ARCHITECTURE INTERNSHIP 2 REPORT
STUDENT PERFORMANCE EVALUATION
Name of the Student: Glenn Clevert C. Matre
Course: Bachellor of Science in Architecture
City Address: 2066 Anonas NDC Compound, Sta. Mesa Manila

Age: 20
Sex: M
Yr & Section: IV 2

A. Rating of Student Characteristics


Using the rating scale, please evaluate the following characteristics for the above named student. If the student made
noticeable improvement in any of the characteristics during his/her internship program, also please not of the act.
Rating Scale:
1 = Excellent
2 = Very Good
3 = Average
4 = Fair
5 = Unsatisfactory
Item
no.
Rating
1. Ability to learn
2. Interesting in Learning
3. Speed of completing assigned responsibilities
4. Ability to perform with supervision
5. Willingness to receive guidelines
6. Relationship with other employees
7. Dependability and Reliability
8. Thoroughness in completing task
9. Judgement
10. Personal appearance and disposition
11. Enthusiasm
12. Courtesy
13. Communication skills
14. Leadership Quality

_____
_____
_____
_____
_____
_____
_____
_____
_____
_____
_____
_____
_____
_____

OVERALL PERFORMANCE

_____

Evaluated by:____________________________
(Signature over printed name)
MENTOR

Check if noticeable
improvement since the beginning
_____
_____
_____
_____
_____
_____
_____
_____
_____
_____
_____
_____
_____
_____

Attachment 4
Republic of the Philippines
College of Architecture and Fine Arts
Polytechnic University of the Philippines
NDS Compound, Sta. Mesa Manila
ARCHITECTURE INTERNSHIP 2 REPORT
WEEKLY LOG OF TRAINING EXPERIENCE
Name of Student: Matre, Glenn Clevert C.__________________________________________
Was Employed by: Tao Pilipinas Inc. Address: 27 A Matiyaga St. Brgy. Central DilimanQ.C.
Reporting period from: April 10, 2012 to April 13, 2012
______________________________________________________________________________
Note: Indicate the training hour/s earned in each training area during the above period. One internship day equals a
maximum of eight (8) hours of acceptable experience. Please limit decimal notation in two places.

Item
no
Apr.
10
2012

Field of Practice

Company
General Orientation

Contract Administration
- Project Orientation
and Preparation for
Site Meeting and
Inspection of Works on
April 12, 2012 at ADB
Project Sitio Pulo,
Navotas City

Preparation of As-built
drawing plan
- Creation of Community
Subdivision Site
Development Plan
(CAD) as plan

Apr
11
2012

Apr

Corresponding Number of Hours of


Described Internship
1

Create Scale Model and


Furniture model of the
PhilSSARE Housing
Project
Preparation of the
Planning Took Kit in
ADB Housing Project
Field-Site consultation

Total No. of
Hours

2
6

12
2012

with client(Samasaisip)
regarding the location
and design of the new
community
infrastructures:
- Multipurpose Hall
- Livelihood Center
Conceptualizes Initial
Schemes of community
infrastructures
Create Scale Model and
Furniture model of the
PhilSSARE Housing
Project

Create schematic and


preliminary drawings of
community facilities
Consultation and
Meeting with Archt.
Arlene, Engineer
Harold& Anna for
evaluation of the design

Report/s Drawings Submitted, if Any


- Preliminary Drawings of
- Community Multipurpose Hall

Picture/s taken, if Any

Certified True and Correct by


________________________
________________________
(Signature over printed name)
(Signature over printed name)
Mentor
Students Name
Date:__________,2012
Date submitted:______,2012
Recommendation/ Comments/ Suggestion for the Trainees further growth: (to be accomplished
by Mentor)
______________________________________________________________________________
______________________________________________________________________________

______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
____________________________________________________________

Check and Approved by:


________________________
(Signature over printed name)
AI Faculty Coordinator
Conformed:
_______________________
(Signature over printed name)
Student Intern

Attachment 5
Republic of the Philippines
College of Architecture and Fine Arts
Polytechnic University of the Philippines
NDS Compound, Sta. Mesa Manila
ARCHITECTURE INTERNSHIP 2 REPORT
DAILY LOG OF TRAINING EXPERIECE
Date: April 10, 2012
Name of student: Matre, Glenn Clevert C.
Office/Company Name: TAO Pilipnas Inc Address: 27 A Matiyaga St. Brgy. Central
DilimanQ.C
Project Title: ADB Project

Project Description: Housing: Community


Participatory Project

Project Location: Sitio Pulo, Navotas City


Assigned Work Task:
Office
Field
Time in: 8:30 AM
Time out: 6:00 PM

Others, pls, specify______________________

Total no. of hour.s spent: 8

Weather Condition:._________________________________Site Condition:.________________


Work Activities Performed:
8:30 10:00
10:00 12:00

General Orientation of TAO Pilipnas Inc.


Bried Project Orientation of ADB Project and Preparation for
Site Meeting on April 12, 2012
Formulation of Question and Consultation on Site Meeting on
April 12, 2012 for consultation in the design and preparation of
as-built plan of following community facilities:
- Multi Purpose Hall bldg.

- Livelihood Center
- Public Sanitary Facility (Public Toilet)
12:00 PM 1:00 PM BREAK TIME
1:00PM 2:00 PM
2:00PM 6:00 PM

Resume project meeting discussion


Creation of Community Site Development Plan as plan created by
the Community in CAD drawing format

New Knowledge and Experience you have gained:


- Housing project in Sitio Pulo Navotas
- ABMAT materials technology to be used on the proposed community facility
a. Micro Concrete Tiles
b. Concrete Boards
This materials are maed on site by the community provided by the companys
construction manual
- Participatory approach in architectural practice
Report/ Drawings Submitted, if any:
- Community Site Developmet Plan

Picture/s taken if any:

Certified True and Corrected by:

_______________________
(Signature above printed name)
Mentor
Date:

________________________
(Signature above printed name)
Student Name
Date:

Attachment 5
Republic of the Philippines
College of Architecture and Fine Arts
Polytechnic University of the Philippines
NDS Compound, Sta. Mesa Manila
ARCHITECTURE INTERNSHIP 2 REPORT
DAILY LOG OF TRAINING EXPERIECE
Date: April 10, 2012
Name of student: Matre, Glenn Clevert C.
Office/Company Name: TAO Pilipnas Inc Address: 27 A Matiyaga St. Brgy. Central
DilimanQ.C
Project Title: ADB Project

Project Description: Housing: Community


Participatory Project

Project Location: Sitio Pulo, Navotas City


Assigned Work Task:
Office
Field
Time in: 8:30 AM
Time out: 6:00 PM

Others, pls, specify______________________

Total no. of hour.s spent: 8

Weather Condition:._________________________________Site Condition:.________________


Work Activities Performed:
8:30 10:00
10:00 12:00

General Orientation of TAO Pilipnas Inc.


Bried Project Orientation of ADB Project and Preparation for
Site Meeting on April 12, 2012
Formulation of Question and Consultation on Site Meeting on
April 12, 2012 for consultation in the design and preparation of
as-built plan of following community facilities:

- Multi Purpose Hall bldg.


- Livelihood Center
- Public Sanitary Facility (Public Toilet)
12:00 PM 1:00 PM BREAK TIME
1:00PM 2:00 PM
2:00PM 6:00 PM

Resume project meeting discussion


Creation of Community Site Development Plan as plan created by
the Community in CAD drawing format

New Knowledge and Experience you have gained:


- Housing project in Sitio Pulo Navotas
- ABMAT materials technology to be used on the proposed community facility
a. Micro Concrete Tiles
b. Concrete Boards
This materials are maed on site by the community provided by the companys
construction manual
- Participatory approach in architectural practice
Report/ Drawings Submitted, if any:
- Community Site Developmet Plan

Picture/s taken if any:

Certified True and Corrected by:

_______________________
(Signature above printed name)
Mentor
Date:

________________________
(Signature above printed name)
Student Name
Date:

Vous aimerez peut-être aussi