Doosan Heavy Industries

Vietnam

Dung Quat Economic Zone,


Binh Thuan, Binh Son, Quang Ngai,
Vietnam
T +84 55 5618 900
F +84 553 618 950

18/10/2012

Rev.

Date

THUY.D.C Y.S.JUNG
Drawn

Checked

K.J.Lim

For Information
Details of Revision

Approved

Owner :

AES-VCM MONG DUONG


POWER COMPANY LIMITED
Owner's Engineer :

Contractor :

Project :

PC
MONG DUONG II 2 X 560MW (NET) COAL FIRED POWER PROJECT

Title :

T10206-QE01-POZEN__-040215 INSPECTION
AND TEST PLAN FOR JUNCTION BOX & LOCAL
PANEL
INSTALLATION

Drawing No. :

T10206-QE01-P0ZEN-040215

Page 1

T10206

UAS :

QE01

Unit :

PO

KKS :

ZEN

Reg. No. 040215


Revision :
Page-No :

A
1 of 4

ITP for Junction Box & Local Panel


Installation

Doc. No.

T10206-QE01-POZEN-040215

Rev. A

Contractor

DOOSAN

2 of 4

AES-VCM

This note is only applicable for AES-VCM Mong Duong

Detailed Legend

Surveillance Point / DOOSAN / Subcontractor does not send a notification to AES-VCM Mong Duong
except for the first or last operation on the basis of each process. AES-VCM Mong Duong
could check the operation, if he is present at the site during the inspection by Doosan.

Report Review Point / DOOSAN / Subcontractor is required to prepare a certificate or document


attesting to the satisfactory performance of the related test or inspection for review by
AES-VCM Mong Duong.
Duong

Witness Point / DOOSAN / Subcontractor shall submit request for inspection to AES-VCM to
decide whether they will attend such inspection or not.

Hold Point / Downstream construction and other activities shall not proceed
without attendance or any written approval of AES-VCM Mong Duong.

NOTE : The Site ITP and all of the abovementioned reports will be kept available by
DOOSAN at anytime for control and or review by AES-VCM Mong Duong.

Page 2

Inspection & Test Plan for Junction Box &


Local Panel Installation

Item Name

A.Material
Receipt

Oper. No.

A1
A2

B.
Junction
Box &
Local
Panel
Installation

Specific Applicable drawing


number, Standard Code number,
Specification

Inspection Process
Check and verify Junction Box & Local Panel with
associated equipment against manufacturer's
drawing & packing list is correct.
Check the physical condition sizes and types of
panels, system cabinets and junction box.

AES-VCM

Rev. A

Contractor

DOOSAN

Page 3 of 4

Inspection & Test Activities


Verification Document

Remarks
(Allowable tolerance)

Packing List

N/A

Packing List

N/A

AES-VCM
A
Sign

Packing List

Packing List

Check the nameplate, bolts & other accessories


and enclosure is properly closed.

T10206-XW01-POZEN-150001

B2

Check available area clearance.

T10206-XW01-POZEN-150001

B3

Check the installed base frames/supports.

T10206-XW01-POZEN-150001
T10206
XW01 POZEN 150001

B4

Check the panels, system cabinets and junction


box orientation and location.

T10206-XW01-POZEN-150001

B5

Check the alignment, level, & base frame fixing


bolts of panels, system cabinets and junction box.

T10206-XW01-POZEN-150001

B6

Check the KKS no.of panels, system cabinets and


junction box.

T10206-XW01-POZEN-150001

B7

Check the earthing connection of panels, system


cabinets and junction box.

T10206-XW01-POZEN-150001

B8

Check the electrical connection or air connection of


panels, system cabinets and junction box.

T10206-XW01-POZEN-150001

W: Witness Inspection

T10206-QE01-POZEN-040215

Subcon DOOSAN
A Sign A Sign

B1

R: Report Review

Doc. No.

Abbreviation :

S: Surveillance

H: Hold Inspection

Note :

All inspection shall be performed in accordance with the approved Site Inspection and Test Plans/Project Specifications

page3

Inspection report for


JB & local panel
checklist
Inspection report for
JB & local panel
checklist
Inspection report for
JB & llocall panell
Inspection report for
JB & local panel
checklist
Inspection
report for
JB & local panel
checklist
Inspection report for
JB & local panel
checklist
Inspection report for
JB & local panel
checklist
Inspection report for
JB & local panel
checklist

N/A

N/A
N/A
N/A
N/A

N/A

N/A

N/A

AES-VCM

Inspection Report for Junction Box & Local Panel Check List
RFI NO

Drawing No

Date :

Specific Location :
CHECK ITEM
No

Verification & Approval

Inspection elements

Yes

No

N/A

Observed Result
/ Remarks

Junction Box & Local Panel Installation


1

Check the nameplate, bolts & other accessories and


enclosure is properly fixed.

Check available area clearance.

Check the installed base frames/supports.

Check the panels, system cabinets and junction box


orientation and location as per drawing

Check the alignment, level, & base frame fixing bolts of


panels, system cabinets and junction box.

Check the KKS no.of panels, system cabinets and junction


box.

Check the earthing connection of panels, system cabinets


and junction box.

Check the electrical connection or air tube connection of


panels, system cabinets and junction box.

Verify no damage of JB after installation

Checked by :
Subcontractor

Verified/Approved By:
DOOSAN Const'n Dept.

DOOSAN QA/QC Dept.

Name & Signature


Position
Date

Page 4