201-18 (Days Rms-2 nos)

m2

806

100%

100%

100%

70%

B1601-1 (Waiting space-2 nos)

m2

107

100%

100%

20%

50%

Primer 20%

Putty
25%

1st Coat
25%

100%

Total (Extra over Ceiling Ht)

45%

4,629

ADDENDUM 17
1

PROGRESS Breakdown

2nd Coat
30%

Emulsion Paint for Wall (Acrylic) - EXCLUDING Electrical Rooms


B100

m2

4,637

100%

100%

B201

m2

8,929

100%

100%

B500

m2

580

100%

100%

70%
45%

100%

70%

Page 14 of 136

SAUDI BINLADIN GROUP - ABCD


Payment Certificate Department
Project

CORRECTIONAL FACILITIES P1182 Dammam

SubCon

MARIM M. JALANI TRADING EST., Contract No. 214 - Painting Works

Subject

Payment Certificate No. 5

Period

As of February 2016

Unit

Qty Per
Bldg

B800

m2

115

100%

100%

100%

70%

B901-1

m2

490

100%

100%

100%

70%

B901-3

m2

490

100%

100%

100%

70%

B901-4

m2

490

100%

100%

100%

70%

B902

m2

577

100%

100%

B903-1

m2

616

100%

100%

20%

50%

B1201-5

m2

869

100%

100%

100%

70%

B1201-6

m2

869

100%

100%

100%

70%

B1201-13

m2

869

100%

100%

B1201-15

m2

869

100%

100%

100%

70%

B1201-18

m2

869

100%

100%

80%

65%

B1204-2

m2

760

100%

20%

B1204-3

m2

760

100%

20%

B1601-1

m2

3,230

100%

B1601-3

m2

3,230

70%

B2100

m2

490

100%

100%

100%

70%

B2501-9

m2

22

100%

100%

100%

70%

B2602-7

m2

20

100%

100%

100%

70%

B3100

m2

1,000

100%

100%

B3202A-4

m2

340

100%

100%

100%

70%

B3202A-5

m2

340

100%

100%

100%

70%

B3202A-7

m2

340

100%

100%

100%

70%

B3202A-8

m2

340

100%

100%

100%

70%

B3202A-12

m2

340

100%

100%

100%

70%

B3202B-1

m2

270

100%

100%

100%

70%

B3202B-6

m2

270

100%

100%

100%

70%

B3203

m2

340

100%

100%

100%

70%

No.

Description

Electrical & Low currents rooms

PROGRESS Breakdown

100%

To Date
Progress

45%

45%

20%

50%
14%

45%

Page 15 of 136

SAUDI BINLADIN GROUP - ABCD


Payment Certificate Department
Project

CORRECTIONAL FACILITIES P1182 Dammam

SubCon

MARIM M. JALANI TRADING EST., Contract No. 214 - Painting Works

Subject

Payment Certificate No. 5

Period

As of February 2016

Unit

Qty Per
Bldg

B100

m2

133

100%

100%

100%

70%

B201

m2

151

100%

100%

100%

70%

B500

m2

32

100%

100%

100%

70%

B800

m2

35

100%

100%

100%

70%

B901-1

m2

63

100%

100%

100%

70%

B901-3

m2

63

100%

100%

100%

70%

B901-4

m2

63

100%

100%

100%

70%

B902

m2

65

100%

100%

100%

70%

B1201-5

m2

151

100%

100%

B1201-6

m2

151

100%

100%

B1201-13

m2

151

100%

100%

B1201-15

m2

151

100%

100%

100%

70%

B1201-18

m2

151

100%

100%

100%

70%

m2

34,721

1st Coat
70%

2nd Coat
30%

No.

Description

Total (Emulsion Wall Acrylic)

Epoxy Coating Skirting

Bar Grill Window Paint as per Consultant Approva

To Date
Progress

PROGRESS Breakdown

45%
100%

70%
45%

B201

pcs

100%

70%

B902

pcs

100%

70%

B1001

pcs

33

100%

70%

B1002

pcs

13

100%

70%

B1201-2

pcs

60

100%

70%

B1201-3

pcs

60

100%

70%

B1201-4

pcs

60

100%

70%

B1201-6

pcs

60

100%

70%

B1201-7

pcs

60

100%

70%

Page 16 of 136

SAUDI BINLADIN GROUP - ABCD


Payment Certificate Department
Project

CORRECTIONAL FACILITIES P1182 Dammam

SubCon

MARIM M. JALANI TRADING EST., Contract No. 214 - Painting Works

Subject

Payment Certificate No. 5

Period

As of February 2016

Unit

Qty Per
Bldg

B1201-9

pcs

60

100%

30%

79%

B1201-10

pcs

60

100%

30%

79%

B1201-11

pcs

60

100%

30%

79%

B1201-12

pcs

60

100%

30%

79%

B1201-13

pcs

60

100%

30%

79%

B1201-15

pcs

60

100%

100%

100%

B1201-17

pcs

60

100%

30%

79%

B1201-18

pcs

60

100%

30%

79%

B1201-19

pcs

60

100%

70%

B1201-20

pcs

60

100%

70%

B1201-21

pcs

60

100%

70%

B1201-22

pcs

60

100%

70%

B1201-23

pcs

60

100%

70%

B1201-24

pcs

60

100%

70%

B1204-1

pcs

70

100%

70%

B1204-2

pcs

70

100%

70%

B1204-3

pcs

70

100%

70%

B1204-4

pcs

70

100%

70%

B1301

pcs

22

90%

63%

B1400

pcs

50

100%

70%

B1601-1

pcs

16

100%

70%

B1601-2

pcs

16

100%

70%

B1601-3

pcs

16

100%

30%

79%

B1601-5

pcs

16

100%

30%

79%

B1601-6

pcs

16

100%

70%

B1701

pcs

11

100%

70%

B1702

pcs

100%

70%

pcs

1,639

No.

Description

Total (Bar grill window)

To Date
Progress

PROGRESS Breakdown

Page 17 of 136

SAUDI BINLADIN GROUP - ABCD


Payment Certificate Department
Project

CORRECTIONAL FACILITIES P1182 Dammam

SubCon

MARIM M. JALANI TRADING EST., Contract No. 214 - Painting Works

Subject

Payment Certificate No. 5

Period

As of February 2016

No.

Description

Qty Per
Bldg

To Date
Progress

PROGRESS Breakdown

Louver Window Paint as per Consultant Approval 1st Coat

2nd Coat

B3202A-1

pcs

100%

70%

B3202A-2

pcs

100%

70%

B3202A-3

pcs

100%

70%

B3202A-5

pcs

100%

70%

B3202A-6

pcs

100%

70%

B3202A-7

pcs

100%

70%

B3202A-8

pcs

100%

70%

B3202A-9

pcs

100%

70%

B3202A-10

pcs

100%

70%

B3202A-11

pcs

100%

70%

B3202A-12

pcs

100%

70%

B3202A-13

pcs

100%

70%

B3202B-1

pcs

100%

70%

B3202B-2

pcs

100%

70%

B3202B-3

pcs

100%

70%

B3202B-4

pcs

100%

70%

B3202B-5

pcs

100%

70%

B3202B-8

pcs

100%

70%

B3202B-9

pcs

100%

70%

B3208

pcs

100%

70%

pcs

46

Total (Louver window)

Unit

ADDENDUM 18

Primer

Putty

1st Coat

2nd Coat

ELC Room (Elect Room-Exterior)

20%

25%

25%

30%

B1201-5

ea

100%

100%

100%

70%

B1201-6

ea

100%

100%

100%

70%

Page 18 of 136

SAUDI BINLADIN GROUP - ABCD


Payment Certificate Department
Project

CORRECTIONAL FACILITIES P1182 Dammam

SubCon

MARIM M. JALANI TRADING EST., Contract No. 214 - Painting Works

Subject

Payment Certificate No. 5

Period

As of February 2016

Unit

Qty Per
Bldg

B1201-7

ea

100%

100%

100%

70%

B1201-8

ea

100%

100%

100%

70%

B1201-17

ea

100%

100%

100%

70%

B1201-19

ea

100%

100%

100%

70%

B1201-20

ea

100%

100%

100%

70%

B1201-21

ea

100%

100%

100%

70%

B1201-24

ea

100%

100%

100%

70%

No.

Description

PROGRESS Breakdown

To Date
Progress

9
2

LC Room (Low Current)


B1201-5

ea

100%

100%

100%

70%

B1201-6

ea

100%

100%

100%

70%

B1201-7

ea

100%

100%

100%

70%

B1201-17

ea

100%

100%

100%

70%

B1201-19

ea

100%

100%

100%

70%

B1201-20

ea

100%

100%

100%

70%

B1201-21

ea

100%

100%

100%

70%

B1201-24

ea

100%

100%

100%

70%

B1204-1

ea

100%

100%

90%

68%

B1204-2

ea

70%

70%

70%

49%

B1204-3

ea

100%

100%

90%

68%

B1204-4

ea

70%

70%

70%

49%

12
3

Bldg Interior Elect Room (Elect Room -Interior)


B903-2

ea

100%

100%

100%

70%

B1100

ea

100%

100%

100%

70%

B1201-5

ea

100%

100%

100%

70%

B1201-6

ea

100%

100%

100%

70%

B1201-7

ea

100%

100%

100%

70%

Page 19 of 136

SAUDI BINLADIN GROUP - ABCD


Payment Certificate Department
Project

CORRECTIONAL FACILITIES P1182 Dammam

SubCon

MARIM M. JALANI TRADING EST., Contract No. 214 - Painting Works

Subject

Payment Certificate No. 5

Period

As of February 2016

Unit

Qty Per
Bldg

B1201-8

ea

100%

100%

100%

70%

B1204-1

ea

100%

100%

100%

70%

B1204-2

ea

70%

70%

70%

49%

B1204-3

ea

100%

100%

90%

68%

B1204-4

ea

100%

100%

100%

70%

B1601-2

ea

100%

100%

100%

70%

B1601-3

ea

100%

100%

100%

70%

B1601-4

ea

100%

100%

100%

70%

B1601-5

ea

100%

100%

100%

70%

B1602

ea

100%

100%

100%

70%

B1701

ea

100%

100%

80%

65%

B1702

ea

100%

100%

ADDENDUM 19

Primer 20%

Putty
25%

1st Coat
25%

2nd Coat
30%

Ceiling Repair (damaged areas)

20%

25%

25%

30%

Paint for Ceiling (EXCLUDING Elect Rooms)

Primer

Putty

1st Coat

2nd Coat

No.

Description

To Date
Progress

PROGRESS Breakdown

45%

23

B100

m2

500

100%

100%

100%

70%

B201

m2

707

100%

100%

20%

50%

B800

m2

546

100%

100%

100%

70%

B901-1

m2

270

100%

100%

20%

50%

B901-3

m2

270

100%

100%

100%

70%

B901-4

m2

270

100%

100%

100%

70%

B902

m2

225

100%

100%

20%

50%

B903-1

m2

272

100%

100%

20%

50%

Page 20 of 136

SAUDI BINLADIN GROUP - ABCD


Payment Certificate Department
Project

CORRECTIONAL FACILITIES P1182 Dammam

SubCon

MARIM M. JALANI TRADING EST., Contract No. 214 - Painting Works

Subject

Payment Certificate No. 5

Period

As of February 2016

Unit

Qty Per
Bldg

B1201-5

m2

1,570

100%

100%

B1201-5 (HCS)

m2

492

100%

100%

100%

70%

B1201-6

m2

1,570

100%

100%

100%

70%

B1201-6 (HCS)

m2

492

100%

100%

100%

70%

B1201-13

m2

1,570

100%

100%

B1201-15

m2

1,570

100%

100%

100%

70%

B1201-15 (HCS)

m2

492

100%

100%

100%

70%

B1201-18

m2

1,570

100%

100%

100%

70%

B1201-18 (HCS)

m2

492

100%

100%

100%

70%

B1601-1

m2

1,000

100%

100%

20%

50%

B2100

m2

145

100%

100%

100%

70%

B2501-9

m2

14

100%

100%

100%

70%

B2602-7

m2

20

100%

100%

100%

70%

B3202A-4

m2

158

100%

100%

100%

70%

B3202A-5

m2

158

100%

100%

100%

70%

B3202A-7

m2

158

100%

100%

100%

70%

B3202A-8

m2

158

100%

100%

100%

70%

B3202A-12

m2

158

100%

100%

100%

70%

B3202B-1

m2

105

100%

100%

100%

70%

B3202B-6

m2

105

100%

100%

100%

70%

B3203

m2

150

100%

100%

100%

70%

No.

Description

PROGRESS Breakdown

To Date
Progress

45%

45%

Electrical & Low currents rooms


B100

m2

11

100%

100%

100%

70%

B201

m2

23

100%

100%

100%

70%

B500

m2

100%

100%

100%

70%

B800

m2

100%

100%

100%

70%

B901-1

m2

13

100%

100%

100%

70%

B901-3

m2

13

100%

100%

100%

70%

Page 21 of 136

SAUDI BINLADIN GROUP - ABCD


Payment Certificate Department
Project

CORRECTIONAL FACILITIES P1182 Dammam

SubCon

MARIM M. JALANI TRADING EST., Contract No. 214 - Painting Works

Subject

Payment Certificate No. 5

Period

As of February 2016

Unit

Qty Per
Bldg

B901-4

m2

13

100%

100%

100%

70%

B902

m2

15

100%

100%

100%

70%

m2

15,304

B1201-7

m2

4,500

35%

B1201-8

m2

4,500

35%

m2

9,000

No.

Description

Total (Ceiling Paint)

PROGRESS Breakdown

To Date
Progress

Addendum 20
1

Internal Plastering - Ceiling

Page 22 of 136

Quantity
Prev

Current

To Date

270.00

30.00

300.00

270.00

30.00

300.00

300.00

0.00

300.00

180.00

180.00

210.00

90.00

300.00

300.00

0.00

300.00

249.00

0.00

249.00

300.00

0.00

300.00

300.00

0.00

300.00

300.00

0.00

300.00

300.00

0.00

300.00

288.00

288.00

288.00

0.00

288.00

259.20

28.80

288.00

288.00

0.00

288.00

3,634.20

646.80

4,281.00

15.12

0.00

15.12

4.80

0.00

4.80

15.96

0.00

15.96

15.96

0.00

15.96

15.96

0.00

15.96

15.96

0.00

15.96

Rem

58%

Page 23 of 136

Quantity
Prev

Current

To Date

15.96

0.00

15.96

10.08

1.68

11.76

10.08

1.68

11.76

10.08

1.68

11.76

10.08

1.68

11.76

15.12

0.00

15.12

15.12

0.00

15.12

16.80

0.00

16.80

16.80

0.00

16.80

16.80

0.00

16.80

16.80

0.00

16.80

5.70

0.00

5.70

4.56

0.00

4.56

0.00

3.36

3.36

247.74

10.08

257.82

134.40

0.00

134.40

216.38

0.00

216.38

71.40

0.00

71.40

21.60

0.00

21.60

21.00

0.00

21.00

37.20

0.00

37.20

42.60

0.00

42.60

38.40

0.00

38.40

38.40

0.00

38.40

38.40

0.00

38.40

38.40

0.00

38.40

Rem

52%

Page 24 of 136

Quantity
Prev

Current

To Date

38.40

0.00

38.40

39.60

0.00

39.60

37.80

0.00

37.80

37.80

0.00

37.80

95.04

0.00

95.04

106.92

0.00

106.92

106.92

0.00

106.92

118.80

0.00

118.80

71.28

71.28

118.80

118.80

118.80

0.00

118.80

118.80

0.00

118.80

59.40

59.40

118.80

0.00

118.80

118.80

0.00

118.80

118.80

0.00

118.80

118.80

0.00

118.80

90.72

0.00

90.72

70.56

0.00

70.56

90.72

0.00

90.72

240.00

0.00

240.00

168.00

72.00

240.00

168.00

168.00

240.00

240.00

162.00

162.00

70.20

70.20

38.40

0.00

38.40

0.60

0.00

0.60

Rem

Page 25 of 136

Quantity
Prev

Current

To Date

1.20

0.00

1.20

1.20

0.00

1.20

1.20

0.00

1.20

9.00

0.00

9.00

9.00

0.00

9.00

15.12

15.12

1.80

0.00

1.80

1.80

0.00

1.80

1.80

0.00

1.80

1.80

0.00

1.80

1.80

0.00

1.80

1.80

0.00

1.80

1.80

0.00

1.80

1.80

0.00

1.80

1.20

0.00

1.20

1.20

0.00

1.20

1.20

0.00

1.20

1.20

0.00

1.20

1.20

0.00

1.20

1.20

0.00

1.20

1.20

0.00

1.20

1.20

0.00

1.20

1.20

0.00

1.20

1.20

0.00

1.20

1.20

0.00

1.20

0.00

0.00

1.20

0.00

1.20

1.20

0.00

1.20

Rem

Page 26 of 136

Quantity
Prev

Current

To Date

51.60

0.00

51.60

39.60

0.00

39.60

14.40

0.00

14.40

14.40

0.00

14.40

14.40

0.00

14.40

14.40

0.00

14.40

14.40

0.00

14.40

14.40

0.00

14.40

14.40

0.00

14.40

14.40

0.00

14.40

14.40

0.00

14.40

14.40

0.00

14.40

14.40

0.00

14.40

14.40

0.00

14.40

14.40

0.00

14.40

10.80

0.00

10.80

10.80

0.00

10.80

10.80

0.00

10.80

10.80

0.00

10.80

10.80

0.00

10.80

10.80

0.00

10.80

10.80

0.00

10.80

10.80

0.00

10.80

10.80

0.00

10.80

16.20

0.00

16.20

0.00

5.40

5.40

3,134.66

982.20

4,116.86

Rem

56%

Page 27 of 136

Quantity
Prev

Current

To Date

149.50

149.50

61.50

61.50

250.00

0.00

250.00

250.00

0.00

250.00

250.00

0.00

250.00

250.00

0.00

250.00

125.00

125.00

250.00

125.00

0.00

125.00

125.00

0.00

125.00

250.00

0.00

250.00

250.00

0.00

250.00

250.00

0.00

250.00

250.00

0.00

250.00

250.00

0.00

250.00

250.00

0.00

250.00

250.00

0.00

250.00

250.00

0.00

250.00

250.00

0.00

250.00

240.00

240.00

240.00

0.00

240.00

240.00

0.00

240.00

240.00

0.00

240.00

4,345.00

576.00

4,921.00

Rem

48%

Page 28 of 136

Quantity
Prev

Current

To Date

75.00

0.00

75.00

209.95

0.00

209.95

226.10

0.00

226.10

226.10

0.00

226.10

22.95

0.00

22.95

50.00

0.00

50.00

675.00

1,275.00

1,950.00

1,275.00

0.00

1,275.00

2,100.00

0.00

2,100.00

1,725.00

300.00

2,025.00

1,415.00

0.00

1,415.00

105.00

0.00

105.00

8,105.10

1,575.00

9,680.10

101.50

101.50

238.50

0.00

238.50

445.00

0.00

445.00

298.00

0.00

298.00

36.80

142.06

178.86

1,018.30

243.56

1,261.86

586.60

0.00

586.60

700.00

1,521.80

2,221.80

Rem

60%

91%

Page 29 of 136

Quantity
Prev

Current

To Date

175.00

0.00

175.00

175.00

0.00

175.00

1,636.60

1,521.80

3,158.40

140.00

0.00

140.00

35.26

0.00

35.26

75.95

0.00

75.95

48.83

0.00

48.83

300.04

0.00

300.04

246.00

0.00

246.00

564.20

564.20

564.20

564.20

362.70

0.00

362.70

564.20

0.00

564.20

564.20

0.00

564.20

53.50

0.00

53.50

1,790.60

1,128.40

2,919.00

3,246.16

0.00

3,246.16

4,017.94

0.00

4,017.94

406.14

0.00

406.14

Rem

70%

57%

63%

Page 30 of 136

Quantity
Prev

Current

To Date

80.36

0.00

80.36

318.49

24.50

342.99

342.99

0.00

342.99

342.99

0.00

342.99

259.61

0.00

259.61

307.98

0.00

307.98

608.06

608.06

608.06

608.06

390.89

0.00

390.89

608.06

0.00

608.06

499.47

65.15

564.62

152.00

152.00

152.00

152.00

1,615.00

0.00

1,615.00

452.20

0.00

452.20

343.00

0.00

343.00

15.40

0.00

15.40

14.00

14.00

450.00

450.00

238.00

0.00

238.00

238.00

0.00

238.00

238.00

0.00

238.00

238.00

0.00

238.00

238.00

0.00

238.00

189.00

0.00

189.00

189.00

0.00

189.00

238.00

0.00

238.00

Rem

Page 31 of 136

Quantity
Prev

Current

To Date

92.84

0.00

92.84

105.88

0.00

105.88

22.26

0.00

22.26

24.64

0.00

24.64

44.11

0.00

44.11

44.11

0.00

44.11

44.11

0.00

44.11

45.57

0.00

45.57

68.11

68.11

105.95

105.95

68.11

0.00

68.11

105.95

0.00

105.95

68.11

37.84

105.95

15,718.35

2,285.65

18,004.00

1.40

0.00

1.40

2.10

0.00

2.10

23.10

0.00

23.10

9.10

0.00

9.10

42.00

0.00

42.00

42.00

0.00

42.00

42.00

0.00

42.00

42.00

0.00

42.00

42.00

0.00

42.00

Rem

52%

Page 32 of 136

Quantity
Prev

Current

To Date

47.40

0.00

47.40

47.40

0.00

47.40

47.40

0.00

47.40

47.40

0.00

47.40

47.40

0.00

47.40

60.00

0.00

60.00

47.40

0.00

47.40

47.40

0.00

47.40

42.00

0.00

42.00

42.00

0.00

42.00

42.00

0.00

42.00

42.00

0.00

42.00

42.00

0.00

42.00

42.00

0.00

42.00

49.00

0.00

49.00

49.00

0.00

49.00

49.00

0.00

49.00

49.00

0.00

49.00

13.86

0.00

13.86

35.00

0.00

35.00

11.20

0.00

11.20

11.20

0.00

11.20

12.64

0.00

12.64

12.64

0.00

12.64

11.20

0.00

11.20

7.70

0.00

7.70

3.50

0.00

3.50

1,204.44

0.00

1,204.44

Rem

73%

Page 33 of 136

Quantity
Prev

Current

To Date

2.10

0.00

2.10

2.10

0.00

2.10

2.10

0.00

2.10

2.10

0.00

2.10

2.10

0.00

2.10

2.10

0.00

2.10

2.10

0.00

2.10

2.10

0.00

2.10

2.10

0.00

2.10

2.10

0.00

2.10

2.10

0.00

2.10

2.10

0.00

2.10

0.70

0.00

0.70

0.70

0.00

0.70

0.70

0.00

0.70

0.70

0.00

0.70

0.70

0.00

0.70

0.70

0.00

0.70

0.70

0.00

0.70

0.00

2.10

2.10

30.10

2.10

32.20

0.70

0.00

0.70

0.45

0.25

0.70

Rem

70%

Page 34 of 136

Quantity
Prev

Current

To Date

0.45

0.25

0.70

0.70

0.00

0.70

0.70

0.70

0.70

0.70

0.70

0.70

0.70

0.00

0.70

0.70

0.00

0.70

3.70

2.60

6.30

0.70

0.00

0.70

0.70

0.70

0.70

0.70

0.70

0.70

0.70

0.70

0.70

0.70

0.70

0.00

0.70

0.70

0.00

0.70

0.68

0.00

0.68

0.49

0.00

0.49

0.68

0.00

0.68

0.49

0.00

0.49

4.43

3.50

7.93

0.70

0.00

0.70

0.70

0.00

0.70

1.40

0.00

1.40

1.40

0.00

1.40

1.40

0.00

1.40

Rem

70%

66%

Page 35 of 136

Quantity
Prev

Current

To Date

1.40

0.00

1.40

0.68

0.02

0.70

0.49

0.00

0.49

0.68

0.00

0.68

0.49

0.21

0.70

0.70

0.00

0.70

0.70

0.70

0.70

0.70

0.70

0.70

0.70

0.00

0.70

1.30

0.00

1.30

0.90

0.00

0.90

12.93

2.34

15.27

350.00

0.00

350.00

353.70

0.00

353.70

382.45

0.00

382.45

135.10

0.00

135.10

189.13

0.00

189.13

189.13

0.00

189.13

112.50

0.00

112.50

136.10

0.00

136.10

Rem

66%

Page 36 of 136

Quantity
Prev

Current

To Date

706.72

706.72

344.40

344.40

353.36

745.98

1,099.34

246.00

98.40

344.40

706.72

0.00

706.72

1,099.34

0.00

1,099.34

344.40

0.00

344.40

1,099.34

0.00

1,099.34

344.40

0.00

344.40

500.00

0.00

500.00

101.50

0.00

101.50

9.80

0.00

9.80

14.00

14.00

110.60

0.00

110.60

110.60

0.00

110.60

110.60

0.00

110.60

110.60

0.00

110.60

110.60

0.00

110.60

73.50

0.00

73.50

73.50

0.00

73.50

105.00

0.00

105.00

7.70

0.00

7.70

15.82

0.00

15.82

1.59

0.00

1.59

2.55

0.00

2.55

8.97

0.00

8.97

8.97

0.00

8.97

Rem

Page 37 of 136

Quantity
Prev

Current

To Date

8.97

0.00

8.97

10.50

0.00

10.50

7,523.01

1,909.49

9,432.51

1,575.00

1,575.00

1,575.00

1,575.00

3,150.00

3,150.00

0.00

Rem

62%

35%

Page 38 of 136

SAUDI BINLADIN GROUP - ABCD


Payment Certificate Department
Project
SubCon
Subject
Period

CORRECTIONAL FACILITIES P1182 Dammam


MARIM M. JALANI TRADING EST., Contract No. 214 - Painting Works
Payment Certificate No. 5
As of February 2016

Item no

Description

Unit

PC1

PC2

PC3

PC4

ADDENDUM 15
1

BAR GRILL DOORS (BGD)


B1201-6

m2

249.0

21.0

B1201-7

m2

249.0

21.0

B1201-10

m2

300.0

B1201-13

m2

B1201-15

m2

B1201-17

m2

B1201-21

m2

B1201-22

m2

300.0

B1201-23

m2

300.0

B1201-24

m2

B1204-2

m2

288.0

B1204-3

m2

259.2

B1204-4

m2

210.0
300.0
249.0
175.0

250.0

50.0

425.0

125.0

1,873.0

288.0

0.0

1,126.2

210.0

ACCESS DOORS (exterior - shaft areas)


B1001

m2

15.1

B1002

m2

4.8

B1201-2

m2

16.0

B1201-3

m2

16.0

B1201-4

m2

16.0

B1201-6

m2

16.0

B1201-7

m2

16.0

B1201-9

m2

10.1

B1201-10

m2

10.1

B1201-11

m2

10.1

B1201-12

m2

10.1

B1201-13

m2

10.1

5.0

B1201-15

m2

10.1

5.0

B1201-21

m2

16.8

B1201-22

m2

16.8

B1201-23

m2

16.8

B1201-24

m2

16.8

Page 39 of 136

SAUDI BINLADIN GROUP - ABCD


Payment Certificate Department
Project
SubCon
Subject
Period

CORRECTIONAL FACILITIES P1182 Dammam


MARIM M. JALANI TRADING EST., Contract No. 214 - Painting Works
Payment Certificate No. 5
As of February 2016

Item no

Description

Unit

B1204-2

m2

B1601-1

m2

PC1

PC3

PC4

5.7
0.0

PC2
0.0

4.6

0.0

217.8

30.0

HOLLOW METAL DOORS (incl Interior & Exterior, Prison toilets)


B100

m2

111.6

22.8

B201

m2

183.3

33.1

B202

m2

B400

m2

17.9

0.4

B500

m2

17.4

3.6

B700

m2

37.2

B800

m2

42.6

B901-1

m2

31.9

B901-2

m2

38.4

B901-3

m2

38.4

B901-4

m2

38.4

B901-5

m2

B902

m2

32.9

6.7

B903-1

m2

31.4

6.4

B903-2

m2

37.8

B1201-2

m2

95.0

B1201-3

m2

106.9

B1201-4

m2

106.9

B1201-10

m2

118.8

B1201-15

m2

118.8

B1201-17

m2

118.8

B1201-21

m2

B1201-22

m2

118.8

B1201-23

m2

118.8

B1201-24

m2

B1204-2

m2

80.6

B1204-3

m2

70.6

B1204-4

m2

70.6

B1601-1

m2

B1601-3

m2

71.4
3.2

6.5

38.4

54.6

78.0

64.2

40.8

199.2

10.1
20.2

40.8
168.0

Page 40 of 136

SAUDI BINLADIN GROUP - ABCD


Payment Certificate Department
Project
SubCon
Subject
Period

CORRECTIONAL FACILITIES P1182 Dammam


MARIM M. JALANI TRADING EST., Contract No. 214 - Painting Works
Payment Certificate No. 5
As of February 2016

Item no

Description

Unit

PC1

PC2

PC3

PC4

B2006

m2

38.4

B2007-1

m2

0.6

B2007-2

m2

1.2

B2007-3

m2

1.2

B2007-4

m2

1.2

B2008-1

m2

9.0

B2008-2

m2

9.0

B2501-1

m2

1.8

B2501-2

m2

1.8

B2501-3

m2

1.8

B2501-4

m2

1.8

B2501-5

m2

1.8

B2501-6

m2

1.8

B2501-7

m2

1.8

B2501-8

m2

1.8

B2602-1

m2

1.2

B2602-2

m2

1.2

B2602-3

m2

1.2

B2602-4

m2

1.2

B2602-5

m2

1.2

B2602-6

m2

1.2

B2602-7

m2

1.2

B2602-8

m2

1.2

B2602-9

m2

1.2

B2602-10

m2

1.2

B2602-11

m2

1.2

B2602-12

m2

B2602-13

m2

1.2

B2602-14

m2

1.2

B3000

m2

51.6

B3100

m2

39.6

B3202A-1

m2

14.4

B3202A-2

m2

B3202A-3

m2

14.4
14.4

Page 41 of 136

SAUDI BINLADIN GROUP - ABCD


Payment Certificate Department
Project
SubCon
Subject
Period

CORRECTIONAL FACILITIES P1182 Dammam


MARIM M. JALANI TRADING EST., Contract No. 214 - Painting Works
Payment Certificate No. 5
As of February 2016

Item no

Description

Unit

PC1

B3202A-4

m2

B3202A-5

m2

B3202A-6

m2

14.4

B3202A-7

m2

14.4

B3202A-8

m2

14.4

B3202A-9

m2

14.4

B3202A-10

m2

14.4

B3202A-11

m2

14.4

B3202A-12

m2

14.4

B3202A-13

m2

14.4

B3202A-14

m2

14.4

B3202B-1

m2

10.8

B3202B-2

m2

10.8

B3202B-3

m2

10.8

B3202B-4

m2

10.8

B3202B-5

m2

10.8

B3202B-6

m2

10.8

B3202B-7

m2

10.8

B3202B-8

m2

10.8

B3202B-9

m2

B3203

m2

PC3

PC4

14.4
14.4

-14.4

10.8
132.6

PC2

16.2
1,553.1

1,120.9

328.1

FULL PUTTY WORKS (as requested & approved by Site Eng'rs)


B1201-6 (BGD)

m2

125.0

125.0

B1201-7 (BGD)

m2

125.0

125.0

B1201-9 (BGD)

m2

250.0

B1201-10 (BGD)

m2

250.0

B1201-11 (BGD)

m2

125.0

B1201-12 (BGD)

m2

125.0

B1201-13 (BGD)

m2

125.0

B1201-15 (BGD)

m2

250.0

B1201-17 (BGD)

m2

250.0

B1201-18 (BGD)

m2

250.0

B1201-19 (BGD)

m2

250.0

Page 42 of 136

SAUDI BINLADIN GROUP - ABCD


Payment Certificate Department
Project
SubCon
Subject
Period

CORRECTIONAL FACILITIES P1182 Dammam


MARIM M. JALANI TRADING EST., Contract No. 214 - Painting Works
Payment Certificate No. 5
As of February 2016

Item no

Description

Unit

PC1

PC2

PC3

B1201-20 (BGD)

m2

B1201-21 (BGD)

m2

250.0

B1201-22 (BGD)

m2

250.0

B1201-23 (BGD)

m2

250.0

B1201-24 (BGD)

m2

250.0

B1204-2

m2

240.0

B1204-3

m2

240.0

B1204-4

m2

PC4
250.0

0.0

0.0

45.0

240.0

0.0

3,845.0

500.0

ADDENDUM 16
1

Epoxy Coating System for Walls


B201

m2

30.0

B901-1

m2

145.4

64.6

B901-3

m2

145.4

80.8

B901-4

m2

145.4

80.8

B902

m2

23.0

B903-1

m2

B1201-6

m2

675.0

B1201-13

m2

1,275.0

B1201-15

m2

810.0

1,290.0

B1201-18

m2

810.0

540.0

B1601-1

m2

B3209

m2

50.0

1,132.0

283.0

1,621.0

375.0

1,998.0

1,830.0

105.00
2,656.1

Epoxy Coating System for Floors


B3206

m2

238.5

B3207

m2

445.0

B3208

m2

298.0

B3209

m2

Anti-Bacterial Paint for Ceiling

Exterior Paint System (stone shield)


B901-3

m2

0.0

0.0

981.5

377.1

0.0

209.5

36.80
36.8

Page 43 of 136

SAUDI BINLADIN GROUP - ABCD


Payment Certificate Department
Project
SubCon
Subject
Period

CORRECTIONAL FACILITIES P1182 Dammam


MARIM M. JALANI TRADING EST., Contract No. 214 - Painting Works
Payment Certificate No. 5
As of February 2016

Item no

Description

Unit

PC1

PC2

PC3

PC4

B1601-1

m2

0.0

500.0

75.0

125.0

B3202A-8

m2

112.5

0.0

62.5

B3202A-12

m2

112.5

0.0

62.5

0.0

602.1

500.0

409.5

125.0

Extra Over Wall Height more than 4.5m


B100

m2

140.0

B1201-13 (Days Rms-2 nos)

m2

35.3

B1201-15 (Days Rms-2 nos)

m2

B1201-18 (Days Rms-2 nos)

m2

76.0
0.0

0.0

48.8

0.0

124.8

175.3

Extra Over Ceiling Height more than 4.5m


B1201-6 (HCS)

m2

246.0

B1201-13 (Day Rms-2 nos)

m2

362.7

B1201-15 (Days Rms-2 nos)

m2

564.2

B1201-18 (Days Rms-2 nos)

m2

362.7

201.5

B1601-1 (Waiting space-2 nos)

m2

53.5

0.0

0.0

1,589.1

201.5

2,385.0

629.3

231.9

0.0

ADDENDUM 17
1

Acrylic Emulsion Paint for Wall


B100

m2

B201

m2

886.0

3,200.0

-68.1

B500

m2

275.4

30.6

71.1

B800

m2

33.8

46.6

B901-1

m2

248.9

-28.4

98.0

B901-3

m2

248.9

-28.4

122.5

B901-4

m2

248.9

-28.4

122.5

B902

m2

288.9

-29.3

B903-1

m2

B1201-13

m2

B1201-15

m2

B1201-18

m2

B1601-1

m2

B1601-3

m2

B2100

m2

340.0

-32.0
325.7

275.4
323.0

65.2

332.7
390.9

1,292.0

29.0

108.6

0.0
452.2
343.0

Page 44 of 136

SAUDI BINLADIN GROUP - ABCD


Payment Certificate Department
Project
SubCon
Subject
Period

CORRECTIONAL FACILITIES P1182 Dammam


MARIM M. JALANI TRADING EST., Contract No. 214 - Painting Works
Payment Certificate No. 5
As of February 2016

Item no

Description

Unit

PC1

PC2

PC3

B2501-9

m2

B3202A-4

m2

76.5

161.5

B3202A-5

m2

76.5

161.5

B3202A-7

m2

107.1

130.9

B3202A-8

m2

153.0

85.0

B3202A-12

m2

153.0

85.0

B3202B-1

m2

B3202B-6

m2

B3203

m2

PC4
15.4

189.0
-

72.9

116.1

107.1

130.9

Electrical / LC Rooms
B100

m2

92.8

B201

m2

105.9

B500

m2

22.3

B800

m2

24.6

B901-1

m2

44.1

B901-3

m2

44.1

B901-4

m2

44.1

B902

m2

45.6

B1201-13

m2

68.1

B1201-15

m2

106.0

B1201-18

m2

0.0

0.0

0.0

68.1

3,794.9

7,027.9

3,408.2

1,487.4

Epoxy Coating Skirting

Bar Grill Window Paint as per Consultant Approval


B201

pcs

1.4

B902

pcs

2.1

B1001

pcs

23.1

B1002

pcs

9.1

B1201-2

pcs

19.8

22.2

B1201-3

pcs

19.8

22.2

B1201-4

pcs

19.8

22.2

B1201-6

pcs

25.2

16.8

B1201-7

pcs

25.2

16.8

Page 45 of 136

SAUDI BINLADIN GROUP - ABCD


Payment Certificate Department
Project
SubCon
Subject
Period

CORRECTIONAL FACILITIES P1182 Dammam


MARIM M. JALANI TRADING EST., Contract No. 214 - Painting Works
Payment Certificate No. 5
As of February 2016

Item no

Description

Unit

PC1

PC3

PC4

B1201-9

pcs

25.2

22.2

B1201-10

pcs

36.0

11.4

B1201-11

pcs

25.2

22.2

B1201-12

pcs

25.2

22.2

B1201-13

pcs

25.2

22.2

B1201-15

pcs

36.0

24.0

B1201-17

pcs

25.2

22.2

B1201-18

pcs

25.2

22.2

B1201-19

pcs

42.0

B1201-20

pcs

42.0

B1201-21

pcs

25.2

16.8

B1201-22

pcs

25.2

16.8

B1201-23

pcs

25.2

16.8

B1201-24

pcs

25.2

16.8

B1204-1

pcs

B1204-2

pcs

B1204-3

pcs

49.0

B1204-4

pcs

49.0

B1301

pcs

13.9

B1400

pcs

35.0

B1601-1

pcs

5.0

6.2

B1601-2

pcs

5.0

6.2

B1601-3

pcs

5.0

7.6

B1601-5

pcs

5.0

7.6

B1601-6

pcs

11.2

B1701

pcs

7.7

B1702

pcs

49.0
29.4

0.0

PC2

19.6

483.4

617.6

3.50
103.5

Louver Window Paint as per Consultant Approval


B3202A-1

pcs

2.1

B3202A-2

pcs

2.1

B3202A-3

pcs

2.1

B3202A-5

pcs

B3202A-6

pcs

2.1
2.1

Page 46 of 136

SAUDI BINLADIN GROUP - ABCD


Payment Certificate Department
Project
SubCon
Subject
Period

CORRECTIONAL FACILITIES P1182 Dammam


MARIM M. JALANI TRADING EST., Contract No. 214 - Painting Works
Payment Certificate No. 5
As of February 2016

Item no

Description

Unit

PC1

PC2

PC3

B3202A-7

pcs

2.1

B3202A-8

pcs

2.1

B3202A-9

pcs

B3202A-10

pcs

2.1

B3202A-11

pcs

2.1

B3202A-12

pcs

2.1

B3202A-13

pcs

2.1

B3202B-1

pcs

0.7

B3202B-2

pcs

0.7

B3202B-3

pcs

0.7

B3202B-4

pcs

0.7

B3202B-5

pcs

0.7

B3202B-8

pcs

0.7

B3202B-9

pcs

PC4

2.1

0.0

0.0

0.7

0.0

25.9

4.2

ADDENDUM 18
ELC Room Paint (exterior)
B1201-5

pcs

0.7

B1201-6

pcs

0.5

B1201-7

pcs

0.5

B1201-8

pcs

0.7

B1201-21

pcs

B1201-24

pcs

0.7
0.0

0.0

0.7

0.0

1.4

2.3

LC Room Paint
B1201-5

pcs

0.7

B1201-21

pcs

B1201-24

pcs

B1204-1

pcs

0.7

B1204-2

pcs

0.5

B1204-3

pcs

0.7

B1204-4

pcs

0.7
-

0.0

0.0

0.7

0.0

0.5

1.4

3.0

Page 47 of 136

SAUDI BINLADIN GROUP - ABCD


Payment Certificate Department
Project
SubCon
Subject
Period

CORRECTIONAL FACILITIES P1182 Dammam


MARIM M. JALANI TRADING EST., Contract No. 214 - Painting Works
Payment Certificate No. 5
As of February 2016

Item no

Description

Unit

PC1

PC2

PC3

PC4

Building Interior Electricity Room Paint (interior)


B903-2

pcs

0.7

B1100

pcs

0.7

B1201-5

pcs

1.4

B1201-6

pcs

1.4

B1201-7

pcs

1.4

B1201-8

pcs

1.4

B1204-1

pcs

0.7

B1204-2

pcs

0.5

B1204-3

pcs

0.7

B1204-4

pcs

B1601-2

pcs

0.7

B1602

pcs

0.7

B1701

pcs

1.3

B1702

pcs

0.0

0.0

0.0

0.5

0.5

0.5

10.2

2.8

ADDENDUM 19
1

Ceiling Repair (damaged areas)

Paint for Ceiling


B100

m2

350.0

B201

m2

365.0

-11.3

B800

m2

123.8

258.7

B901-1

m2

141.5

-6.4

B901-3

m2

89.1

100.0

B901-4

m2

89.1

100.0

B902

m2

120.0

-7.5

B903-1

m2

142.5

-6.4

B1201-6

m2

B1201-6 (HCS)

m2

250.0

-4.0

B1201-13

m2

432.0

274.7

B1201-15

m2

432.0

667.3

B1201-15 (HCS)

m2

135.0

209.4

353.4

Page 48 of 136

SAUDI BINLADIN GROUP - ABCD


Payment Certificate Department
Project
SubCon
Subject
Period

CORRECTIONAL FACILITIES P1182 Dammam


MARIM M. JALANI TRADING EST., Contract No. 214 - Painting Works
Payment Certificate No. 5
As of February 2016

Item no

Description

Unit

PC1

PC2

PC3

PC4

432.0

274.7

392.6

B1201-18

m2

B1201-18 (HCS)

m2

B1601-1

m2

B2100

m2

B2501-9

m2

B3202A-4

m2

35.6

75.1

B3202A-5

m2

35.6

75.1

B3202A-7

m2

42.7

67.9

B3202A-8

m2

71.1

39.5

B3202A-12

m2

71.1

39.5

B3202B-1

m2

B3202B-6

m2

B3203

m2

344.4
500.0

0.0
101.5
9.8

73.5
-

28.4

45.2

33.8

71.3

Electrical / LC Rooms
B100

m2

7.7

B201

m2

15.8

B500

m2

1.6

B800

m2

2.5

B901-1

m2

9.0

B901-3

m2

9.0

B901-4

m2

9.0

B902

m2

0.0

3,570.1

10.50

0.00

2,502.8

1,450.2

Page 49 of 136

PC5

To Date

270.0
270.0
300.0
210.0
300.0
249.0
300.0
300.0
300.0
300.0
288.0
259.2
288.0
3,634.2
15.1
4.8
16.0
16.0
16.0
16.0
16.0
10.1
10.1
10.1
10.1
15.1
15.1
16.8
16.8
16.8
16.8

Page 50 of 136

PC5

To Date
5.7
4.6
247.8
134.4
216.4
71.4
21.6
21.0
37.2
42.6
38.4
38.4
38.4
38.4
38.4
39.6
37.8
37.8
95.0
106.9
106.9
118.8
118.8
118.8
118.8
118.8
118.8
118.8
90.7
70.6
90.7
240.0
168.0

Page 51 of 136

PC5

To Date
38.4
0.6
1.2
1.2
1.2
9.0
9.0
1.8
1.8
1.8
1.8
1.8
1.8
1.8
1.8
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
1.2
0.0
1.2
1.2
51.6
39.6
14.4
14.4
14.4

Page 52 of 136

PC5

To Date
14.4
14.4
14.4
14.4
14.4
14.4
14.4
14.4
14.4
14.4
0.0
10.8
10.8
10.8
10.8
10.8
10.8
10.8
10.8
10.8
16.2
3,134.6
250.0
250.0
250.0
250.0
125.0
125.0
125.0
250.0
250.0
250.0
250.0

Page 53 of 136

PC5

To Date
250.0
250.0
250.0
250.0
250.0
240.0
240.0
240.0
4,345.0

75.0
210.0
226.1
226.1
23.0
50.0
675.0
1,275.0
2,100.0
1,725.0
1,415.0
105.0
8,105.1
238.5
445.0
298.0
36.8
1,018.3

586.6

Page 54 of 136

PC5

To Date
700.0
175.0
175.0
1,636.6
140.0
35.3
76.0
48.8
300.1
246.0
362.7
564.2
564.2
53.5
1,790.6

3,246.2
4,017.9
406.1
80.4
318.5
343.0
343.0
259.6
308.0
390.9
608.1
499.5
1,615.0
452.2
343.0

Page 55 of 136

PC5

To Date
15.4
238.0
238.0
238.0
238.0
238.0
189.0
189.0
238.0
0.0
92.8
105.9
22.3
24.6
44.1
44.1
44.1
45.6
68.1
106.0
68.1
15,718.3

1.4
2.1
23.1
9.1
42.0
42.0
42.0
42.0
42.0

Page 56 of 136

PC5

To Date
47.4
47.4
47.4
47.4
47.4
60.0
47.4
47.4
42.0
42.0
42.0
42.0
42.0
42.0
49.0
49.0
49.0
49.0
13.9
35.0
11.2
11.2
12.6
12.6
11.2
7.7
3.5
1,204.4
2.1
2.1
2.1
2.1
2.1

Page 57 of 136

PC5

To Date
2.1
2.1
2.1
2.1
2.1
2.1
2.1
0.7
0.7
0.7
0.7
0.7
0.7
0.7
30.1

0.7
0.5
0.5
0.7
0.7
0.7
3.7
0.7
0.7
0.7
0.7
0.5
0.7
0.5
4.4

Page 58 of 136

PC5

To Date
0.7
0.7
1.4
1.4
1.4
1.4
0.7
0.5
0.7
0.5
0.7
0.7
1.3
1.0
13.0

0.0

350.0
353.7
382.5
135.1
189.1
189.1
112.5
136.1
353.4
246.0
706.7
1,099.3
344.4

Page 59 of 136

PC5

To Date
1,099.3
344.4
500.0
101.5
9.8
110.6
110.6
110.6
110.6
110.6
73.5
73.5
105.0
7.7
15.8
1.6
2.5
9.0
9.0
9.0
10.5
7,523.0

Page 60 of 136

SAUDI BINLADIN GROUP


Project
SubCon
Subject
Period

CORRECTIONAL FACILITIES JEDDAH P1182


Marim M. Jilani, Contract No. 214 - PAINT WORKS
Payment Certificate No 9
Up to October 2014
MAIN CONTRACT
BUILDING LOCATIONS
Bar Grill Door

Access Door

2602-1

2602-2

2602-3

2602-4

2602-5

2602-6

2602-7

2602-8

2602-9

2602-10

2602-11

2602-12

2602-13

2602-14

Page 61 of 136

SAUDI BINLADIN GROUP


Project
SubCon
Subject
Period

CORRECTIONAL FACILITIES JEDDAH P1182


Marim M. Jilani, Contract No. 214 - PAINT WORKS
Payment Certificate No 9
Up to October 2014
MAIN CONTRACT
BUILDING LOCATIONS
Hollow Core Door

2602-1

100%

2602-2

100%

2602-3

100%

2602-4

100%

2602-5

100%

2602-6

100%

2602-7

100%

2602-8

100%

2602-9

100%

2602-10

100%

2602-11

100%

2602-12

100%

2602-13

100%

2602-14

100%

Page 62 of 136

SAUDI BINLADIN GROUP


Project
SubCon
Subject
Period

CORRECTIONAL FACILITIES JEDDAH P1182


Marim M. Jilani, Contract No. 214 - PAINT WORKS
Payment Certificate No 9
Up to October 2014

BUILDING

213 Hani Al
Elaimi

214 Marim
Jalani

220 Emad Al
Belad

337 Sacodeco

202
903-1

58%

903-2

67%

1002

78%

1100

12%

59%

1201-1
1201-2

96%

1201-3

57%

43%

1201-4

57%

43%

1201-10

67%

1201-11

67%

1201-18

62%

1202

38%
16%

1204-1
1204-2
1204-3
1204-4
1301
1302
1601-1

50%
30%

54%

1602
1701

33%

2008-1

26%

2008-2

26%

3000

45%

Page 63 of 136

SAUDI BINLADIN GROUP


Project
SubCon
Subject
Period

CORRECTIONAL FACILITIES JEDDAH P1182


Marim M. Jilani, Contract No. 214 - PAINT WORKS
Payment Certificate No 9
Up to October 2014

BUILDING

213 Hani Al
Elaimi

214 Marim
Jalani

220 Emad Al
Belad

3202A-2

93%

3202A-4

93%

3202A-7

96%

337 Sacodeco

Page 64 of 136

SAUDI BINLADIN GROUP


Project
SubCon
Subject
Period

CORRECTIONAL FACILITIES JEDDAH P1182


Marim M. Jilani, Contract No. 214 - PAINT WORKS
Payment Certificate No 9
Up to October 2014

BUILDING

354 Finest

Work Done

Balance

202

41%

41%

59%

903-1

58%

42%

903-2

67%

33%

1002

78%

22%

1100

71%

29%

1201-1

63%

63%

37%

1201-2

4%

100%

0%

1201-3

43%

57%

1201-4

43%

57%

1201-10

67%

33%

1201-11

67%

33%

1201-18

100%

0%

1202

16%

84%

1204-1

37%

37%

63%

1204-2

89%

89%

11%

1204-3

89%

89%

11%

1204-4

28%

28%

72%

1301

33%

33%

67%

1302

95%

5%

1601-1

54%

46%

99%

1%

1701

33%

67%

2008-1

26%

74%

2008-2

26%

74%

67%

33%

1602

3000

99%

67%

Page 65 of 136

SAUDI BINLADIN GROUP


Project
SubCon
Subject
Period

CORRECTIONAL FACILITIES JEDDAH P1182


Marim M. Jilani, Contract No. 214 - PAINT WORKS
Payment Certificate No 9
Up to October 2014

BUILDING

354 Finest

Work Done

Balance

3202A-2

93%

7%

3202A-4

93%

7%

3202A-7

96%

4%

SAUDI BINLADIN GROUP


Project
SubCon
Subject
Period
Item no
1

CORRECTIONAL FACILITIES JEDDAH P1182


Marim M. Jilani, Contract No. 214 - PAINT WORKS
Payment Certificate No 8
Up to October 2014
Description
Bar Grill Doors
BD 1900 x 2700
BD1 2300 x 2700
BD2 4000 x 2700
Access Doors
AC2 600 x 2000 - External
AC1 1000 x 2000 - External
AC2 600 x 2000 - Internal
Hollow Core Doors
Various sizes - Internal
Various sizes- External

Quantity Surveyor

Units

Previous

311667989.xlsx

Current

To Date

400

601

700

800

901.3

901.4

901.5

m2
m2
m2

60.00
408.13
7,044.80

60.00
408.13
7,044.80

m2
m2
m2

330.01
58.00
120.07
5,758.31
851.95

330.01
58.00
120.07
5,758.31
851.95

1.68

2.04

2.04

26.39
10.01

32.05
12.16

32.05
12.16

m2
m2

66 of 136

5.76
-

24.45
18.36

21.76
5.74

33.53
4.80

SAUDI BINLADIN GROUP


Project
SubCon
Subject
Period
Item no
1

CORRECTIONAL FACILITIES JEDDAH P1182


Marim M. Jilani, Contract No. 214 - PAINT WORKS
Payment Certificate No 8
Up to October 2014
Description
Bar Grill Doors
BD 1900 x 2700
BD1 2300 x 2700
BD2 4000 x 2700
Access Doors
AC2 600 x 2000 - External
AC1 1000 x 2000 - External
AC2 600 x 2000 - Internal
Hollow Core Doors
Various sizes - Internal
Various sizes- External

Quantity Surveyor

Units

311667989.xlsx

1001

m2
m2
m2

164.16

m2
m2
m2

18.24
9.24

m2
m2

205.88
30.55

67 of 136

SAUDI BINLADIN GROUP


Project
SubCon
Subject
Period
Item no
1

CORRECTIONAL FACILITIES JEDDAH P1182


Marim M. Jilani, Contract No. 214 - PAINT WORKS
Payment Certificate No 8
Up to October 2014
Description
Bar Grill Doors
BD 1900 x 2700
BD1 2300 x 2700
BD2 4000 x 2700
Access Doors
AC2 600 x 2000 - External
AC1 1000 x 2000 - External
AC2 600 x 2000 - Internal
Hollow Core Doors
Various sizes - Internal
Various sizes- External

Quantity Surveyor

Units

311667989.xlsx

1100

1201.2

1201.3

1201.4

1201.5

1201.6

1201.7

1201.8

1201.9

1201.12

m2
m2
m2

24.75
473.44

24.75
69.44

24.75
69.44

16.09
331.41

17.33
331.41

17.33
331.41

17.33
331.41

17.33
331.41

14.85
284.06

m2
m2
m2

19.19
4.00
4.80

19.19
4.00
4.80

2.80
1.73

2.80
1.73

13.43
2.80
3.36

13.43
2.80
3.36

13.43
2.80
3.36

13.43
2.80
3.36

11.51
-

135.75
21.72

166.00
21.72

167.00
21.72

62.64
7.82

121.80
15.20

121.80
15.20

121.80
15.20

121.80
15.20

121.80
15.20

m2
m2

11.44
9.60

68 of 136

SAUDI BINLADIN GROUP


Project
SubCon
Subject
Period
Item no
1

CORRECTIONAL FACILITIES JEDDAH P1182


Marim M. Jilani, Contract No. 214 - PAINT WORKS
Payment Certificate No 8
Up to October 2014
Description
Bar Grill Doors
BD 1900 x 2700
BD1 2300 x 2700
BD2 4000 x 2700
Access Doors
AC2 600 x 2000 - External
AC1 1000 x 2000 - External
AC2 600 x 2000 - Internal
Hollow Core Doors
Various sizes - Internal
Various sizes- External

Quantity Surveyor

Units

311667989.xlsx

1201.13

1201.14

1201.15

1201.16

1201.17

1201.18

1201.19

1201.20

1201.21

1201.22

m2
m2
m2

14.85
284.06

14.85
165.70

17.33
165.70

17.33
473.44

22.28
426.10

13.37
255.64

22.28
426.10

22.28
426.10

22.28
426.10

22.28
426.10

m2
m2
m2

9.60
2.00
1.68

9.60
2.00
-

9.60
2.00
-

9.60
2.00
-

17.27
4.32

17.27
3.60
4.32

17.27
3.60
4.32

17.27
3.60
4.32

17.27
3.60
4.32

17.27
3.60
4.32

m2
m2

104.40
13.03

104.40
13.03

104.40
13.03

174.00
21.72

156.60
19.55

24.60
5.43

139.20
17.38

139.20
17.38

139.20
17.38

139.20
17.38

69 of 136

SAUDI BINLADIN GROUP


Project
SubCon
Subject
Period
Item no
1

CORRECTIONAL FACILITIES JEDDAH P1182


Marim M. Jilani, Contract No. 214 - PAINT WORKS
Payment Certificate No 8
Up to October 2014
Description
Bar Grill Doors
BD 1900 x 2700
BD1 2300 x 2700
BD2 4000 x 2700
Access Doors
AC2 600 x 2000 - External
AC1 1000 x 2000 - External
AC2 600 x 2000 - Internal
Hollow Core Doors
Various sizes - Internal
Various sizes- External

Quantity Surveyor

Units

311667989.xlsx

1201.23

1201.24

1202

1400

1500

1601.1

1601.2

1601.3

1601.4

1601.5

m2
m2
m2

22.28
426.10

22.28
426.10

m2
m2
m2

17.27
3.60
4.32

17.27
3.60
4.32

28.00
-

0.69
2.77

0.76
3.02

1.07
4.28

m2
m2

156.60
19.55

139.20
17.38

220.00
-

184.55
20.42

201.33
22.28

285.22
31.56

147.00
10.50

70 of 136

87.00
3.83

86.53
36.40

224.36
36.52

SAUDI BINLADIN GROUP


Project
SubCon
Subject
Period
Item no
1

CORRECTIONAL FACILITIES JEDDAH P1182


Marim M. Jilani, Contract No. 214 - PAINT WORKS
Payment Certificate No 8
Up to October 2014
Description
Bar Grill Doors
BD 1900 x 2700
BD1 2300 x 2700
BD2 4000 x 2700
Access Doors
AC2 600 x 2000 - External
AC1 1000 x 2000 - External
AC2 600 x 2000 - Internal
Hollow Core Doors
Various sizes - Internal
Various sizes- External

Quantity Surveyor

Units

311667989.xlsx

1601.6

1900
-

2001

2002

2003

2004

m2
m2
m2

m2
m2
m2

1.07
4.28

12.00

3.36

3.36

3.61

5.04

m2
m2

285.22
31.56

325.72
31.20

76.66
6.72

76.41
7.39

80.67
5.26

77.11
6.72

71 of 136

2006 2007-1,2,3&4 2100

22.05
13.44

60.00
16.00

2201

16.86
4.94

94.24
-

SAUDI BINLADIN GROUP


Project
SubCon
Subject
Period
Item no
1

CORRECTIONAL FACILITIES JEDDAH P1182


Marim M. Jilani, Contract No. 214 - PAINT WORKS
Payment Certificate No 8
Up to October 2014
Description
Bar Grill Doors
BD 1900 x 2700
BD1 2300 x 2700
BD2 4000 x 2700
Access Doors
AC2 600 x 2000 - External
AC1 1000 x 2000 - External
AC2 600 x 2000 - Internal
Hollow Core Doors
Various sizes - Internal
Various sizes- External

Quantity Surveyor

Units

311667989.xlsx

2202

2301

2700

2900

3100

3202B-2 3202B-3 3202B-4 3202B-7 3202B-8

m2
m2
m2

m2
m2
m2

0.60

9.00

7.20

9.00

9.00

m2
m2

88.60
-

13.86
7.20

26.36
6.16

49.86
11.55

72 of 136

26.29
20.16

18.00

SAUDI BINLADIN GROUP


Project
SubCon
Subject
Period
Item no
1

CORRECTIONAL FACILITIES JEDDAH P1182


Marim M. Jilani, Contract No. 214 - PAINT WORKS
Payment Certificate No 8
Up to October 2014
Description
Bar Grill Doors
BD 1900 x 2700
BD1 2300 x 2700
BD2 4000 x 2700
Access Doors
AC2 600 x 2000 - External
AC1 1000 x 2000 - External
AC2 600 x 2000 - Internal
Hollow Core Doors
Various sizes - Internal
Various sizes- External

Quantity Surveyor

Units

311667989.xlsx

3203

3208

3209

m2
m2
m2

m2
m2
m2

1.30
4.55

4.00

m2
m2

6.40
16.80

73 of 136

Page 74

Main Contract

SAUDI BINLADIN GROUP


Project
CORRECTIONAL FACILITIES JEDDAH P1182
SubCon
Marim M. Jilani, Contract No. 214 - PAINT WORKS
Subject
Payment Certificate No 8
Period
Up to October 2014
Item no
1

Description
Bar Grill Doors
BG 1900 x 2700
BD1 2300 x 2700
BD2 4000 x 2700
Access Doors
AC2 600 x 2000 - External
AC1 1000 x 2000 - External
AC2 600 x 2000 - Internal
Hollow Core Doors
Various sizes - Internal
Various sizes- External

Units

400

601

700

800

901.3

901.4

901.5

m2
m2
m2

1100

95%

26%

65%
65%

55%
55%

Page 74 of 136

70%
70%

70%

85%

85%

70%

70%
70%

85%
85%

85%
85%

95%
95%

1201.2

100%
100%

95%

m2
m2
m2
m2
m2

1001

100%
100%
100%
100%
100%

100%
100%

Eng. Ahmed Sheikh


All Segment

Page 75

Main Contract

SAUDI BINLADIN GROUP


Project
CORRECTIONAL FACILITIES JEDDAH P1182
SubCon
Marim M. Jilani, Contract No. 214 - PAINT WORKS
Subject
Payment Certificate No 8
Period
Up to October 2014
Item no
1

Description
Bar Grill Doors
BG 1900 x 2700
BD1 2300 x 2700
BD2 4000 x 2700
Access Doors
AC2 600 x 2000 - External
AC1 1000 x 2000 - External
AC2 600 x 2000 - Internal
Hollow Core Doors
Various sizes - Internal
Various sizes- External

Units

1201.3

1201.4

1201.5

1201.6

1201.7

1201.8

1201.9

1201.12

1201.13

1201.14

m2
m2
m2

100%
100%

100%
100%

65%
70%

70%
70%

70%
70%

70%
70%

70%
70%

60%
60%

60%
60%

60%
35%

m2
m2
m2

100%
100%
100%

70%
36%

70%
70%
70%

70%
70%
70%

70%
70%
70%

60%

70%
36%

70%
70%
70%

50%
50%
35%

50%
50%

m2
m2

100%
100%

100%
100%

36%
36%

70%
70%

70%
70%

70%
70%

70%
70%

70%
70%

60%
60%

60%
60%

Page 75 of 136

Eng. Ahmed Sheikh


All Segment

Page 76

Main Contract

SAUDI BINLADIN GROUP


Project
CORRECTIONAL FACILITIES JEDDAH P1182
SubCon
Marim M. Jilani, Contract No. 214 - PAINT WORKS
Subject
Payment Certificate No 8
Period
Up to October 2014
Item no
1

Description
Bar Grill Doors
BG 1900 x 2700
BD1 2300 x 2700
BD2 4000 x 2700
Access Doors
AC2 600 x 2000 - External
AC1 1000 x 2000 - External
AC2 600 x 2000 - Internal
Hollow Core Doors
Various sizes - Internal
Various sizes- External

Units

1201.15

1201.16

1201.17

1201.18

1201.19

1201.20

1201.21

1201.22

1201.23

1201.24

m2
m2
m2

70%
35%

70%
100%

90%
90%

90%
90%

90%
90%

90%
90%

90%
90%

90%
90%

90%
90%

90%
90%

m2
m2
m2

50%
50%

50%
50%

90%
90%

90%
90%
90%

90%
90%
90%

90%
90%
90%

90%
90%
90%

90%
90%
90%

90%
90%
90%

90%
90%
90%

m2
m2

60%
60%

90%
90%

25%
25%

80%
80%

80%
80%

80%
80%

80%
80%

90%
90%

80%
80%

100%
100%

Page 76 of 136

Eng. Ahmed Sheikh


All Segment

Page 77

Main Contract

SAUDI BINLADIN GROUP


Project
CORRECTIONAL FACILITIES JEDDAH P1182
SubCon
Marim M. Jilani, Contract No. 214 - PAINT WORKS
Subject
Payment Certificate No 8
Period
Up to October 2014
Item no
1

Description
Bar Grill Doors
BG 1900 x 2700
BD1 2300 x 2700
BD2 4000 x 2700
Access Doors
AC2 600 x 2000 - External
AC1 1000 x 2000 - External
AC2 600 x 2000 - Internal
Hollow Core Doors
Various sizes - Internal
Various sizes- External

Units

1202

1400

1500

1601.1

1601.2

1601.3

1601.4

1601.5

1601.6

1900

55%

60%

85%

85%

55%

60%

85%

85%

100%

55%
55%

60%
60%

85%
85%

85%
85%

100%
100%

m2
m2
m2
m2
m2
m2

100%

m2
m2

100%

50%
50%

50%
50%

Page 77 of 136

70%
70%

70%
70%

Eng. Ahmed Sheikh


All Segment

Page 78

Main Contract

SAUDI BINLADIN GROUP


Project
CORRECTIONAL FACILITIES JEDDAH P1182
SubCon
Marim M. Jilani, Contract No. 214 - PAINT WORKS
Subject
Payment Certificate No 8
Period
Up to October 2014
Item no
1

Description
Bar Grill Doors
BG 1900 x 2700
BD1 2300 x 2700
BD2 4000 x 2700
Access Doors
AC2 600 x 2000 - External
AC1 1000 x 2000 - External
AC2 600 x 2000 - Internal
Hollow Core Doors
Various sizes - Internal
Various sizes- External

Units

2001

2002

2003

2004

2006 2007-1,2,3&4 2100

m2
m2
m2

2201

2202

2301

100%

m2
m2
m2

70%

70%

70%

70%

m2
m2

70%
70%

70%
70%

70%
70%

70%
70%

Page 78 of 136

75%
70%
70%

100%

70%
70%

90%

70%
-

75%
75%

Eng. Ahmed Sheikh


All Segment

Page 79

Main Contract

SAUDI BINLADIN GROUP


Project
CORRECTIONAL FACILITIES JEDDAH P1182
SubCon
Marim M. Jilani, Contract No. 214 - PAINT WORKS
Subject
Payment Certificate No 8
Period
Up to October 2014
Item no
1

Description
Bar Grill Doors
BG 1900 x 2700
BD1 2300 x 2700
BD2 4000 x 2700
Access Doors
AC2 600 x 2000 - External
AC1 1000 x 2000 - External
AC2 600 x 2000 - Internal
Hollow Core Doors
Various sizes - Internal
Various sizes- External

Units

2700

2900

3100

70%
70%

75%
75%

70%
70%

3202B-2 3202B-3 3202B-4 3202B-7 3202B-8

3203

3208

80%
80%

65%
65%

m2
m2
m2
m2
m2
m2
m2
m2

Page 79 of 136

50%

40%

100%

50%

50%

Eng. Ahmed Sheikh


All Segment

Page 80

Main Contract

SAUDI BINLADIN GROUP


Project
CORRECTIONAL FACILITIES JEDDAH P1182
SubCon
Marim M. Jilani, Contract No. 214 - PAINT WORKS
Subject
Payment Certificate No 8
Period
Up to October 2014
Item no
1

Description
Bar Grill Doors
BG 1900 x 2700
BD1 2300 x 2700
BD2 4000 x 2700
Access Doors
AC2 600 x 2000 - External
AC1 1000 x 2000 - External
AC2 600 x 2000 - Internal
Hollow Core Doors
Various sizes - Internal
Various sizes- External

Units

3209

m2
m2
m2
m2
m2
m2
m2
m2

100%

Page 80 of 136

Eng. Ahmed Sheikh


All Segment

Page 81

Addendum - 1

SAUDI BINLADIN GROUP


Project
SubCon
Subject
Period
Item no
1
2
3
4
5

CORRECTIONAL FACILITIES JEDDAH P1182


Marim M. Jilani, Contract No. 214 - PAINT WORKS
Payment Certificate No 8
Up to October 2014
Description
Finishing Works
Anti Bacterial Paint for Prison Cell
Ceilings
Epoxy Paint for Walls
Exterior Paint for Dyrup
Emulsion Paint for Ceilings
Surface Cleaning for Wall & Ceiling

Quantity Surveyor

Units
m2
m2
m2
m2
m2

Previous
4,055
14,672
8,867
9,848

Current
-

To Date
4,055
14,672
8,867
9,848

Page 81 of 136

400

601
-

700
-

800
-

244
-

901.3

901.4

901.5

Page 82

Addendum - 1

SAUDI BINLADIN GROUP


Project
SubCon
Subject
Period
Item no
1
2
3
4
5

CORRECTIONAL FACILITIES JEDDAH P1182


Marim M. Jilani, Contract No. 214 - PAINT WORKS
Payment Certificate No 8
Up to October 2014
Description
Finishing Works
Anti Bacterial Paint for Prison Cell
Ceilings
Epoxy Paint for Walls
Exterior Paint for Dyrup
Emulsion Paint for Ceilings
Surface Cleaning for Wall & Ceiling

Quantity Surveyor

Units
m2
m2
m2
m2
m2

1001
-

1201.2
462
953
-

1201.3

1201.4

1201.5

1201.6

1201.7

Page 82 of 136

1201.8
462
1,217
874
-

1201.9
-

1201.12
-

1201.13
-

Page 83

Addendum - 1

SAUDI BINLADIN GROUP


Project
SubCon
Subject
Period
Item no
1
2
3
4
5

CORRECTIONAL FACILITIES JEDDAH P1182


Marim M. Jilani, Contract No. 214 - PAINT WORKS
Payment Certificate No 8
Up to October 2014
Description
Finishing Works
Anti Bacterial Paint for Prison Cell
Ceilings
Epoxy Paint for Walls
Exterior Paint for Dyrup
Emulsion Paint for Ceilings
Surface Cleaning for Wall & Ceiling

Quantity Surveyor

Units
m2
m2
m2
m2
m2

1201.14
577
2,029
660
2,011

1201.15
-

1201.16

1201.17

Page 83 of 136

1201.18
-

1201.19
-

1201.20

1201.21

1201.22

1,039
3,653
1,429
2,687

156
548
214
457

1,039
3,450
1,350
2,687

1201.23
-

1201.24
239
2,280
629
1,817

Page 84

Addendum - 1

SAUDI BINLADIN GROUP


Project
SubCon
Subject
Period
Item no
1
2
3
4
5

CORRECTIONAL FACILITIES JEDDAH P1182


Marim M. Jilani, Contract No. 214 - PAINT WORKS
Payment Certificate No 8
Up to October 2014
Description
Finishing Works
Anti Bacterial Paint for Prison Cell
Ceilings
Epoxy Paint for Walls
Exterior Paint for Dyrup
Emulsion Paint for Ceilings
Surface Cleaning for Wall & Ceiling

Quantity Surveyor

Units
m2
m2
m2
m2
m2

1400

1500

1601.1

1601.2

1601.3

1601.4

1601.5

Page 84 of 136

1601.6
81
495
81
-

1900

2001

2002
-

Page 85

Addendum - 1

SAUDI BINLADIN GROUP


Project
SubCon
Subject
Period
Item no
1
2
3
4
5

CORRECTIONAL FACILITIES JEDDAH P1182


Marim M. Jilani, Contract No. 214 - PAINT WORKS
Payment Certificate No 8
Up to October 2014
Description
Finishing Works
Anti Bacterial Paint for Prison Cell
Ceilings
Epoxy Paint for Walls
Exterior Paint for Dyrup
Emulsion Paint for Ceilings
Surface Cleaning for Wall & Ceiling

Quantity Surveyor

Units
m2
m2
m2
m2
m2

2003

2004

2006

2100

660
337
-

Page 85 of 136

2201
-

2202
-

2301
-

2700
189
189

2900
-

3100
1,018
-

3202A-7
18
17
-

Page 86

Addendum - 1

SAUDI BINLADIN GROUP


Project
SubCon
Subject
Period
Item no
1
2
3
4
5

CORRECTIONAL FACILITIES JEDDAH P1182


Marim M. Jilani, Contract No. 214 - PAINT WORKS
Payment Certificate No 8
Up to October 2014
Description
Finishing Works
Anti Bacterial Paint for Prison Cell
Ceilings
Epoxy Paint for Walls
Exterior Paint for Dyrup
Emulsion Paint for Ceilings
Surface Cleaning for Wall & Ceiling

Quantity Surveyor

Units 3202A-10 3202A-13 3202A-14 3202B-2 3202B-3 3202B-7 3202B-8


m2
m2
m2
m2
m2

16
101
-

20
107
-

22
107
-

Page 86 of 136

31
68
-

38
66
-

34
73
-

38
66
-

3203
-

3207
122
10
-

3208
274
-

3209
-

Page 87

Addendum - 1

SAUDI BINLADIN GROUP


Project
CORRECTIONAL FACILITIES JEDDAH P1182
SubCon
Marim M. Jilani, Contract No. 214 - PAINT WORKS
Subject
Payment Certificate No 8
Period
Up to October 2014
Item no
1
2
3
4
5

Description
Finishing Works
Anti Bacterial Paint for Prison Cell
Ceilings
Epoxy Paint for Walls
Exterior Paint for Dyrup
Emulsion Paint for Ceilings
Surface Cleaning for Wall & Ceiling

Units
m2
m2
m2
m2
m2

400

601

700

800

901.3

901.4

901.5

1001

1201.2

1201.3

1201.4

100%

60%

Page 87 of 136

100%

Eng. Ahmed Sheikh


All Segment

Page 88

Addendum - 1

SAUDI BINLADIN GROUP


Project
CORRECTIONAL FACILITIES JEDDAH P1182
SubCon
Marim M. Jilani, Contract No. 214 - PAINT WORKS
Subject
Payment Certificate No 8
Period
Up to October 2014
Item no
1
2
3
4
5

Description
Finishing Works
Anti Bacterial Paint for Prison Cell
Ceilings
Epoxy Paint for Walls
Exterior Paint for Dyrup
Emulsion Paint for Ceilings
Surface Cleaning for Wall & Ceiling

Units
m2
m2
m2
m2
m2

1201.5

1201.6

1201.7

1201.8

1201.9

1201.12

1201.13

1201.14

40%
30%

100%
100%

55%

100%
100%

Page 88 of 136

1201.15

1201.16

1201.17

Eng. Ahmed Sheikh


All Segment

Page 89

Addendum - 1

SAUDI BINLADIN GROUP


Project
CORRECTIONAL FACILITIES JEDDAH P1182
SubCon
Marim M. Jilani, Contract No. 214 - PAINT WORKS
Subject
Payment Certificate No 8
Period
Up to October 2014
Item no
1
2
3
4
5

Description
Finishing Works
Anti Bacterial Paint for Prison Cell
Ceilings
Epoxy Paint for Walls
Exterior Paint for Dyrup
Emulsion Paint for Ceilings
Surface Cleaning for Wall & Ceiling

Units
m2
m2
m2
m2
m2

1201.18

1201.19

1201.20

1201.21

1201.22

90%
90%

90%
90%

90%
85%

90%
90%

90%
98%

90%
90%

85%
98%

90%
98%

Page 89 of 136

1201.23

1201.24

1400

1500

1601.1

1601.2

Eng. Ahmed Sheikh


All Segment

Page 90

Addendum - 1

SAUDI BINLADIN GROUP


Project
CORRECTIONAL FACILITIES JEDDAH P1182
SubCon
Marim M. Jilani, Contract No. 214 - PAINT WORKS
Subject
Payment Certificate No 8
Period
Up to October 2014
Item no
1
2
3
4
5

Description
Finishing Works
Anti Bacterial Paint for Prison Cell
Ceilings
Epoxy Paint for Walls
Exterior Paint for Dyrup
Emulsion Paint for Ceilings
Surface Cleaning for Wall & Ceiling

Units
m2
m2
m2
m2
m2

1601.3

1601.4

1601.5

1601.6

1900

2001

2002

2003

2004

2006

35%
35%

85%

35%

85%

Page 90 of 136

2100

Eng. Ahmed Sheikh


All Segment

Page 91

Addendum - 1

SAUDI BINLADIN GROUP


Project
CORRECTIONAL FACILITIES JEDDAH P1182
SubCon
Marim M. Jilani, Contract No. 214 - PAINT WORKS
Subject
Payment Certificate No 8
Period
Up to October 2014
Item no
1
2
3
4
5

Description
Finishing Works
Anti Bacterial Paint for Prison Cell
Ceilings
Epoxy Paint for Walls
Exterior Paint for Dyrup
Emulsion Paint for Ceilings
Surface Cleaning for Wall & Ceiling

Units
m2
m2
m2
m2
m2

2201

2202

2301

2700

95%
95%

Page 91 of 136

2900

3100

80%

3202A-7 3202A-10 3202A-13 3202A-14 3202B-2

50%

45%

55%

60%

65%

35%

80%

85%

85%

65%

Eng. Ahmed Sheikh


All Segment

Page 92

Addendum - 1

SAUDI BINLADIN GROUP


Project
CORRECTIONAL FACILITIES JEDDAH P1182
SubCon
Marim M. Jilani, Contract No. 214 - PAINT WORKS
Subject
Payment Certificate No 8
Period
Up to October 2014
Item no
1
2
3
4
5

Description
Finishing Works
Anti Bacterial Paint for Prison Cell
Ceilings
Epoxy Paint for Walls
Exterior Paint for Dyrup
Emulsion Paint for Ceilings
Surface Cleaning for Wall & Ceiling

Units
m2
m2
m2
m2
m2

3202B-3 3202B-7 3202B-8

3203

3207

80%

70%

80%

80%

80%

70%

80%

20%

Page 92 of 136

3208

3209

70%

Eng. Ahmed Sheikh


All Segment

Page 93

Addendum - 2

SAUDI BINLADIN GROUP


Project
SubCon
Subject
Period
Item no
1

CORRECTIONAL FACILITIES JEDDAH P1182


Marim M. Jilani, Contract No. 214 - PAINT WORKS
Payment Certificate No 8
Up to October 2014
Description
Paint Works (incl scaffolding)
Clean & Paint Prison Bar Grill
Window

Units
pcs

Previous
999.50

Current

To Date

999.50

Page 93 of 136

902
1.30

1201.2
55.80

1201.3
55.80

1201.4
55.80

1201.5
37.20

1201.6
37.20

1201.7
37.20

Page 94

Addendum - 2

SAUDI BINLADIN GROUP


Project
SubCon
Subject
Period
Item no
1

CORRECTIONAL FACILITIES JEDDAH P1182


Marim M. Jilani, Contract No. 214 - PAINT WORKS
Payment Certificate No 8
Up to October 2014
Description
Paint Works (incl scaffolding)
Clean & Paint Prison Bar Grill
Window

Units
pcs

1201.8
37.20

1201.9
37.20

1201.11

1201.12

1201.13

1201.14

1201.15

1201.16

1201.17

1201.18

1201.19

37.20

37.20

43.40

43.40

43.40

43.40

49.60

49.60

49.60

Page 94 of 136

Page 95

Addendum - 2

SAUDI BINLADIN GROUP


Project
SubCon
Subject
Period
Item no
1

CORRECTIONAL FACILITIES JEDDAH P1182


Marim M. Jilani, Contract No. 214 - PAINT WORKS
Payment Certificate No 8
Up to October 2014
Description
Paint Works (incl scaffolding)
Clean & Paint Prison Bar Grill
Window

Units
pcs

1201.2
49.60

1201.21

1201.22

1201.23

49.60

49.60

49.60

Page 95 of 136

1201.242007-1,2,3&4
49.60

Page 96

Addendum - 2

SAUDI BINLADIN GROUP


Project
CORRECTIONAL FACILITIES JEDDAH P1182
SubCon
Marim M. Jilani, Contract No. 214 - PAINT WORKS
Subject
Payment Certificate No 8
Period
Up to October 2014
Item no
1

Description
Clean & Paint Prison Bar Grill
Window

Units
pcs

902
90%

1201.2
90%

1201.3
90%

1201.4
90%

Page 96 of 136

1201.5
60%

1201.6
60%

1201.7
60%

1201.8
60%

1201.9
60%

1201.11
60%

1201.12
60%

Eng. Ahmed Sheikh


All Segment.

Page 97

Addendum - 2

SAUDI BINLADIN GROUP


Project
CORRECTIONAL FACILITIES JEDDAH P1182
SubCon
Marim M. Jilani, Contract No. 214 - PAINT WORKS
Subject
Payment Certificate No 8
Period
Up to October 2014
Item no
1

Description
Clean & Paint Prison Bar Grill
Window

Units
pcs

1201.13
70%

1201.14
70%

1201.15
70%

1201.16
70%

Page 97 of 136

1201.17
80%

1201.18
80%

1201.19
80%

1201.20
80%

1201.21
80%

1201.22
80%

1201.23
80%

Eng. Ahmed Sheikh


All Segment.

Page 98

Addendum - 2

SAUDI BINLADIN GROUP


Project
CORRECTIONAL FACILITIES JEDDAH P1182
SubCon
Marim M. Jilani, Contract No. 214 - PAINT WORKS
Subject
Payment Certificate No 8
Period
Up to October 2014
Item no
1

Description
Clean & Paint Prison Bar Grill
Window

Units
pcs

1201.242007-1,2,3&4
80%

Page 98 of 136

Eng. Ahmed Sheikh


All Segment.

Page 99

Addendum - 3

SAUDI BINLADIN GROUP


Project
SubCon
Subject
Period
Item no
1
2
3
4

CORRECTIONAL FACILITIES JEDDAH P1182


Marim M. Jilani, Contract No. 214 - PAINT WORKS
Payment Certificate No 8
Up to October 2014
Description
Apply Terrazo & Ceramic Tiles
Terrazo tiles 400x400x40mm
Terrazo tiles 400x100x20mm
Ceramic Wall tiles 100x100mm
Ceramic Wall and Floor tiles
200x200mm

Units
m2
Lm
m2
m2

Previous
570.88
51.98
212.64

Current

To Date

Page 99 of 136

570.88
51.98
212.64

800
277.20
50.40
41.30

1201.8
162.43
102.00

1601.6
131.25
1.58
69.34

Addendum - 3
SAUDI BINLADIN GROUP
Project
CORRECTIONAL FACILITIES JEDDAH P1182
SubCon
Marim M. Jilani, Contract No. 214 - PAINT WORKS
Subject
Payment Certificate No 8
Period
Up to October 2014
Item no
1.00
2.00
4.00
3.00

Description
Apply Terrazo & Ceramic Tiles
Terrazo tiles 400x400x30mm
Terrazo tiles 400x100x20mm
Ceramic Wall tiles 100x100mm
Ceramic Wall and Floor tiles
200x200mm

Units

800

1201.8

1601.6

m2
Lm
m2
m2

70%

75%

35%

70%
70%

75%

35%
35%

Eng. Ahmed Sheikh


All Segment

Page 101

Addendum - 5

SAUDI BINLADIN GROUP


Project
SubCon
Subject
Period
Item no
1

CORRECTIONAL FACILITIES JEDDAH P1182


Marim M. Jilani, Contract No. 214 - PAINT WORKS
Payment Certificate No 8
Up to October 2014
Description
Supply & Apply
of one Primer coat
for Bar GrillBar
include
Clean, emery,
Grill:Doors
putty, primer coat and make surface
ready to receive final paint coat
according to the approved
specifications & Submittals

Quantity Surveyor

Units
m2

Previous
2,979.90

Current

To Date

2,979.90

Page 101 of 136

1201.2
473.00

1201.5

1201.17

1201.18

1201.19

331.10

331.10

331.10

1201.2
378.40

1201.21
378.40

Page 102

Addendum - 5

SAUDI BINLADIN GROUP


Project
SubCon
Subject
Period
Item no
1

CORRECTIONAL FACILITIES JEDDAH P1182


Marim M. Jilani, Contract No. 214 - PAINT WORKS
Payment Certificate No 8
Up to October 2014
Description
Supply & Apply
of one Primer coat
for Bar GrillBar
include
Clean, emery,
Grill:Doors
putty, primer coat and make surface
ready to receive final paint coat
according to the approved
specifications & Submittals

Quantity Surveyor

Units
m2

1201.23

1201.24

378.40

378.40

1701
-

3100
-

Page 102 of 136

Page 103

Addendum - 5

SAUDI BINLADIN GROUP


Project
CORRECTIONAL FACILITIES JEDDAH P1182
SubCon
Subject
Period
Item no
1

Marim M. Jilani, Contract No. 214 - PAINT WORKS


Payment Certificate No 8
Up to October 2014
Description
Supply & Apply
of one Primer coat for Units
Bar Grill include
: Clean,
emery, putty,
Bar Grill
Doors
primer coat and make surface ready
m2
to receive final paint coat according to
the approved specifications &
Submittals

1201.2
100%

1201.5

1201.17

1201.18

1201.19

1201.20

1201.21

1201.23

1201.24

70%

70%

70%

80%

80%

80%

80%

Page 103 of 136

1701

3100

Eng. Ahmed Sheikh


All Segment.

Page 104

Addendum - 6

SAUDI BINLADIN GROUP


Project
SubCon
Subject
Period
Item no
1
2

CORRECTIONAL FACILITIES JEDDAH P1182


Marim M. Jilani, Contract No. 214 - PAINT WORKS
Payment Certificate No 8
Up to October 2014
Description
Painting Works
Epoxy Floor Coating including repair
of Screed
Emulsion Paint for Walls

Quantity Surveyor

Units
m2
m2

Previous
803.65
8,329.61

Current

To Date

803.65
8,329.61

Page 104 of 136

800
71.00
888.00

1201.2
204.00

1201.8
664.30

1201.14

1201.20

1201.22

1201.24

511.08

828.00

782.00

511.00

Page 105

Addendum - 6

SAUDI BINLADIN GROUP


Project
SubCon
Subject
Period
Item no
1
2

CORRECTIONAL FACILITIES JEDDAH P1182


Marim M. Jilani, Contract No. 214 - PAINT WORKS
Payment Certificate No 8
Up to October 2014
Description
Painting Works
Epoxy Floor Coating including repair
of Screed
Emulsion Paint for Walls

Quantity Surveyor

Units
m2
m2

1601.6
618.10

2700

3100

924.35

552.00

3202A-7 3202A-10 3202A-13 3202A-14 3202B-2 3202B-3 3202B-7 3202B-8


53.10
20.40

Page 105 of 136

61.95
166.60

132.75
166.60

132.75
202.30

76.70
171.60

94.40
169.60

82.60
74.20

94.40
167.48

Page 106

SAUDI BINLADIN GROUP


Project
SubCon
Subject
Period
Item no
1
2

CORRECTIONAL FACILITIES JEDDAH P1182


Marim M. Jilani, Contract No. 214 - PAINT WORKS
Payment Certificate No 8
Up to October 2014
Description
Painting Works
Epoxy Floor Coating including repair
of Screed
Emulsion Paint for Walls

Quantity Surveyor

Units
m2
m2

3207

3208

4.00
472.80

235.20

Page 106 of 136

Addendum - 6

Page 107

Addendum - 6

SAUDI BINLADIN GROUP


Project
CORRECTIONAL FACILITIES JEDDAH P1182
SubCon
Marim M. Jilani, Contract No. 214 - PAINT WORKS
Subject
Payment Certificate No 8
Period
Up to October 2014
Item no
1
2
3
4
5

Description
Painting Works
Epoxy Floor Coating including repair
of Screed
Emulsion Paint for Walls
Sealant for Joints between roof &
Walls
Installation of single Leaf Doors
Installation of Double Leaf Doors

Units

800

m2
m2
Lm
No.
No.

100%
60%

1201.2

100%

1201.8

65%

1201.14

100%

Page 107 of 136

1201.20

90%

1201.22

85%

1201.24

100%

1601.6

35%

2700

95%

3100

3202A-7

80%

30%
30%

Eng. Ahmed Sheikh


All Segment.

Page 108

Addendum - 6

SAUDI BINLADIN GROUP


Project
CORRECTIONAL FACILITIES JEDDAH P1182
SubCon
Marim M. Jilani, Contract No. 214 - PAINT WORKS
Subject
Payment Certificate No 8
Period
Up to October 2014
Item no
1
2
3
4
5

Description
Painting Works
Epoxy Floor Coating including repair
of Screed
Emulsion Paint for Walls
Sealant for Joints between roof &
Walls
Installation of single Leaf Doors
Installation of Double Leaf Doors

Units 3202A-10 3202A-13 3202A-14 3202B-2 3202B-3 3202B-7 3202B-8


m2
m2
Lm
No.
No.

35%
70%

75%
70%

75%
85%

65%
65%

Page 108 of 136

80%
80%

70%
70%

80%
80%

3207

3208

10%
60%

70%

Eng. Ahmed Sheikh


All Segment.

Addendum - 8

SAUDI BINLADIN GROUP


Project
SubCon
Subject
Period
Item no
1
2

CORRECTIONAL FACILITIES JEDDAH P1182


Marim M. Jilani, Contract No. 214 - PAINT WORKS
Payment Certificate No 8
Up to October 2014
Current
Description
Units Previous
To Date
Supply & Apply Paint including : clean, emery, Putty, Prime Coat and Finish Coat
Steel Handrail & Guard Rail
Lm
390.80
390.80
Steel Stair
Lm
55.00
55.00

201

202

14.70
-

16.10
-

1201-17
-

1201-18

1201-19

45.00
5.00

110.00
20.00

1201-20
-

Addendum - 8

1201-21
110.00
20.00

1201-22
-

1201-23
55.00
10.00

1201-24
-

1900
28.00
-

3204
-

3209
12.00
-

Addendum - 8
SAUDI BINLADIN GROUP
Project
CORRECTIONAL FACILITIES JEDDAH P1182
SubCon
Marim M. Jilani, Contract No. 214 - PAINT WORKS
Subject
Payment Certificate No 8
Period
Up to October 2014
Item no
1
2

Description
Supply & Apply
Paint including :
clean, emery , Putty, Prime Coat
and
Finish
Coat
Steel
Handrail
& Guard Rail
Steel Stair

Units

201

202

Lm
Lm

70%

70%

1201-17

1201-18

1201-19

100%
100%

100%
100%

1201-20

1201-21
100%
100%

1201-22

1201-23
50%
50%

Eng. Ahmed Sheikh


All Segment.

Addendum - 8

1201-24

1900
100%

3204

3209
100%

Eng. Ahmed Sheikh


All Segment.

Page 113

Addendum - 10

SAUDI BINLADIN GROUP


Project
SubCon
Subject
Period
Item no
1
2
3

CORRECTIONAL FACILITIES JEDDAH P1182


Marim M. Jilani, Contract No. 214 - PAINT WORKS
Payment Certificate No 8
Up to October 2014
Description
Units
Previous
Emery Maintenance work Plus putty and final paint
Bar Grill Doors
m2
3,190.80
2
Hollow Core Doors
m
5,828.54
2
Access Doors
m
268.80

Quantity Surveyor

Current
-

To Date
3,190.80
5,828.54
268.80

Page 113 of 136

100

201

601

700

800

230.00
-

460.00
-

180.00
-

52.00
-

74.00
-

Page 114

Addendum - 10

SAUDI BINLADIN GROUP


Project
SubCon
Subject
Period
Item no
1
2
3

CORRECTIONAL FACILITIES JEDDAH P1182


Marim M. Jilani, Contract No. 214 - PAINT WORKS
Payment Certificate No 8
Up to October 2014
Description
Units
901.1
Emery Maintenance work Plus putty and final paint
Bar Grill Doors
m2
2
Hollow Core Doors
m
52.30
2
Access Doors
m
2.40

Quantity Surveyor

901.4
52.30
2.40

903-1
62.00
-

Page 114 of 136

903-2
57.00
-

1100
151.00
-

1201.1
174.00
22.00

1201.2
473.00
174.00
22.00

1201.3
473.00
174.00
22.00

1201.3
Repeated
174.00
-

Page 115

Addendum - 10

SAUDI BINLADIN GROUP


Project
SubCon
Subject
Period
Item no
1
2
3

CORRECTIONAL FACILITIES JEDDAH P1182


Marim M. Jilani, Contract No. 214 - PAINT WORKS
Payment Certificate No 8
Up to October 2014
Description
Units
1201.4
Emery Maintenance work Plus putty and final paint
Bar Grill Doors
m2
473.00
2
Hollow Core Doors
m
2
Access Doors
m
22.00

Quantity Surveyor

1201.7

1201.8

Page 115 of 136

1201.9
88.00
-

1201.10

1201.11

1201.12

1201.13

1201.14

80.00
-

96.00
-

104.00
-

174.00
-

473.00
174.00
-

Page 116

Addendum - 10

SAUDI BINLADIN GROUP


Project
SubCon
Subject
Period
Item no
1
2
3

CORRECTIONAL FACILITIES JEDDAH P1182


Marim M. Jilani, Contract No. 214 - PAINT WORKS
Payment Certificate No 8
Up to October 2014
Description
Units 1201.15
Emery Maintenance work Plus putty and final paint
Bar Grill Doors
m2
473.00
2
Hollow Core Doors
m
174.00
2
Access Doors
m
-

Quantity Surveyor

1201.16

1201.17

1201.18

1201.19

1201.20

1201.21

1201.22

1201.23

139.20
-

283.80
88.00
22.00

66.00
12.00
22.00

94.00
22.00

200.00
22.00

228.00
90.00
22.00

22.00

22.00

Page 116 of 136

Page 117

Addendum - 10

SAUDI BINLADIN GROUP


Project
SubCon
Subject
Period
Item no
1
2
3

CORRECTIONAL FACILITIES JEDDAH P1182


Marim M. Jilani, Contract No. 214 - PAINT WORKS
Payment Certificate No 8
Up to October 2014
Description
Units 1201.24
Emery Maintenance work Plus putty and final paint
Bar Grill Doors
m2
2
Hollow Core Doors
m
2
Access Doors
m
22.00

Quantity Surveyor

1202
48.00
90.00
-

1400

1500

266.00
-

245.66
-

Page 117 of 136

1601-4
200.00
-

1601-5
150.00
-

1602

1701

1702

330.00
-

300.00
-

222.00
-

Page 118

Addendum - 10

SAUDI BINLADIN GROUP


Project
SubCon
Subject
Period
Item no
1
2
3

CORRECTIONAL FACILITIES JEDDAH P1182


Marim M. Jilani, Contract No. 214 - PAINT WORKS
Payment Certificate No 8
Up to October 2014
Description
Units
1900
Emery Maintenance work Plus putty and final paint
Bar Grill Doors
m2
2
Hollow Core Doors
m
99.00
2
Access Doors
m
-

Quantity Surveyor

2001
24.00
-

2006
48.00
-

Page 118 of 136

2301
28.08
-

2400
-

3100
62.00
-

3202A-1

3202A-2

3202A-6

24.00
-

24.00
-

24.00
-

Page 119

Addendum - 10

SAUDI BINLADIN GROUP


Project
SubCon
Subject
Period
Item no
1
2
3

CORRECTIONAL FACILITIES JEDDAH P1182


Marim M. Jilani, Contract No. 214 - PAINT WORKS
Payment Certificate No 8
Up to October 2014
Description
Units 3202A-7 3202A-10 3202A-11 3202A-12 3202A-13 3202A-14 3202B-1
Emery Maintenance work Plus putty and final paint
Bar Grill Doors
m2
2
Hollow Core Doors
m
24.00
24.00
24.00
24.00
24.00
24.00
24.00
2
Access Doors
m
-

Quantity Surveyor

Page 119 of 136

3202B-2

3202B-3

24.00
-

24.00
-

Page 120

Addendum - 10

SAUDI BINLADIN GROUP


Project
SubCon
Subject
Period
Item no
1
2
3

CORRECTIONAL FACILITIES JEDDAH P1182


Marim M. Jilani, Contract No. 214 - PAINT WORKS
Payment Certificate No 8
Up to October 2014
Description
Units
3202B-5
Emery Maintenance work Plus putty and final paint
Bar Grill Doors
m2
2
Hollow Core Doors
m
24.00
2
Access Doors
m
-

Quantity Surveyor

3202B-6

3202B-7

3202B-8

24.00
-

24.00
-

24.00
-

Page 120 of 136

Page 121

Addendum - 10

SAUDI BINLADIN GROUP


Project
CORRECTIONAL FACILITIES JEDDAH P1182
SubCon
Marim M. Jilani, Contract No. 214 - PAINT WORKS
Subject
Payment Certificate No 8
Period
Up to October 2014
Item no
1
2
3

Description
Units
100
201
Emery Maintenance work Plus putty and final paint
Bar Grill Doors
m2
Hollow Core Doors
m2
100% 100%
2
Access Doors
m

601

700

800

901.1

901.4

903-1

903-2

1100

1201.1

100%

100%

100%

100%
100%

100%
100%

100%

100%

100%

100%
100%

Page 121 of 136

Eng. Ahmed Sheikh


All Segment

Page 122

Addendum - 10

SAUDI BINLADIN GROUP


Project
CORRECTIONAL FACILITIES JEDDAH P1182
SubCon
Marim M. Jilani, Contract No. 214 - PAINT WORKS
Subject
Payment Certificate No 8
Period
Up to October 2014
Item no
1
2
3

Description
Units 1201.2
Emery Maintenance work Plus putty and final paint
Bar Grill Doors
m2
100%
2
Hollow Core Doors
m
100%
2
Access Doors
m
100%

1201.3
100%
100%
100%

1201.3
Repeated

1201.4

1201.7

1201.8

1201.9

1201.10

1201.11

1201.12

1201.13

100%

100%

100%

100%

100%

100%
100%
100%

Page 122 of 136

Eng. Ahmed Sheikh


All Segment

Page 123

Addendum - 10

SAUDI BINLADIN GROUP


Project
CORRECTIONAL FACILITIES JEDDAH P1182
SubCon
Marim M. Jilani, Contract No. 214 - PAINT WORKS
Subject
Payment Certificate No 8
Period
Up to October 2014
Item no
1
2
3

Description
Units 1201.14
Emery Maintenance work Plus putty and final paint
Bar Grill Doors
m2
100%
2
Hollow Core Doors
m
100%
2
Access Doors
m

1201.15
100%
100%

1201.16

1201.17

1201.18

80%

60%
100%
100%

100%
100%
100%

Page 123 of 136

1201.19

100%
100%

1201.20

1201.21

1201.22

1201.23

1201.24

100%

100%
100%
100%

100%

100%

100%

100%

Eng. Ahmed Sheikh


All Segment

Page 124

Addendum - 10

SAUDI BINLADIN GROUP


Project
CORRECTIONAL FACILITIES JEDDAH P1182
SubCon
Marim M. Jilani, Contract No. 214 - PAINT WORKS
Subject
Payment Certificate No 8
Period
Up to October 2014
Item no
1
2
3

Description
Units
1202
Emery Maintenance work Plus putty and final paint
Bar Grill Doors
m2
100%
2
Hollow Core Doors
m
100%
2
Access Doors
m

1400

1500

1601-4

1601-5

1602

1701

1702

1900

2001

2006

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

Page 124 of 136

Eng. Ahmed Sheikh


All Segment

Page 125

Addendum - 10

SAUDI BINLADIN GROUP


Project
CORRECTIONAL FACILITIES JEDDAH P1182
SubCon
Marim M. Jilani, Contract No. 214 - PAINT WORKS
Subject
Payment Certificate No 8
Period
Up to October 2014
Item no
1
2
3

Description
Units
2301
Emery Maintenance work Plus putty and final paint
Bar Grill Doors
m2
Hollow Core Doors
m2
100%
2
Access Doors
m

2400

3100

3202A-1

3202A-2

3202A-6

100%

100%

100%

100%

Page 125 of 136

3202A-7 3202A-10 3202A-11 3202A-12 3202A-13

100%

100%

100%

100%

100%

Eng. Ahmed Sheikh


All Segment

Page 126

Addendum - 10

SAUDI BINLADIN GROUP


Project
CORRECTIONAL FACILITIES JEDDAH P1182
SubCon
Marim M. Jilani, Contract No. 214 - PAINT WORKS
Subject
Payment Certificate No 8
Period
Up to October 2014
Item no
1
2
3

Description
Units 3202A-14 3202B-1
Emery Maintenance work Plus putty and final paint
Bar Grill Doors
m2
Hollow Core Doors
m2
100%
100%
2
Access Doors
m

3202B-2

3202B-3

3202B-5

3202B-6

3202B-7

3202B-8

100%

100%

100%

100%

100%

100%

Page 126 of 136

Eng. Ahmed Sheikh


All Segment

Page 127

Addendum - 1

SAUDI BINLADIN GROUP


Project
SubCon
Subject
Period
Item no

CORRECTIONAL FACILITIES JEDDAH P1182


Marim M. Jilani, Contract No. 214 - PAINT WORKS
Payment Certificate No 8
Up to October 2014
Description
Epoxy Paint for Ceilings
Epoxy Paint Steel Structure
Paint of Steel Louvers
Additional Coat on Windows
Steel Ladder
Steel Stair Handrail
Putty for Bar Grill Doors
Putty for Hollow Core Doors
Putty for Access Doors

Quantity Surveyor

Units
m2
m2
pcs
Pcs
Lm
Lm
m2
m2
m2

100

100%

201

100%

700

100%

800

100%

Page 127 of 136

903-1

100%

903-2

1001

1201.1

1201.2

1201.3

1201.4

100%

100%
100%
100%

100%

100%

100%

100%

Page 128

Addendum - 1

SAUDI BINLADIN GROUP


Project
SubCon
Subject
Period
Item no

CORRECTIONAL FACILITIES JEDDAH P1182


Marim M. Jilani, Contract No. 214 - PAINT WORKS
Payment Certificate No 8
Up to October 2014
Description
Epoxy Paint for Ceilings
Epoxy Paint Steel Structure
Paint of Steel Louvers
Additional Coat on Windows
Steel Ladder
Steel Stair Handrail
Putty for Bar Grill Doors
Putty for Hollow Core Doors
Putty for Access Doors

Quantity Surveyor

Units
m2
m2
pcs
Pcs
Lm
Lm
m2
m2
m2

1201.5

1201.6

1201.7

1201.8
30%

1201.9

1201.10

1201.11

1201.12

1201.13

1201.14
100%

100%

100%

100%

100%

100%

100%

100%

100%

60%

100%

Page 128 of 136

Page 129

Addendum - 1

SAUDI BINLADIN GROUP


Project
SubCon
Subject
Period
Item no

CORRECTIONAL FACILITIES JEDDAH P1182


Marim M. Jilani, Contract No. 214 - PAINT WORKS
Payment Certificate No 8
Up to October 2014
Description
Epoxy Paint for Ceilings
Epoxy Paint Steel Structure
Paint of Steel Louvers
Additional Coat on Windows
Steel Ladder
Steel Stair Handrail
Putty for Bar Grill Doors
Putty for Hollow Core Doors
Putty for Access Doors

Quantity Surveyor

Units
m2
m2
pcs
Pcs
Lm
Lm
m2
m2
m2

1201.15

1201.16

1201.17

1201.18

1201.19

1201.20
90%

1201.21
100%

1201.22
85%

1201.23

1201.24
90%

85%

100%
85%

100%
85%

100%
85%

85%

85%

85%

85%

100%

1202

100%
100%

60%
100%
100%

Page 129 of 136

Page 130

Addendum - 1

SAUDI BINLADIN GROUP


Project
SubCon
Subject
Period
Item no

CORRECTIONAL FACILITIES JEDDAH P1182


Marim M. Jilani, Contract No. 214 - PAINT WORKS
Payment Certificate No 8
Up to October 2014
Description
Epoxy Paint for Ceilings
Epoxy Paint Steel Structure
Paint of Steel Louvers
Additional Coat on Windows
Steel Ladder
Steel Stair Handrail
Putty for Bar Grill Doors
Putty for Hollow Core Doors
Putty for Access Doors

Quantity Surveyor

Units
m2
m2
pcs
Pcs
Lm
Lm
m2
m2
m2

1400

1602

1701

1900 2007-1,2,3,4 3100

3204
80%

100%
100%

100%

100%

100%

100%

Page 130 of 136

100%

Page 131

Addendum - 1

SAUDI BINLADIN GROUP


Project
SubCon
Subject
Period
Item no

CORRECTIONAL FACILITIES JEDDAH P1182


Marim M. Jilani, Contract No. 214 - PAINT WORKS
Payment Certificate No 8
Up to October 2014
Description
Epoxy Paint for Ceilings
Epoxy Paint Steel Structure
Paint of Steel Louvers
Additional Coat on Windows
Steel Ladder
Steel Stair Handrail
Putty for Bar Grill Doors
Putty for Hollow Core Doors
Putty for Access Doors

Quantity Surveyor

Units
m2
m2
pcs
Pcs
Lm
Lm
m2
m2
m2

Previous
773.71
64.00
32.00
148.00
115.60
32.00
2,921.20
2,800.88
36.00

Current
-

To Date
773.71
64.00
32.00
148.00
115.60
32.00
2,921.20
2,800.88
36.00

Page 131 of 136

100

201

230.00
-

460.00
-

700
37.00
-

800
44.00
-

903-1
56.00
-

Page 132

Addendum - 1

SAUDI BINLADIN GROUP


Project
SubCon
Subject
Period
Item no

CORRECTIONAL FACILITIES JEDDAH P1182


Marim M. Jilani, Contract No. 214 - PAINT WORKS
Payment Certificate No 8
Up to October 2014
Description
Epoxy Paint for Ceilings
Epoxy Paint Steel Structure
Paint of Steel Louvers
Additional Coat on Windows
Steel Ladder
Steel Stair Handrail
Putty for Bar Grill Doors
Putty for Hollow Core Doors
Putty for Access Doors

Quantity Surveyor

Units
m2
m2
pcs
Pcs
Lm
Lm
m2
m2
m2

903-2
56.00
-

1001
173.00
248.88
10.00

1201.1
174.00
-

Page 132 of 136

1201.2
174.00
-

1201.3
174.00
-

1201.4
174.00
-

1201.5
190.00
-

1201.6
180.00
-

Page 133

Addendum - 1

SAUDI BINLADIN GROUP


Project
SubCon
Subject
Period
Item no

CORRECTIONAL FACILITIES JEDDAH P1182


Marim M. Jilani, Contract No. 214 - PAINT WORKS
Payment Certificate No 8
Up to October 2014
Description
Epoxy Paint for Ceilings
Epoxy Paint Steel Structure
Paint of Steel Louvers
Additional Coat on Windows
Steel Ladder
Steel Stair Handrail
Putty for Bar Grill Doors
Putty for Hollow Core Doors
Putty for Access Doors

Quantity Surveyor

Units
m2
m2
pcs
Pcs
Lm
Lm
m2
m2
m2

1201.6
170.00
-

1201.8
22.59
150.00
-

1201.9
260.00
-

1201.10
250.00
-

Page 133 of 136

1201.11
230.00
-

1201.12
260.00
-

1201.14
125.50
480.00
-

1201.15
24.00
190.00
-

1201.16
388.20
-

1201.17
14.45
-

Page 134

Addendum - 1

SAUDI BINLADIN GROUP


Project
SubCon
Subject
Period
Item no

CORRECTIONAL FACILITIES JEDDAH P1182


Marim M. Jilani, Contract No. 214 - PAINT WORKS
Payment Certificate No 8
Up to October 2014
Description
Epoxy Paint for Ceilings
Epoxy Paint Steel Structure
Paint of Steel Louvers
Additional Coat on Windows
Steel Ladder
Steel Stair Handrail
Putty for Bar Grill Doors
Putty for Hollow Core Doors
Putty for Access Doors

Quantity Surveyor

Units
m2
m2
pcs
Pcs
Lm
Lm
m2
m2
m2

1201.18
24.00
14.45
-

1201.19
24.00
14.45
-

1201.20
203.31
24.00
14.45
-

1201.21
37.65
14.45
-

Page 134 of 136

1201.22
181.35
14.45
-

1201.23
14.45
-

1201.24
203.31
14.45
-

1202
32.00
83.00
26.00

1400
40.00
-

1602
330.00
-

1701
12.00
90.00
-

Page 135

SAUDI BINLADIN GROUP


Project
SubCon
Subject
Period
Item no

CORRECTIONAL FACILITIES JEDDAH P1182


Marim M. Jilani, Contract No. 214 - PAINT WORKS
Payment Certificate No 8
Up to October 2014
Description
Epoxy Paint for Ceilings
Epoxy Paint Steel Structure
Paint of Steel Louvers
Additional Coat on Windows
Steel Ladder
Steel Stair Handrail
Putty for Bar Grill Doors
Putty for Hollow Core Doors
Putty for Access Doors

Quantity Surveyor

Units
m2
m2
pcs
Pcs
Lm
Lm
m2
m2
m2

1900 2007-1,2,3,4 3100


32.00
420.00
50.00
-

3204
64.00
-

Page 135 of 136

Addendum - 1

29.98
1
1.3
2.3
3.6
1.6
1.6
0.6
2.3

2.975
2.35
2.75
3.75
1.6
1.6
1.6
0.9
3.9

89.1905
-2.35
-3.575
-8.625
-5.76
-2.56
-2.56
-0.54
-8.97
54.2505
108.501