OM8210#16.0
General
The dp water level transmitter unit controls and supervises the water level in the
boiler. The complete unit is installed in a vertical position and connected to the
boiler sockets, provided for this purpose, by means of shut-off valves (see Figure 1).
The dp water level transmitter unit includes reference leg, variable leg, transmitter
connection valves mounted on a manifold, and a differential pressure transmitter.
The differential pressure transmitter converts the detected water level into an
analogue signal (4-20 mA) which is transmitted to the control system. The signal
can also be used for remote level indication in the engine control room.
Illustration of the dp water level transmitter unit
S h u t- o ff v a lv e s
F illi n g p lu g
R e f e r e n c e le g
D r a in v a lv e
B o ile r
F illi n g p lu g
V a r i a b le le g
D r a in v a lv e
V a l v e m a n if o ld
C o n n e c t io n
v a lv e s
E q u a lis in g v a lv e
d p - t r a n s m it t e r
Figure 1
dpunit.cdr
The differential pressure transmitter is installed with the process connections upward
to prevent trapping of air. The pipes are mounted with continuous fall (at least 5)
from the boiler connections to the transmitter also to prevent trapping of air.
The reference impulse leg (upper connection point) is connected to the high pressure
connection (+), and the variable impulse leg (lower connection point) to the low
pressure connection (-).
Note: The dp water level transmitter unit or any part of it must not be
insulated to ensure the correct function.
Language UK
Page 1/10
OM8210#16.0
Commissioning
2.1 Initial commissioning
Before the boiler is pressurised and started for the first time some initial
commissioning procedures can be performed with regard to the valves of the dp
water level transmitter unit. The shut-off valves, transmitter connection valves, and
equalising valve should be operated in the following sequence during the initial
commissioning:
Step A: Initial setting; all valves of the dp water level transmitter unit closed (see
Figure 1).
Step B: Open the equalising valve located on the valve manifold.
Step C: Unscrew the filling plugs for the reference leg and variable leg. Fill the legs
with feed water.
Step D: Open the transmitter connection valve and venting facility on the reference
leg side of the transmitter.
Step E: Close the venting facility on the reference leg side of the transmitter when
no more air escapes.
Step F: Open the venting facility on the variable leg side of the transmitter.
Step G: Close the transmitter connection valve on the reference leg side of the
transmitter when no more air escapes.
Step H: Open the transmitter connection valve on the variable leg side of the
transmitter.
Step I: Close the venting facility on the variable leg side of the transmitter when no
more air escapes.
Step J: Close the transmitter connection valve on the variable leg side of the
transmitter.
Step K: Close the equalising valve.
Step L: Refill the legs with feed water and screw on the filling plugs for the
reference leg and variable leg.
Step M: Open both transmitter connection valves fully.
Page 2/10
OM8210#16.0
When the water level in the boiler is at the lower connection point the pressure
difference over the transmitter is equal to the height between the connection
points (column of water) corrected with the density of the water in the reference
leg. The value must be specified and entered in engineering unit, e.g. in mm
H2O.
20 mA output signal from the differential pressure transmitter:
When the water level in the boiler is at the upper connection point the pressure
difference over the transmitter is equal to the height between the connection
points corrected with the density difference between the water in the reference
leg and in the boiler. The value must be specified and entered in engineering
unit, e.g. in mm H2O.
Figure 2 indicates the calculation procedures of the differential pressures. As
standard it is assumed that the temperature in the reference leg (condensate receiver)
is 40C. Table 1 shows the calculated values for some standard heights between the
connection points. If the actual boiler plant does not fit any of the standard
calculations the specified calculated values can be entered in the table for calibration
record purpose.
If the boiler plant is intended to operate at different set points (high/low pressure
mode) the differential pressure transmitter must be calibrated so that the minimum
indicated "Too low water level" on the control system not is lower than the actual
"Too low water level" mark. Because of the density difference in the boiler water at
different working pressures/temperatures the indicated water levels will not be
identical. This means that the differential pressures for start of scale and full scale
should be calculated using the parameters from operation in high pressure mode.
When the differential pressures corresponding to the "start of scale" and "full scale"
have been calculated carry out the following work steps (please also see the specific
instruction for the differential pressure transmitter):
Step A: Unscrew the screws that hold the protective cover of the differential
pressure transmitter for access to the push buttons.
Step B: Use the "M" key to select modes on the differential pressure transmitter.
When a mode is selected, the keys and are used to change the mode
value.
Language UK
Page 3/10
OM8210#16.0
Step C: Set the values in mode 4 (electrical damping), 9 (output in error situation),
10 (pushbuttons functions), 11 (characteristic), 13 (value displayed), and 14
(engineering units). In mode 14 select e.g. "mm H2O" as engineering units.
Step D: Select mode 5 using the "M" key.
Step E: Use the or key to set the start of scale in the selected engineering unit.
If mm H2O is selected as engineering units, then set the start of scale to the
calculated value in mm H2O (differential pressure at 4 mA).
Step F: Press both the and keys simultaneously for about 2 seconds, and the
start of scale is set to zero (in the selected engineering unit).
Step G: Select mode 6 using the "M" key.
Step H: Use the or key to set the full scale in the selected engineering unit. If
mm H2O is selected as engineering units, then set the full scale to the
calculated value in mm H2O (differential pressure at 20 mA).
Step I: Press both the and keys simultaneously for about 2 seconds, and the full
scale is set to the upper limit (in the selected engineering unit).
Step J: Mount the protective cover of the differential pressure transmitter again.
Calibration of differential pressure transmitter
Height between
Working pressure
Transmitter output,
Connection point
connection [mm]
[barg - kg/cm2]
[mA]
Calculations for standard heights, working pressures, and ambient temperature (40C)
Lower connection
4
7.0
Upper connection
20
525
Lower connection
4
16.0
Upper connection
20
Lower connection
4
7.0
Upper connection
20
700
Lower connection
4
16.0
Upper connection
20
Lower connection
4
7.0
Upper connection
20
800
Lower connection
4
16.0
Upper connection
20
Calculation records for other heights, working pressures, and/or ambient temperatures
Lower connection
4
Upper connection
20
Lower connection
4
Upper connection
20
Lower connection
4
Upper connection
20
Lower connection
4
Upper connection
20
Lower connection
4
Upper connection
20
Lower connection
4
Upper connection
20
Language UK
Differential pressure
calibration [mm H2O]
521
47
521
68
695
63
695
90
794
72
794
103
Page 4/10
OM8210#16.0
Table 1
Calculation of the differential pressures
o
t2 = 4 0 C , d e n s ity : 9 9 2 .2 k g / m
t1 = n o t e x is t in g
D iffe r e n tia l p r e s s u r e
b e tw e e n c o n n e c tio n s :
5 2 5 x 0 .9 9 2 2 =
H e ig h t b e tw e e n
c o n n e c t io n s , e .g .:
525 m m
5 2 1 m m H 2O ( a t 4 m A )
W a te r le v e l
t3 = 1 6 5 C a t 7 b a rg ,
2 0 1 oC a t 1 6 b a r g
t2 = 4 0 C , d e n s ity : 9 9 2 .2 k g / m
D iffe r e n tia l p r e s s u r e
b e tw e e n c o n n e c tio n s
(a t 7 b a rg ):
5 2 5 x (0 .9 9 2 2 - 0 .9 0 2 5 ) =
4 7 .1 m m H 2O ( a t 2 0 m A )
t 1 = n o t e x i s t in g
W a te r le v e l
H e ig h t b e tw e e n
c o n n e c t io n s , e .g .:
525 m m
D iffe r e n tia l p r e s s u r e
b e tw e e n c o n n e c tio n s
(a t 1 6 b a rg ):
5 2 5 x (0 .9 9 2 2 - 0 .8 6 3 6 ) =
6 7 .5 m m H 2O ( a t 2 0 m A )
o
t3 = 1 6 5 C a t 7 b a rg ,
d e n s it y 9 0 2 .5 k g / m
2 0 1 C a t 1 6 b a rg ,
d e n s it y 8 6 3 .6 k g / m
Figure 2
dpunit_cali.cdr
Language UK
Page 5/10
OM8210#16.0
However, if the boiler plant is intended to operate at different set points (high/low
pressure mode) the differential pressure transmitter must be calibrated so that the
minimum indicated "Too low water level" on the control system not is lower than
the actual "Too low water level" mark. Because of the density difference in the
boiler water at different working pressures/temperatures the indicated water levels
will not be identical. This means that the differential pressure transmitter should be
calibrated when the boiler plant operates in high pressure mode.
When the boiler operates at normal working pressure carry out the following work
steps (please also see the specific instruction for the differential pressure
transmitter):
Step A: Unscrew the screws that hold the protective cover of the differential
pressure transmitter for access to the push buttons.
Step B: Use the "M" key to select modes on the differential pressure transmitter.
When a mode is selected, the keys and are used to change the mode
value.
Step C: Set the values in mode 4 (electrical damping), 9 (output in error situation),
10 (pushbuttons functions), 11 (characteristic), 13 (value displayed), and 14
(engineering units). In mode 14 select "mA" as engineering units.
Step D: Ensure that the boiler cannot be filled with feed water by closing the feed
water valves or stopping the feed water pumps.
Step E: Slowly decrease the water level in the boiler until the lower connection
point is reached (socket centre line of the variable leg). The water level can
be decreased by means of the blow down valves.
Step F: The upper and lower connection points will normally be beyond the visual
indication area of the water level gauges. It is therefore impossible to see
when the water level is at these points. However, the rising/falling rate of
the water level can be controlled, by throttling the feed water valves/blow
down valves. By clocking the rate it can be calculated when the water level
has reached the connection points.
Step G: Select mode 2 using the "M" key.
Step H: Set the output current corresponding to the start of scale using the and
keys. Or set the output current to 4 mA by pressing the and keys
simultaneously for about 2 seconds.
Step I: Slowly increase the water level in the boiler until the upper connection point
is reached (socket centre line of the reference leg). The water level can be
increased by means of the feed water pumps.
Step J: When the water level is increased operate the burner so that the boiler
pressure is kept at normal working pressure.
Step K: Select mode 3 using the "M" key.
Language UK
Page 6/10
OM8210#16.0
Step L: Set the output current corresponding to the full scale using the and
keys. Or set the output current to 20 mA by pressing the and keys
simultaneously for about 2 seconds.
Step M: Mount the protective cover of the differential pressure transmitter again.
Page 7/10
OM8210#16.0
Step H: Decrease the water level somewhat until the lower connection point is
reached (socket centre line of the variable leg). Check that the output signal
from the differential pressure transmitter is at 4 mA or the start of scale
value in the selected engineering units.
Step I: After completion of the function test open the feed water valves or start the
feed water pumps.
Language UK
Page 8/10
OM8210#16.0
Step F: Screw on the filling plug and slowly open the shut-off valve for the
reference leg.
Step G: Open the two transmitter connection valves in the manifold.
Step H: After performing the blow-through check that the dp water level transmitter
unit and feed water control valve are fully operational.
In case of contaminated boiler water, e.g. sludge, mud, etc., the blow-through
procedure of the impulse legs must be done more often.
3.1.2 Blow-through procedure of the connection pipes
The blow-through procedure should be performed as describe below when the boiler
plant is stopped, but still pressurised. The procedure should be carried out at least
once each year.
Step A: Open the venting facilities located on the valve manifold for the impulse
legs. The transmitter connection valves must remain open and the
equalising valve closed during the blow-through procedure.
Step B: Close the venting facilities on the valve manifold when only clean water
escapes.
Step C: Close the shut-off valve for the reference leg.
Step D: Slowly open the drain valve of the reference leg.
Step E: Close the drain valve again when the reference leg is completely
depressurised.
Step F: Unscrew the filling plug of the reference leg and fill the leg with feed water.
Step G: Screw on the filling plug and slowly open the shut-off valve for the
reference leg.
In case of contaminated boiler water, e.g. sludge, mud, etc., the blow-through
procedure of the connection pipes must be done more often.
3.1.3 Function test of the dp water level transmitter unit
During normal operation of the boiler plant a function test of dp water level
transmitter unit should be carried out at least once each month. The purpose of the
function test is to check that the connected warnings/alarms and control functions
are operational. The boiler should be operated at normal working pressure during the
test to provide for correct indications. When the boiler is at normal water level and
the burner is in operation, carry out the following work steps:
Step A: Slowly increase the water level in the boiler by forcing operation of the feed
water pump until the water level has risen to the "High water level" level.
The control system should indicate a warning, (if provided).
Note: Note that alarms, warnings, and cut out functions can be delayed via
timers in the control system.
Language UK
Page 9/10
OM8210#16.0
Step B: Increase the water level somewhat until the "Too high water level" mark is
reached. The burner should stop, and an alarm should be indicated on the
control system, (if provided).
Step C: Ensure that the boiler cannot be filled with feed water by closing the feed
water valves or stopping the feed water pumps.
Step D: Decrease the water level in the boiler by means of the blow down valves
until the water level has fallen to the " Low water level " level. The control
system should indicate a warning.
Step E: Decrease the water level somewhat until the "Too low water level" mark is
reached. The burner should stop, and an alarm should be indicated on the
control system.
Step F: After completion of the function test open the feed water valves or start the
feed water pumps.
Language UK