Académique Documents
Professionnel Documents
Culture Documents
To ensure the best performance of the inspection and obtain the most reliable
result, a Standard Inspection Package (SIP) must be supplied by the factory. The
SIP includes, but is not limited to the following items:
2 Preproduction samples or TOP samples
An 8 x 8 inch fabric swatch for each approved color/print
Bon-Ton approved wash shades should be provided (i.e. denim Pigment dye,
etc.)
Size specifications including tolerances approved by Bon Ton via PLM
Sketches, photos, or drawing of the products.
Bon Ton How to Measure for every style
Approved actual accessories, hang tags and labels
Assortment sheet indicating style number, quantity, delivery, and color
assortment.
Packing instructions
Regulatory documentation General Conformity Certificate (GCC) as required by
law, corresponding testing reports and results, current factory social compliance
audit and results
Any other information the factory deems important to the inspection.
Completion of Inspection
INSPECTION DISPOSITIONS
The third party inspection service will issue an inspection report to the Bon-Ton
QA Department and the vendor/factory within 24 hours of receipt of the
inspector's detailed report of the inspection. However, all inspections will require
a sign off by an Bon Ton official.
If the result of the inspection passes the AQL adopted by the Bon-Ton QA
Department, the final typed report and disposition will be emailed within
48 hours to the vendor so that the shipment can be released.
If there is a failing or doubtful result, the shipment will be rejected. ULVS
will notify the Bon-Ton QA Department immediately. A disposition will be
communicated to the vendor and internally.
The Bon-Ton QA Department will review the inspection report findings and
determine the severity of deficiencies found with the appropriate Bon-Ton
merchandising staff. If deficiencies found are considered to be
commercially acceptable, the QA Department will release the final report
with comments and acceptability.
In cases where inspection results are deemed to be a concern and would
result in unacceptable quality to be shipped to our stores, the Bon-Ton QA
FABRIC INSPECTION
CUTTING INSPECTION
SEWING LINES
FINISHING LINE
the correct temperature based upon the fabric in question and avoiding heavy
pressing those results in shiny appearance.
Packaging area must be organized and properly supervised. This is a critical
inspection checkpoint, as Bon-Ton has zero tolerance on packaging
discrepancies.
Supervisors must ensure that the correct hangtags, price tickets, etc. are provided
to the proper production packing stations to avoid any possibility of mislabeling.
Worktables should be cleared of all merchandise, tags / tickets (that are not
applicable) prior to starting another size / color or style.
FINAL INSPECTION
6.1 The following in-line inspection procedures are to be used in conjunction with
the final inspection procedures outlined
6.2 The purpose of an in-line inspection is to help a new factory, the vendor, and the
Bon-Ton to identify potential problems early enough in the manufacturing
process that they can be fixed and the quality of the product improved.
6.3 The in-line inspection shall be conducted on finished garments when the
production stage is at least 20% complete and have been through the factorys
own QC. Garments are not required to be packed.
6.4 Results of this inspection are discussed, in detail, with the factory management
so that the factory can develop, and present to Bon-Ton, corrective action /
preventative action plans that address any deficiencies found. Note: The ULVS
inspector cannot give opinion or advice regarding how to correct defects.
7.1 The final inspection shall be conducted on finished garments when the
production stage is 100% complete. Garments are required to be at least 80%
packed and sealed, unless otherwise noted by Bon-Ton. Bon-Ton Requirements
and Procedures Bon-Ton Incorporated Quality Assurance The Bon-Ton Stores, Inc.
GARMENT INSPECTION PROCEDURES.
7.2 If the factory is short/over shipping and the amount is greater than +/- 5% the
inspector shall provide a comment in the report and describe the percentage
from the order quantity.
7.3 ULVS will inspect each Bon-Ton style individually and treat each as an individual
lot for random statistical sampling purposes. However, each style (lot) can
include various colors and size ranges and multiple shipping destinations. These
will be combined within one report.
7.4 The inspections are to be conducted in accordance with ANSI/ASQ Z1.4- 2008,
Normal Inspection, General Level II. The AQL is 0 for Critical defects, 2.5 for
Major defectsincluding critical measurement points that are out of tolerance
and 4.0 for Minor defectsincluding non-critical measurement points that are
out of tolerance. This requirement may only be changed, in writing, from Bon-Ton
to ULVS, and the written instruction must specify the orders where the change
will be applied. All points of measure for each style should be measured. If all
measurements are not taken another inspection will be required.
CLASSIFICATION OF DEFECTS
CONCLUSION
Defect Definitions Defects are classified into three main categories: (1) Critical Defects (2) Major Defects (3) Minor Defects
The classified defects can then be divided into three subcategories: (a) Material Defects (b) Production Defects (c) Packaging Defects
(a)
In this manual the specification about the sample is not
defined which will increase the chances of mistake in
production.
(b)
The defects in the manual are described theoretically not
pictorially if described pictorially than it will be better for
manufacturing industry to understand and less rejection of
shipment will happen hence increasing the efficiency.
(c)
The inspection procedure is good here and their are less
chances for rejection.
(d)
The company has hired a third party inspection team
which will inspect for them,as it will be good for company
because the people who are expert will check it and hence
more efficiency. Despite it will increase the cost of the
garment.
(e)
Measurements are not given precisely with diagrams so it
will not be of accurate standards for the company.
Referencehttp://logistics.bonton.com/Documents/BON-TON%20QA
%20INSPECTION%20MANUAL.pdf