Non-sway frame - solution by moment distribution method

2 of 4

http://civilengineer.webinfolist.com/str/prob82.htm

Solved example on Moment Distribution method for non-sway Frame


Problem 8-2
Featured
Use Moment distribution method to find Links
the resultant end moments for the Moment
Distribution
non-sway frame shown in figure 8-2(a). CalculatorNew
Take EI as constant for all the members Easy to use
calculator for
of the frame.
solving
Indeterminate
beams with
different load
Ov erhanging

Beam
CalculatorNew
Bending Moment &
Shear Force
Calculation for
Overhanging beam
with different loads

Solution:

Figure 8-2(a)

Step 1: The given rigid frame is non-sway because


of lateral support at D. Consider each span (AB,
BC, CD and CE) with both ends fixed and calculate
the fixed-end moments as follows;

MAB = 0
MBA = 0
MBC = wL2 /12 = -6.67 kNm
MCB = -wL2 /12 = +6.67 kNm
MCD = PL/8 = -10 kNm
MDC = -PL/8 = +10 kNm
MCE = 0
MEC = 0

Moment of
Inertia
calculatorNew
For different
sections
including
I-section and
T-section.
Deflection
Calculator
Easy to use
calculator for
different loads
on beams
Problem
SolverNew
A collection of
illustrated
solved
examples for
civil
engineers.
RC Beam
CalculatorNew
Calculate the
strength of
reinforced
concrete
beams
Reinforced
concreteNew
Analysis and
design of
reinforced
concrete
structures
Bending
Moment
calculatorNew
Calculate
Bending
moments for
simply
supported
beams

Step 2: Stiffness Coefficients


kAB = 4EI/L = 4EI/5 =0.8EI

CE QUIZNew
A collection of

3/25/2016 12:53 AM

Non-sway frame - solution by moment distribution method

3 of 4

http://civilengineer.webinfolist.com/str/prob82.htm

kBA = 4EI/L = 4EI/5 =0.8EI

quiz in
different areas
of civil
engineering

kBC = 4EI/L = 4EI/4 = EI


kCB = 4EI/L = 4EI/4 = EI
kCD = 4EI/L = 4EI/4 = EI
kDC = 4EI/L = 4EI/4 = EI
kCE = 4EI/L = 4EI/4 = EI
kEC = 4EI/L = 4EI/4 = EI

CE
HorizonNew
Online Civil
Engineering
Journal and
Magazine

Step 3: Distribution factors

DAB = 0
DBA = 0.8EI/(0.8EI+EI) = 0.44
DBC = EI/(0.8EI+EI) = 0.56
DCB = EI/(EI+EI+EI) =0.33
DCD = EI/(EI+EI+EI) = 0.33
DCE = EI/(EI+EI+EI) = 0.33
DDC = 0
DEC = 0

(all values in kNm)


(span moment in blue colour, support moment in
red colour
Figure 8-2(b)

Profile of
Civil
EngineersNew
Get to know
about
distinguished
civil engineers

Calculation for moment distribution is shown in a systematic way in a tabular form.


Each joint is balanced by distributing the unbalanced moment into the connected
members in proportion of distribution factors. These calculation steps for
balancing of joints are shown with grey colour. The carry-over moments (half of
the balancing moment at near end) are applied on the far end, e.g. carry-over half
of the balancing moment from BC to CB. Resultant bending moment diagram in
figure 8-2(b) is plotted by superposing the span moment diagram and support
moment diagram.
Note: Please use our bending moment calculator to get the values of span
moments

Table for Moment Distribution


Joints
A
Members
AB
Distribution
0
Factors
Initial Fixed-end
0
Moments
Balancing
Carry-over

1.47

Balancing
Carry-over

-0.121

Balancing
Carry-over

0.07

Balancing
Carry-over
Final
End-Moments
Like

Share

-0.006
1.41
1K

Tweet
+7 Recommend this on Google

B
BA BC

CB CE

0.44 0.56

0.33 0.33

0 -6.67

+6.67 0

6.67x0.44 6.67x0.56

+3.33x0.33 +3.33x0.33

2.94 3.74
0.555

1.11 1.11
1.87

-0.555x0.44 -0.555x0.56

-1.87x0.33 -1.87x0.33

-0.242 -0.312
-0.31

-0.62 -0.62
-0.156

0.31x0.44 0.31x0.56

0.156x0.33 0.l56x0.33

0.14 0.17
0.026

0.052 0.052
0.09

-0.026x0.44 -0.026x0.56

-0.09x0.33 -0.09x0.33

CD

D
DC

E
EC

0.33

-10

+10

0.555

0.555

-0.31

-0.31

0.026

0.026

-0.015

-0.015

10.26

0.26

+3.33x0.33

1.11
-1.87x.33

-0.62
0.156x0.33

0.052
-0.09x0.33

-0.011 -0.015
-0.015

-0.03 -0.03
-0.007

-0.03

2.83 -2.83

8.98 0.51

-9.49

Problem 8-1 for solving indeterminate


beam by moment distribution method
For other problems please visit our
Problem SolverNew

3/25/2016 12:53 AM

Non-sway frame - solution by moment distribution method

4 of 4

Share

http://civilengineer.webinfolist.com/str/prob82.htm

If you don't find the required information please suggest us We are


updating the website regularly.

Join the mailing list to get informed about new products or


links
Applied Mechanics

Geotechnics

Hydraulics

Structural Analysis

Transportation

Design of Structures

Land Surveying

Environmental
Engineering

Construction Materials
Engineering Graphics
Disaster Management
Skyscrapers

Construction
Management

Research Papers

Home

Journals & Magazines

Tell-a-friend

Quantity Surveying

Construction
Companies

Join us

Irrigation Engineering

Construction Disputes

Offshore Engineering

Construction Technology Consultants

Job Search

Book Store
Construction Equipments Professional Societies Scholarships
Computer Software
Colleges &
Conferences

Universities

Photo Album

Learning Support

Last updated on Sunday December 02, 2012

3/25/2016 12:53 AM

Vous aimerez peut-être aussi