Académique Documents
Professionnel Documents
Culture Documents
GE
MOE
TBC
0-740078-00-C-10102_Rev 2
(Status: RCN)
necessary .
0-740078-00-G-00101_Rev 2
OK. confirmed
(Status: RCN)
ok
Item-1:
Location of equipment in Electrical and
Control Building will be as follows:
Ground Floor:
Electrical Switchgear Room:
- 6,6 kV Switchgear Panels
- 0,4 kV LV Switchgear and MCC
Panels
- The protection and metering
system panels for Generator Step-Up
and
Unit Auxiliary Transformers
- DC UPS and Distribution sytem
panels of BOP systems
Battery Room:
- Battery groups and battery
switches of BOP DC-UPS systems
Item 2:
1- Will
orientation of units
&building within the site )
0-740078-00-G-00103_Rev 2
Power Plant Orientation Concept
Plan (Status: RNC)
ok
CLOSED
CLOSED
HOLD
CLOSED
O.K. &design a main road from the
entrances down to and around the
GTs. This road will be designed with
a 7.5m width.
GE Notes (1-30-12)
ITEM -1:
We
confirm H.V building is in your scope
as mentioned in
1Chapter 3 civil tabel item 99.3
2-Chapter 10 clause 10.3.5.7
3- chapter 10 "summary of main civil
work page 109"
ITEM -2:
THIS STORE BUILDING FOR YOUR
NEEDS DURING PLANT
CONSTRUCTION AS MENTIONED ON
CHAPTER 3 CIVIL TABEL ITEM (99.6)
AND WILL BE TURNED OVERTO MOE
AFTER THE COMPLETION OF PROJECT
(CHAPTER10 CLAUSE 10.3.5.2)& THIS
STORE SHOULD COMPLY WITH
DURABILITY REQUIREMENTS OF
OTHER BUILDINGS AS IT SHALL MAKE
APARTS OF THE FINAL POWER PLANT
DESIGN (CHAPTER10 PAGE 109).
HOLD
HOLD
HOLD