eNB
SITE NAME
LIM_PQ_7_DE_AGOS
SITE ID
LIMCOM006
DIRECCIN
PROVINCIA
LIMA
DEPARTAMENTO
LIMA
DISTRITO
COMAS
COORDENADAS
LATITU
D
LONGIT
UD
11
77
54 42.55"
03 19.08"
PERSONAL DE ZTE
VICTOR
PERSONAL DE VIDECA
DIEGO LUDEA
11:45 AM
itm
TEST
DESCRIPTION
REMARKS
Acceptance Test on Hardware
Power supply and bateries test
BBU:
Voltajes
AC= 218.5 V
DC= -50.3 V
1
1.1
Pruebas de bateras
Inicio:
Fin:
Alarma: Embedded power AC power off
Comentario:
La prueba no se realiz correctamente.
2. Check that the input voltage of the power supply stay within the required range by using the
multi-meter.
3. After obtaining the value of the input voltage, turn off the power supply and the batteries
has to take over the energy of equipment
RRU:
1. Check that the input voltage of the power supply stay within the required range by using the
multi-meter.
1.2
B900 power module redundancy test
1. Check the load in each of the 3 modules. The total current must be shared between the 3
modules. Enter to Main Menu -> MSG -> SRM -> (ENTER)
2. Remove one module
RRU
HORA(O
FF)
HORA(O
N)
RRU1
RRU2
RRU3
3. Check the load in each of the 2 modules. The total current must be shared between the 2
modules.
4. Remove 2 modules
5. Check the load in the module. The total current is in this module.
6. Insert both modules and check that the current is shared between the 3 modules.
ITOTAL= 10.2 A
IBATERIAS= -0.6 A
Comentario: Las alarmas de los rectificadores no llegaron correctamente al NOC .
1.3
Hardware Functions
1. Test the BBU boards
2. Test the RRU hardware
Comentario: Las pruebas no se realizaron con normalidad
1.4
Switchover and Restarting
1. Check the status of the power supply indicator and the board status indicators.
Comentario:
La prueba no se realiz correctamente
3. Power on the eNodeB one minute later. Run the eNodeB services 15 minutes later.
4. Check the status of the power supply indicator and the board status indicators.
1.5
Transmission Interruption
1. Disconnect all GE electrical interfaces from the eNodeB by removing the Ethernet cables
from the GE electrical interfaces on the CC board. Check the status on indicator for the
transmission board.
2. Insert the Ethernet cables into the GE electrical interfaces again to restore the transmission.
Wait for 2 minutes and then check the status on indicator for the transmission board.
3. Start the service test.
2
Acceptance Test on Dry Contact Alarms (Optional)
2.1
Door Control Test
1. Open the door control for the equipment room where the eNodeB resides.
2. In the EMS alarm management module, check that the door control alarm is reported.
3. Close the door control for the equipment room where the eNodeB resides.
4. In the EMS alarm management module, check that the door control alarm is cleared.
2.2
Water Immersion
Test
2.4
Over-temperature
Test
1. Review in configuration
management in netnumen the IP
and VLAN configurations.
2. Query the X2 status in
dynamic management in
netnumen.
1. Review in configuration
management in netnumen the IP
and VLAN configurations.
2. Query the X2 status in
dynamic management in
netnumen.
1. Review in configuration
management in netnumen the IP
and VLAN configurations.
2. Query the X2 status in
dynamic management in
netnumen.
IP:
VLAN:
IP:
VLAN:
IP:
VLAN:
6. PENDIENTES
- Se tiene que regresar al site realzar las pruebas ya que no realizaron correctamente
por motivos de que el nodo estaba cado.