1
2
3
4
5
6
7
8
9
10
Living Room
Balcony
Common Toilet
Kitchen
Dry Balcony
BR1-Master Bed
Master Toilet
BR-2
BR-2-Attached Toilet
Bed Room 3
11
12
Elevator Lobby
Staircase
Ceiling
Plot 17
Gypsum Plaster + White OBD
Wall
Plot 07
Plot 17
Gypsum Plaster + Ivory Acrylic
Flooring
Plot 07
Plot 17
Skirting / Dado
Plot 07
Plot 17
Miscellaneous
Plot 07
Plot 17
Doors
Plot 07
Plot 17
Plot 07
Page 1
file:///var/www/apps/conversion/tmp/scratch_5/312909169.xls
Type
T3.1
Location
T3.2
Toilet 1
Floor Mounted
Type of Trap
P-Trap
Floor Mounted
S-Trap
Floor Mounted
S-Trap
T3.4
Master Toilet
Toilet 4
Floor Mounted
P-Trap
T3.5
Guest Toilet
Toilet 5
Floor Mounted
S-Trap
T3.3
3 BHK
Type
Location
Type of Trap
T2.1
Toilet 1
Floor Mounted
S-Trap
T2.2
Floor Mounted
P-Trap
T2.3
Floor Mounted
P-Trap
T2.4
Master Toilet
Type
Location
Toilet 4
Floor Mounted
S-Trap
Type of Trap
T1.1
Studio
Floor Mounted
P-Trap
T1.2
Floor Mounted
P-Trap
T1.3
Master Toilet
Toilet 3
Floor Mounted
S-Trap
Total
Convertible
To convert to
Wall Mount,
Plumbing
is Ledge
Deviations?
Wall
Required?
Total Count
Ledge Wall
Converting
to Wall
Mount
Feasible?
38
No
Yes
Yes
Yes
38
Yes
No
N.A
Yes
38
Yes
No
N.A
Yes
38
No
Yes
Yes
Yes
38
Yes
No
N.A
Yes
Ledge Wall
Converting
to Wall
Mount
Feasible?
Total Count
To convert to
Wall Mount,
Plumbing
is Ledge
Deviations?
Wall
Required?
42
Yes
No
Yes
Yes
42
No
Yes
Yes
Yes
42
No
Yes
No
No
42
Yes
No
Yes
Yes
Total Count
Ledge Wall
Converting
to Wall
Mount
Feasible?
30
No
Yes
yes
yes
30
No
Yes
yes
yes
To convert to
Wall Mount,
Plumbing
is Ledge
Deviations?
Wall
Required?
30
448
220
Yes
No
Yes
Yes
Technically Recommended
YES
NO
Refer to point 2
NO
YES
Refer to point 2
NO
Technically Recommended
NO
YES
YES
NO
Technically Recommended
YES
YES
NO
COST IMPLICATION
Yes
N-A
Yes
N-A
N-A
Yes
N-A
N-A
N-A
Yes
Yes
Yes
N-A
Yes
Yes
Yes
N-A
Yes
Technically Recommended
N-A
N-A
Similar to point 1
similar to point 1 +Change in EWC
Technically Recommended
N-A
N-A
Technically Recommended
N-A
Technical Alternative
Approximate Cost
Involved along with Flush
Tank
N-A
N-A
N-A
N-A
same as point 1
N-A
Technical Alternative
N-A
N-A
N-A
N-A
Technical Alternative
N-A
N-A
N-A
floor near the hole gets affected. It can never be made monolithic unless completely re-done.
LOCATION
BAY WINDOW
ISSUE
1. Thickening of edge of Granite projecting
2. Glass Support
SOLUTION
A strip of 63mm wide and 20mm thk granite to be
pasted to granite using Araldite. Both granites to have
quarter round nosing so as to see half round after
pasting. Refer to attached Sketch for Bay Window.
As per attached detail