INFORME DE SUPERVISIN DE PRUEBAS PRIMARIAS DE ATP DE

eNB

SITE NAME

LIM_PQ_7_DE_AGOS

SITE ID

LIMCOM006

DIRECCIN
PROVINCIA

LIMA

DEPARTAMENTO

LIMA

DISTRITO

COMAS

COORDENADAS
LATITU
D
LONGIT
UD

11

77

54 42.55"

03 19.08"

PERSONAL DE ZTE
VICTOR

PERSONAL DE VIDECA

DIEGO LUDEA

FECHA DE EJECUCCIN 18-03-2016


HORA DE INICIO

11:45 AM

itm
TEST
DESCRIPTION
REMARKS
Acceptance Test on Hardware
Power supply and bateries test
BBU:
Voltajes
AC= 218.5 V
DC= -50.3 V

1
1.1

Pruebas de bateras
Inicio:
Fin:
Alarma: Embedded power AC power off
Comentario:
La prueba no se realiz correctamente.

1. Turn on the power supply of the rack.

2. Check that the input voltage of the power supply stay within the required range by using the
multi-meter.

3. After obtaining the value of the input voltage, turn off the power supply and the batteries
has to take over the energy of equipment

4. Wait till 4 hours with commercial power off.

RRU:

1. Check that the input voltage of the power supply stay within the required range by using the
multi-meter.
1.2
B900 power module redundancy test
1. Check the load in each of the 3 modules. The total current must be shared between the 3
modules. Enter to Main Menu -> MSG -> SRM -> (ENTER)
2. Remove one module

RRU

HORA(O
FF)

HORA(O
N)

RRU1
RRU2
RRU3

3. Check the load in each of the 2 modules. The total current must be shared between the 2
modules.
4. Remove 2 modules
5. Check the load in the module. The total current is in this module.
6. Insert both modules and check that the current is shared between the 3 modules.
ITOTAL= 10.2 A
IBATERIAS= -0.6 A
Comentario: Las alarmas de los rectificadores no llegaron correctamente al NOC .
1.3
Hardware Functions
1. Test the BBU boards
2. Test the RRU hardware
Comentario: Las pruebas no se realizaron con normalidad
1.4
Switchover and Restarting
1. Check the status of the power supply indicator and the board status indicators.
Comentario:
La prueba no se realiz correctamente

2. Power off the eNodeB.

3. Power on the eNodeB one minute later. Run the eNodeB services 15 minutes later.

4. Check the status of the power supply indicator and the board status indicators.
1.5
Transmission Interruption
1. Disconnect all GE electrical interfaces from the eNodeB by removing the Ethernet cables
from the GE electrical interfaces on the CC board. Check the status on indicator for the
transmission board.
2. Insert the Ethernet cables into the GE electrical interfaces again to restore the transmission.
Wait for 2 minutes and then check the status on indicator for the transmission board.
3. Start the service test.
2
Acceptance Test on Dry Contact Alarms (Optional)
2.1
Door Control Test
1. Open the door control for the equipment room where the eNodeB resides.

2. In the EMS alarm management module, check that the door control alarm is reported.

3. Close the door control for the equipment room where the eNodeB resides.

4. In the EMS alarm management module, check that the door control alarm is cleared.

2.2

Water Immersion
Test

1. All board indicators are in


normal status.
2. The dry contact
cables are properly
3. Installed and connected to
required items.
4. In the EMS alarm management
module, the alarm statistic
collecting function for the dry
contact alarm has been enabled.
In the EMS, no dry contact alarm
is found.

2.3 Smog Test

2.4

Over-temperature
Test

1. Give off smog around the


smog sensor.
2. Check that the smog alarm is
reported in the EMS alarm
management module.
1. In the EMS, modify the
threshold of the over.
temperature alarm to a lower
value.
2. In the EMS alarm management
module, check that the overtemperature alarm is reported.
3. In the EMS, return the
threshold of the overtemperature alarm to its original
value.

4. In the EMS alarm management


module, check that the overtemperature alarm is cleared.

Acceptance Test on Services

3.1 HTTP Page Browsing

1. Open the test UE and browse


the web page for 20 times.
Before each page browsing,
please clear up the IE cache.

3.2 FTP Downloading

1. Connect the test UEs to the


FTP server.
2. Download files from the FTP
server and observe the
downloading rate.
3. The UE is attached to the

network in good RF conditions.

Acceptance Test on software and configuration

4.1 Software version

1.Query in software management Versin:


in netnumen the current software
version of eNB

4.2 eNB IP Address (CPlane)

1. Review in configuration
management in netnumen the IP
and VLAN configurations.
2. Query the X2 status in
dynamic management in
netnumen.
1. Review in configuration
management in netnumen the IP
and VLAN configurations.
2. Query the X2 status in
dynamic management in
netnumen.
1. Review in configuration
management in netnumen the IP
and VLAN configurations.
2. Query the X2 status in
dynamic management in
netnumen.

4.3 eNB IP Address (UPlane)

4.4 eNB IP Address


(Managment)

IP:
VLAN:

IP:
VLAN:

IP:
VLAN:

6. PENDIENTES
- Se tiene que regresar al site realzar las pruebas ya que no realizaron correctamente
por motivos de que el nodo estaba cado.

PERSONAL RESPONSABLE DEL ATP


Nombre:
Diego Ludea
Fecha: 18-03-16
Firma: ..