Task Name To replace packing for S-1105


Equip. Name: HCL Scrubber
P&ID /
Equip Tag # : S-1105
A1-1112
Drawing #:
Functional Loc.: 1100
__________

Scheduling Info:

System Owner
(s):

Julaini

Frequency Months

Date

Work (hrs / hrs)

Resource(s)

(# )

hrs

(Date Comp.
05.01.11 )

hrs

hrs

N/A

(Date Comp. )

Job Walkthrough
Scaffolding -

Work Order #:

SAP Maintenance Plan:

Line Items / Subtasks


JSA / Risk
Prediction

Owner (s): HSE

_______________

Updated (Rev#):
ICC Aproval

Category: Maint - CM
Process: UTILITY

External

Internal

NOTES

UBF (in-house)
Atmajaya

Insulation

(Remove / Install)

N/A

Steam Tracer

(Remove / Install)

N/A

LO/TO

(Install / Remove)

/ hrs

hrs

/ hrs

hrs

hrs

hrs

CSE (use Notes to specify additional. CSE dates)


Open / Close Vessel
Crane /
Blower /

Vacuum Truck /
Lighting /

Forklift /

Drums /

Empty Vessel
Wash

Skylift

Gen. Set

Method : Cold Water

, Mech

Operation
CSE Crew FPG
Mech

Cont.

hrs

Operation
Operation

hrs

hrs

hrs

hrs

hrs

FORM-PM-SIMPTWW

Develop: 15/10/2010

Rev. # 01

SIMPTWW FORM
Task Name To replace packing for S-1105
Equip. Name: HCL Scrubber
P&ID /
Equip Tag # : S-1105
A1-1112
Drawing #:
Functional Loc.: 1100
Scheduling Info:

__________

Updated (Rev#):

_______________

Category: Maint - CM
Process: UTILITY
Owner (s): HSE
Work Order #:
System Owner
(s):

SAP Maintenance Plan:

Julaini

Frequency Months

Additional Information Required - Pls. add drawings, sketches, photo etc. to show the location and scope of work.
Comments :
Shutdown Procedure (by System Owner) : Use Sd Procedure Template and MUST be attached to this document
Work Procedure / Sequence (by Job Owner) :
1. Open manway & handhole
2. Remove packing
3. Install new packing
4. Box up hand hole
Controlled Doc./ SOP # (if any):
List of man way and hand hole need to be opened. Please take note. DO NOT OPEN hand hole N5 6 hand hole packing dump. Contractor will open the hole.
1. N3 8 goose neck vent
2. N4 6 liquid out let

If additional tasks are required, add them on the back of this form. Identify where the additional tasks belong in the sequence and provide details to the Maintenance Planner to update the Schedule.
FORM-PM-SIMPTWW

Develop: 15/10/2010

Rev. # 01

SIMPTWW FORM
Task Name To replace packing for S-1105
Equip. Name: HCL Scrubber
P&ID /
Equip Tag # : S-1105
A1-1112
Drawing #:
Functional Loc.: 1100
Scheduling Info:

__________

Updated (Rev#):

_______________

Category: Maint - CM
Process: UTILITY
Owner (s): HSE
Work Order #:
System Owner
(s):

SAP Maintenance Plan:

Julaini

Frequency Months

Material Master #
(Parts)

Bin #

Part #

Qty

Tools (specify size, spec etc.)

Qty

Notes: