Project

Job ref.
Qatar Primary Routes Dukhan Highway Central Contract

5090882

Part of Structure

Calc sheet no.

rev.

Proposed additional Q.P 14 Ethylene pipe culvert box-Single Cell

WS Atkins & Partners Overseas


P O Box 7562
Abu Drawing ref.
Dhabi United Arab Emirates

Ref.

Calc. by
Uday
Calculations

Date

Check by

Date

JAN-11

Output

INDEX

Sr No

Content

1.0

Introduction &

2.0

Box Culvert Design- Single Cell

2.1

Box Culvert Load calculations

B1 to B8

2.2

Box Culvert Robot output

C1 to C38

2.3

Top slab -SAM Results

D1 to D20

2.4

Vertical wall -SAM Results

E1 to E20

2.5

Base slab -SAM Results

F1 to F20

3.0

Wing wall 4.0m Height.

3.1

Calucation of Forces & Moments

G1 to G6

3.2

SAM Results

H1 to H30

4.0

Wing wall 2.50 Height.

4.1

Calucation of Forces & Moments

I1 to I6

4.2

SAM Results

J to J20

APPENDIX A

Page No

design data

A1

List of Drawings

Drg No

Title

ERC 0638/D2/CC/QP/4651

A Highway plan for Culverts Ch 16+200 to 16+800

ii

ERC 0638/D2/CC/QP/4651

A GA & Reinforcement details ( Single Cell )

ii

ERC 0638/D2/CC/QP/4652

A Details Of Wing wall ( Single Cell )

Introduction & Design data.

Introduction & Design data.

Box Culvert Design


Single Cell

Design Of Wing Wall 4.0m Heigh

Design Of Wing Wall 2.5m Height

APPENDIX A
List Of Drawings.

APPENDIX A
List Of Drawings.

Project

Job ref.
Qatar Primary Routes Dukhan Highway Central Contract

Part of Structure
Proposed additional Q.P 14 Ethylene pipe culvert box-Single Cell
WS Atkins & Partners Overseas
P O Box 7562
Abu Drawing ref.
Calc. by
Date
Dhabi United Arab Emirates
Jan 11
Uday

Ref.
1.0

Calculations
Introduction

Design codes
BS 8007

Water retaining structure.

BS 8110

Code of practice for design and construction.

BD 31 / 01 The design of Buried Concrete Box and Frame Structures.


Volume 2 , Section 2 , Part 12
BD 28 / 87 Early Thermal Cracking of Concrete.
1.2

Design data

1.2.1

Material
Structural concrete for roof, wall and bases

1.2.2

Mass concrete

Class C

Reinforced concrete

Class B C40

Reinforcing steel

Grade 420

Material unit weight.


Concrete

1.2.3

25.0

kN/m3

Finishes and waterproofing

Reinforced & Mass

23.0

kN/m3

Earth

20.0

kN/m3

1.50

kN/m2

Live load
Live load

1.2.4

1.2.5

Earth pressure coefficient


Coefficient of active pressure

Ka

Coefficient of active pressure

Ka

0.33

Coefficient of passive pressure

Kp

3.00

Coefficient of earth pressure at rest

Ko

0.60

min

0.20

Cover
Clear concrete cover to steel reinforcement as per following
Base slab

Bottom face

100

mm

Top face

75

mm

Backfill face

75

mm

Inner face

50

mm

Walls

Earth face

75

mm

Internal faces

Inner face

50

mm

Top slab

1.2.6

Crack width
Tensile faces of elements ate checked for crack width 0.200 mm

1.2.7

Bearing capacity

file:///var/www/apps/conversion/tmp/scratch_5/312718648.xlsx

Check by
Output

Following pages furnish the design calculation for box culvert.Culvert is underground rectangular in
shape,Vertical walls are supported by base slab.It is designed for earth pressure & other forces as
applicable.
1.1

5090882
Calc sheet no. rev.

312718648.xlsx

Project

Job ref.
Qatar Primary Routes Dukhan Highway Central Contract

Part of Structure
Proposed additional Q.P 14 Ethylene pipe culvert box-Single Cell
WS Atkins & Partners Overseas
P O Box 7562
Abu Drawing ref.
Calc. by
Date
Dhabi United Arab Emirates
Jan 11
Uday

Ref.

Calculations
Safe bearing capacity 200 kN/m2

file:///var/www/apps/conversion/tmp/scratch_5/312718648.xlsx

5090882
Calc sheet no. rev.

312718648.xlsx

Check by
Output

Project

Job ref.
Qatar Primary Routes Dukhan Highway Central Contract

Part of Structure
Proposed additional Q.P 14 Ethylene pipe culvert box-Single Cell
WS Atkins & Partners Overseas
P O Box 7562
Abu Drawing ref.
Calc. by
Date
Dhabi United Arab Emirates
Jan 11
Uday

Ref.

file:///var/www/apps/conversion/tmp/scratch_5/312718648.xlsx

5090882
Calc sheet no. rev.

Calculations

312718648.xlsx

Check by
Output

Project

Job ref.
Qatar Primary Routes Dukhan Highway Central Contract

Part of Structure
Proposed additional Q.P 14 Ethylene pipe culvert box-Single Cell
WS Atkins & Partners Overseas
P O Box 7562
Abu Drawing ref.
Calc. by
Date
Dhabi United Arab Emirates
Jan 11
Uday

Ref.

file:///var/www/apps/conversion/tmp/scratch_5/312718648.xlsx

5090882
Calc sheet no. rev.

Calculations

312718648.xlsx

Check by
Output

Project

Job ref.
Qatar Primary Routes Dukhan Highway Central Contract

Part of Structure
Proposed additional Q.P 14 Ethylene pipe culvert box-Single Cell
WS Atkins & Partners Overseas
P O Box 7562
Abu Drawing ref.
Calc. by
Date
Dhabi United Arab Emirates
Jan 11
Uday

Ref.

file:///var/www/apps/conversion/tmp/scratch_5/312718648.xlsx

5090882
Calc sheet no. rev.

Calculations

312718648.xlsx

Check by
Output

Project

Job ref.
Qatar Primary Routes Dukhan Highway Central Contract

Part of Structure
Proposed additional Q.P 14 Ethylene pipe culvert box-Single Cell
WS Atkins & Partners Overseas
P O Box 7562
Abu Drawing ref.
Calc. by
Date
Dhabi United Arab Emirates
Jan 11
Uday

Ref.

file:///var/www/apps/conversion/tmp/scratch_5/312718648.xlsx

5090882
Calc sheet no. rev.

Calculations

312718648.xlsx

Check by
Output

Project

Job ref.
Qatar Primary Routes Dukhan Highway Central Contract

Part of Structure
Proposed additional Q.P 14 Ethylene pipe culvert box-Single Cell
WS Atkins & Partners Overseas
P O Box 7562
Abu Drawing ref.
Calc. by
Date
Dhabi United Arab Emirates
Jan 11
Uday

Ref.

file:///var/www/apps/conversion/tmp/scratch_5/312718648.xlsx

5090882
Calc sheet no. rev.

Calculations

312718648.xlsx

Check by
Output

Project

Job ref.
Qatar Primary Routes Dukhan Highway Central Contract

Part of Structure
Proposed additional Q.P 14 Ethylene pipe culvert box-Single Cell
WS Atkins & Partners Overseas
P O Box 7562
Abu Drawing ref.
Calc. by
Date
Dhabi United Arab Emirates
Jan 11
Uday

Ref.

file:///var/www/apps/conversion/tmp/scratch_5/312718648.xlsx

5090882
Calc sheet no. rev.

Calculations

312718648.xlsx

Check by
Output

Project

Job ref.
Qatar Primary Routes Dukhan Highway Central Contract

Part of Structure
Proposed additional Q.P 14 Ethylene pipe culvert box-Single Cell
WS Atkins & Partners Overseas
P O Box 7562
Abu Drawing ref.
Calc. by
Date
Dhabi United Arab Emirates
Jan 11
Uday

Ref.

file:///var/www/apps/conversion/tmp/scratch_5/312718648.xlsx

5090882
Calc sheet no. rev.

Calculations

312718648.xlsx

Check by
Output

Project

Job ref.
Qatar Primary Routes Dukhan Highway Central Contract

Part of Structure
Proposed additional Q.P 14 Ethylene pipe culvert box-Single Cell
WS Atkins & Partners Overseas
P O Box 7562
Abu Drawing ref.
Calc. by
Date
Dhabi United Arab Emirates
Jan 11
Uday

Ref.

file:///var/www/apps/conversion/tmp/scratch_5/312718648.xlsx

5090882
Calc sheet no. rev.

Calculations

312718648.xlsx

Check by
Output

Project

Job ref.
Qatar Primary Routes Dukhan Highway Central Contract

Part of Structure
Proposed additional Q.P 14 Ethylene pipe culvert box-Single Cell
WS Atkins & Partners Overseas
P O Box 7562
Abu Drawing ref.
Calc. by
Date
Dhabi United Arab Emirates
Jan 11
Uday

Ref.

file:///var/www/apps/conversion/tmp/scratch_5/312718648.xlsx

5090882
Calc sheet no. rev.

Calculations

312718648.xlsx

Check by
Output

Project

Job ref.
Qatar Primary Routes Dukhan Highway Central Contract

Part of Structure
Proposed additional Q.P 14 Ethylene pipe culvert box-Single Cell
WS Atkins & Partners Overseas
P O Box 7562
Abu Drawing ref.
Calc. by
Date
Dhabi United Arab Emirates
Jan 11
Uday

Ref.

file:///var/www/apps/conversion/tmp/scratch_5/312718648.xlsx

5090882
Calc sheet no. rev.

Calculations

312718648.xlsx

Check by
Output

Project

Job ref.
Qatar Primary Routes Dukhan Highway Central Contract

Part of Structure
Proposed additional Q.P 14 Ethylene pipe culvert box-Single Cell
WS Atkins & Partners Overseas
P O Box 7562
Abu Drawing ref.
Calc. by
Date
Dhabi United Arab Emirates
Jan 11
Uday

Ref.

file:///var/www/apps/conversion/tmp/scratch_5/312718648.xlsx

5090882
Calc sheet no. rev.

Calculations

312718648.xlsx

Check by
Output

Project

Job ref.
Qatar Primary Routes Dukhan Highway Central Contract

Part of Structure
Proposed additional Q.P 14 Ethylene pipe culvert box-Single Cell
WS Atkins & Partners Overseas
P O Box 7562
Abu Drawing ref.
Calc. by
Date
Dhabi United Arab Emirates
Jan 11
Uday

Ref.

file:///var/www/apps/conversion/tmp/scratch_5/312718648.xlsx

5090882
Calc sheet no. rev.

Calculations

312718648.xlsx

Check by
Output

Project

Job ref.
Qatar Primary Routes Dukhan Highway Central Contract

5090882

Part of Structure

Calc sheet no. rev.

Proposed additional Q.P 14 Ethylene pipe culvert box-Single Cell


WS Atkins & Partners Overseas
P O Box 7562
Abu Drawing ref.
Calc. by
Date
Dhabi United Arab Emirates
Jan 11
Uday

Ref.

Check by

Calculations

Output

Reinforcement calculation:
Component

Thk-mm

I] Vertical wall

Outer face

Reservoir

Inner face
Mini rein @

Main c/c

500
0.30

Wt-kg/m

16

100

1.578

15.78

16

100

1.578

15.78

11.78

Total
2] Roof slab
Reservoir

Main bottom

43.34
400

16

100

1.578

15.78

Main top

16

100

1.578

15.78

Main bottom

16

100

1.578

15.78

Main top

16

100

1.578

15.78

Total
3] Base slab
Reservoir

Main bottom

63.13
1500

16

100

1.578

15.78

Main top

16

100

1.578

15.78

Main bottom

16

100

1.578

15.78

Main top

16

100

1.578

15.78

Total
4] Column
Reservoir

Main bottom

63.13
202.5

Links

16 4

1.578

6.31

12 7

0.888

11.19

Total
5] Pump station
Vertical wall

Main E face

17.50
425

25

100

3.853

38.53

Op face

12

100

0.888

8.88

Minimum

12

150

0.888

5.92

Minimum

12

150

0.888

Total
6] Pump station
Planks

Main bottom

12

150

0.888

5.92

Op face

12

200

0.888

4.44

Minimum

12

200

0.888

4.44

Minimum

12

200

0.888

Total
7] Pump station
Beam U

Main bottom

32

6.313

25.25

Op face

25

3.853

15.41

Links

16

1.578

56.82

Side bars

16

25

1.578

Total

file:///var/www/apps/conversion/tmp/scratch_5/312718648.xlsx

126

150

158

kg/m3

229

250

42

kg/m3

61

100

86

kg/m3

125

150

139

kg/m3

202

225

96

kg/m3

139

150

124

kg/m3

180

200

39.46
136.95

312718648.xlsx

kg/m3

4.44
19.24

1102

87

5.92
59.25

200

Say

Wt

Project

Job ref.
Qatar Primary Routes Dukhan Highway Central Contract

Part of Structure
Proposed additional Q.P 14 Ethylene pipe culvert box-Single Cell
WS Atkins & Partners Overseas
P O Box 7562
Abu Drawing ref.
Calc. by
Date
Dhabi United Arab Emirates
Jan 11
Uday

Ref.

file:///var/www/apps/conversion/tmp/scratch_5/312718648.xlsx

5090882
Calc sheet no. rev.

Calculations

312718648.xlsx

Check by
Output

Project

Job ref.
Qatar Primary Routes Dukhan Highway Central Contract

Part of Structure
Proposed additional Q.P 14 Ethylene pipe culvert box-Single Cell
WS Atkins & Partners Overseas
P O Box 7562
Abu Drawing ref.
Calc. by
Date
Dhabi United Arab Emirates
Jan 11
Uday

Ref.

file:///var/www/apps/conversion/tmp/scratch_5/312718648.xlsx

5090882
Calc sheet no. rev.

Calculations

312718648.xlsx

Check by
Output

Project

Job ref.
Qatar Primary Routes Dukhan Highway Central Contract

Part of Structure
Proposed additional Q.P 14 Ethylene pipe culvert box-Single Cell
WS Atkins & Partners Overseas
P O Box 7562
Abu Drawing ref.
Calc. by
Date
Dhabi United Arab Emirates
Jan 11
Uday

Ref.

2.0

5090882
Calc sheet no. rev.

Check by

Calculations

Output

Introduction

Following pages furnish the design calculation for Single cell Box culvert.It is below ground & rectangular
in plan,It is designed for earth pressure & vehicular live load forces as applicable.
2.1

Loads on box culvert


i

Dead load

ii

Vertical earth load

Top slab , base slab , Walls

iii

Vertical vehicular live load

iv

Horizontal earth pressure

Horizontal live load surcharge

vi

Horizontal force due to Traction

HA or HB loads

HA or HB loads

General arrangement
C Line of Dukhan highway

Plan

( Indicative only )

Proposed Finished
Road level 29.839

H=

1.025

1.325
LL= 6.600

0.600

7.475
0.800

3.500

1.500

0.800

6.625

EGL
5.000

0.850

6.150

Project

Job ref.
Qatar Primary Routes Dukhan Highway Central Contract

5090882

Part of Structure

Calc sheet no. rev.

Proposed additional Q.P 14 Ethylene pipe culvert box-Single Cell


WS Atkins & Partners Overseas
P O Box 7562
Abu Drawing ref.
Calc. by
Date
Dhabi United Arab Emirates
Jan 11
Uday

Ref.

Calculations

Output

Section
3.0

Load calculation

3.1

Dead load
i Load due to top slab

0.600

x 25

V1 =

15.00

kN/m2

ii Load due earth fill

1.025

x 20

V2 =

20.5

kN/m2

iii Horizontal earth pressure at A

0.60

x 7.475 x 20

H1 =

89.7

kN/m2

iv Horizontal earth pressure at B

0.60

x 1.325 x 20

H1 =

15.9

kN/m2

3.2

Highway loading

3.2.1

HA load
For the purpose of calculating the loads to be applied to the top slab one carriageway notational
lanes is considered
Notional lane width

bl

3.60

meter

Loaded length

5.00

meter

BS5400-2-2206

For loaded length up to & including 50 m UDL in KN/m of notional length by follwing equation

6.2.1

HA UDL

Part 12 BD/01

W = 336 [ 1/L] 0.67

336

5.00

0.67

W =

114.30 kN/m

KEL

120.00 kN

Wheel load

100.00 kN

10.00

kN

2.50

kN

x 10.00

300.00 kN

75.00

As depth of fill >0.6 m HA load shall be replaced by 30 Units of HB loading.

3.2.1 (ii)
3.2.2

HB-load
The HB vehicle defined in the Standard represents four axles with four wheels per axle
Load per axle with four wheels
Load per wheel

10.00

Part 12 BD/01

HB load-30 units

3.2.1 b (ii)

Minimum of 30 units of HB loading shall be applied to structure


Load for

30

unit containg one axle

Load per wheel


3.2.1 c (ii)

30.0
300.00

kN

Considering dispersion of wheel load through the fill longitudinaly & Transversly at 2 vertically to1 horizontally
Effective presure under wheel
Contact area under wheel

75.00

1100

size of square shape area


say
Dispersion of wheel load
BL

1.28
1.00

Bw
4.28

Check by

1.00
1.00

1.10

N/mm2

0.0682 m2

0.2611 m2

0.250

meter

Project

Job ref.
Qatar Primary Routes Dukhan Highway Central Contract

5090882

Part of Structure

Calc sheet no. rev.

Proposed additional Q.P 14 Ethylene pipe culvert box-Single Cell


WS Atkins & Partners Overseas
P O Box 7562
Abu Drawing ref.
Calc. by
Date
Dhabi United Arab Emirates
Jan 11
Uday

Ref.

Calculations

1.80

spacing

Output

6-11-16-21-26

1.80

1.80

1.00

1.00

1.00

fill depth
2:1

fill depth

1.025
1.275

2:1

1.025

1.275

4.275

Dispersion in longitudinal direction

Dispersion in transverse direction

Despersion width in transverse direction

Bw =
BL =

4.275

meter

1.28

meter

55.04

kN/m2

55.04

kN/m2

70.18

kN/m

72.00

kN/m

72.00 x 1.275

91.80

kN

91.80 x 1.500

137.70 kN

Despersion length in longitudinal direction


Intensity of load

75.00 x 4.00

1.28 x 4.28

For 30 Units

say

Udl load per meter

300

4.28
say

On concervative side considering as point load


For 45Units
On concervative side considering as point load
3.2.3

HB traction
30 units
HB longitudinal load = 25 % of nominal HB load

25

x 1200

100

300

kN

300

37.50

kN

92.31

kN

138.46 kN

LL

6.60

meter

1.03

meter

Kt

0.93

Force per wheel


Traction force for 30 Units per notional lane

300

Traction force for 45 Units per notional lane

92

3.25
1.5

Part 12 BD/01

3.2.7 e

3.2.4

Traction force is modified by applying factor Kt


Factor Kt = [ LL - H ) / [ LL - 0.6 ] but 1 > Kt > 0

Traction force for 30 Units per notional lane

92.31

x 0.93

85.77

Traction force for 45 Units per notional lane

138.46 x 0.93

128.65 kN

Horizontal Live load

kN

psc = K.vsc
vsc

Part 12 BD/01

Vertical live load

3.2.6 (a)

30 units of HB

12.0

kN/m2

45 units of HB

20.0

kN/m2

4.0

Load & Load combinations

4.1

Loads

Comb 1

Check by

Comb 4

SLS

ULS

SLS

ULS

1 Self wt

DL

V1

1.0

1.20

1.0

1.20

2 Earth fill load

SDL

V2

1.0

1.20

1.0

1.20

3 Vertical live load

LL

V3

1.1

1.30

4 Earth pressure

EP

H1

1.0

1.50

1.0

1.50

5 Live load Surcharge

LLS

H2

1.0

1.50

1.0

1.50

6 Traction

TR

H3

1.0

1.0

1.10

Project

Job ref.
Qatar Primary Routes Dukhan Highway Central Contract

5090882

Part of Structure

Calc sheet no. rev.

Proposed additional Q.P 14 Ethylene pipe culvert box-Single Cell


WS Atkins & Partners Overseas
P O Box 7562
Abu Drawing ref.
Calc. by
Date
Dhabi United Arab Emirates
Jan 11
Uday

Ref.

Calculations

4.2

Load cases & Load factors

Output

Following load cases are analysed

A/1

Max Vertical load with Max Horizontal load

A/5

Traction with Min Vertical load

Part 12 BD/01

ii

A/2

Min Vertical load with Max Horizontal load

vi

A/6

Sliding

Appendix-A

iii

A/3

Max Vertical load with Min Horizontal load

vii A/7

iv

A/4

Traction with Max Vertical load

4.2.1

Live load

Bearing pressure

3-LL= 2.15

1.325

2-SDL= 1.40
ULS

19.80

27.03

H= 1.025

SLS

7.20

15.90

20.5

1-DL=

30.80

27.03

19.80

22.00 KN/m2

15.90

7.20

1.40

7.475
6.150

SLS

7.20

89.70

KN/m2

89.70

7.20

ULS

19.8

152.49

KN/m2

152.49

19.80

5-LLSC

4-Earth

Load

4-Earth

5-LLSC

0.60

0.60

0.60

0.60

20.00

20.00

kN/m3

20.00

20.00

2.75

1.70

fL.f3

1.70

2.75

22.00

27.03

19.80

22.00 KN/m2

15.9

7.20

7-101

8-201

Box structures

Combination

1-DL

2-SDL

3-LL

4-Earth

SLS- fL

1.00

1.00

1.10

1.00

1.00

fL

1.20

1.20

1.30

1.50

1.50

.f3

1.10

1.10

1.10

1.10

1.10

ULS-fL.f3

1.32

1.32

2.15

1.65

2.75

ULS-fL.f3

1.40

1.40

2.15

1.70

2.75

Digram A/1a

5-LLSC

Maximum Vertical load with Maximum Horizontal load

4.2.2

No live load

0.00

1.325

2-SDL= 1.00
ULS

19.80

27.03

SLS

7.20

15.9

H= 1.025

1-DL= 1.00

7.475
6.150

SLS

7.20

89.7

KN/m2

89.7

7.20

ULS

19.80

152.49

KN/m2

152.49

19.80

5-LLSC

4-Earth

Load

4-Earth

5-LLSC

0.60

0.60

0.60

0.60

20.00

20.00

kN/m3

20.00

20.00

2.75

1.70

fL.f3

1.70

2.75

Box structures

Check by

Project

Job ref.
Qatar Primary Routes Dukhan Highway Central Contract

5090882

Part of Structure

Calc sheet no. rev.

Proposed additional Q.P 14 Ethylene pipe culvert box-Single Cell


WS Atkins & Partners Overseas
P O Box 7562
Abu Drawing ref.
Calc. by
Date
Dhabi United Arab Emirates
Jan 11
Uday

Ref.

Calculations

9-102

10-202

Output

Combination

1-DL

2-SDL

3-LL

4-Earth

SLS- fL

1.00

1.00

0.00

1.00

1.00

1.00

1.00

fL

1.00

1.00

0.00

1.50

1.50

1.50

1.50

.f3

1.00

1.00

0.00

1.10

1.10

1.10

1.10

ULS-fL.f3

1.00

1.00

0.00

1.65

2.75

1.65

2.75

ULS-fL.f3

1.00

1.00

0.00

1.70

2.75

1.70

2.75

Digram A/2a

5-LLSC

4-Earth

5-LLSC

Minimum Vertical load with Maximum Horizontal load

4.2.3

Live load

3-LL= 2.15
2-SDL= 1.40

ULS

5.30

SLS

5.30

H= 1.025

30.80

5.30

22.00 KN/m2

5.30

1-DL=

1.325

1.40

7.475
6.150

11

SLS

29.90

ULS

29.90

12-103

13-203

KN/m2

11

29.90

Box structures

29.90

4-Earth

Load

4-Earth

0.20

0.20

20.00

kN/m3

20.00

1.00

fL.f3

1.00

Combination

1-DL

2-SDL

3-LL

11-Earth

11-Earth

SLS- fL

1.00

1.00

1.10

1.00

1.00

fL

1.20

1.20

1.30

1.00

1.00

.f3

1.10

1.10

1.10

1.00

1.00

ULS-fL.f3

1.32

1.32

2.15

1.00

1.00

ULS-fL.f3

1.40

1.40

2.15

1.00

1.00

Digram A/3a

Maximum Vertical load with Minimum Horizontal load

4.2.4

Live load
Traction

3-LL= 2.15

1.82

2-SDL= 1.40

ULS

156.1

14.87

SLS

85.77

8.75

H= 1.025

30.80
22.00 KN/m

1-DL=

15.90
2

1.325

15.90

1.40

7.475
6.150
15

16

14

SLS

3.96

49.335

ULS

10.89

83.87

5-LLSC

3-Earth

Load

3-Earth

0.33

0.33

0.60

12.00

20.00

kN/m3

20.00

KN/m2

Box structures

Check by

89.70
89.70

Project

Job ref.
Qatar Primary Routes Dukhan Highway Central Contract

5090882

Part of Structure

Calc sheet no. rev.

Proposed additional Q.P 14 Ethylene pipe culvert box-Single Cell


WS Atkins & Partners Overseas
P O Box 7562
Abu Drawing ref.
Calc. by
Date
Dhabi United Arab Emirates
Jan 11
Uday

Ref.

Calculations
2.75

Output

fL.f3

1.70

20.00
1.00

Combination
17-104 SLS- fL

18-204

1-DL

2-SDL

3-LL

14-Earth 15-LLSC 6-Traction

16-Earth

1.00

1.00

1.10

1.00

1.00

1.00

1.00

fL

1.20

1.20

1.30

1.50

1.50

1.10

1.00

.f3

1.10

1.10

1.10

1.10

1.10

1.10

1.00

ULS-fL.f3

1.32

1.32

2.15

1.65

2.75

1.82

1.00

ULS-fL.f3

1.40

1.40

2.15

1.70

2.75

1.82

1.00

Digram A/4a

Traction With Maximum Vertical load

4.2.5

Live load

3-LL= 1.50

Traction 1.82

2-SDL= 1.00

ULS

156.10

14.87

SLS

85.77

8.75

H= 1.025

22.00

15.90

22.00 KN/m2

1-DL=

1.325

15.90

1.00

7.475
6.150
15

16

14

SLS

3.96

49.335

KN/m2

ULS

10.89

83.87

KN/m2

89.70

5-LLSC

3-Earth

Load

3-Earth

0.33

0.33

0.60

12.00

20.00

kN/m3

20.00

2.75

1.70

fL.f3

19-105

20-205

89.70

Box structures

1.00

Combination

1-DL

2-SDL

3-LL

SLS- fL

1.00

1.00

1.10

1.00

1.00

1.00

1.00

fL

1.00

1.00

1.00

1.50

1.50

1.10

1.00

.f3

1.00

1.00

1.00

1.10

1.10

1.10

1.00

ULS-fL.f3

1.00

1.00

1.50

1.65

2.75

1.82

1.00

ULS-fL.f3

1.00

1.00

1.50

1.70

2.75

1.82

1.00

Digram A/5a

14-Earth 15-LLSC 6-Traction

Live load
Traction
ULS

156.10

SLS

85.77

1.82

3-LL= 1.50
2-SDL= 1.00

14.87
F3

16-Earth

Traction With Minimum Vertical load

4.2.6

H= 1.025

8.745

1-DL=

22.00

15.90

22.00 KN/m2

15.90

1.325

1.00

7.475
F2

F1
15

6.150

F4
21

14

SLS

3.96

49.335 KN/m2

Box structures

89.70

ULS

10.89

83.87

Box structures

89.70

KN/m2

Check by

Project

Job ref.
Qatar Primary Routes Dukhan Highway Central Contract

5090882

Part of Structure

Calc sheet no. rev.

Proposed additional Q.P 14 Ethylene pipe culvert box-Single Cell


WS Atkins & Partners Overseas
P O Box 7562
Abu Drawing ref.
Calc. by
Date
Dhabi United Arab Emirates
Jan 11
Uday

Ref.

Calculations

22-106

23-206

Earth

Load

Earth

0.33

0.33

0.60

20.00

kN/m3

20.00

1.70

fL.f3

4.4.2 ( c )

1.00

Combination

1-DL

2-SDL

3-LL

SLS- fL

1.00

1.00

1.10

1.00

1.00

1.00

1.00

fL

1.00

1.00

1.00

1.50

1.50

1.10

1.00

.f3

1.00

1.00

1.00

1.10

1.10

1.10

1.00

ULS-fL.f3

1.00

1.00

1.50

1.65

2.75

1.82

1.00

ULS-fL.f3

1.00

1.00

1.50

1.70

2.75

1.82

1.00

Digram A/6a

Part 12 BD/01

Output

LLSC

2.75

14-Earth 15-LLSC 6-Traction

21-Earth

Sliding

Sliding check as per A/6 a


Friction force (FR) developed at the base is given by
FR = Vtot.tan b
b =

design angle of base friction =

tan b =

0.75 x tan'

Considering design angle of shearing resistance =


tan b =
0.75 x tan
Vtot.
form results tabulated ref 5.1
FR = Vtot.tan b

' =
b =

30

683.0 x 0.43

30

degrees

0.43

683.00 kN

295.75 kN

F1 due to earth pressure


At base

0.33 x 20.00

7.48

x 1.70

83.87

kN/m2

x 1.70

14.87

kN/m2

x 6.150

303.61 kN

At top

0.33 x 20.00

1.33

F1

83.87 + 14.87

x0.50

F2 due to surcharge pressure

0.33 x 12.00

F3 due to Traction

85.77 x 1.10

6.15

x 2.75

66.97

x 1.10

x 1.50

155.67 kN

7.48

x 1.00

89.70

kN/m2

At top

0.60 x 20.00
0.60 x 20.00

1.33

x 1.00

15.90

kN/m2

F4

89.70 + 15.90

x0.50

x 6.150

324.72 kN

kN

F4 Relieving Earth Pressure


At base

Following relationship to be satisfied for the structure as a whole


[ Traction + Distrubing Earth Pressure ) fL.f3 <
[ Relieving Earth Pressure + FR ]
[Traction+Distrubing Earth Pressure) fL.f3 =F1+F2+F3

303.61 + 66.97 +155.67

526.26 kN

[ Relieving Earth Pressure + FR ]

324.72 +295.75

620.47 kN
OK

4.2.7

Live load

3-LL= 1.10
2-SDL= 1.00

H= 1.025
15.9

22.00
22.00 KN/m2

1-DL=

Check by

1.325
15.9

1.00

7.475

Project

Job ref.
Qatar Primary Routes Dukhan Highway Central Contract

5090882

Part of Structure

Calc sheet no. rev.

Proposed additional Q.P 14 Ethylene pipe culvert box-Single Cell


WS Atkins & Partners Overseas
P O Box 7562
Abu Drawing ref.
Calc. by
Date
Dhabi United Arab Emirates
Jan 11
Uday

Ref.

Calculations

Output

6.150

KN/m2

7.20

89.7

Load

LLSC

Earth

Earth

0.60

0.60

0.60

20.00

20.00

kN/m3

24-107

1-DL

2-SDL

3-LL

4-Earth

SLS- fL

1.00

1.00

1.10

1.00

Digram A/7a

5.0

89.7

Box structures

Combination

5-LLSC

4-Earth

1.00

1.0

Bearing pressure

Structure is analysed for above load caes using ROBOT Millenuim & sectiona are designed.
Results are tabulated below
Load case

[ Ref output sheets attached ]

A/1a

A/2a

A/3a

A/4a

A/5a

A/6a

A/7a

1.0 Top slab


1.1

1.2

SLS

ULS

+BM kN.m

139

29

174

152

152

152

143

-BM kN.m

-156

-87

-121

-202

-202

-202

-186

+BM kN.m

234

11

310

283

187

187

-BM kN.m

-278

-128

-203

-510

-454

-454

-Vu-kN

-410

92

-410

-520

-398

-398

+Vu-kN

129

129

239

200

200

+BM kN.m

110 (i)

122

74

74

74

74

100

-BM kN.m

-165 (o)

-121

-158

-210

-210

-210

-220

+BM kN.m

231

283

161

77

100

100

-BM kN.m

-285

-158

-267

-615

-558

-558

-Vu-kN

-361

-360

-62

-570

-578

-578

+Vu-kN

32

11

22

156

150

150

2.0 Vertical wall


2.1

2.2

SLS

ULS

3.0 Base slab


3.1

3.2

5.1

SLS

ULS

-BM kN.m

-163 (T)

-79

-221

-185

-185

-185

-171

+BM kN.m

174 (B)

158

86

177

177

177

215

-BM kN.m

-241

-12

-366

-485

-396

-396

+BM kN.m

305

259

115

554

535

535

-Vu-kN

-485

-48

-457

-416

-292

-292

+Vu-kN

160

201

410

495

362

362

Summary of design
Item
i Top slab

ii Vertical walls

Depth
600

800

Reinforcement

Check by

[ Ref SAM analysis results sheets attached ]

20-100

Top Main Reinforcement

20-100

Bottom Main Reinforcement

16-100

Minimum reinforcement top & Bottom

25-100

Main vertical reinforcement near earth face

Project

Job ref.
Qatar Primary Routes Dukhan Highway Central Contract

5090882

Part of Structure

Calc sheet no. rev.

Proposed additional Q.P 14 Ethylene pipe culvert box-Single Cell


WS Atkins & Partners Overseas
P O Box 7562
Abu Drawing ref.
Calc. by
Date
Dhabi United Arab Emirates
Jan 11
Uday

Ref.

Calculations

iii Base slab

5.2

800

Output

20-100

Main vertical reinforcement far from earth face

16-100

Minimum horizontal reinforcement on both faces.

20-100

Top Main Reinforcement

25-100

Bottom Main Reinforcement

16-100

Minimum reinforcement top & Bottom

Bearing pressure check


Maximum vertical load from structure at base

744

kN

Mement acting at base

7.27

kN.m

Width of base

1.00

meter
meter

Length of base
Bearing pressure at base

P/A

Bearing pressure at base

M/Zxx

744.0
7.27

x 6.0

Maximum pressure

6.60

1.00 x 6.60

112.73 kN/m2

1.00 x 6.60 x 6.60

1.00

113.73 kN/m2

112.73 + 1.00 x

kN/m2

<200 kN/m2 ok
END

Check by

Project

Job ref.
Qatar Primary Routes Dukhan Highway Central Contract

5090882

Part of Structure

Calc sheet no. rev.

Proposed additional Q.P 14 Ethylene pipe culvert box-Single Cell


WS Atkins & Partners Overseas
P O Box 7562
Abu Drawing ref.
Calc. by
Date
Dhabi United Arab Emirates
Jan 11
Uday

Ref.

Calculations

Output

Bearing pressure

KN/m2

0.00

Live load

25.00 KN/m2

H= 0.000

50.00 KN/m2

1.325
0

0.00

7.475
0.000

0.80
1.70

0.6

1.70

4.00
173.54

Net pr

136.24

24.037

116.24

BM

167.96 kN.m

VU=

174.36 kN

Wt
Earth wt

1.70

7.475

20

254.15

LA

BM

1.15

292.27

Check by

Project

Job ref.
Qatar Primary Routes Dukhan Highway Central Contract

5090882

Part of Structure

Calc sheet no. rev.

Proposed additional Q.P 14 Ethylene pipe culvert box-Single Cell


WS Atkins & Partners Overseas
P O Box 7562
Abu Drawing ref.
Calc. by
Date
Dhabi United Arab Emirates
Jan 11
Uday

Ref.

Calculations
SLL

1.70

1.000

12

20.4

1.15

345

Force from BM from analysis


Toptal

-266
49.733

PA

154.89

M/Z

4.2

Output

23.46

619.55

18.65

Pmax

173.54

Pmin

136.24

Design of vertical wall


Depth of section

Width of section
Total design moment

SLS

BM

Total design moment

ULS

BM

BS8007

Grade of concrete

or cube strength

fc

Table 3.1

Stress in reinforcement

fy

Modulus of Elasticity of concrete

E28

Modulus of Elasticity of reinforcement steel

Es

Nominal cover to reinforcement

Cnom

Area of reinforcement

12 dia

100

mm c/c +

0 dia

Nos

Actual Cover to reinforcement


Modular ratio = Es / Ec

200000

Effective depth

150

31000
75

150
1000
#REF!

40
420
31000
200000
35
1131
75
6.45
69

mm
mm
kN-m
kN-m
N/mm2
N/mm2
N/mm2
N/mm2
mm
N/mm2
mm
mm

Ultimate check:
Mu

deff

Ast

kN/m

mm

mm

mm

1000

69

1131

Neutral axis equation bn2/2 = m. Ast . [d-n]


n2 2
1000
= 6.45 1130.97
2n2 +14.593 n= 1006.9
1.00
[d-x]

0.95d

mm

mm

mm

kN.m

#VALUE!

#VALUE!

66

###

#VALUE!

69

-1

mm

43.74

mm

1131.0 44

3.0 + 6.45

5 Elastic section modulus :

5374873

Concrete Zc = I/dc

19332298

25.26

Steel

19332298

43.74

Zs =

6 Stress in concrete BM / Zc
Stress in steel

###

84.736

4 Second moment if inertia of cracked section in concrete units

25.26

Mu

25.26

NA to crack surface

1000

#REF!

1000000
1000000 6.45
#REF!

765221.19

I=

b.dc3 / 3 + m .As [ d-dc]2

+13957425

#REF!

19332298 mm4

765221 mm
442019.234 mm
N/mm
#REF!
#REF!
N/mm

442019.23

31000

7 Strain in conc & Steel


Strain in Concrete Stress / Ece

Check by

#REF!

2
2

Project

Job ref.
Qatar Primary Routes Dukhan Highway Central Contract

5090882

Part of Structure

Calc sheet no. rev.

Proposed additional Q.P 14 Ethylene pipe culvert box-Single Cell


WS Atkins & Partners Overseas
P O Box 7562
Abu Drawing ref.
Calc. by
Date
Dhabi United Arab Emirates
Jan 11
Uday

Ref.

Calculations
Strain in Steel = Stress / Es

Output

Bar dia

spacing

Cnom

bt

a'

As

12

100

69

150.00
acr

1000

110.00

1131

BM=DL+LL

35
1

h-x

d-x

25.26
2

#REF!

#VALUE!

58.66

124.74

43.74

0.000356

2 =1.bt. [ h-x ]. [ a' - x ] / [ 3.Es.As. [ d-n ]

BS8007:1987

B.4 (3)
m =

#VALUE!

125

1000

3.00
1 +

58.66

85

35.00

150.00

25.26

84.74

200000 1131 43.74

#VALUE!

stiffening effrct considered

#VALUE!

58.66

a'-x

stiffening effect of concrete for crack width of 0.2 mm

#VALUE!
0.0003561 1.000
w= 3.acr.m / [ 1 + 2 [ acr - Cmin ] / [h-x]

#VALUE!
1 +
2 0.19

###

mm

= 150

mm

Depth

Effective depth

deff = 69

mm

Width of section

= 1000

mm

Shear force =

Vu

= #REF! kN

= #REF! N/mm2

Shear stress v /bd

#REF!

BS 8110

P % of steel =

1131

Table3.8

400/d

1000
100
400

(fcu/25)1/3
Table3.8

#VALUE!

200000

Strain at the level where crack is being checked.

fcu =

40.0

1000
1000

69
69

69

= 1.17
0.79.P1/3 .[ 400/d ]1/4 / m

Check for Early thermal cracking


fcu-mpa fy-mpa Ac-mm2
fct*

Ast-mm2 fct*/fb

40

460
T1

250000
T2

1.2E-05

35

20

P%

= 5.80

= 1.64

N/mm2

Design concrete shear stress vc.

= 1.35

R
0.20

1.59
863
th 0.8(T1+T2)

0.67
Ast

16
Ast (reqd.)

0.000528

172

863

N/mm2

sh

ult

0.200

0.0001

0.0002

sp -req Pro-sp As-pro Remark

16

233

100

2011

OK

Provide 12 ida 100 mm c/c at centre of wall in one layer in both direction
5

Bearing pressure calculation

5.1

Weight calculation
i]

Top screed

1.500

ii]

Slab portion

1.500

iii] Long walls

1.500

iv] Short walls

0.450

v]

1.500

Base slab

0.750
0.750
0.150
0.150
0.750

0.100
0.200
#REF!
#REF!
0.150

1.000
1.000
2.000
2.000
1.000

23

2.59

kN

25

5.63

kN

25

25

25

4.22

kN

#VALUE!

kN

Total weight
5.2

kN
kN

Bearing pressure :
a]

Net wt of of structure

b]

Live load

1.500

d]

Other load

0.000

0.750
0.000

Total weight for bearing pressure

1.000
0.000

1.000
0.000

Check by

#VALUE!

kN

1.5

1.69

kN

kN

#VALUE!

kN

Project

Job ref.
Qatar Primary Routes Dukhan Highway Central Contract

5090882

Part of Structure

Calc sheet no. rev.

Proposed additional Q.P 14 Ethylene pipe culvert box-Single Cell


WS Atkins & Partners Overseas
P O Box 7562
Abu Drawing ref.
Calc. by
Date
Dhabi United Arab Emirates
Jan 11
Uday

Ref.

Calculations

Bearing pressure :

3.4

###

Output

0.75

1.50

0.150

-25

= -3.75

kN/m2

kN/m2

Net Design pressure

#VALUE!

kN/m2

Considering design pressure for base slab

23.00

kN/m2

Base slab is supported by vertical wall at all edges.


Length of short span

Lx

Length of long span

Ly

r = Ly/Lx

Load coefficient Wx / W = r4/[ 1+r4 ]


Load taken by short span

23.00

0.500

Wx

Load taken by long span

23.00

11.50

Wy

Multiplying factor for Span moment Mx = 1-5/18 [ r2/(1+r4)]


Multiplying factor for Span moment My = 1-5/18 [ r2/(1+r4)]

3.4.1

#VALUE!

Design of Base slab:


self wt of base slab

Mid span moment + ve ,

Mx = Wx Lx2 .MF / 24

Mid span moment + ve ,

My = Wy Ly .MF / 24

Support moment -ve ,

Mx = Wx Lx2 / 12

Support moment -ve ,

My = Wx Lx2 / 12

Shear force short span

Vx=1.5 . W.Lx / 3

Shear force Long span

Vy= 1.5\.W.Lx[ r / (2+r ) ]

Design of Base slab

For -BM on Top face due to upward load

Depth of section

Width of section

Total design moment

SLS

BM

Total design moment

ULS

BM

BS8007

Grade of concrete

or cube strength

fc

Table 3.1

Stress in reinforcement

fy

Modulus of Elasticity of concrete

E28

Modulus of Elasticity of reinforcement steel

Es

Nominal cover to reinforcement


Area of reinforcement

100

mm c/c +

0 dia

Nos

Actual Cover to reinforcement


Modular ratio = Es / Ec

200000

Effective depth

150

31000
75

0.45
0.45
1.00
0.50
11.50
11.50
0.86
0.86
0.08
0.08
0.19
0.19
5.18
5.18

meter
meter

kN/m
kN/m

kN.m
kN.m
kN.m
kN.m
kN
kN

150
1000
0.19
0.29

Cnom

12 dia

mm
mm
kN-m
kN-m

40
420
31000
200000
35
1131
75
6.45
69

N/mm2
N/mm2
N/mm2
N/mm2
mm
N/mm2
mm
mm

Ultimate check:
Mu

deff

Ast

kN/m

mm

mm

mm2

0.29

1000

69

1131

k
0.00152853

0.95d

Mu

mm

mm

mm

kN.m

69

66

66

32

OK

Neutral axis equation bn2/2 = m. Ast . [d-n]


1000
1.00
[d-x]

n2 2

2n2
2

+14.593

= 6.45
n= 1006.9

1130.97

69

-1

Check by

25.26
43.74

mm
mm

Project

Job ref.
Qatar Primary Routes Dukhan Highway Central Contract

5090882

Part of Structure

Calc sheet no. rev.

Proposed additional Q.P 14 Ethylene pipe culvert box-Single Cell


WS Atkins & Partners Overseas
P O Box 7562
Abu Drawing ref.
Calc. by
Date
Dhabi United Arab Emirates
Jan 11
Uday

Ref.

Calculations

Output

NA to crack surface

84.736

4 Second moment if inertia of cracked section in concrete units


3

1000

25.26

1131.0 44

3.0 + 6.45

5 Elastic section modulus :

I=

19332298

25.26

Steel

19332298

43.74

Zs =

Stress in steel

1000000

0.19

1000000 6.45

b.dc3 / 3 + m .As [ d-dc]2

+13957425

5374873

Concrete Zc = I/dc
6 Stress in concrete BM / Zc

19332298 mm4
3
3

765221.19

OK

442019.23

OK

Strain in Concrete Stress / Ece

0.25

31000

Strain in Steel = Stress / Es

2.8

200000

N/mm2

100.0

N/mm2

spacing

Cnom

bt

a'

As

12

100

35
1

69

150.00
acr

1000

110.00

1131

h-x

d-x

25.26
2

58.66

124.74

43.74

0.000356

0.2
0.000027 0.000014
2 =1.0 bt. [ h-x ]. [ a' - x ] / [ 3.Es.As. [ d-n ]

B.4 (3)
m =

0.000027

0.000027

1000
0.0003561

125
1.000

3.00
1 +

58.66

85

35.00

150.00

25.26

Check for Early thermal cracking


fcu-mpa fy-mpa Ac-mm2
fct*
40

460

1.2E-05

T1

75000
T2

35

20

84.74

200000 1131 43.74

-0.00033

stiffening effrct considered

-0.00033

58.66

a'-x

stiffening effect of concrete for crack width of 0.2 mm

w= 3.acr.m / [ 1 + 2 [ acr - Cmin ] / [h-x]

-0.058
+
2

Ast-mm2 fct*/fb

1.59
259
th 0.8(T1+T2)

0.67
Ast

0.000528

39

-0.042

0.19

mm

sh

ult

12

0.20

0.200

0.0001

0.0002

Ast (reqd.)
259

12

sp -req Pro-sp As-pro Remark


437

100

1131

OK

Provide 10 dia 100 c/c in 1 layer in both direction.


Check for shear
Depth

Effective depth

deff = 69

mm

Width of section

= 1000

mm

Shear force =

Vu

= 5.18

kN

= 0.08

N/mm2

= 1.64

P%

Shear stress v /bd

5.18

BS 8110

P % of steel =

1131

Table3.8

400/d

1000
100
400

(fcu/25)1/3
Table3.8

20.0

Bar dia

BM=DL+LL

3.4.3

0.000008
0.000014
0.000027

Strain at the level where crack is being checked.

3.4.2

765221 mm
442019.234 mm
N/mm
0.25
2.83
N/mm

7 Strain in conc & Steel

BS8007:1987

Check by

fcu =

40.0

1000

69
69

69

N/mm2

Design concrete shear stress vc.


No shear reinforcement is required

T12-100 c/c

1000

= 150

mm

= 5.80
= 1.17

0.79.P1/3 .[ 400/d ]1/4 / m

= 1.35

N/mm2

Project

Job ref.
Qatar Primary Routes Dukhan Highway Central Contract

Part of Structure
Proposed additional Q.P 14 Ethylene pipe culvert box-Single Cell
WS Atkins & Partners Overseas
P O Box 7562
Abu Drawing ref.
Calc. by
Date
Dhabi United Arab Emirates
Jan 11
Uday

Ref.

Calculations
T12-100 c/c
T12-100 c/c

T12-100 c/c

END

Check by
Output

T12-100 c/c

For Bearing presure

5090882
Calc sheet no. rev.

T12-100 c/c

Project

Job ref.
Qatar Primary Routes Dukhan Highway Central Contract

Part of Structure
Proposed additional Q.P 14 Ethylene pipe culvert box-Single Cell
WS Atkins & Partners Overseas
P O Box 7562
Abu Drawing ref.
Calc. by
Date
Dhabi United Arab Emirates
Jan 11
Uday

Ref.

5090882
Calc sheet no. rev.

Calculations

Check by
Output

Project

Job ref.
Qatar Primary Routes Dukhan Highway Central Contract

Part of Structure
Proposed additional Q.P 14 Ethylene pipe culvert box-Single Cell
WS Atkins & Partners Overseas
P O Box 7562
Abu Drawing ref.
Calc. by
Date
Dhabi United Arab Emirates
Jan 11
Uday

Ref.

5090882
Calc sheet no. rev.

Calculations

Check by
Output

Project

Job ref.
Qatar Primary Routes Dukhan Highway Central Contract

Part of Structure
Proposed additional Q.P 14 Ethylene pipe culvert box-Single Cell
WS Atkins & Partners Overseas
P O Box 7562
Abu Drawing ref.
Calc. by
Date
Dhabi United Arab Emirates
Jan 11
Uday

Ref.

5090882
Calc sheet no. rev.

Calculations

Check by
Output

Project

Job ref.
Qatar Primary Routes Dukhan Highway Central Contract

Part of Structure
Proposed additional Q.P 14 Ethylene pipe culvert box-Single Cell
WS Atkins & Partners Overseas
P O Box 7562
Abu Drawing ref.
Calc. by
Date
Dhabi United Arab Emirates
Jan 11
Uday

Ref.

5090882
Calc sheet no. rev.

Calculations

Check by
Output

Project

Job ref.
Qatar Primary Routes Dukhan Highway Central Contract

Part of Structure
Proposed additional Q.P 14 Ethylene pipe culvert box-Single Cell
WS Atkins & Partners Overseas
P O Box 7562
Abu Drawing ref.
Calc. by
Date
Dhabi United Arab Emirates
Jan 11
Uday

Ref.

5090882
Calc sheet no. rev.

Calculations

Check by
Output

Project

Job ref.
Qatar Primary Routes Dukhan Highway Central Contract

Part of Structure
Proposed additional Q.P 14 Ethylene pipe culvert box-Single Cell
WS Atkins & Partners Overseas
P O Box 7562
Abu Drawing ref.
Calc. by
Date
Dhabi United Arab Emirates
Jan 11
Uday

Ref.

5090882
Calc sheet no. rev.

Calculations

Check by
Output

Project

Job ref.
Qatar Primary Routes Dukhan Highway Central Contract

Part of Structure
Proposed additional Q.P 14 Ethylene pipe culvert box-Single Cell
WS Atkins & Partners Overseas
P O Box 7562
Abu Drawing ref.
Calc. by
Date
Dhabi United Arab Emirates
Jan 11
Uday

Ref.

5090882
Calc sheet no. rev.

Calculations

Check by
Output

Project

Job ref.
Qatar Primary Routes Dukhan Highway Central Contract

Part of Structure
Proposed additional Q.P 14 Ethylene pipe culvert box-Single Cell
WS Atkins & Partners Overseas
P O Box 7562
Abu Drawing ref.
Calc. by
Date
Dhabi United Arab Emirates
Jan 11
Uday

Ref.

5090882
Calc sheet no. rev.

Calculations

Check by
Output

Project

Job ref.
Qatar Primary Routes Dukhan Highway Central Contract

Part of Structure
Proposed additional Q.P 14 Ethylene pipe culvert box-Single Cell
WS Atkins & Partners Overseas
P O Box 7562
Abu Drawing ref.
Calc. by
Date
Dhabi United Arab Emirates
Jan 11
Uday

Ref.

5090882
Calc sheet no. rev.

Calculations

Check by
Output

Project

Job ref.
Qatar Primary Routes Dukhan Highway Central Contract

Part of Structure
Proposed additional Q.P 14 Ethylene pipe culvert box-Single Cell
WS Atkins & Partners Overseas
P O Box 7562
Abu Drawing ref.
Calc. by
Date
Dhabi United Arab Emirates
Jan 11
Uday

Ref.

5090882
Calc sheet no. rev.

Calculations

Check by
Output

Project

Job ref.
Qatar Primary Routes Dukhan Highway Central Contract

Part of Structure
Proposed additional Q.P 14 Ethylene pipe culvert box-Single Cell
WS Atkins & Partners Overseas
P O Box 7562
Abu Drawing ref.
Calc. by
Date
Dhabi United Arab Emirates
Jan 11
Uday

Ref.

5090882
Calc sheet no. rev.

Calculations

Check by
Output

Project

Job ref.
Qatar Primary Routes Dukhan Highway Central Contract

Part of Structure
Proposed additional Q.P 14 Ethylene pipe culvert box-Single Cell
WS Atkins & Partners Overseas
P O Box 7562
Abu Drawing ref.
Calc. by
Date
Dhabi United Arab Emirates
Jan 11
Uday

Ref.

5090882
Calc sheet no. rev.

Calculations

Check by
Output

Project

Job ref.
Qatar Primary Routes Dukhan Highway Central Contract

5090882

Part of Structure

Calc sheet no. rev.

Proposed additional Q.P 14 Ethylene pipe culvert box-Single Cell


WS Atkins & Partners Overseas
P O Box 7562
Abu Drawing ref.
Calc. by
Date
Dhabi United Arab Emirates
Jan 11
Uday

Ref.

Check by

Calculations

Output

Reinforcement calculation:
Component

Thk-mm

I] Vertical wall

Outer face

Reservoir

Inner face
Mini rein @

Main c/c

500
0.30

Wt-kg/m

100

1.578

15.78

16

100

1.578

15.78

11.78

Total
2] Roof slab
Reservoir

Main bottom

43.34
400

16

100

1.578

15.78

Main top

16

100

1.578

15.78

Main bottom

16

100

1.578

15.78

Main top

16

100

1.578

15.78

Total
3] Base slab
Reservoir

Main bottom

63.13
1500

16

100

1.578

15.78

Main top

16

100

1.578

15.78

Main bottom

16

100

1.578

15.78

Main top

16

100

1.578

15.78

Total
4] Column
Reservoir

Main bottom

63.13
202.5

Links

16 4

1.578

6.31

12 7

0.888

11.19

Total
5] Pump station
Vertical wall

Main E face

17.50
425

25

100

3.853

38.53

Op face

12

100

0.888

8.88

Minimum

12

150

0.888

5.92

Minimum

12

150

0.888

5.92

Total
6] Pump station
Planks

Main bottom

59.25
12

150

0.888

5.92

Op face

12

200

0.888

4.44

Minimum

12

200

0.888

4.44

Minimum

12

200

0.888

Total

200

Say

Wt

16

87

kg/m3

126

150

158

kg/m3

229

250

42

kg/m3

61

100

86

kg/m3

125

150

139

kg/m3

202

225

96

kg/m3

139

150

4.44
19.24

Project

Job ref.
Qatar Primary Routes Dukhan Highway Central Contract

5090882

Part of Structure

Calc sheet no. rev.

Proposed additional Q.P 14 Ethylene pipe culvert box-Single Cell


WS Atkins & Partners Overseas
P O Box 7562
Abu Drawing ref.
Calc. by
Date
Dhabi United Arab Emirates
Jan 11
Uday

Ref.

Calculations
7] Pump station
Beam U

Main bottom

Output

32

6.313

25.25

Op face

25

3.853

15.41

Links

16

1.578

56.82

Side bars

16

25

1.578

Total

1102

Check by

39.46
136.95

124

kg/m3

180

200

Project

Job ref.
Qatar Primary Routes Dukhan Highway Central Contract

Part of Structure
Proposed additional Q.P 14 Ethylene pipe culvert box-Single Cell
WS Atkins & Partners Overseas
P O Box 7562
Abu Drawing ref.
Calc. by
Date
Dhabi United Arab Emirates
Jan 11
Uday

Ref.

5090882
Calc sheet no. rev.

Calculations

Check by
Output

Project

DOHA WEST

Part of Structure
WS Atkins & Partners Overseas
PO Box 7562
Abu Dhabi United Arab Emirates

Head Wall for pipe culvert


Head wall design- 1,65m Height

Drawing Ref

Calc by Date
AN

DW077-P00-ATK-SW-7065

07 Oct 2015

Design Data for the Retaining wall considered

Wall height above footing


Top of wall thickness
Bottom of wall thickness
Heel length (Backfill side)
Toe length
Thickness of base slab
Total base slab length
Toe backfill above footing
Horizontal distance from edge of top wall to slope of soil
Density of soil
Angle of repose, backfill
Angle of repose, bearing
Backfill slope angle
Density of concrete
Concrete grade
Reinforcement grade
Live Load Surcharge
Allowable soil pressure
Load factor for Ultimate check
Coefficent of friction
FOS against overturning
FOS against sliding

H=
t1 =
t2 =
L1 =
L2 =
D=
B=
H3 =
Ds =
s =
=
1 =
=
c =
fcu =
fy =
Udl =
Qall =
LF =
=
FOS o =
FOS s =

2000 mm
400 mm
400 mm
1750 mm
1200 mm
600 mm
3350 mm
0 mm
500 mm
20 kN/m3
34 Degree
11.5 Degree
11.3 Degree
25 kN/m3
40 N/mm
500 N/mm
20 kN/m
250 kN/m
1.65
0.20 0.20
1.50 1.50
1.20

Backfill above toe is ignored

Degree = 0.593 Rad


Degree = 0.201 Rad
Degree = 0.197 Rad

cos - Sqrt{(cos) - (cos)}


cos --------------------------------------------cos + Sqrt{(cos) - (cos)}
Therefore Ka =
0.298

Active earth pressure coefficient, Ka =

Pressure at rest coefficient, Ko (minimum 0.5)


Selected Pressure at rest coefficient, Ko

Ko = (1 - sin) (1 + sin)
Ko =
0.527

Passive earth pressure coefficient, Kp

Kp = 1 + sin

312718648.xlsx - W1_h=4.00m

1.50

0.527

1 - sin
USING ACTIVE EARTH PRESSURE Ka FOR STABILITY CHECK
Height of surcharge
Total height of soil,

312718648.xlsx - W1_h=4.00m

H1 =
Hs = H + D + H1 =
H2 = H + H1 =

1.25 x tan
2.85 m
2.25 m

0.25 m

Project

DOHA WEST

Part of Structure

Head Wall for pipe culvert

WS Atkins & Partners Overseas


PO Box 7562
Abu Dhabi United Arab Emirates

Head wall design- 1,65m Height


Drawing Ref

Calc by Date
AN

DW077-P00-ATK-SW-7065

07 Oct 2015

The relevant calculations are shown in the following table:


Load due to
Stem (W1)
0.40
0.00

x
x

2.00
1.00

Magnitude
of load
W (KN)

Dist.
from (a)
(m)

Moment
about (a)
(kN.m)

x
x

25.00
25.00

20.00
0.00

1.40
1.20

28.0
0.0

Wt. of earth (W2)_above heel


1.75
x
2.00
0.12
x
1.25

x
x

20.00
20.00

70.00
3.12

2.48
2.93

173.3
9.2

Base slab (W3)


3.35
x

0.60

25.00

50.25

1.68

84.2

Toe backfill (W4)


0.00
x

1.20

20.00

0.00

0.60

0.0

Vertical soil pressure, Pv =(Ka gs Hs /2) sin()


2.85
0.298
x
20.00
x
2
2

4.74
3.35
Stabilizing moment <==

0.20

15.9
310.5

Minus moment of soil pressure, M = {Kags*Hs3/6}*cos()


0.298

2.85
6

20.00

0.98

-22.5

Minus moment of surcharge, M = (Udl x Ka x Hs /2 ) * cos()


2.85
0.298
x
20.00
x
0.98
2

Overturning moment <==

Total

148.11

Therefore (eccentrity relative to point (a)

z=

Eccentricity e (relative to C.G.) = B/2 - z =

264

148

264.21

1.784

-0.109 m < B/6, So O.K.

Maximum and minimum pressures at the base are given by


p=

W
B

44.21

p toe =
p heel =

35.59
52.83

(1

6e
B

) kN/m,

W = 148.1114 kN

-8.62

kN/m less than


250.0
kN/m, So O.K. (No tension)

kN/m, So O.K.

Pressure at junction of stem with toe


= 35.594062

35.59406

3350

52.83

1200

41.76836 kN/m

3350

52.83

1750

43.82646 kN/m

310.5
46.2

Pressure at junction of stem with heel


= 52.830645

35.59406

CHECK FOR OVERTURNING AND SLIDING


Factor of safety against overturning
= Stabilizing moment
Overturning moment

6.71

>

Total earth pressure + surcharge = P = Ka x s x Hs x Hs/2 + Udl x Ka x Hs

312718648.xlsx - W1_h=4.00m

1.5

-23.7
-46.2

==> So O.K.

24.2

16.97

Therefore horizontal earth pressure = P * cos


Maximum available friction without surcharge weight
= W =
0.203
x
Factor of safety against sliding =

312718648.xlsx - W1_h=4.00m

*W
P * cos

41.2 kN
=

40.36 kN

148.11

30.1336 kN

0.747

<

1.2

==> So Not O.K.

Project

DOHA WEST

Part of Structure
WS Atkins & Partners Overseas
PO Box 7562
Abu Dhabi United Arab Emirates

Head Wall for pipe culvert


Head wall design- 1,65m Height

Drawing Ref

Calc by Date
AN

DW077-P00-ATK-SW-7065

07 Oct 2015

A key is to be provided or consider passive pressure to increase resistance against sliding


Provide a key of
850
mm deep and
400
mm wide under the stem to increase factor of
safety against sliding. Sliding will take place along the surface at the bottom of key.
Total active pressure
= Pa = Ka x s x Hk x Hk/2 + Udl x Ka x Hk
=
=

40.8
+
62.803 kN

22.04

where Hk = Hs + Depth of key


=
3.70 m

kN

Total weight at the bottom level of the key = W + Wt. of key + Wt. of soil
Wt =
151.360
+
8.5
+
50.15
=
Total passive pressure
= Pp = Kp x s x (Depth of base slab + Depth of key)2/2

Total horizontal resisting force, Fr = x Wt + Pp

42.73

Factor of Safety for Sliding =

Fr
Pa x cos

1.205

>

210.0101 kN

31.496 kN
+

1.20

31.496

74.22

==> So O.K.

REINFORCEMENT DESIGN FOR STEM (USE Ko IF Ka < Ko FOR REINFORCEMENT DESIGN)


Maximum bending moment at the bottom of the stem due to earth pressure and surcharge
M=

0.516962

13.8

20

20.7

Concrete cover =
Mu =
bd2

1.65
1000
lever arm, z =
As req. =
As min. =

x
x

75 mm
34.5
x 106
319 ^2

303.05 mm
431 mm
600 mm

Therefore provide T 12

2.00 ^3
+
6.00
34.5 kNm
Hence for
effective d =
0.558817

K = Mu / bd2 fcu =

150

mm c/c

20.68

12 mm main bars,
319 mm

0.0140

As, prov. = 753.984 mm


100As,prov./bd = 0.236359

> As req. So O.K.

Main Vertical Reinforcement For Exposed Wall


Provide minimum shrinkage and temperature steel = 0.12%bh
=
Therefore provide T 12
200
mm c/c
A's, prov. =
100A's,prov./bd =

480 mm
565.488 mm
0.177

> As req. So O.K.

565.488 mm

> As req. So O.K.

Distribution steel
Provide minimum steel = 0.13%bh
Therefore provide T 12

520

200

mm

mm c/c

As =

DEFLECTION CHECK - TOP OF CANTILEVER


Slenderness ratio =
Therefore allowable =

312718648.xlsx - W1_h=4.00m

2000
7.00

319
=
x modification factors =

6.27
17.13

==> So OK !

Tension reinforcement modification factor = 0.55 + ( 477 - fs )/{120(0.9 + M/bd 2)} = 1.85
where fs = 248.679 < 0.8fy So OK !
Compression reinforcement modification factor = 1+ 100A's,prov/bd/(3+ 100A's,prov/bd) =

1.06

Modification factor for triangular load =

1.25

312718648.xlsx - W1_h=4.00m

Project

DOHA WEST

Part of Structure

Head Wall for pipe culvert

WS Atkins & Partners Overseas

Head wall design- 1,65m Height


Drawing Ref

PO Box 7562
Abu Dhabi United Arab Emirates

Calc by Date
AN

DW077-P00-ATK-SW-7065

CURTAILMENT OF STEM REINFORCEMENT


At depth 'h' metres from top, let As be the steel required.
Effective depth

Bending Moment =

s x h 3
6

319

0
2

x Ko * cos + Udl x Ko * cos x h x h / 2

Mu = 1.723207 h3 x
=

2.84 h

1.65

Ult. Bending
Moment
( kN-m )

0.00
0.20
0.40
0.60
0.80
1.00
1.20
1.40
1.60
1.80
2.00

8.529872 h

As = 2.843291 h3 +
0.87 fy z
At depth 'h'
metres from
top

xh)

5.16962 h2 x

8.529872 h2

Effective
Depth
d (mm)

Area
Req.
(mm)

319.00
319.00
319.00
319.00
319.00
319.00
319.00
319.00
319.00
319.00
319.00

600
600
600
600
600
600
600
600
600
600
600

0.0
0.4
1.5
3.7
6.9
11.4
17.2
24.5
33.5
44.2
56.9

1.65

CHECK ULTIMATE SHEAR STRESS AT BASE OF STEM (USE Ko IF Ka < Ko)


Total shear at base of stem = P = Ko * cos x s x H x H/2 + Udl x Ko * cos x H
=
20.68 +
20.68
=
41.36 kN
Ultimate shear stress v =
Allowable shear stress, vc =

1.65
1000

x
x

41357
319

0.214 N/mm

0.484 N/mm > v, So O.K.

DESIGN OF TOE SLAB (PRESSURE USE Ko IF Ka < Ko) _ BOTTOM STEEL


Self load of the base per metre run

0.6

25

15 kN/m

The force acting on toe are pressure from soil acting upwards and self-weight acting downwards.
If Ka < Ko, then Ko will be used for pressure calculation to get the worst bending moment and shear.
W=
151.8 kN
Moment about a =
228.59 kNm
Therefore z = 228.5886
/
151.7613
Eccentricity e = B/2 - z =
0.17 m < B/6, so O.K. !

1.506238 m

Therefore Maximum and minimum pressures at the base are given by


p=

W
B

p toe =

312718648.xlsx - W1_h=4.00m

(1
58.99

6e)
B
kN/m

45.302

13.693 kN/m

07 Oct 2015

p heel = 31.61 kN/m


Pressure at junction of stem with toe
= 58.994889

58.99489

3350

31.61

1200

49.18498 kN/m

3350

31.61

1750

45.92 kN/m

Pressure at junction of stem with heel


= 31.608892

312718648.xlsx - W1_h=4.00m

58.99489

Project

DOHA WEST

Part of Structure

Head Wall for pipe culvert

WS Atkins & Partners Overseas


PO Box 7562
Abu Dhabi United Arab Emirates

Head wall design- 1,65m Height


Drawing Ref

Calc by Date
AN

DW077-P00-ATK-SW-7065

07 Oct 2015

Therefore Maximum Bending Moment


=

49.18498

15
2.00

43.994889

34.2

1.2

1.2

1.2
x

3
=

2.0

29.3 kNm
Concrete cover =

Mu =
bd2

1.65
1000

x
x

75

mm

Hence for
effective d =

29.3 x 106
517

lever arm, z =
As req. =
As min. =

0.181007

491.15 mm
226 mm
900 mm

Therefore provide T 16

200

16 mm main bars,
517 mm

K = Mu/bd2fcu =

mm c/c

0.0045

As, prov. = 1005.312 mm


100As,prov./bd = 0.194451

> As req. So O.K.

CHECK FOR SHEAR


Maximum shear force = 43.99489

Ultimate shear stress v =

Allowable shear stress, vc =

1.65
1000

+
2

34.18

x
x

46908
517

1.2

46.90792 kN

0.149706 N/mm

0.428 N/mm > v, So O.K.

DESIGN OF THE HEEL SLAB _ TOP STEEL


The forces acting on the heel are pressure of soil acting upwards and weight of earth retained and self-weight acting downwards.
The relevant calculations are shown in the following table:
Load due to

Magnitude
of load
W (kN)

Dist.
fr. c
(m)

Moment
about c
(kNm)

Wt. of earth (W2)


1.75
x
0.12
x

2.00
1.25

x
x

20.00
20.00

70.00
3.12

0.88
1.33

61.3
4.2

Wt. of heel slab (W3a)


1.75
x

0.60

25.00

26.25

0.88

23.0

Vertical soil pressure Pv


72.9
x
0.1959461

14.28

1.75

25.0

Deduct for upward pressure


31.6
x
1.75
14.31
x
0.88

55.32
12.52

0.88
0.58

-48
-7.3

Total

45.82

Therefore maximum bending moment for heel slab =


And maximum shear force for heel slab =
Concrete cover =
Hence for

312718648.xlsx - W1_h=4.00m

75 mm
16 mm main bars,

57.66
57.7 kN-m
45.8 kN
effective d =

517 mm

Mu =
bd2

1.65
1000
lever arm, z =
As req. =
As min. =

x
x

57.7
x 106
517 ^2

491.2 mm

0.355958

K = Mu / bd2 fcu =

0.0089

445 mm
900 mm

Therefore provide T 16

312718648.xlsx - W1_h=4.00m

200

mm c/c

100As,prov./ bd = 0.194451
As, prov. = 1005.312 mm
> As req. So O.K.

Project

DOHA WEST

Part of Structure
WS Atkins & Partners Overseas
PO Box 7562
Abu Dhabi United Arab Emirates

Head Wall for pipe culvert


Head wall design- 1,65m Height

Drawing Ref

Calc by Date
AN

DW077-P00-ATK-SW-7065

Distribution steel
Provide minimum steel = 0.13%bh
=
780 mm
Therefore provide T 16

200

mm c/c

As = 1005.312 mm
> As req. So O.K.

CHECK FOR SHEAR


Maximum shear force =

45.8 kN

Ultimate shear stress v =

1.65
1000

Allowable shear stress, vc =

312718648.xlsx - W1_h=4.00m

x
x

45816
517

0.428 N/mm > v, So O.K.

0.14622 N/mm

07 Oct 2015

312718648.xlsx - W1_h=4.00m

Job ref
5099998
Calc sheet no.

rev

2
Check by Date

oe is ignored

mm
mm
mm

312718648.xlsx - W1_h=4.00m

312718648.xlsx - W1_h=4.00m

Job ref
5099998
Calc sheet no.

rev

Check by Date

Moment
about (a)
(kN.m)
28.0
0.0
173.3
9.2
84.2
0.0
15.9
310.5

-22.5
-23.7
-46.2
264.21

312718648.xlsx - W1_h=4.00m

312718648.xlsx - W1_h=4.00m

Job ref
5090882
Calc sheet no.

rev

Check by Date

kN

req. So O.K.

req. So O.K.

req. So O.K.

312718648.xlsx - W1_h=4.00m

312718648.xlsx - W1_h=4.00m

Job ref
5099998
Calc sheet no.

rev

Check by Date

312718648.xlsx - W1_h=4.00m

312718648.xlsx - W1_h=4.00m

Job ref
5090882
Calc sheet no.

rev

Check by Date

req. So O.K.

ng downwards.

312718648.xlsx - W1_h=4.00m

312718648.xlsx - W1_h=4.00m

Job ref
5099998
Calc sheet no.

rev

Check by Date

312718648.xlsx - W1_h=4.00m

312718648.xlsx - W1_h=4.00m

Project

QP Culverts

Part of Structure
WS Atkins & Partners Overseas
PO Box 7562
Abu Dhabi United Arab Emirates

Box Culvert
Wing walls design- 2.5 m Height

Drawing Ref

Calc by Date
Uday

23 Jan 2011

Design Data for the Retaining wall considered

Wall height above footing


Top of wall thickness
Bottom of wall thickness
Heel length (Backfill side)
Toe length
Thickness of base slab
Total base slab length
Toe backfill above footing
Horizontal distance from edge of top wall to slope of soil
Density of soil
Angle of repose, backfill
Angle of repose, bearing
Backfill slope angle
Density of concrete
Concrete grade
Reinforcement grade
Soil surcharge_Live Load Surcharge
Allowable soil pressure
Load factor for Ultimate check
Coefficent of friction
FOS against overturning
FOS against sliding

H=
t1 =
t2 =
L1 =
L2 =
D=
B=
H3 =
Ds =
s =
=
1 =
=
c =
fcu =
fy =
Udl =
Qall =
LF =
=
FOS o =
FOS s =

2500 mm
500 mm
500 mm
1400 mm
500 mm
500 mm
2400 mm
0 mm
0 mm
17 kN/m3
34 Degree
27.2 Degree
0.0 Degree
25 kN/m3
40 N/mm
420 N/mm
0 kN/m
200 kN/m
1.65
0.514 0.514
1.50 1.50
2.00

Backfill above toe is ignored

Degree = 0.593 Rad


Degree = 0.475 Rad
Degree = 0.000 Rad

cos - Sqrt{(cos) - (cos)}


cos --------------------------------------------cos + Sqrt{(cos) - (cos)}
Therefore Ka =
0.283

Active earth pressure coefficient, Ka =

Pressure at rest coefficient, Ko (minimum 0.5)


Selected Pressure at rest coefficient, Ko

Ko = (1 - sin) (1 + sin)
Ko =
0.500

Passive earth pressure coefficient, Kp

Kp = 1 + sin

312718648.xlsx - W2_h=2.50m

2.68

0.500

1 - sin
USING ACTIVE EARTH PRESSURE Ka FOR STABILITY CHECK
Height of surcharge
Total height of soil,

312718648.xlsx - W2_h=2.50m

H1 =
Hs = H + D + H1 =
H2 = H + H1 =

1.40 x tan
3.00 m
2.50 m

0.00 m

Project

QP Culverts

Part of Structure

Box Culvert

WS Atkins & Partners Overseas


PO Box 7562
Abu Dhabi United Arab Emirates

Wing walls design- 2.5 m Height


Drawing Ref

Calc by Date
Uday

23 Jan 2011

The relevant calculations are shown in the following table:


Load due to
Stem (W1)
0.50
0.00

x
x

2.50
1.25

Magnitude
of load
W (KN)

Dist.
from (a)
(m)

Moment
about (a)
(kN.m)

x
x

25.00
25.00

31.25
0.00

0.75
0.50

23.4
0.0

Wt. of earth (W2)_above heel


1.40
x
2.50
0.00
x
1.40

x
x

17.00
17.00

59.50
0.00

1.70
1.93

101.2
0.0

Base slab (W3)


2.40
x

0.50

25.00

30.00

1.20

36.0

Toe backfill (W4)


0.00
x

0.50

17.00

0.00

0.25

0.0

Vertical soil pressure, Pv =(Ka gs Hs /2) sin()


3.00
0.283
x
17.00
x
2
2

0.00
2.40
Stabilizing moment <==

0.00

0.0
160.6

Minus moment of soil pressure, M = {Kags*Hs3/6}*cos()


0.283

3.00
6

17.00

1.00

-21.6

Minus moment of surcharge, M = (Udl x Ka x Hs /2 ) * cos()


3.00
0.283
x
0.00
x
1.00
2

Overturning moment <==

Total

120.75

Therefore (eccentrity relative to point (a)

z=

Eccentricity e (relative to C.G.) = B/2 - z =

139

121

138.96

1.151

0.049 m < B/6, So O.K.

Maximum and minimum pressures at the base are given by


p=

W
B

50.31

p toe =
p heel =

56.50
44.12

(1

6e
B

) kN/m,

W=

120.75 kN

6.19

kN/m less than


200.0
kN/m, So O.K. (No tension)

kN/m, So O.K.

Pressure at junction of stem with toe


= 56.500199

56.5002

2400

44.12

500

53.92199 kN/m

2400

44.12

1400

51.34378 kN/m

160.6
21.6

Pressure at junction of stem with heel


= 44.124801

56.5002

CHECK FOR OVERTURNING AND SLIDING


Factor of safety against overturning
= Stabilizing moment
Overturning moment

7.43

>

Total earth pressure + surcharge = P = Ka x s x Hs x Hs/2 + Udl x Ka x Hs

312718648.xlsx - W2_h=2.50m

1.5

0.0
-21.6

==> So O.K.

21.6

0.00

Therefore horizontal earth pressure = P * cos


Maximum available friction without surcharge weight
= W =
0.514
x
120.75
Factor of safety against sliding =

312718648.xlsx - W2_h=2.50m

*W
P * cos

2.869

21.6 kN
=

21.63 kN

62.05707 kN

>

2.0

==> So O.K.

Project

QP Culverts

Part of Structure
WS Atkins & Partners Overseas
PO Box 7562
Abu Dhabi United Arab Emirates

Box Culvert
Wing walls design- 2.5 m Height

Drawing Ref

Calc by Date
Uday

23 Jan 2011

Provide a key of
0
mm deep and
0
mm wide under the stem to increase factor of
safety against sliding. Sliding will take place along the surface at the bottom of key.
Total active pressure
= Pa = Ka x s x Hk x Hk/2 + Udl x Ka x Hk
=
=

21.6
+
21.628 kN

0.00

where Hk = Hs + Depth of key


=
3.00 m

kN

Total weight at the bottom level of the key = W + Wt. of key + Wt. of soil
Wt =
120.750
+
0
+
0
=
Total passive pressure
= Pp = Kp x s x (Depth of base slab + Depth of key)2/2

Total horizontal resisting force, Fr = x Wt + Pp

62.06

Factor of Safety for Sliding =

Fr
Pa x cos

3.133

>

120.75 kN

5.703299 kN
+

2.00

5.703299

67.76

==> So O.K.

REINFORCEMENT DESIGN FOR STEM (USE Ko IF Ka < Ko FOR REINFORCEMENT DESIGN)


Maximum bending moment at the bottom of the stem due to earth pressure and surcharge
M=

0.5

22.1

17

0.0

Concrete cover =
Mu =
bd2

1.65
1000
lever arm, z =
As req. =
As min. =

x
x

75 mm
22.1
x 106
417 ^2

396.15 mm
252 mm
750 mm

Therefore provide T 16

2.50 ^3
+
6.00
22.1 kNm
Hence for
effective d =
0.210039

K = Mu / bd2 fcu =

125

mm c/c

0.00

1.25

16 mm main bars,
417 mm

0.0053

As, prov. = 1608.499 mm


100As,prov./bd = 0.385731

> As req. So O.K.

Main Vertical Reinforcement For Exposed Wall


Provide minimum shrinkage and temperature steel = 0.12%bh
=
600 mm
Therefore provide T 16
125
mm c/c
A's, prov. = 1608.499 mm
100A's,prov./bd =
0.386

> As req. So O.K.

Distribution steel
Provide minimum steel = 0.13%bh
Therefore provide T 16

650

125

mm

mm c/c

As = 1608.499 mm

DEFLECTION CHECK - TOP OF CANTILEVER


Slenderness ratio =
Therefore allowable =

312718648.xlsx - W2_h=2.50m

2500
7.00

417
=
x modification factors =

6.00
19.49

==> So OK !

> As req. So O.K.

Tension reinforcement modification factor = 0.55 + ( 477 - fs )/{120(0.9 + M/bd 2)} = 2.00
where fs = 122.3967 < 0.8fy So OK !
Compression reinforcement modification factor = 1+ 100A's,prov/bd/(3+ 100A's,prov/bd) =

1.11

Modification factor for triangular load =

1.25

312718648.xlsx - W2_h=2.50m

Project

QP Culverts

Part of Structure

Box Culvert

WS Atkins & Partners Overseas

Wing walls design- 2.5 m Height


Drawing Ref

PO Box 7562
Abu Dhabi United Arab Emirates

Calc by Date
Uday

CURTAILMENT OF STEM REINFORCEMENT


At depth 'h' metres from top, let As be the steel required.
Effective depth

Bending Moment =

s x h 3
6

417

0
2.5

x Ko * cos + Udl x Ko * cos x h x h / 2

Mu = 1.416667 h3 x
=
As =
At depth 'h'
metres from
top

2.34 h

1.65

+
0h

2.3375 h3 +
0.87 fy z

Ult. Bending
Moment
( kN-m )

0.00
0.25
0.50
0.75
1.00
1.25
1.50
1.75
2.00
2.25
2.50

xh)

1.65

0 h2

Effective
Depth
d (mm)

Area
Req.
(mm)

417.00
417.00
417.00
417.00
417.00
417.00
417.00
417.00
417.00
417.00
417.00

750
750
750
750
750
750
750
750
750
750
750

0.0
0.0
0.3
1.0
2.3
4.6
7.9
12.5
18.7
26.6
36.5

h2 x

CHECK ULTIMATE SHEAR STRESS AT BASE OF STEM (USE Ko IF Ka < Ko)


Total shear at base of stem = P = Ko * cos x s x H x H/2 + Udl x Ko * cos x H
=
26.56 +
0.00
=
26.56 kN
Ultimate shear stress v =
Allowable shear stress, vc =

1.65
1000

x
x

26563
417

0.105 N/mm

0.538 N/mm > v, So O.K.

DESIGN OF TOE SLAB (PRESSURE USE Ko IF Ka < Ko) _ BOTTOM STEEL


Self load of the base per metre run

0.5

25

12.5 kN/m

The force acting on toe are pressure from soil acting upwards and self-weight acting downwards.
If Ka < Ko, then Ko will be used for pressure calculation to get the worst bending moment and shear.
W=
120.8 kN
Moment about a =
122.34 kNm
Therefore z = 122.3375
/
120.75
Eccentricity e = B/2 - z =
0.19 m < B/6, so O.K. !

1.013147 m

Therefore Maximum and minimum pressures at the base are given by


p=

W
B

p toe =

312718648.xlsx - W2_h=2.50m

(1
73.82

6e)
B
kN/m

50.313

23.5026 kN/m

23 Jan 2011

p heel = 26.81 kN/m


Pressure at junction of stem with toe
= 73.815104

73.8151

2400

26.81

500

64.02235 kN/m

2400

26.81

1400

54.23 kN/m

Pressure at junction of stem with heel


= 26.809896

312718648.xlsx - W2_h=2.50m

73.8151

Project

QP Culverts

Part of Structure

Box Culvert

WS Atkins & Partners Overseas

Wing walls design- 2.5 m Height


Drawing Ref

PO Box 7562
Abu Dhabi United Arab Emirates

Calc by Date
Uday

23 Jan 2011

Therefore Maximum Bending Moment


= 64.022352

12.5
2.00

61.315104

51.5

0.5

0.5

0.5
x

3
=

2.0

7.3 kNm
Concrete cover =

Mu =
bd2

1.65
1000

100

x
x

mm

Hence for
effective d =

7.3 x 106
392

lever arm, z =
As req. =
As min. =

0.077917

372.4 mm
88 mm
750 mm

Therefore provide T 16

150

16 mm main bars,
392 mm

K = Mu/bd2fcu =

mm c/c

0.0019

As, prov. = 1340.416 mm


100As,prov./bd = 0.341943

> As req. So O.K.

CHECK FOR SHEAR


Maximum shear force =

61.3151

+
2

Ultimate shear stress v =

1.65
1000

x
x

Allowable shear stress, vc =

51.52

28209
392

0.5

28.20936 kN

0.118738 N/mm

0.520 N/mm > v, So O.K.

DESIGN OF THE HEEL SLAB _ TOP STEEL


The forces acting on the heel are pressure of soil acting upwards and weight of earth retained and self-weight acting downwards.
The relevant calculations are shown in the following table:
Load due to

Magnitude
of load
W (kN)

Dist.
fr. c
(m)

Moment
about c
(kNm)

Wt. of earth (W2)


1.40
x
0.00
x

2.50
1.40

x
x

17.00
17.00

59.50
0.00

0.70
0.93

41.7
0.0

Wt. of heel slab (W3a)


1.40
x

0.50

25.00

17.50

0.70

12.3

0.00

1.40

0.0

37.53
19.19

0.70
0.47

-26
-9.0

Vertical soil pressure Pv


38.3
x

Deduct for upward pressure


26.8
x
1.40
27.42
x
0.70
Total

20.27

Therefore maximum bending moment for heel slab =


And maximum shear force for heel slab =
Concrete cover =
Hence for

312718648.xlsx - W2_h=2.50m

100 mm
16 mm main bars,

18.67
18.7 kN-m
20.3 kN
effective d =

392 mm

Mu =
bd2

1.65
1000
lever arm, z =
As req. =
As min. =

x
x

18.7
x 106
392 ^2

372.4 mm

0.200465

K = Mu / bd2 fcu =

0.0050

226 mm
750 mm

Therefore provide T 16

312718648.xlsx - W2_h=2.50m

150

mm c/c

100As,prov./ bd = 0.341943
As, prov. = 1340.416 mm
> As req. So O.K.

Project

QP Culverts

Part of Structure
WS Atkins & Partners Overseas
PO Box 7562
Abu Dhabi United Arab Emirates

Box Culvert
Wing walls design- 2.5 m Height

Drawing Ref

Calc by Date
Uday

Distribution steel
Provide minimum steel = 0.13%bh
=
650 mm
Therefore provide T 16

150

mm c/c

As = 1340.416 mm
> As req. So O.K.

CHECK FOR SHEAR


Maximum shear force =

20.3 kN

Ultimate shear stress v =

1.65
1000

Allowable shear stress, vc =

312718648.xlsx - W2_h=2.50m

x
x

20272
392

0.520 N/mm > v, So O.K.

0.08533 N/mm

23 Jan 2011

312718648.xlsx - W2_h=2.50m

Job ref
5090882
Calc sheet no.

rev

Check by Date

oe is ignored

mm
mm
mm

Bowles P.712

312718648.xlsx - W2_h=2.50m

312718648.xlsx - W2_h=2.50m

Job ref
5090882
Calc sheet no.

rev

Check by Date

Moment
about (a)
(kN.m)
23.4
0.0
101.2
0.0
36.0
0.0
0.0
160.6

-21.6
0.0
-21.6
138.96

312718648.xlsx - W2_h=2.50m

312718648.xlsx - W2_h=2.50m

Job ref
5090882
Calc sheet no.

rev

Check by Date

kN

req. So O.K.

req. So O.K.

req. So O.K.

312718648.xlsx - W2_h=2.50m

312718648.xlsx - W2_h=2.50m

Job ref
5090882
Calc sheet no.

rev

Check by Date

312718648.xlsx - W2_h=2.50m

312718648.xlsx - W2_h=2.50m

Job ref
5090882
Calc sheet no.

rev

Check by Date

req. So O.K.

ng downwards.

312718648.xlsx - W2_h=2.50m

312718648.xlsx - W2_h=2.50m

Job ref
5090882
Calc sheet no.

rev

Check by Date

312718648.xlsx - W2_h=2.50m

312718648.xlsx - W2_h=2.50m