TBC Submittals

GE

MOE

TBC

MOE notes (26-12-2011)

TBC Comments to MOE(11 Jan.2012)

AL- Hydaria TBC Transmittal No.1

0-740078-00-C-10102_Rev 2

Add bore holes for equipment


related to future conversion to
combined cycle (e.g. HRSG,
STG). This soil data will be
necessary to share with the future
contractors for combined cycle
conversion.

Boreholes for future extension


area are excluded from our
scope. We can provide these
additional services for a fee.

TBC has given a proper consideration


for future requirements of CCGT per GE
specifications and contract clause
10.3.4.i. based on the geotechnical soil
information there is no issues on the
site that would impact any future CCTG
we believe these B.H are necessary installation
to have a good consideration of the
requirements for future CCGT
conversion ( clause 10.3.4.1.i )

Bore Hole and Electrical Resistivity


Test Location Plan

1 .At least (6 B.H.)


should be 50 m depth
The present number and depth
( 4 B.H. for units area &
of bore holes are enough for our
2 B.H for tanks farm ) to
design purposes.
get a good evaluation
for the site .

(Status: RCN)

The present number and depth

from our experience & adjacent


projects which have similar soil
properties we think these B.H are
necessary .

TBC's engineer believs that present


number of bore holes and depthes are
suficient for the designe however , TBc
will review the goetechnical report and
will respond shortly

from our experience & adjacent

2- The B.H. for tanks to be


projects which have similar soil
of bore holes are enough for our
properties we think these B.H are
30 m.
design purposes.

Reviewed Comments Noted

necessary .

0-740078-00-G-00101_Rev 2

1.The design of the fuel


unloading area (number of trucks
for each type of fuel) shall be
finalized after TBC submits the
design calculations of the fuels
unloading area

We are preparing a capacity


calculation document for
unloading and storage system
and will submit this shortly.

Power Plant - Plot Plan

2. GE advise minimum Radius of


25 m

OK. confirmed

(Status: RCN)

Reviewed Comments Noted

3. Please ensure that all main


roads are not less than 7.5 meters

GEs concept layout indicates


6.0 meters width for all plant
roads with some exceptions in
the truck unloading area. We
will kept the same design. We
will include in our design a main

The document will be submitted in


Week-2, 2012.

ok

OK. This will be considered in next


revision of plant layout.

1-GE layout is conceptual.


2 - in
addition to what you mentioned we
believe that the roads around tanks MOE states that the GE layout is
farm is main road.
conceptual , however , it is the bases of
our bid price in conjunction with
Contract clause 10.3.5.9 which stated
that ,the main access road to the plant
will connect to an existing public , and
will be paved . All other roads inside the
plant connecting different areas of the
Power island will be gravel. The typical

3. Please ensure that all main


roads are not less than 7.5 meters
wide

GEs concept layout indicates


6.0 meters width for all plant
roads with some exceptions in
the truck unloading area. We
will kept the same design. We
will include in our design a main
road from the entrance down to
and around the GTs. This road
will be designed with a 7.5m
width.

that ,the main access road to the plant


will connect to an existing public , and
will be paved . All other roads inside the
plant connecting different areas of the
Power island will be gravel. The typical
plant gravel section shall be designed
to support the design load stated above
. TBC will provide 7.5 m Concrete
roads around CCGTs and the tanks ,
all other roads will be 6.0 m and
even though it is not required we
will provide concrete in-lieu of
gravel.

TBC has followed the requirements of


the tender documents the conceptual
drawing are only indicative of the
general layout or requirement . TBC has
engineered a system that meet all the
requirements in the contract and
provides for a (5) days continuous
operation period ...please advice if you
have any comments on our
calculations ...please identify what
problems there are with our approach

TBC feels that they have met


the requirements of the
contract, especially we have
considered the following and
have provided a system that
meets the HFO (5) day
operation requirement.

The Plant is a Tri-Fuel Plant with


HFO, LDO and Natural GAS and
as result will be highly reliable .

We have considered the


requirement in Article-6.1.2.3.1
(page 12) of Chapter-6 of
Contact document, where it is
specified as follows:

Fuel oil storage tanks with


heating system: storage tanks
total capacity of 5 days total
plant consumption two Raw
Heavy Oil, three treated Heavy
Oil tanks and two certified
tank located in a bunded area.

HFO consumption at -5C ambient


temperature as given in Section VI, Ch. 6,
Annex-01 of Contract document:
Mass flow for each gas turbine (GE 9E) :
32000 kg/h
Average density of HFO : 0,95 kg/l
Volume flow for each gas turbine (GE 9E) :
32000 / 950 = 33,7 m3/h
Volume flow for each power block (2*GTG) :
33,7 m3/h * 2 = 67,37 m3/h

4. HFO Tank capacity do not


match with GE conceptual
Layout.

You have to follow the tender


documents regarding the tanks size.

Volume flow for two power blocks (4*GTG) :


67,37 m3/h * 2 = 134,7 m3/h

Total net capacity of HFO storage tanks


(2 x Raw HFO Tanks + 2 x Certification Tanks
+ 3 x Treated HFO Tanks)

4. HFO Tank capacity do not


match with GE conceptual
Layout.

according to Section VI, Ch. 6, 6.1.2.3.1 will


be equal to

5 days of GT power plant consumption: :


134,7 * 24 * 5 = 16164 m3

However, certification tanks are not included


in this calculation since these may contain
fuel that is out of specification.

Therefore, total net volume two Raw


HFO Tanks and three Treated HFO tanks
should be 16164 m3, at least.
Treated HFO Tanks (3 Ea):
To be able to ensure the 24 hours settlement
of the fuel oil before use (according to the
specification
GEK 28163), three (3) tanks of treated HFO
are necessary: One tank in filling, one tank
in settlement
and one tank is supplying to the GT.
Therefore, net volume of each tank should
be enough for 24 hours
of plant consumption:
Net volume of each Treated HFO tank :
134,7 * 24 = 3233 m3

Total net volume of three Treated HFO


tanks : 3233 * 3 = 9699 m3
Raw HFO Tanks (2 Ea):
The filling flow of the tank from unloading
station shall be designed for a continuous
operation of the FOTP

including the 24 hours settling time before


use.
Net volume of each Raw HFO tank :
134,7 * 24 = 3233 m3
Total net volume of three Raw HFO tanks :
3233 * 2 = 6466 m3

Total net volume of Raw and Treated


HFO Tanks is : 6466 + 9699 = 16165 m3

which is equal to 5 days of plant


consumption.

You have to follow the tender


documents regarding the tanks size.

Item-1:
Location of equipment in Electrical and
Control Building will be as follows:
Ground Floor:
Electrical Switchgear Room:
- 6,6 kV Switchgear Panels
- 0,4 kV LV Switchgear and MCC
Panels
- The protection and metering
system panels for Generator Step-Up
and
Unit Auxiliary Transformers
- DC UPS and Distribution sytem
panels of BOP systems
Battery Room:
- Battery groups and battery
switches of BOP DC-UPS systems

First of all HV building is in


switchyard scope, not in power
plant scope. However, MV/LV
Electrical Building and Central
Control Building are shown as
separate buildings in GEs
concept layout, we combined
Electrical building and Control
building into a single building.
This is a two-storey building
plus a basement. Basement will
be formed by constructing a
steel mezzanine floor.

Item 2:

5. The building shown on the GA


do not correlate to the buildings
included in Chapter 3 of the
contract or on the coneptual
layout. For example, the HV
building is missing. Please
review the contract requirements
and ensure all requirements are
shown on the GA.. For example

Occupied area of the building is


14.4 meters by 36 meters.
Basement shall be constructed
because of the easier entrance
of the cables to the panel
rooms. Clear height of cable
basement will be 2.45 meters.

1- Will

you please clarify where is the


(electrical equipment protection ,
metering panels for main
transformer & generators ) will be
installed . 2- the store building &
guard towers are missing

The basement contains the


cable room and store room (1).
The ground floor contains MV/LV
switchgear room, store room (1)
and battery room. The first floor
contains the central control
room for the overall power
plant, control panel room (CPR),
and office rooms.

The store building is not


included in our bid according to the fact
mentioned in Section VI_Chapter
10_Civil Works , page 108- summry of
main civil works which states that
Prefabricated steel Store Building for
sites had already being purchased and
ordered by MoE and consequently shall
not be supplied by the Contractor.
The Gaurd
Towers will be considerd in our next
revison of layout

Structure shall be reinforced


concrete. Building walls shall be
hollow block wall with plaster
finish and paint.

We submitted another drawing


titled Power Plant Orientation
Concept Plan (dwg. no. 0
740078 00 G 001 03) to show
the complete 600 x 900 m site
boundary together with
orientation of 500 x 500 m
plant area. This drawing is also
referenced in general note-1 of
1. The layout should show plant layout drawing. S1, S2, S3
the site boundary (600*900) and S4 plant boundary corner
m according to the site
points are shown in both
1- the site boundry & plant boundary
corners coordinates attached drawings together with their
have the same meaning
2 to site handing over
coordinates.
the praiemeter fence is for site
certificate (i.e the points S1 ,
boundary (600 * 900)m
{ clause 3.4.3.1 table 3 ( civil work )
S2 , S3 & S4 are reference
item 91 }
points to show the

orientation of units
&building within the site )

TBC's plant site is not the same as


MOE's site. It can be seen in Tender
Documnets Section VI_Chapter
3_Annex 08_Conceptual
Drawings/site.jpg , that MOE's site is
defined as (1000m X 900m) and TBC's
Plant site is defined as (500m x 400 m)
this is further confirmed by GE drawing
No 144E 1348 / ENGINEERING
DOCUMENTATION /CONCEPTUAL/PLANT
LAYOUT. This drawing has a defined
fence aera of(500m X 500m),
accordingly TBC consided (500mx500m)
as its plant site area and as inculed as
the basis in our priced offer

{ clause 3.4.3.1 table 3 ( civil work )


item 91 }

S2 , S3 & S4 are reference


points to show the
orientation of units
&building within the site )
We preferred not to show site
boundary and plant boundary in
the same drawing since this
would necessitate a smaller
scale (probably 1/1500) to fit
everything in A0 sheet making it
difficult to see plant layout
details on paper.

2. The location of tie-in


This is under review and will
points should be located on
advise.
the site boundary

3. The 2 water wells should


be backfilled and
landscaped in proper
manner

These two water wells will be


backed filled by utilizing soil
removed from the foundations
from the site. However, no
structures will be allowed and a
fence will be constructed.

this will addressed by a separate letter

Using soil removed from the


foundation from the site will be
subjected to Approval after
submission the soil investigation
report.

4. The F.F.L will be decided


OK-Confirmed
after finishing the
topography study

0-740078-00-G-00103_Rev 2
Power Plant Orientation Concept
Plan (Status: RNC)

Reviewed Comments Noted

Plant Elevation is under review


and will be advised shortly

ok

TBC explained in our previous


answer,water well areas will be
provided with security fencing and
construction of structures will not be
allowed on these locations. Proposed
backfilling is for security reasons only
and it is not going to be a structural
backfill. Therefore, use of excavated
material should be acceptable for such
backfilling. In any case, there will be
some degree of compaction during
backfilling to provide a stable ground
surface.

MOE notes (19-1-2012)

O.K. & We're strongly


recommended that (FUTURE
EXTENSION REQUIREMENT) NOT
AFFECTED BY YOUR UTILTIES
WORKS

CLOSED

CLOSED

HOLD

CLOSED
O.K. &design a main road from the
entrances down to and around the
GTs. This road will be designed with
a 7.5m width.

GE Notes (1-30-12)

1-Raw HFO tanks size should be


enough for the plant for 5 days as
mentioned in chapter 6 annex01
clause 4 (i.e. 2tanks*8100m3)2Certified HFO tank are O.K 3Treated Certified HFO tank are O.K

The GE Concept Layout drawing for AL


Hydaria does call out 27.45m Dia x
12.8m H tanks for the RAW HDO and
1-Raw HFO tanks size should be the LDO storage tanks which is
enough for the plant for 5 days as approximately a storage volume of
mentioned in chapter 6 annex01 7,564m^3 each whereas, based on 4
clause 4 (i.e. 2tanks*8100m3)2- GT's consuming a fuel flow of
32,000kg/hr each, the storage volume
Certified HFO tank are O.K 3of the tanks would be 7,680m^3 each.
Treated Certified HFO tank are O.K Therefore with the EPC planning on
supplying tanks with a volume of
9,035m^3 each, it appears that the
technical requirements of the contact
for a 5-day operating flow storage
volume are being met.

ITEM -1:
We
confirm H.V building is in your scope
as mentioned in
1Chapter 3 civil tabel item 99.3
2-Chapter 10 clause 10.3.5.7
3- chapter 10 "summary of main civil
work page 109"
ITEM -2:
THIS STORE BUILDING FOR YOUR
NEEDS DURING PLANT
CONSTRUCTION AS MENTIONED ON
CHAPTER 3 CIVIL TABEL ITEM (99.6)
AND WILL BE TURNED OVERTO MOE
AFTER THE COMPLETION OF PROJECT
(CHAPTER10 CLAUSE 10.3.5.2)& THIS
STORE SHOULD COMPLY WITH
DURABILITY REQUIREMENTS OF
OTHER BUILDINGS AS IT SHALL MAKE
APARTS OF THE FINAL POWER PLANT
DESIGN (CHAPTER10 PAGE 109).

GUARD TOWERS - CLOSED


MOE SITE IS (1000M*900M)
CONTAIN TWO PROJECTS "GAS
POWER PLANT 600m*900m
&400KV substation". It's crisatl
clear maitioned in tender
document (invintation letter)
THAT THE THE SITE DIMENSION IS
(600M*900M)

Ground floor swgr. room shall be for


6.6kV and 0.4kV swgrs. 0.4kV MCCs
and panels shall be in another room.
The protection and metering system
panels of BOP systems shall be in a
room at the same level as the control
room. Battery room shall be in gr. floor
for batteries only, as it generates
corrosive gas. DC-UPS and Distribution
system panels of BOP system shall be
in control room floor, in adjascent room
to relay room. All these rooms shall
have at least two doors and facility for
equipment removal at a later date.

HOLD

THIS ARE SHOULD BE BACK FILLED


ACCORDING SPECIFICATIONS
TAKING IN CONSIDERATION THE
PRABOLITY OF USING IT FOR
FUTURE EXTENSION

HOLD
HOLD