SIMPTWW FORM

Task Name Inspect & calibrate relief valve


Equip. Name: 1" x 2" relief valve
P&ID /
Equip Tag # : PSV C210
A1-314
Drawing #:
Functional Loc.: 300
Major Turnaround

Scheduling Info:

Updated (Rev#):

Job Walkthrough
Scaffolding -

External

Work Order #:
System Owner
(s):

_______________

Julaini

Frequency Months

Date

Work (hrs / hrs)

Resource(s)

hrs

(Date Comp. 22.12.10)

hrs

(Date Comp. )

hrs

N/A

(# )

JSA / Risk
Prediction

Owner (s): HSE

SAP Maintenance Plan:

Line Items / Subtasks


ICC Aproval

Category: Tech Safety - PSV


Process: ESTER SYSTEM

Internal

NOTES

UBF (in-house)
Atmajaya

Insulation

(Remove / Install)

N/A

Steam Tracer

(Remove / Install)

N/A

LO/TO

(Install / Remove)

/ hrs

hrs

/ hrs

hrs

hrs

hrs

CSE (use Notes to specify additional. CSE dates)


Open / Close Vessel
Crane /
Blower /

Vacuum Truck /
Lighting /

Empty Vessel
Wash

Forklift /

Drums /

Skylift

Gen. Set

Method :

, Mech

Operation
CSE Crew FPG
Mech

Cont.

hrs

Operation
Operation

hrs

hrs

hrs

hrs

hrs

FORM-PM-SIMPTWW

Develop: 15/10/2010

Rev. # 01

SIMPTWW FORM
Task Name Inspect & calibrate relief valve
Equip. Name: 1" x 2" relief valve
P&ID /
Equip Tag # : PSV C210
A1-314
Drawing #:
Functional Loc.: 300
Scheduling Info:

Major Turnaround

Updated (Rev#):

_______________

Category: Tech Safety - PSV


Process: ESTER SYSTEM
Owner (s): HSE
Work Order #:
System Owner
(s):

SAP Maintenance Plan:

Julaini

Frequency Months

Additional Information Required - Pls. add drawings, sketches, photo etc. to show the location and scope of work.
Comments :
Shutdown Procedure (by System Owner) : Use Sd Procedure Template and MUST be attached to this document
Work Procedure / Sequence (by Job Owner) :
1. Remove
2. inspect
3. calibrate
4. reinstall
Controlled Doc./ SOP # (if any):

PSV C210

E-304

FORM-PM-SIMPTWW

Develop: 15/10/2010

Rev. # 01

SIMPTWW FORM
Task Name Inspect & calibrate relief valve
Equip. Name: 1" x 2" relief valve
P&ID /
Equip Tag # : PSV C210
A1-314
Drawing #:
Functional Loc.: 300
Scheduling Info:

_______________

Major Turnaround

Updated (Rev#):

Category: Tech Safety - PSV


Process: ESTER SYSTEM
Owner (s): HSE
Work Order #:
System Owner
(s):

SAP Maintenance Plan:

Julaini

Frequency Months

If additional tasks are required, add them on the back of this form. Identify where the additional tasks belong in the sequence and provide details to the Maintenance Planner to update the Schedule.

Material Master #
(Parts)

Bin #

Part #

Qty

Tools (specify size, spec etc.)

Qty

FORM-PM-SIMPTWW

Develop: 15/10/2010

Rev. # 01

SIMPTWW FORM
Task Name Inspect & calibrate relief valve
Equip. Name: 1" x 2" relief valve
P&ID /
Equip Tag # : PSV C210
A1-314
Drawing #:
Functional Loc.: 300
Scheduling Info:

Major Turnaround

Updated (Rev#):

_______________

Category: Tech Safety - PSV


Process: ESTER SYSTEM
Owner (s): HSE
Work Order #:
System Owner
(s):

SAP Maintenance Plan:

Julaini

Frequency Months

Notes:

FORM-PM-SIMPTWW

Develop: 15/10/2010

Rev. # 01