Scheduling Info:
Updated (Rev#):
Job Walkthrough
Scaffolding -
External
Work Order #:
System Owner
(s):
_______________
Julaini
Frequency Months
Date
Resource(s)
hrs
hrs
(Date Comp. )
hrs
N/A
(# )
JSA / Risk
Prediction
Internal
NOTES
UBF (in-house)
Atmajaya
Insulation
(Remove / Install)
N/A
Steam Tracer
(Remove / Install)
N/A
LO/TO
(Install / Remove)
/ hrs
hrs
/ hrs
hrs
hrs
hrs
Vacuum Truck /
Lighting /
Empty Vessel
Wash
Forklift /
Drums /
Skylift
Gen. Set
Method :
, Mech
Operation
CSE Crew FPG
Mech
Cont.
hrs
Operation
Operation
hrs
hrs
hrs
hrs
hrs
FORM-PM-SIMPTWW
Develop: 15/10/2010
Rev. # 01
SIMPTWW FORM
Task Name Inspect & calibrate relief valve
Equip. Name: 1" x 2" relief valve
P&ID /
Equip Tag # : PSV C210
A1-314
Drawing #:
Functional Loc.: 300
Scheduling Info:
Major Turnaround
Updated (Rev#):
_______________
Julaini
Frequency Months
Additional Information Required - Pls. add drawings, sketches, photo etc. to show the location and scope of work.
Comments :
Shutdown Procedure (by System Owner) : Use Sd Procedure Template and MUST be attached to this document
Work Procedure / Sequence (by Job Owner) :
1. Remove
2. inspect
3. calibrate
4. reinstall
Controlled Doc./ SOP # (if any):
PSV C210
E-304
FORM-PM-SIMPTWW
Develop: 15/10/2010
Rev. # 01
SIMPTWW FORM
Task Name Inspect & calibrate relief valve
Equip. Name: 1" x 2" relief valve
P&ID /
Equip Tag # : PSV C210
A1-314
Drawing #:
Functional Loc.: 300
Scheduling Info:
_______________
Major Turnaround
Updated (Rev#):
Julaini
Frequency Months
If additional tasks are required, add them on the back of this form. Identify where the additional tasks belong in the sequence and provide details to the Maintenance Planner to update the Schedule.
Material Master #
(Parts)
Bin #
Part #
Qty
Qty
FORM-PM-SIMPTWW
Develop: 15/10/2010
Rev. # 01
SIMPTWW FORM
Task Name Inspect & calibrate relief valve
Equip. Name: 1" x 2" relief valve
P&ID /
Equip Tag # : PSV C210
A1-314
Drawing #:
Functional Loc.: 300
Scheduling Info:
Major Turnaround
Updated (Rev#):
_______________
Julaini
Frequency Months
Notes:
FORM-PM-SIMPTWW
Develop: 15/10/2010
Rev. # 01