INDEX
SEC
TITLE
1.0
SCOPE OF SPECIFICATION
1.1
1.2
1.3
Introduction
Other NOC Specifications
Data Sheets
4
4
5
2.0
DEFINITIONS
2.1
2.2
Technical
Contractual
5
5
3.0
DESIGN
3.1
3.2
10
4.0
MATERIALS
14
4.1
4.2
4.3
4.4
ASME Requirements
H2S Corrosion
Miscellaneous
Mechanical Seals
14
14
14
15
5.0
INSPECTION
15
5.1
5.2
5.3
Procedures
Scope
Nameplates
15
16
16
6.0
TESTING
16
6.1
6.2
6.3
Required Tests
Test Requirements
Test Certificates
16
17
18
7.0
DOCUMENTATION
18
7.1
7.2
7.3
7.4
Introduction
Schedules and Reports
Data and Drawings
Manuals
18
18
18
19
3.3
PAGE
GES G.02
Page 3 of 21
Rev 0 1999
SEC
TITLE
8.0
PRIOR TO SHIPMENT
19
8.1
8.2
8.3
8.4
8.5
19
20
20
20
20
DATA SHEETS
ASME Form A1 Centrifugal Pump Data Sheet (1 sheet)
PAGE
GES G.02
Page 4 of 21
Rev 0 1999
1.0
SCOPE OF SPECIFICATION
1.1
Introduction
1.1.1
This specification gives the minimum requirements for the design, material selection, inspection, testing,
documentation and preparation for shipment of single horizontal end suction and vertical in-line centrifugal
pumps.
1.1.2
This specification applies mainly to pumps in non-flammable, non-toxic and auxiliary services e.g. Glycol,
Water etc., but in special circumstances the specification may be applied to onshore oil production and
petroleum product service, with the prior approval of the Owner.
1.1.3
Pumps for oil production and petroleum product services are covered by GES G.01, Centrifugal Pumps
(API 610), 8th Edition.
1.1.4
The Vendor/Contractor shall comply fully with the provisions laid down in the specification. Any
exception must be authorised in writing by the Owner.
1.1.5
In the event of any conflict between this specification and the Data Sheets, or with any of the applicable
Codes and Standards, the Vendor/Contractor shall inform the Owner in writing and receive written
clarification before proceeding with the work.
1.1.5
This General Engineering Specification will form part of the Purchase Order/Contract.
1.2
GES A.06
Site Data
GES G.01
GES K.10
GES L.11
GES N.01
GES S.06
Skid Assemblies
GES X.01
GES X.02
GES X.03
The Vendor/Contractor shall also ensure all Sub-Contractors comply with the relevant sections for the
above specifications.
1.3
Data Sheets
The technical data supplied by the Owner for the equipment is given on the ASME B73.1M and 2M Data
GES G.02
Page 5 of 21
Rev 0 1999
Sheet which is included at the end of this specification. The Vendor/Contractor shall complete the Data
Sheet with the remaining information and return it with his bid.
Prior to shipment, the Vendor/Contractor shall submit a completed "As Built" Data Sheet.
2.0
DEFINITIONS
2.1
Technical
The technical terms used in this specification are as defined below:
NPSH
Net positive suction head is the total suction head in feet of liquid absolute (at the pump
centreline or impeller eye) less the absolute vapour pressure in feet of the liquid being
pumped at the pumping temperature.
NPSH required by the pump to prevent cavitation. Cavitation shall be deemed to have
taken place when the rated head has been reduced by 3% when the pump is operated at
rated flow.
Contractual
The commercial terms used in this specification are defined as follows:
Owner
The oil and gas company, an associate or subsidiary, who is the end user of the equipment and facilities.
Vendor
The company supplying the equipment and material.
Contractor
The main contractor for a defined piece of work
Sub-Contractor
A company awarded a contract by a contractor to do part of the work awarded to the Contractor.
Inspection Authority
The organisation representing the Owner or Contractor that verifies that the equipment and facilities have
been designed, constructed, inspected and tested in accordance with the requirements of this specification
and the Purchase Order/Contract.
GES G.02
Page 6 of 21
Rev 0 1999
Inspector
A qualified individual representing the Owner, Vendor/Contractor or the assigned Inspection Authority,
who verifies that the equipment and facilities have been designed, constructed, inspected and tested in
accordance with the requirements of this specification and the Purchase Order/Contract.
3.0
DESIGN
3.1
3.1.1
Horizontal pumps shall conform to ASME B73.IM "Specification for Horizontal End Suction Centrifugal
Pumps for Chemical Process", as amended by this specification.
3.1.2
Vertical pumps shall conform to ASME B73.2M "Specification for Vertical In-Line Centrifugal Pumps for
Chemical Process", as amended by this specification.
Only where called for in this specification, both horizontal and vertical pumps shall comply with the
requirements of API 610 "Centrifugal Pumps for Petroleum, Heavy Duty Chemical and Gas Industry
Services".
3.2
ASME 4.1
4.1.1
4.1.4
ASME 4.2
4.2.1
ASME 4.3
4.3.1
Casing
Add:
"Drain connections shall be supplied at the lowest point of the pump casing".
4.3.5
Jackets shall not be used on the casing, nor the stuffing box.
4.3.7
4.3.8
Add:
"For flammable or toxic liquids, connections shall be socket welded and terminate in a
GES G.02
Page 7 of 21
Rev 0 1999
Impeller
Add:
"Closed Impellers are preferred".
4.4.3
4.4.5
4.4.6
4.4.7
ASME 4.5
4.5.1
Shaft
Add:
"All pumps shall be provided with a shaft sleeve sealed and locked to the shaft. The shaft
sleeve shall be resistant to wear, corrosion and erosion. The shaft sleeve shall be of the
replaceable type".
ASME 4.6
4.6.1
Shaft-sealing
Add:
"All pumps on process duty shall have mechanical seals. Welded metal bellows seals are
preferred.
All seals shall be single, balanced, hydraulic design, interior type.
Seals shall be identified by the classification in Appendix `D' of API 610, Eighth Edition.
The Vendor/Contractor shall provide seal piping and accessories as defined in Figures A2
and A3 of ASME B73.IM - 1991. Where the Owner has not specified the seal and piping
plan on the Data Sheet, the Vendor/Contractor shall propose an arrangement suitable for
the duty for approval by the Owner.
GES G.02
Page 8 of 21
Rev 0 1999
Seals shall be provided with a floating, carbon bushing, auxiliary sealing device".
4.6.2
ASME 4.7
4.7.1
In hot service (>212F (100C)) the seal fluid temperature shall not exceed 122F (50C);
the cooler shall be sized accordingly.
Bearings
Add:
"For pumps handling flammable or toxic liquids, the brackets between the pump casing
and the bearing housings shall be of steel".
4.7.5
ASME 4.8
4.8.1
Materials of Construction
Add:
"For flammable or toxic service, pump casings shall be in steel material".
ASME 4.12
4.12.1
4.12.7
4.12.7.1 "All pumps shall be provided with a drip rim type baseplate. A tapped drain opening shall be
provided of not less than NPT 1 at the pump end of the baseplate.
Fabricated baseplates are preferred. The baseplate shall extend under the pump and
driver. Two screwed earthing bosses shall be welded to the baseplate, at diametrically
opposite corners.
4.12.7.2 Mounting pads shall be provided for the pump and driver. The pads shall be larger than the foot
of the mounted equipment to allow levelling of the baseplate without removal of the
equipment.
The pads shall be fully machined flat and parallel. Corresponding surfaces shall be in the
same plane within 0.002 inch per foot (0.17 mm per metre) of distance between the pads.
These requirements shall be met by suporting and clamping the baseplate at the
foundation bolt holes only.
4.12.7.3 All pads for drive train components shall be machined to allow for the installation of shims at least
_ ins (3 mm) thick under each component. A set of stainless steel shims at least _ ins (3
mm) thick shall be furnished".
Add new paragraph:
4.12.8
"Couplings
GES G.02
Page 9 of 21
Rev 0 1999
Spacer type couplings shall be provided. The minimum service factor shall be 1.5, based
on the driver nameplate rating.
Couplings operating at or above 3500 rpm with shaft diameter over 2 ins (65 mm) shall
be dynamically balanced and match marked".
Add new paragraph:
4.12.9
% Margin
% Margin
1-4 HP
30
51-75HP
15
5-25 HP
25
> 75
10
26-50 HP
20
--
--
Pump motors shall preferably be of sufficient size to operate the pump without overload
at the end of curve condition".
Add new paragraph:
4.12.10
"Piping
4.12.10.1
Steel pump casing connections and piping for vent and drain shall be welded and flanged,
and shall have the same rating as the pump discharge flange.
For cast iron pumps where use of a studded boss or flange is impractical, threaded
connections will be considered. Piping and fittings shall be socket or butt welded: seal
welded threaded joints are not acceptable. For non toxic non flammable service, socket
weld "unions" may be provided to allow disassembly and maintenance.
4.12.10.2
All piping, except cooling water piping, shall be Schedule 80 seamless pipe for sizes 1
and smaller and Schedule 40 minimum for NPS 2 and over. Seal flush piping shall be
NPS minimum Schedule 40S stainless steel pipe, socket welded.
4.12.10.3
Cooling water piping shall be NPS minimum, Schedule 80 seamless pipe or ins
(12.7 mm) minimum stainless steel tubing, 0.035 ins (0.95 mm) minimum wall thickness.
4.12.10.4
Swage nipples or reducing couplings shall be used for pipe size changes. Bushings and
street elbows are not acceptable.
4.12.10.5
Casing drain and vent connections shall be valved as close as possible to the pump. The
piping shall extend to the edge of the baseplate.
4.12.10.6
There shall be sufficient space between the pump casing and baseplate to allow
installation and removal of the elbow and valve on the drain connection".
4.13
GES G.02
Page 10 of 21
Rev 0 1999
3.3
ASME 4.1
4.1.1
4.1.4
ASME 4.2
ASME 4.3
4.3.1
Casing
Add:
"Drain connections shall be supplied at the lowest point of the pump casing".
4.3.5
Jackets shall not be used on the casing nor the stuffing box.
4.3.7
4.3.8
ASME 4.4
4.4.1
GES G.02
Page 11 of 21
Rev 0 1999
4.4.5
4.4.6
4.4.7
ASME 4.5
4.5.1
Shaft
Add:
"All pumps shall be provided with a shaft sleeve sealed and locked to the shaft. The shaft
sleeve shall be resistant to wear, corrosion and erosion. The shaft sleeve shall be of the
replaceable type".
ASME 4.6
4.6.1
Shaft-sealing
Add:
"All pumps shall have mechanical seals. Welded metal bellow seals are preferred.
All seals shall be single, balanced hydraulic design, interior type.
Seals shall be identified by the classification in Appendix `D' of API 610, Eighth Edition.
The Vendor/Contractor shall provide seal piping and accessories as defined in Figures A2
and A3 of ASME B73.2M - 1991. Where the Owner has not specified the seal and
piping plan on the data sheet, the Vendor/Contractor shall propose an arrangement
suitable for the duty for approval by the Owner.
Seals shall be provided with a floating, carbon bushing, auxiliary sealing device".
ASME 4.7
4.7.4
GES G.02
Page 12 of 21
Rev 0 1999
Motors shall be sized with a nominal nameplate rating of at least the following minimum
percentage margin over the pump rated horsepower:-
% Margin
% Margin
1-4 HP
30
51-75HP
15
5-25 HP
25
> 75
10
26-50 HP
20
--
--
Pump motors shall be of sufficient size to operate the pump without overload, at the end
of curve condition."
4.7.6
Bearing - VB Pumps
Add new paragraph (d)
"Pump bearings shall preferably be designed for grease lubrication".
ASME 4.8
4.8.1
Materials of Construction
Add:
"For flammable or toxic service pump casings shall be in steel material".
ASME 4.12
4.12.1
4.12.8
"Piping
4.12.8.1 Steel pump casing connections and piping for vent and drain shall be welded and flanged and have
the same rating as the pump discharge flange. For cast iron pumps where use of a
studded boss or flange is impractical threaded connections will be considered. Piping and
fittings shall be socket or butt welded: seal welded threaded joints are not acceptable.
For non toxic non flammable service, socket weld "unions" may be provided to allow
disassembly and maintenance. Small bore auxiliary connections on seals may also be
screwed where space/access prohibit the use of flanges.
4.12.8.2 All piping, except cooling water piping, shall be Schedule 80 seamless pipe for sizes 1 ins (38
mm) and smaller and Schedule 40 minimum for sizes 2 ins (50.8 mm) and over. Seal
flush piping shall be ins minimum (12.7 mm) Schedule 40S stainless steel pipe, socket
welded.
4.12.8.3 Cooling water piping shall be in (19 mm) minimum, Schedule 80 seamless pipe or ins (12.7
mm) minimum stainless steel tubing, 0.035 ins (0.95 mm) minimum wall thickness.
GES G.02
Page 13 of 21
Rev 0 1999
4.12.8.4 Swage nipples shall be used for pipe size changes. Bushings and street elbows are not acceptable.
4.12.8.5 Casing drain and vent connections shall be valved as close as possible to the pump".
Add new paragraph:
4.12.9
"Pedestals
The Owner shall specify if support pedestals are to be provided".
Add new paragraph:
4.12.10
"Couplings
The minimum coupling service factor shall be 1.5 based on the driver nameplate rating.
Couplings operating at or above 3500 rpm with shaft diameter over 2 ins (50 mm) shall
be dynamically balanced and match marked".
Add new paragraph:
ASME 4.13
ASME 5.1
5.1.3
4.0
MATERIALS
4.1
ASME Requirements
4.1.1
Where materials are not specified, the Vendor/Contractor shall propose the most suitable materials for the
duty from paragraph 4.8 of ASME B73.1M - 1991 and ASME B73.2M - 1991, for the approval of the
Owner.
Similarly, in the absence of a detailed seal specification, the Vendor/Contractor shall also propose the most
appropriate mechanical seal type and materials using the API 610 designation, for the approval of the
Owner.
4.1.2
Materials, casting factors and the quality of any welding shall be equal to those required by Section VIII,
Division 1 of the ASME Code. The manufacturer's data report forms, as specified in the code, are not
required.
4.2
H2S Corrosion
4.2.1
Any corrosive agents present in the process fluids and in the environment, including constituents that may
cause stress corrosion cracking, will be specified by the Owner.
4.2.2
All materials subject to pressure and exposure to a medium (whether gas or liquid) containing H2S shall
GES G.02
Page 14 of 21
Rev 0 1999
comply with the yield strength and hardness restrictions stipulated in NACE MR-01-75 (94).
When approved, wear surfaces may be hardened by the application of a suitable coating.
4.3
Miscellaneous
4.3.1
The use of chaplets in pressure castings shall be held to a minimum. The chaplets shall be clean and
corrosion free (plating permitted) and of a composition compatible with the casing.
4.3.2
Where mating parts such as studs and nuts of AISI Standard Type 300 stainless steel, or materials with
similar galling tendencies are used, they shall be lubricated with a suitable anti-seizure compound.
4.3.3
If austenitic stainless steel parts exposed to conditions that promote inter-granular corrosion are to be
fabricated, hard-faced, overlaid or repaired by welding, they shall be made of low carbon or stabilized
grades.
4.3.4
Minor parts that are not identified (such as nuts, springs, washers, gaskets and keys) shall have corrosion
resistance at least equal to that of specified parts in the same environment. Seal / O-ring material between
the shaft and the shaft sleeve shall be verified by the Vendor/Contractor as being satisfactory for the service
conditions.
Welding of piping, pressure-containing parts, and wetted parts, as well as any weld repairs to such parts,
shall be performed by personnel and procedures qualified in accordance with Section VIII, Division 1 and
Section IX of the ASME Code.
4.3.5
Impact testing is required for critical exposure temperatures below -20F (-29C).
4.3.6
PWHT is required for all carbon and ferritic alloy steel pressure containing components that are welded
and/or weld repaired, when the weldment is exposed to a process environment containing wet H2S. The
PWHT procedure outlined in the ASME Code, Section VIII, paragraphs UW-40, UW-49, UHA-32 and
UCS-56 shall be followed, except that notes in Tables UHA-32 and USC-56 do not apply. All welds,
regardless of type or size, that are exposed to wet H2S shall be PWHT at a minimum temperature of 1100F
(595C). External attachments on P-1 Group 1 and 2 materials do not require PWHT.
4.3.7
4.3.8
Asbestos shall not be used in any form which can result in free asbestos becoming a health hazard. The
Vendor/Contractor shall declare all asbestos use and submit alternative material for review by the Owner.
4.4
Mechanical Seals
Springs shall be Alloy 20 or 316 stainless steel. Other metal parts shall be 316 stainless steel or another
corrosion-resistant material suitable for the service, except that metal bellows shall be of the seal
manufacturer's recommended material for the service. Metal bellows shall have a corrosion rate of less
than 2 mils (51 micrometres) per year.
Mechanical seal gasket materials shall comply with the table below:
GES G.02
Page 15 of 21
Rev 0 1999
Gasket Material
Maximum
TFE
-20 (-29)
+350 (+177)
Nitrile (Buna-N)
-20 (-29)
+ 210 (+99)
Neoprene
0 (-18)
+200 (+93)
Fluoroelastomer
0 (-18)
+350 (+177)
FFMK Elastomer
+ 10 (-12)
+350 (+177)
Graphite Foil
-20 (-29)
+350 (+177)
5.0
INSPECTION
5.1
Procedures
5.1.1
The inspection requirements are covered by the document "General Conditions of Purchase" which forms
part of the Purchase Order/Contract. Additional requirements are given below.
5.1.2
All items of plant and equipment referenced within this specification shall be subject to inspection by the
Owner or the Inspection Authority.
GES G.02
Page 16 of 21
Rev 0 1999
5.1.3
Inspection shall be in accordance with 4.1 and 4.2 of API 610 Eighth Edition as amended by this
specification. All inspection activities to be performed, including any special requirements, shall be agreed
with the Owner and shall be incorporated within the agreed Quality Control Plan provided by the
Vendor/Contractor. The Vendor/Contractor shall submit procedures for all applicable NDT techniques for
approval by the Owner before production commences.
5.1.4
All operators of NDT equipment shall have thorough knowledge of the operation of the equipment to be
used and shall hold an appropriate certificate of competence, which is to be agreed by the Owner.
5.1.5
The Vendor/Contractor is to furnish the Owner's Inspector with all reasonable facilities, to satisfy himself
that the equipment is fabricated and tested in accordance with the relevant code and this specification.
5.1.6
Any approvals given by the Owner's Inspector and/or the Inspection Authority do not relieve the
Vendor/Contractor of any responsibility regarding guarantees, workmanship or compliance with the code
and this specification.
5.2
Scope
Inspection and testing shall comply with paragraphs 4.1 and 4.2 of API 610, as amended below:
The Owner reserves the right to observe any inspection carried out by the Vendor/Contractor, as
agreed at an inspection coordination meeting to be held within four (4) weeks of order placement.
4.1.6*
5.3
4.2.3.1*
4.2.3.2*
Hardness verification is only required if hydrogen sulphide is present (paragraph 2.11.1.11 of API
610).
Nameplates
Nameplates shall be provided complying with paragraph 3.6 of API 674.
6.0
TESTING
6.1
Required Tests
The following tests may be required and witnessed by the Owner:
-
hydrostatic (mandatory)
GES G.02
Page 17 of 21
Rev 0 1999
The Owner may waive the execution and/or witnessing of the tests if the pumps involved are of small
power requirements or where NPSHA significantly exceeds NPSHR. Specific requirements will be given
on the Data Sheet by the Owner.
6.2
Test Requirements
6.2.1
Test requirements as indicated on the Data Sheet shall be carried out in accordance with paragraphs (a) to
(f) below:
(a) Hydrostatic Test
A hydrostatic test complying with paragraph 5.2.1 of ASME B73.1M - 1991/ASME B73.2M - 1991 as
amended below, shall be carried out on pressure containing components of all pumps except:
5.2.1 - Delete "10 minutes" and replace with "30 minutes".
(b) Mechanical Run
The mechanical run shall be at rated head and speed for a minimum period of one (1) hour.
(c) Performance Test
Paragraph 5.2.2 of ASME B73.1M - 1991/ASME B73.2M - 1991 shall apply. Performance curves
shall comply with paragraph 5.2.3 of ASME B73.1M - 1991 and ASME B73.2M - 1991, and shall be
included in the data book.
(d) NPSHR Test
NPSHR tests, when required, shall comply with paragraph 4.3.4.1 of API 610 8th edition. Testing shall
be carried out with contract mechanical seals installed.
(e) Auxiliary Equipment Tests
When required auxiliary equipment such as oil systems, gears and control systems shall be tested in the
Vendor's/Contractor's shop. Details of the auxiliary-equipment test shall be developed jointly by the
Owner and the Vendor/Contractor.
(f) Vibration Test
Vibration readings, when required, shall be taken on the bearing housings. Unless otherwise agreed,
the acceptance limits shall be as stated in API 610 paragraphs 2.8.3.7 to 2.8.3.9.
GES G.02
Page 18 of 21
Rev 0 1999
6.2.2
For all specified tests above the Vendor/Contractor shall submit test procedures in writing to the Owner for
approval prior to the start of the testing programme. The test procedures shall be detailed and include the
acceptance criterion (for each test) which shall be internationally accepted.
6.2.3
No preservative or paint shall be applied to welds, mechanical joints or pressure containing components
prior to any hydrostatic test.
6.2.4
All test gauges shall have been calibrated within 12 months and the calibration certificates made available
to the Inspector.
6.3
Test Certificates
Test certificates shall be provided as follows:(a) The manufacturer's physical and chemical certification for pressure containing parts
(b) NDT certification (radiographic, magparticle, ultrasonic, dye penetrant)
(c) Hydrotest certificates
(d) Shop mechanical run/performance/NPSH test data
7.0
DOCUMENTATION
7.1
Introduction
7.1.1
This section covers the documentation requirements for design, materials, inspection, testing, installation
and operation of the pump(s).
7.2
7.2.1
The Vendor/Contractor shall supply with his proposal, a schedule showing submission of all documents for
review and approval, proposed Sub-Contractors and material procurement and a production/fabrication
programme.
7.2.2
The Vendor/Contractor shall submit with his proposal a Quality Control Plan for the contract.
7.2.3
After the contract award, monthly reports on design, material procurement and production progress shall be
submitted to the Owner.
7.2.4
A co-ordination meeting shall be held within six (6) weeks of the placement of the Purchase
Order/Contract, to review all engineering and manufacturing requirements of the order.
7.3
7.3.1
The documents detailed below shall be submitted for approval/review to the Owner and to the Inspection
Authority within the periods agreed between the Owner and Vendor/Contractor. It shall be the
responsibility of the Vendor/Contractor to ensure that the production schedule takes into account
documentation submission periods, plus a three (3) week approval review period by the Owner and/or the
Inspection Authority. The Vendor/Contractor shall be responsible for obtaining approvals from the
Inspection Authority.
7.3.2
All calculations shall be carried out in a clear and logical manner. The source of formulae or methods shall
be clearly referenced. Computer calculations will only be accepted if all input is shown, together with
calculated values of intermediate terms and factors and the computer program has been validated to the
GES G.02
Page 19 of 21
Rev 0 1999
The Vendor/Contractor shall submit as a minimum, the data and drawings listed below:
For Proposals (Typical Data)
(a)
(b)
(c)
(d)
(e)
Performance curves
Outline drawing with max forces on nozzles
Data sheet completed
Seal description and piping arrangement
Cross section drawings
Manuals
Requirements for data books and Installation Operation and Maintenance Manuals are as follows:
7.4.1
Data Books
Two (2) copies of the data book shall be provided containing the shop manufacturing Record/Test
Certificates.
7.4.2
8.0
PRIOR TO SHIPMENT
8.1
GES G.02
Page 20 of 21
Rev 0 1999
Spares
The Vendor/Contractor shall submit with his initial equipment proposal, a priced list of recommended spare
parts for "Start-up" and for "Two Years Operation".
8.3
4.4.3.2
4.4.3.3
Shipping
Detailed shipping arrangements are covered by the Purchase Order/Contract.
The equipment shall not leave the Vendor's/Contractor's works for shipment until the release has been
approved by the Owner's Inspector.
8.5
Warranty
The Contractor shall provide manufacturer's written guarantees of the pumps performance. Curves of head
versus flow with efficiency and power lines shall be provided to cover the operating range.
GES G.02
Page 21 of 21
Rev 0 1999
The Vendor/Contractor shall warrant all materials and services supplied against any defect for a minimum
of twelve (12) months after commissioning or twenty-four (24) months from the date of delivery to site,
whichever is the shorter period, or for the period stipulated in the Order.
Should any item be found defective, the Vendor/Contractor shall be responsible for all costs associated
with restoring the equipment to the standard specified by the Purchase Order/Contract.
SHEET
SERVICE
ITEM No.
of
No. of UNITS
Vendor /Contractor
2
3
BRG. Frame
Item No.
Service
No. Turbines Req'd
Item No.
4
5
Liquid/Slurry
PT.F Norm
SP.GR. At Norm PT
PERFORMANCE
Performance Curve No.
Max.
US GPM at Norm
Rated
Total Head,
FT Rated
10 Corr./Eros. Caused By
Rated
% BHP Rated
NPSH (Water)
Eff.
FT
PH
RPM
& Max.
Viscosity
12
13 CONSTRUCTION
ASME B73.1M
14 Pump Type:
Horiz.
15
Cradled Mnt.
ASME B73.2M
Vert.In-Line
Foot
Verticle Mount:
Motor Shaft
18
Split:
Radial
19
Press:
Max.Allow.
20
Connect:
21 Impeller Dia.
PSIG
Rated
Radial
23
Oil
Lube:
24 Coupling:
25
MFR
Rigid Coupling
F
Hydro Test
Oil Mist
Grease
Wit. Hydro.
Nonwit.NPSH
Wit. NPSH
Nonwit. Vibration
Wit. Vibr.
PSIG
Other
Model
Pump MFR.
PUMP MATERIAL
Thrust
Grease for Life
Casing
Guard
Oiler
Impeller
Driver MFR.
Purchaser
Jacketed
Yes
Wear Rings
Seal Only
Shaft/Sleeve
Size/No. of Rings
Gland
No
Gaskets
Material Code
30
Balanced
Unbalanced
31
Double
Back to Back
32
Cartridge
Wit. Perf.
Nonwit. Hydro.
Gage Discharge
Impeller Type
29 Mech. Seal:
Double
Max.
Standard
Lantern Rings:
Other
Single
Gage Suction
22 Bearings Type:
Nonwit. Perf.
Centerline
17
Drain
SHOP TESTS
OTHER
Single
Inside
Tandem
Baseplate
Outside
Coupling Guard
Face to Face
Other:
33
34
35
36
Total GPM
PSIG
37
GPM
PISG
38
GPM
INSPECTION
In Process
39 DRIVER:
Motor
Turbine
Other
40 HP
RPM
Frame
41 MFR.
Bearings
Service Factor
42 Type
Insulation
AMPS:
43 Lube
Temp. Rise F
Encl.
44 Inlet Press.
Exhaust Press.
Not Required
Final
Provided By
Volts/Phase/Hertz
FL
Steam Temp.
ADDITIONAL REQUIREMENTS/COMMENTS
LR
Water Rate
45 Other
46
Customer/User
47
Location
48
49
Item No(s)
50
Equip. No(s)
Pump Serial No(s)
Revision No./Date
Prepared by/Date
Authorised by/Date
Purpose