1
THE TASKS, THE DESIGN DATA, AND ANALYSIS RESULTS
1.1
1.

The Tasks of The Case Study


Design the RC-Frame structure in figure 1 that is subjected to a static load F static only:
a.

2.

calculate both, reinforcement amounts with respect to bending as well as shear


effects and provide an appropiate reinforcement layout.
Design the RC-Frame structure in figure 1 that is subjected to a static load F dynamic :
a.

separate axial and shear quotas from a general acceleration wave induced by an
impact force Fdynamic ;

b.

3.

calculate the dynamic response of the RC-frame structure:


- in first step, discretize the frame into number of finite beam elements;
- modify a general beam element to ensure a transmission of compression and
shear waves separately;
- compute structural response by means of acceleration development along
system axis
- shear waves shall be analyzed with respect to pure bending and shear effects.
The finite element program InfoCAD has to be used for calculation purposes

1.1.1

The design of the RC-Frame structure subjected to s static load Fstatic only

Since the F-static is inclined to y-axis, thus, the force could be devided into 2 parts,
Fy and Fz, where:
Fy
=
707.1 x cos
45
=
499.995205 taken
Fz
=
707.1 x sin
45
=
499.995205 taken

The other load case to be considered in the structure analysis is self weight load of the members.
The self weight will be a uniform load with the distribution of the load can be calculated as:
for beam and column in z directions:
qz
=
1.35 x
0.4 x
0.5 x
25 kN/m3
=
6.75

1.1.2

The cross sections properties of the elements


The structures devided into 3 elements as follows.
2

el. 2

el.3
3

element-1

500.00
500.00

EL.
#

1.1.3

Dimensions
width depth

Cross Section
Area

Inertia
Moment-x

Inertia
Moment-y

m
0.4

m
0.5

m2
0.20

m4
0.0041666667

m4
0.0026666667

0.4

0.5

0.20

0.0041666667

0.0026666667

0.4

0.5

0.20

0.0041666667

0.0026666667

The design result using InfoCAD


After doing input data for InfoCAD and run the static analysis for the static forces
according the forces as described above, we got the internal forces for each element.
The internal forces could be described at the next page.
a.

Element 1
M-i
=
M-j
=
N
=
M-i
M-j
N

b.

Element 2
M-i
=
M-j
=
Qz
=
M-i
M-j
Qz
N

c.

=
=
=

=
=
=
=

Element 3
M-i
=
M-j
=
Qz
=
M-i
M-j
Qz
N

=
=
=
=

Momen at the end of column, at the ground support


Momen at the end of column, at the joint
Normal Force
27.47 kN-m
-51.96 kN-m
-284.64 kN-m

Momen at the joint of column - beam


Momen at the mid-span of entire beam
Shear force
-51.96 kN-m
161.52 kN-m
284.64 kN
-26.48 kN

Momen at the joint of beam el. 2 - beam el.3


Momen at the end of entire beam
Shear force
161.52 kN-m
0 kN-m
-215.36 kN
473.52 kN

CHAPTER
2
THE CROSS SECTION DESIGN
DUE TO F-STATIC ONLY
2.1

The Design Results for Beam (Element 2 and 3)


For the load case 1, the design results could be plotted as the following diagrams
The bending moment diagram for beam:
-51.96

kN-m

161.52

kN-m

The normal force diagram:


-26.48
kN
(compression)

The shear force diagram


284.64

kN

For the load case 2, the design results could be plotted as the following diagrams
The bending moment diagram for beam:
-0.43

kN-m

1.69
The normal force diagram (neglected)
-0.21
kN
(compression)

The shear force diagram


5.35 kN

kN-m

2.2

The Beam Cross Section Bending Design Due To F-static Only


The cross section design will be devided into 2 parts, which are:
- the cross section design of the mid-span, and
- the cross section design of the end-span.

2.2.1

The cross section design of mid span of beam

2.2.1.1

MEd

161.52 kN-m
1.69 kN-m
163.21 kN-m

concrete cover

30 mm

NEd

473.52 kN

Bar-diameter
Stirrup-dia.

=
=

19 mm
8 mm

0.5 m

500 mm

d1
d
zs1
bw

=
=
=
=

0.057015 m
0.442985 m
0.2214925 m
0.4 m

=
=
=
=

57.015 mm
442.985 mm
221.4925 mm
400 mm

MEds

=
=
=

MEd

- NEd
.
zs1
163.21 473.52 .
58.329 kN-m

0.1287063896

0.2214925

Design of bending reinforcement

The following calculations show the reinforcement bar for bending without compressive
reinforcement. For Simplicity, all the calculation will be described in a table. The symbols
used in the calculation, could be explained in the following list.
c2
s1

=
=

ultimate compressive strain of concrete (maximum = -3,5 )


ultimate strain of steel (maximum = 25 )
c2
s1

2
3 . c2

- 1/2 .

c2

+
+

---------------------> for : -2,0 c2 -3,5

R
(

c2

c2 . c2
6

) ---> for :

0 c2 -2,0

=
=

. d
3 . c2 . c2 + 4 . c2 + 2
6 . c2 . c2 + 4 . c2

---> for : -2,0 c2 -3,5

ka
c2 + 8
4 . ( c2 + 6 )
ka . x
d - a
bw . x . R . fcd

---------------------> for :

a
=
z
=
Fcd
=
MRd
=
Fcd . z
design without compressive reinforcement
Iterc2
s1

ation
in
in
1

-3.500
Fcd
=

2.175
0.4

-2.500
Fcd
=

20.000
0.4

-2.000
Fcd
=

25.000
0.4

0 c2 -2,0

x
m

ka

a
m

0.6167
0.8095
0.2732
0.273206608 . 0.80952381 .

0.3367
30

0.0920
= 2.654007048
= 2654.007048

0.1111
0.7333
0.0492
0.049220556 . 0.733333333 .

0.2867
30

0.0741
0.6667
0.0328
0.032813704 . 0.666666667 .

0.2500
30

0.0082
=
0.26250963
= 262.5096296

0.0495
0.5096
0.0219
0.021919972 . 0.509580156 .

0.3564
30

0.0078
= 0.134039791
= 134.0397909

=
=

0.0141
0.433140889
433.1408889

After several trials..., we got:


4

-1.301
Fcd
=

25.000
0.4

As1

1
s1d

1
435000

NEd

58.33041357 +
0.4352

1396.689 mm2

7 16

use

473.52

0.0013966892 m2

2.2.2

MEds

16

1407.43 mm2

The cross section design of end-span of beam


MEd

NEd

-51.96 kN-m
-0.43 kN-m
-52.39 kN-m
-26.48 kN

concrete cover

30 mm

Bar-diameter

19 mm

Stirrup-dia.
h
d1
d
zs1
bw

=
=
=
=
=

0.5 m
0.0475 m
0.4525 m
0.22625 m
0.4 m

=
=
=
=
=

8 mm

500 mm
47.5 mm
452.5 mm
226.25 mm
400 mm

= MEd
- NEd
.
zs1
=
-52.39 -26.48
.
=
-46.399 kN-m
design without compressive reinforcement
Iterc2
s1

R
ation
in
in

0.1049723757

MEds

-3.500
Fcd
=

2.175
0.4

-2.500
Fcd
=
-2.000
Fcd
=

0.22625

x
m

ka

0.6167
0.8095
0.2791
0.27907489 . 0.80952381 .

0.3367
30

20.000
0.4

0.1111
0.7333
0.0492
0.049220556 . 0.733333333 .

0.2867
30

25.000
0.4

0.0741
0.6667
0.0328
0.032813704 . 0.666666667 .

0.2500
30

0.0435
0.4605
0.0193
0.019254322 . 0.460458667 .

0.3528
30

( MEds
z
.
(

a
m
0.0940
= 2.711013216
= 2711.013216
=
=

0.0141
0.433140889
433.1408889

=
=

0.0082
0.26250963
262.5096296

After several trials..., we got:


4

-1.136
Fcd
=

25.000
0.4

As1

1
s1d

=
=
=
=

402.12 mm2

then to check against the minimum reinforcement:


As,min
= 0,26 . fctm . bt . d /fyk
=

NEd

1
46.40641024 +
-26.48
435000
0.4362
0.0001837008 m2
183.701 mm2
=
1
16

2 16

use

0.26

30 .

20.4461687 mm2

------> fctm

452.5
500
but not less than

0,30 . fctk 2/3

=
=

0.0013
0.0013

2.89647 .

(the limitation is verified succesfully!!)

2.3
a.

0.0068
= 0.106389833
= 106.3898333

The Beam Cross Section Shear Design Due To F-static Only


design of shear according to left hand side diagram
VR,d
=
284.64
+
5.35
NEd
=
-26.48 kN

289.99

kN

=
=
. bt . d
.
400

0.3
2.89647

cd

=
=

VRd,c

0.435 m
-0.02648
=
-0.1324 MPa
0.20
[ cj . 0,48 . 1 . fck^(1/3) . [ 1 + 1,2 . (cd/fcd)] ] bw . Z

0.5

0.48

.
0.43517
0.129122 MN
0.85
x
30
1.5

1.0

30 1/3

.[

1 +

1.2

0.4

=
=

fcd

=
=

129.122
17.0

kN

Calculation of cot :
cot

1,2 - 1,4 . cd/fvd


1 - VRd,c/VEd

1.2
0.58

cot

1.4

-0.1324
17.0
129.122
289.99

=
1-

VRd,max

=
asw

=
=
=

0.4

0.43517 .

0.840368 MN

cot 2
0.75 .

17.0

840.3675148 kN

VEd
fywd . Z . (cot + cot ) . Sin
0.28464
435 .
0.435 . ( 2.182844703 +
0) .
1.0
0.0006888466 m2/m
= 688.8466025 mm2/m

alternatives of shear reinforcement:


6

sw
(mm)

10

100

565.4866776

1005.309649

1570.796327

150

376.9911184

670.2064328

1047.197551

200

282.7433388

502.6548246

785.398163

taken -->

2.182844703

= 24.61335835 deg.
bw . z . c . fcd .
cot + cot
1+

10 -

200 mm

2.183
+
1+
2.183
289.99 kN

Asw

sw . bw . Sin

200

check against the minimum shear reinforcement:


w - min
=
0.08 .
SQRT(

785.40
400 .

30

0.009817477

0.0010073059 <

0.009817477

435

2.4

The Design Results for Column (Element 1)

The design results, hence, internal forces, could be described in the following diagrams.
a. The bending moment diagram for column
Load case 1
Load case 2
-0,43 kN-m
-51,96 kN-m

b.

27,47 kN-m
The normal forces
Load case 1
-5,35 kN

0,21 kN-m
Load case 2
-284,64 kN

c.

-25,6 kN
The shear force
Load case 1
-26,48 kN

Load case 2
-0,21 kN

2.4.1 Calculation of the effective length of column,


for the unbraced member, the effective length should be taken as the larger value between
these two formulas
lo

l . SQRT(1 + 10 . k1 . k2/(k1 + k2))

or
lo

l . (1 + k1/(1 + k1)) . (1 + k2/(1 + k2))

where,
kn

(I / l) column
2 . (I / l) beam

the 'n' shows the respective end of column, in our case, we take k1 as the stiffness at the top
of the column, and k2 as the stiffness at the bottom, here k2 = 0.
Icolumn

(1/12)

0.4

0.5

0.5

0.5

0.0041666667

Ibeam

(1/12)

0.4

0.5

0.5

0.5

0.0041666667

k1

0.004166667 /
3.00
2.
0.004166667 /

lo

3.00

SQRT(

or
lo

3.00

thus, the effective length is taken as

=
1.5
1+

1+

0.25

10 .
0.25
=

0.25

/(

3.60

0/
0.25

))

0.25
.

2.4.2 Checking the slenderness of the column


Eurocode 2 states that second order effects may be ignored if they are less than 10% of the first
order effects. As an alternative, if the slenderness (l) is less than the slenderness limit (llim), then

=
=

second order effects may be ignored.


Slenderness, = lo/i where i = radius of gyration and slenderness limit.
lim

20ABC
SQRT(n)

15.4C
SQRT(n)

where
1/(1+0.2 ef)
(if ef is not known, A = 0.7 may be used)
A
=
B
= (if , reinforcement ratio, is not known, B = 1.1 may be used)
(if rm is not known, C = 0.7 may be used see below)
C
= 1.7 rm
n
= NEd / (Ac fcd)
rm = M01/M02
M01, M02 are the first order end moments, |M02| |M01|
M01
= Min {|Mtop|, |Mbottom|} + ei NEd
M02
= Max {|Mtop|, |Mbottom|} + ei NEd
ei
= Max {lo/400, h/30, 20} (units to be in millimetres).

ei

-1 =

ei

-2 =

3600
400
500
30

=
=

mm

16.6667 mm

first, we calculate the slenderness limit for this column.


NEd
=
-284.64 +
-25.6
=
M2
=
-51.96
+
-0.43
=
M1
=
27.47
+
0.21
=
M02
M01

=
=

-52.390
27.680

+
+

-310.240
-310.240

rm

-0.36650351

C
n

=
=

21.475
-58.595
1.7 0.31024

=
lim

-0.36650351
/(
0.4 x

.
.

-310.240 kN
-52.390 kN
27.680 kN
0.020
0.020

=
0.5

=
=

2.0665
x
30
1.5

20 mm

-0.31024 MN

-58.595
21.475

kN-m
kN-m

0.07756
20 .
0.7 .
1.1
SQRT(
0.07756 )

2.067

should be less or equal to:


=

ei

taken

15.4 .
2.067
SQRT(
0.07756 )

114.2715106

114.271510562

the slenderness, can be calculated as:

=
=

3.46
3.46

.
.

lo
3.60

/
/

h
0.5

24.912

thus, we can conclude that the column is not slender, and the M Ed could be taken equal to M02
(second order calculation should not be taken as consideration)
M Ed
= M 02
=
-58.595 kN-m
2.4.3 Design of longitudinal reinforcements
The design of longitudinal reinforcement can be proceeded by the table which provided
in the eurocode.
d2
h
d2/h

=
=
=

47.50 mm
500.00 mm
0.10

M
b.h.h.fck

N
b.h.fck

0.4

0.4

from the diagram, thus we get:


As.fyk
=
b.h.fck

0.0585948
0.5 .
0.5

0.31024
0.5 .

0.0195316

0.051706667

30

30

In this case, we take the minimum for the longitudinal reinforcement:


NEd
As,min
=
0.1 x
>=
0,002 Ac
fyd
=

0.1

0.31024
500
1.15

7.1355E-005 m2

=
=
=

0.002
.
400
400.00 mm2

71.3552

mm2

should be larger or equal to:

500

if we use reinforcement bar of diameter 16 mm, then we get:


=
400.00 mm2
=
2

16

if we use 4 reinforcement bars, thus we should check the requiring for the minimum
longitudinal bar spacing, which are:
for the b direction we will get the spacing of the bars as:
400 50 50 =
300 mm

>
<
>

240 mm
----> not ok
20 .
16
=
60% .
400
=

320
240

for the h direction we will get the spacing of the bars as:
500 50 50 =
400 mm

>
>
>

240 mm
----> not ok
20 .
16
=
60% .
400
=

320
240

thus we use 8 times diameter 16 mm


2.4.4 The shear reinforcements of column
Firstly, we check the shear strength of concrete without shear reinforcements.
VRd,c

[0,12 . k . (100 . 1. fck)^(1/3)].bw . d

VRd,c

[0,05 . k^(3/2) . fck^(1/2) ].bw. d

, this value should not less than:

where:
k =
1 =

( 1 + SQRT(200/d)) 2,0
As1 / (bw . d) 0,02
As1 is the area of tensile reinforcement

1+

SQRT(

0.25
400

200

.
.

450.00

.
450

16

16

1.666666667

0.003351032

VRd,c

=
=
=

0.05 .
1.66667 ^ (
1.5 ) . 30 ^
0.5 .
400
.
450
106066.0172 N
106.0660172 kN
thus, we can conclude that we do not need shear reinforcement
for this column
In that case, we use the minimum shear reinforcement, which is:
0.001007306 (already calculated above, in the design shear for the
beam)

Asw

=
=

0.001007306 .
200
80.58446823 mm2

we use:
alternatives of shear reinforcement:
6

sw
(mm)
200

282.743339

we use, 6 - 200 mm

400

502.6548246

10

785.3981634

The figure bellow shows us the reinforcement detail for beam and column a

due to F-static only. The detailed reinforcing for beam could be found in the

SIS RESULTS
B

0,25Lo

0,5Lo

A - cross section:
2

50 cm

40 cm
stirrup :

500.00 kN
500.00 kN

10

200

B - cross section:
2

50 cm

kN/m

40 cm
stirrup :

10

200

16
stirrup :

(kN-m)
(kN-m)
(N)

(kN-m)
(kN-m)
(N)

(kN-m)
(kN-m)
(N)

473.52
(tension)

kN

-215.36

kN

-4.79

kN

-3,5

2 -2,0

-3,5

2 -2,0

z
m

MRd

0.3510
2.654007048 MN
2654.007048 kN

931.521591

0.4289
0.433140889 MN
433.1408889 kN

185.763345

0.4348
0.26250963 MN
262.5096296 kN

114.13435

0.4352
0.134039791 MN
134.0397909 kN

58.330

z
m

MRd

0.3585
2.711013216 MN
2711.013216 kN

971.968189

0.4289
0.433140889 MN
433.1408889 kN

185.763345

0.4348
0.26250963 MN
262.5096296 kN

114.13435

0.4362
0.106389833 MN
106.3898333 kN

46.40641

0.3 .
2.89647

452.5 =

30

2/3

235.3

-0.1324
30

3.0

0
.

2.183
---> OK

].

0.009817477

0.009817477 --->

OK

0.0041666667 m4
0.0041666667 m4
0.25

3.00

3.60

larger or equal to:

mm
mm

gn shear for the

mm
mm

or beam and column after analysis

m could be found in the Appendix E.


B

0,25Lo
B

16

16
200 mm

16

16
200 mm

200 mm

D
NAMA ELEMENT
Element-1
Element-2
Element-3
Element-4
Element-5
Element-6
Element-7
Element-8
Element-9
Element-10
Element-11
Element-12
Element-13
Element-14
Element-15
Element-16
Element-17
Element-18
Element-19
Element-20
Element-21
Element-22
Element-23
Element-24
Element-25

(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(

Kolom
Kolom
Kolom
Kolom
Kolom
Kolom
Kolom
Kolom
Kolom
Kolom
Balok
Balok
Balok
Balok
Balok
Balok
Balok
Balok
Balok
Balok
Kolom
Kolom
Kolom
Kolom
Kolom

)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)

N1
kN
78.055
141.662
372.358
464.865
246.218
236.765
379.813
236.275
273.832
80.914
17.055
9.376
-9.415
-27.686
-27.686
0.823
0.823
2.441
8.157
8.157
38.065
37.926
197.071
218.395
70.011

R1
kN
-1.180
-0.832
-5.116
-3.035
4.113
-5.583
-14.769
2.286
3.777
22.625
68.516
35.472
29.476
81.551
-0.525
68.763
1.631
29.658
61.411
4.390
-1.180
-10.246
-23.387
25.474
5.731

M1
kN-m
-1.241
-2.392
-10.179
0.222
13.318
-4.472
-9.924
-12.701
9.223
2.562
49.299
38.604
24.976
101.224
-60.829
92.045
-48.744
35.119
49.584
-32.667
4.955
-22.794
-52.290
70.459
34.577

N2
kN
-38.065
-67.402
-311.097
-389.844
-165.171
-155.718
-304.791
-155.228
-190.666
-40.925
-17.055
-36.952
9.415
27.686
27.686
-0.823
-0.823
-2.441
-8.157
-8.157
-17.798
-8.843
-160.716
-167.499
-19.115

R2
kN
1.180
0.832
5.116
3.035
-4.113
5.583
14.769
-2.286
-3.777
-22.625
77.661
28.659
32.475
0.525
102.685
-1.631
65.502
26.848
-4.390
52.631
1.180
10.246
23.387
-25.474
-5.731

M2
kN-m
-4.955
-2.182
-17.960
-16.913
9.302
-26.237
-36.598
18.074
2.674
20.063
-72.162
-20.063
-30.974
60.829
-145.591
48.744
-78.998
-30.904
32.667
-27.634
-9.970
-18.192
-64.646
107.856
5.541

D
NAMA ELEMENT
Element-26
Element-27
Element-28
Element-29
Element-30
Element-31
Element-32
Element-33
Element-34
Element-35
Element-36
Element-37
Element-38
Element-39
Element-40
Element-41

(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(

Kolom
Kolom
Kolom
Balok
Kolom
Balok
Balok
Kolom
Kolom
Balok
Balok
Balok
Balok
Balok
Balok
Balok

)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)

N1
kN
67.459
102.597
84.122
1.180
17.868
11.427
9.347
153.769
33.300
34.814
34.814
9.340
9.340
3.609
3.477
3.477

R1
kN
0.132
-5.870
9.347
17.798
-11.427
10.597
40.214
-34.814
3.477
139.228
-2.630
23.011
5.467
7.038
10.443
-0.522

M1
kN-m
7.556
9.560
30.885
9.970
1.339
12.765
34.124
70.110
-1.083
139.738
-133.457
52.923
-4.031
3.649
8.902
-3.499

N2
kN
-16.563
-73.514
-37.952
-1.180
-10.597
-11.427
-9.347
-139.228
-11.487
-34.814
-34.814
-9.340
-9.340
-3.609
-3.477
-3.477

R2
kN
-0.132
5.870
-9.347
-9.026
11.427
6.947
37.952
34.814
-3.477
2.630
144.488
-5.467
12.077
6.120
0.522
11.487

M2
kN-m
-6.630
-33.042
28.468
16.853
-12.765
-5.464
-28.468
-139.738
11.512
133.457
-160.780
4.031
-9.190
-2.272
3.499
-11.512

SDS

L
NAMA ELEMENT
Element-1
Element-2
Element-3
Element-4
Element-5
Element-6
Element-7
Element-8
Element-9
Element-10
Element-11
Element-12
Element-13
Element-14
Element-15
Element-16
Element-17
Element-18
Element-19
Element-20
Element-21
Element-22
Element-23
Element-24
Element-25

(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(

Kolom
Kolom
Kolom
Kolom
Kolom
Kolom
Kolom
Kolom
Kolom
Kolom
Balok
Balok
Balok
Balok
Balok
Balok
Balok
Balok
Balok
Balok
Kolom
Kolom
Kolom
Kolom
Kolom

N1
kN
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)

0.38
43.08
57.22
87.48
74.58
78.40
144.62
80.14
114.23
19.72
10.58
2.46
1.22
2.71
2.71
3.95
3.95
3.17
5.63
5.63
0.38
-0.44
0.12
-0.24
-0.27

R1
kN
-0.03
-1.73
-1.52
-1.27
2.37
-3.13
-10.28
0.30
5.94
9.65
48.32
18.70
14.79
19.80
1.84
37.47
1.54
18.91
39.86
3.94
-0.03
-0.51
-0.03
-0.03
1.58

M1
kN-m
0.06
-3.58
-3.21
-2.78
3.85
-6.25
-11.11
-15.81
5.72
-0.06
37.09
21.69
8.22
27.14
-16.14
53.21
-24.81
23.23
36.03
-18.72
0.20
-2.29
-1.06
-0.63
8.46

N2
kN
-0.38
-14.34
-41.05
-71.32
-53.02
-56.84
-128.46
-58.59
-92.67
-19.72
-10.58
-16.65
-1.22
-2.71
-2.71
-3.95
-3.95
-3.17
-5.63
-5.63
-0.38
0.44
-0.12
0.24
0.27

R2
kN
0.03
1.73
1.52
1.27
-2.37
3.13
10.28
-0.30
-5.94
-9.65
52.27
14.30
21.14
-1.84
34.09
-1.54
34.38
17.01
-3.94
31.99
0.03
0.51
0.03
0.03
-1.58

M2
kN-m
-0.20
-5.92
-5.15
-4.21
9.18
-10.98
-21.28
16.50
12.99
9.71
-46.98
-9.71
-20.92
16.14
-48.37
24.81
-40.87
-20.38
18.72
-16.34
-0.31
0.26
0.94
0.40
2.62

N1
kN
-109.39
-25.81
57.93
33.44
-100.69
3.27
32.78
111.95
-50.12
158.60
307.57
355.60
285.53
266.27
266.27
271.51
271.51
264.16
257.76
257.76
-109.39
66.07
1.09
35.05
-51.47

L
NAMA ELEMENT
Element-26
Element-27
Element-28
Element-29
Element-30
Element-31
Element-32
Element-33
Element-34
Element-35
Element-36
Element-37
Element-38
Element-39
Element-40
Element-41

(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(

Kolom
Kolom
Kolom
Balok
Kolom
Balok
Balok
Kolom
Kolom
Balok
Balok
Balok
Balok
Balok
Balok
Balok

)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)

N1
kN
-0.03
26.60
24.19
0.03
-0.06
0.53
5.01
0.05
0.49
0.56
0.56
0.59
0.59
-0.99
-0.32
-0.32

R1
kN
-0.67
-5.34
5.01
0.38
-0.53
-0.06
26.11
-0.56
-0.32
0.05
0.05
-0.19
-0.19
-0.46
-0.49
-0.49

M1
kN-m
-4.67
-0.16
12.29
0.31
-0.71
-0.17
24.35
-0.85
-3.16
0.27
0.06
-0.54
0.21
-1.65
-0.27
0.96

N2
kN
0.03
-26.60
-24.19
-0.03
0.06
-0.53
-5.01
-0.05
-0.49
-0.56
-0.56
-0.59
-0.59
0.99
0.32
0.32

R2
kN
0.67
5.34
-5.01
-0.38
0.53
0.06
24.19
0.56
0.32
-0.05
-0.05
0.19
0.19
0.46
0.49
0.49

M2
kN-m
0.00
-21.19
19.55
0.45
0.17
-0.09
-19.55
-0.27
2.19
-0.06
0.14
-0.21
-0.97
0.26
-0.96
-2.19

N1
kN
32.52
-3.20
29.31
-24.16
-43.32
-89.60
38.76
-42.22
26.11
195.48
195.48
142.74
142.74
101.34
51.10
51.10

0.6055746667

Eh
NAMA ELEMENT
Element-1
Element-2
Element-3
Element-4
Element-5
Element-6
Element-7
Element-8
Element-9
Element-10
Element-11
Element-12
Element-13
Element-14
Element-15
Element-16
Element-17
Element-18
Element-19
Element-20
Element-21
Element-22
Element-23
Element-24
Element-25

(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(

Kolom
Kolom
Kolom
Kolom
Kolom
Kolom
Kolom
Kolom
Kolom
Kolom
Balok
Balok
Balok
Balok
Balok
Balok
Balok
Balok
Balok
Balok
Kolom
Kolom
Kolom
Kolom
Kolom

)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)

R1
kN
24.16
34.94
56.30
47.50
48.75
56.63
-37.47
270.10
27.44
318.89
-79.17
-19.73
-91.88
-35.05
-35.05
-36.67
-36.67
-85.90
-115.15
-115.15
24.16
65.44
37.04
52.74
41.40

M1
kN-m
131.68
136.50
173.60
154.79
154.35
167.37
-6.18
349.54
56.09
257.19
-237.70
-45.68
-206.45
-134.35
5.86
-150.89
-4.20
-140.95
-231.59
56.29
4.86
150.76
159.36
190.47
169.65

Ev
N2
kN
109.39
25.81
-57.93
-33.44
100.69
-3.27
-32.78
-111.95
50.12
-158.60
-307.57
-355.60
-285.53
-266.27
-266.27
-271.51
-271.51
-264.16
-257.76
-257.76
109.39
-66.07
-1.09
-35.05
51.47

R2
kN
-24.16
-34.94
-56.30
-47.50
-48.75
-56.63
37.47
-270.10
-27.44
-318.89
79.17
19.73
91.88
35.05
35.05
36.67
36.67
85.90
115.15
115.15
-24.16
-65.44
-37.04
-52.74
-41.40

M2
kN-m
-4.86
55.69
136.08
106.48
113.78
144.12
-111.84
285.20
30.35
61.69
-158.13
-61.69
-161.09
-5.86
-146.07
4.20
-142.48
-116.75
-56.29
-344.16
97.80
111.02
25.85
178.70
120.14

N1
kN
9.45
17.16
45.10
56.30
29.82
28.68
46.00
28.62
33.17
9.80
2.07
1.14
-1.14
-3.35
-3.35
0.10
0.10
0.30
0.99
0.99
4.61
4.59
23.87
26.45
8.48

R1
kN
-0.14
-0.10
-0.62
-0.37
0.50
-0.68
-1.79
0.28
0.46
2.74
8.30
4.30
3.57
9.88
-0.06
8.33
0.20
3.59
7.44
0.53
-0.14
-1.24
-2.83
3.09
0.69

Eh
NAMA ELEMENT
Element-26
Element-27
Element-28
Element-29
Element-30
Element-31
Element-32
Element-33
Element-34
Element-35
Element-36
Element-37
Element-38
Element-39
Element-40
Element-41

(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(

Kolom
Kolom
Kolom
Balok
Kolom
Balok
Balok
Kolom
Kolom
Balok
Balok
Balok
Balok
Balok
Balok
Balok

)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)

R1
kN
50.24
12.34
38.76
-109.39
89.60
-43.32
-29.31
126.64
51.10
-42.22
-42.22
-7.17
-7.17
-58.64
-26.11
-26.11

M1
kN-m
204.22
58.96
173.46
-97.80
9.96
-79.64
-73.89
67.79
83.50
-185.49
-16.60
-26.40
2.28
-89.18
-60.76
4.52

Ev
N2
kN
-32.52
3.20
-29.31
24.16
43.32
89.60
-38.76
42.22
-26.11
-195.48
-195.48
-142.74
-142.74
-101.34
-51.10
-51.10

R2
kN
-50.24
-12.34
-38.76
109.39
-89.60
43.32
29.31
-126.64
-51.10
42.22
42.22
7.17
7.17
58.64
26.11
26.11

M2
kN-m
147.49
-9.61
72.67
-120.98
79.64
-93.64
-72.67
185.49
69.80
16.60
-152.30
-2.28
-30.96
-86.73
-4.52
-69.80

N1
kN
8.17
12.43
10.19
0.14
2.16
1.38
1.13
18.62
4.03
4.22
4.22
1.13
1.13
0.44
0.42
0.42

R1
kN
0.02
-0.71
1.13
2.16
-1.38
1.28
4.87
-4.22
0.42
16.86
-0.32
2.79
0.66
0.85
1.26
-0.06

Ev
NAMA ELEMENT
Element-1
Element-2
Element-3
Element-4
Element-5
Element-6
Element-7
Element-8
Element-9
Element-10
Element-11
Element-12
Element-13
Element-14
Element-15
Element-16
Element-17
Element-18
Element-19
Element-20
Element-21
Element-22
Element-23
Element-24
Element-25

(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(

Kolom
Kolom
Kolom
Kolom
Kolom
Kolom
Kolom
Kolom
Kolom
Kolom
Balok
Balok
Balok
Balok
Balok
Balok
Balok
Balok
Balok
Balok
Kolom
Kolom
Kolom
Kolom
Kolom

)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)

M1
kN-m
-0.15
-0.29
-1.23
0.03
1.61
-0.54
-1.20
-1.54
1.12
0.31
5.97
4.68
3.02
12.26
-7.37
11.15
-5.90
4.25
6.01
-3.96
0.60
-2.76
-6.33
8.53
4.19

N2
kN
-4.61
-8.16
-37.68
-47.22
-20.00
-18.86
-36.91
-18.80
-23.09
-4.96
-2.07
-4.48
1.14
3.35
3.35
-0.10
-0.10
-0.30
-0.99
-0.99
-2.16
-1.07
-19.47
-20.29
-2.32

R2
kN
0.14
0.10
0.62
0.37
-0.50
0.68
1.79
-0.28
-0.46
-2.74
9.41
3.47
3.93
0.06
12.44
-0.20
7.93
3.25
-0.53
6.37
0.14
1.24
2.83
-3.09
-0.69

M2
kN-m
-0.60
-0.26
-2.18
-2.05
1.13
-3.18
-4.43
2.19
0.32
2.43
-8.74
-2.43
-3.75
7.37
-17.63
5.90
-9.57
-3.74
3.96
-3.35
-1.21
-2.20
-7.83
13.06
0.67

Ev
NAMA ELEMENT
Element-26
Element-27
Element-28
Element-29
Element-30
Element-31
Element-32
Element-33
Element-34
Element-35
Element-36
Element-37
Element-38
Element-39
Element-40
Element-41

(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(

Kolom
Kolom
Kolom
Balok
Kolom
Balok
Balok
Kolom
Kolom
Balok
Balok
Balok
Balok
Balok
Balok
Balok

)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)

M1
kN-m
0.92
1.16
3.74
1.21
0.16
1.55
4.13
8.49
-0.13
16.92
-16.16
6.41
-0.49
0.44
1.08
-0.42

N2
kN
-2.01
-8.90
-4.60
-0.14
-1.28
-1.38
-1.13
-16.86
-1.39
-4.22
-4.22
-1.13
-1.13
-0.44
-0.42
-0.42

R2
kN
-0.02
0.71
-1.13
-1.09
1.38
0.84
4.60
4.22
-0.42
0.32
17.50
-0.66
1.46
0.74
0.06
1.39

M2
kN-m
-0.80
-4.00
3.45
2.04
-1.55
-0.66
-3.45
-16.92
1.39
16.16
-19.47
0.49
-1.11
-0.28
0.42
-1.39

0.000
+

U1 (1,4D)
NAMA ELEMENT
Element-1
Element-2
Element-3
Element-4
Element-5
Element-6
Element-7
Element-8
Element-9
Element-10
Element-11
Element-12
Element-13
Element-14
Element-15
Element-16
Element-17
Element-18
Element-19
Element-20
Element-21
Element-22
Element-23
Element-24
Element-25

(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(

Kolom
Kolom
Kolom
Kolom
Kolom
Kolom
Kolom
Kolom
Kolom
Kolom
Balok
Balok
Balok
Balok
Balok
Balok
Balok
Balok
Balok
Balok
Kolom
Kolom
Kolom
Kolom
Kolom

)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)

M1
kN-m
-1.74
-3.35
-14.25
0.31
18.64
-6.26
-13.89
-17.78
12.91
3.59
69.02
54.04
34.97
141.71
-85.16
128.86
-68.24
49.17
69.42
-45.73
6.94
-31.91
-73.21
98.64
48.41

M2
kN-m
-6.94
-3.06
-25.14
-23.68
13.02
-36.73
-51.24
25.30
3.74
28.09
-101.03
-28.09
-43.36
85.16
-203.83
68.24
-110.60
-43.27
45.73
-38.69
-13.96
-25.47
-90.50
151.00
7.76

N1
kN
109.28
198.33
521.30
650.81
344.70
331.47
531.74
330.79
383.37
113.28
23.88
13.13
-13.18
-38.76
-38.76
1.15
1.15
3.42
11.42
11.42
53.29
53.10
275.90
305.75
98.02

N2
kN
-53.29
-94.36
-435.54
-545.78
-231.24
-218.01
-426.71
-217.32
-266.93
-57.29
-23.88
-51.73
13.18
38.76
38.76
-1.15
-1.15
-3.42
-11.42
-11.42
-24.92
-12.38
-225.00
-234.50
-26.76

R1
kN
-1.65
-1.16
-7.16
-4.25
5.76
-7.82
-20.68
3.20
5.29
31.68
95.92
49.66
41.27
114.17
-0.73
96.27
2.28
41.52
85.98
6.15
-1.65
-14.35
-32.74
35.66
8.02

R2
kN
1.65
1.16
7.16
4.25
-5.76
7.82
20.68
-3.20
-5.29
-31.68
108.73
40.12
45.47
0.73
143.76
-2.28
91.70
37.59
-6.15
73.68
1.65
14.35
32.74
-35.66
-8.02

M1
kN-m
-1.39
-8.60
-17.35
-4.18
22.15
-15.37
-29.68
-40.54
20.22
2.98
118.50
81.03
43.12
164.89
-98.81
195.59
-98.19
79.31
117.15
-69.15
6.26
-31.02
-64.45
83.54
55.03

U1 (1,4D)
NAMA ELEMENT
Element-26
Element-27
Element-28
Element-29
Element-30
Element-31
Element-32
Element-33
Element-34
Element-35
Element-36
Element-37
Element-38
Element-39
Element-40
Element-41

(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(

Kolom
Kolom
Kolom
Balok
Kolom
Balok
Balok
Kolom
Kolom
Balok
Balok
Balok
Balok
Balok
Balok
Balok

)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)

M1
kN-m
10.58
13.38
43.24
13.96
1.87
17.87
47.77
98.15
-1.52
195.63
-186.84
74.09
-5.64
5.11
12.46
-4.90

M2
kN-m
-9.28
-46.26
39.86
23.59
-17.87
-7.65
-39.86
-195.63
16.12
186.84
-225.09
5.64
-12.87
-3.18
4.90
-16.12

N1
kN
94.44
143.64
117.77
1.65
25.02
16.00
13.09
215.28
46.62
48.74
48.74
13.08
13.08
5.05
4.87
4.87

N2
kN
-23.19
-102.92
-53.13
-1.65
-14.84
-16.00
-13.09
-194.92
-16.08
-48.74
-48.74
-13.08
-13.08
-5.05
-4.87
-4.87

R1
kN
0.19
-8.22
13.09
24.92
-16.00
14.84
56.30
-48.74
4.87
194.92
-3.68
32.22
7.65
9.85
14.62
-0.73

R2
kN
-0.19
8.22
-13.09
-12.64
16.00
9.73
53.13
48.74
-4.87
3.68
202.28
-7.65
16.91
8.57
0.73
16.08

M1
kN-m
1.60
11.21
56.73
12.46
0.48
15.04
79.90
82.77
-6.35
168.12
-160.05
62.64
-4.49
1.74
10.26
-2.66

12.292
U2 (1,2D+1,6L)
NAMA ELEMENT
Element-1
Element-2
Element-3
Element-4
Element-5
Element-6
Element-7
Element-8
Element-9
Element-10
Element-11
Element-12
Element-13
Element-14
Element-15
Element-16
Element-17
Element-18
Element-19
Element-20
Element-21
Element-22
Element-23
Element-24
Element-25

(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(

Kolom
Kolom
Kolom
Kolom
Kolom
Kolom
Kolom
Kolom
Kolom
Kolom
Balok
Balok
Balok
Balok
Balok
Balok
Balok
Balok
Balok
Balok
Kolom
Kolom
Kolom
Kolom
Kolom

)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)

M2
kN-m
-6.26
-12.10
-29.79
-27.03
25.85
-49.05
-77.96
48.10
24.00
39.61
-161.76
-39.61
-70.65
98.81
-252.10
98.19
-160.19
-69.69
69.15
-59.31
-12.46
-21.42
-76.08
130.07
10.83

N1
kN
94.27
238.93
538.38
697.81
414.79
409.56
687.17
411.75
511.36
128.64
37.39
15.19
-9.35
-28.88
-28.88
7.31
7.31
7.99
18.80
18.80
46.28
44.80
236.67
261.69
83.58

N2
kN
-46.28
-103.83
-439.00
-581.92
-283.04
-277.81
-571.28
-280.01
-377.07
-80.65
-37.39
-70.99
9.35
28.88
28.88
-7.31
-7.31
-7.99
-18.80
-18.80
-21.96
-9.90
-193.05
-200.61
-22.50

U3 (0,9D+1
R1
kN
-1.46
-3.76
-8.57
-5.68
8.73
-11.71
-34.17
3.22
14.04
42.59
159.53
72.49
59.03
129.54
2.31
142.46
4.42
65.85
137.47
11.57
-1.46
-13.11
-28.11
30.52
9.41

R2
kN
1.46
3.76
8.57
5.68
-8.73
11.71
34.17
-3.22
-14.04
-42.59
176.83
57.27
72.79
-2.31
177.76
-4.42
133.61
59.44
-11.57
114.34
1.46
13.11
28.11
-30.52
-9.41

M1
kN-m
130.41
134.06
163.20
155.02
167.95
162.80
-16.31
336.57
65.51
259.81
-187.36
-6.26
-180.95
-30.99
-56.25
-56.90
-53.98
-105.09
-180.96
22.93
9.92
127.48
105.97
262.42
204.96

M2
kN-m
-9.92
53.46
117.74
89.21
123.28
117.33
-149.21
303.65
33.08
82.18
-231.82
-82.18
-192.72
56.25
-294.73
53.98
-223.15
-148.31
-22.93
-372.38
87.62
92.44
-40.16
288.83
125.80

U2 (1,2D+1,6L)
NAMA ELEMENT
Element-26
Element-27
Element-28
Element-29
Element-30
Element-31
Element-32
Element-33
Element-34
Element-35
Element-36
Element-37
Element-38
Element-39
Element-40
Element-41

(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(

Kolom
Kolom
Kolom
Balok
Kolom
Balok
Balok
Kolom
Kolom
Balok
Balok
Balok
Balok
Balok
Balok
Balok

)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)

M2
kN-m
-7.95
-73.55
65.44
20.94
-15.04
-6.70
-65.44
-168.12
17.32
160.05
-192.71
4.49
-12.58
-2.31
2.66
-17.32

N1
kN
80.90
165.67
139.65
1.46
21.34
14.57
19.24
184.61
40.75
42.67
42.67
12.16
12.16
2.75
3.66
3.66

N2
kN
-19.83
-130.77
-84.24
-1.46
-12.61
-14.57
-19.24
-167.16
-14.57
-42.67
-42.67
-12.16
-12.16
-2.75
-3.66
-3.66

U3 (0,9D+1
R1
kN
-0.91
-15.58
19.24
21.96
-14.57
12.61
90.03
-42.67
3.66
167.16
-3.07
27.31
6.26
7.71
11.75
-1.41

R2
kN
0.91
15.58
-19.24
-11.44
14.57
8.44
84.24
42.67
-3.66
3.07
173.30
-6.26
14.79
8.08
1.41
14.57

M1
kN-m
211.93
68.72
205.00
-87.62
11.33
-66.60
-39.04
139.38
82.39
-42.81
-152.87
27.64
-1.84
-85.46
-51.67
0.94

M2
kN-m
140.72
-43.35
101.74
-103.77
66.60
-99.22
-101.74
42.81
81.55
152.87
-316.48
1.84
-40.34
-89.05
-0.94
-81.55

U3 (0,9D+1,0E)
NAMA ELEMENT
Element-1
Element-2
Element-3
Element-4
Element-5
Element-6
Element-7
Element-8
Element-9
Element-10
Element-11
Element-12
Element-13
Element-14
Element-15
Element-16
Element-17
Element-18
Element-19
Element-20
Element-21
Element-22
Element-23
Element-24
Element-25

(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(

Kolom
Kolom
Kolom
Kolom
Kolom
Kolom
Kolom
Kolom
Kolom
Kolom
Balok
Balok
Balok
Balok
Balok
Balok
Balok
Balok
Balok
Balok
Kolom
Kolom
Kolom
Kolom
Kolom

)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)

N1
kN
-29.69
118.84
438.15
508.12
150.72
245.04
420.62
353.21
229.50
241.22
324.98
365.18
275.92
238.00
238.00
272.35
272.35
266.65
266.09
266.09
-70.52
104.80
202.33
258.06
20.02

N2
kN
70.52
-43.01
-375.59
-431.51
-67.96
-162.28
-344.01
-270.46
-144.57
-200.38
-324.98
-393.33
-275.92
-238.00
-238.00
-272.35
-272.35
-266.65
-266.09
-266.09
91.22
-75.10
-165.20
-206.09
31.95

U3 (0,9D-1,0E)
R1
kN
22.95
34.10
51.08
44.40
52.95
50.93
-52.55
272.44
31.30
341.99
-9.20
16.49
-61.79
48.22
-35.59
33.54
-35.01
-55.62
-52.44
-110.67
22.95
54.98
13.16
78.75
47.25

R2
kN
-22.95
-34.10
-51.08
-44.40
-52.95
-50.93
52.55
-272.44
-31.30
-341.99
158.47
48.99
125.05
35.59
139.91
35.01
103.56
113.31
110.67
168.89
-22.95
-54.98
-13.16
-78.75
-47.25

M1
kN-m
-132.65
-138.37
-181.53
-154.62
-143.98
-170.85
-1.55
-359.44
-48.91
-255.20
276.10
75.74
225.90
213.19
-53.24
222.58
-33.76
168.30
270.21
-81.73
-1.00
-168.51
-200.09
-135.59
-142.72

M2
kN-m
1.00
-57.39
-150.07
-119.65
-106.53
-164.56
83.34
-271.12
-28.26
-46.07
101.93
46.07
136.96
53.24
32.67
33.76
80.95
92.68
81.73
322.64
-105.57
-125.18
-76.20
-94.69
-115.82

N1
kN
170.19
136.15
232.10
328.64
292.47
181.14
263.05
72.08
263.40
-95.57
-294.29
-348.30
-292.87
-287.84
-287.84
-270.87
-270.87
-262.25
-251.41
-251.41
139.04
-36.53
152.40
135.05
106.00

U3 (0,9D+1,0E)
NAMA ELEMENT
Element-26
Element-27
Element-28
Element-29
Element-30
Element-31
Element-32
Element-33
Element-34
Element-35
Element-36
Element-37
Element-38
Element-39
Element-40
Element-41

(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(

Kolom
Kolom
Kolom
Balok
Kolom
Balok
Balok
Kolom
Kolom
Balok
Balok
Balok
Balok
Balok
Balok
Balok

)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)

N1
kN
101.41
101.56
115.21
-22.95
-25.07
-77.93
48.30
114.79
60.11
231.03
231.03
152.28
152.28
105.03
54.65
54.65

N2
kN
-49.44
-71.87
-68.06
22.95
32.50
77.93
-48.30
-99.94
-37.84
-231.03
-231.03
-152.28
-152.28
-105.03
-54.65
-54.65

U3 (0,9D-1,0E)
R1
kN
50.38
6.34
48.30
-91.22
77.93
-32.50
11.75
91.09
54.65
99.94
-44.91
16.33
-1.59
-51.45
-15.45
-26.64

R2
kN
-50.38
-6.34
-48.30
100.17
-77.93
50.41
68.06
-91.09
-54.65
44.91
189.76
1.59
19.50
64.88
26.64
37.84

M1
kN-m
-198.33
-51.51
-149.41
105.57
-8.92
89.58
100.47
-13.18
-84.34
294.33
-87.35
67.62
-5.42
92.02
67.70
-7.24

M2
kN-m
-152.65
-16.13
-50.49
134.10
-89.58
89.38
50.49
-294.33
-60.83
87.35
27.07
5.42
23.80
84.96
7.24
60.83

N1
kN
20.02
83.11
36.21
25.08
57.24
98.50
-31.48
161.99
-0.18
-168.36
-168.36
-135.47
-135.47
-98.53
-48.39
-48.39

U3 (0,9D-1,0E)
NAMA ELEMENT
Element-1
Element-2
Element-3
Element-4
Element-5
Element-6
Element-7
Element-8
Element-9
Element-10
Element-11
Element-12
Element-13
Element-14
Element-15
Element-16
Element-17
Element-18
Element-19
Element-20
Element-21
Element-22
Element-23
Element-24
Element-25

(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(

Kolom
Kolom
Kolom
Kolom
Kolom
Kolom
Kolom
Kolom
Kolom
Kolom
Balok
Balok
Balok
Balok
Balok
Balok
Balok
Balok
Balok
Balok
Kolom
Kolom
Kolom
Kolom
Kolom

)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)

N2
kN
-139.04
-78.31
-184.38
-270.21
-229.34
-118.01
-204.61
-8.95
-198.63
126.72
294.29
326.82
292.87
287.84
287.84
270.87
270.87
262.25
251.41
251.41
-123.25
59.18
-124.09
-95.41
-66.35

U4.1 (1,2D+1,0E+0,5L)
R1
kN
-25.08
-35.59
-60.29
-49.87
-45.55
-60.98
25.96
-268.32
-24.50
-301.27
132.53
47.36
114.84
98.57
34.64
90.23
37.94
109.00
162.98
118.57
-25.08
-73.42
-55.26
-32.90
-36.94

R2
kN
25.08
35.59
60.29
49.87
45.55
60.98
-25.96
268.32
24.50
301.27
-18.68
2.59
-66.59
-34.64
44.93
-37.94
14.35
-64.99
-118.57
-74.16
25.08
73.42
55.26
32.90
36.94

M1
kN-m
130.07
131.55
158.55
153.69
173.87
158.34
-24.84
324.86
71.14
260.55
-154.02
16.17
-169.34
12.95
-82.57
-2.68
-81.01
-82.94
-148.07
3.77
11.51
119.50
89.75
283.24
219.56

M2
kN-m
-11.51
49.85
109.78
82.03
130.65
103.97
-170.83
317.33
40.38
93.05
-276.95
-93.05
-212.47
82.57
-362.59
81.01
-267.28
-167.77
-3.77
-388.84
84.48
87.11
-59.09
321.39
128.77

N1
kN
-6.08
182.88
578.46
691.32
261.88
355.27
606.87
464.17
368.76
275.35
335.39
369.22
273.71
231.05
231.05
274.57
274.57
268.96
271.36
271.36
-58.91
115.95
261.50
323.46
40.89

N2
kN
58.91
-70.40
-489.45
-584.12
-144.03
-237.42
-499.68
-346.32
-248.11
-222.52
-335.39
-412.75
-273.71
-231.05
-231.05
-274.57
-274.57
-268.96
-271.36
-271.36
85.69
-77.53
-213.48
-256.22
26.35

U3 (0,9D-1,0E)
NAMA ELEMENT
Element-26
Element-27
Element-28
Element-29
Element-30
Element-31
Element-32
Element-33
Element-34
Element-35
Element-36
Element-37
Element-38
Element-39
Element-40
Element-41

(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(

Kolom
Kolom
Kolom
Balok
Kolom
Balok
Balok
Kolom
Kolom
Balok
Balok
Balok
Balok
Balok
Balok
Balok

)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)

N2
kN
19.62
-60.46
-0.25
-25.08
-51.57
-98.50
31.48
-150.67
17.16
168.36
168.36
135.47
135.47
98.53
48.39
48.39

U4.1 (1,2D+1,0E+0,5L)
R1
kN
-50.14
-16.91
-31.48
123.25
-98.50
51.57
60.63
-153.76
-48.39
150.67
40.18
25.09
11.43
64.12
34.25
25.71

R2
kN
50.14
16.91
31.48
-116.42
98.50
-37.91
0.25
153.76
48.39
-40.18
70.32
-11.43
2.24
-53.87
-25.71
-17.16

M1
kN-m
211.87
71.51
220.41
-84.48
11.38
-62.86
-16.63
159.99
80.49
-0.75
-192.88
43.25
-2.94
-85.18
-49.13
0.38

M2
kN-m
138.73
-63.85
120.05
-98.49
62.86
-100.90
-120.05
0.75
86.10
192.88
-364.64
2.94
-43.58
-89.60
-0.38
-86.10

N1
kN
121.63
145.64
152.54
-22.58
-19.74
-74.24
53.62
160.95
70.35
241.75
241.75
155.38
155.38
105.62
55.53
55.53

N2
kN
-54.39
-107.22
-91.54
22.58
29.35
74.24
-53.62
-141.74
-41.53
-241.75
-241.75
-155.38
-155.38
-105.62
-55.53
-55.53

U4.1 (1,2D+1,0E+0,5L)
NAMA ELEMENT
Element-1
Element-2
Element-3
Element-4
Element-5
Element-6
Element-7
Element-8
Element-9
Element-10
Element-11
Element-12
Element-13
Element-14
Element-15
Element-16
Element-17
Element-18
Element-19
Element-20
Element-21
Element-22
Element-23
Element-24
Element-25

(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(

Kolom
Kolom
Kolom
Kolom
Kolom
Kolom
Kolom
Kolom
Kolom
Kolom
Balok
Balok
Balok
Balok
Balok
Balok
Balok
Balok
Balok
Balok
Kolom
Kolom
Kolom
Kolom
Kolom

)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)

U4.1 (1,2D-1,0E+0,5L)
R1
kN
22.58
32.98
48.79
42.86
55.37
47.69
-62.12
273.27
35.40
353.60
35.51
36.49
-45.55
82.59
-34.83
72.91
-33.75
-37.26
-14.09
-107.38
22.58
51.65
6.13
86.38
49.76

R2
kN
-22.58
-32.98
-48.79
-42.86
-55.37
-47.69
62.12
-273.27
-35.40
-353.60
207.90
64.74
145.36
34.83
187.76
33.75
140.40
129.87
107.38
200.67
-22.58
-51.65
-6.13
-86.38
-49.76

M1
kN-m
-132.99
-140.88
-186.18
-155.94
-138.05
-175.32
-10.09
-371.15
-43.28
-254.46
309.43
98.17
237.50
257.12
-79.56
276.80
-60.79
190.45
303.10
-100.89
0.58
-176.49
-216.30
-114.77
-128.12

M2
kN-m
-0.58
-61.01
-158.03
-126.83
-99.15
-177.92
61.72
-257.45
-20.97
-35.19
56.79
35.19
117.21
79.56
-35.19
60.79
36.82
73.22
100.89
306.17
-108.71
-130.51
-95.13
-62.14
-112.85

N1
kN
193.79
200.19
372.42
511.84
403.62
291.37
449.30
183.03
402.67
-61.44
-283.88
-344.26
-295.08
-294.78
-294.78
-268.64
-268.64
-259.94
-246.15
-246.15
150.65
-25.38
211.58
200.45
126.86

N2
kN
-150.65
-105.70
-298.24
-422.82
-305.41
-193.15
-360.28
-84.82
-302.16
104.59
283.88
307.41
295.08
294.78
294.78
268.64
268.64
259.94
246.15
246.15
-128.78
56.75
-172.36
-145.54
-71.95

R1
kN
-25.44
-36.71
-62.58
-51.41
-43.13
-64.23
16.39
-267.49
-20.40
-289.65
177.25
67.35
131.08
132.94
35.40
129.59
39.20
127.35
201.34
121.85
-25.44
-76.75
-62.29
-25.27
-34.42

U4.1 (1,2D+1,0E+0,5L)
NAMA ELEMENT
Element-26
Element-27
Element-28
Element-29
Element-30
Element-31
Element-32
Element-33
Element-34
Element-35
Element-36
Element-37
Element-38
Element-39
Element-40
Element-41

(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(

Kolom
Kolom
Kolom
Balok
Kolom
Balok
Balok
Kolom
Kolom
Balok
Balok
Balok
Balok
Balok
Balok
Balok

)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)

U4.1 (1,2D-1,0E+0,5L)
R1
kN
50.09
1.91
53.62
-85.69
74.24
-29.35
36.87
80.37
55.53
141.74
-45.67
23.14
-0.04
-49.57
-12.56
-27.05

R2
kN
-50.09
-1.91
-53.62
97.28
-74.24
52.53
91.54
-80.37
-55.53
45.67
233.08
0.04
23.22
66.95
27.05
41.53

M1
kN-m
-198.40
-48.73
-133.99
108.71
-8.87
93.32
122.88
7.43
-86.25
336.39
-127.36
83.23
-6.52
92.29
70.23
-7.81

M2
kN-m
-154.64
-36.63
-32.18
139.38
-93.32
87.70
32.18
-336.39
-56.28
127.36
-21.09
6.52
20.56
84.41
7.81
56.28

N1
kN
40.24
127.19
73.54
25.44
62.56
102.19
-26.17
208.15
10.06
-157.64
-157.64
-132.37
-132.37
-97.94
-47.51
-47.51

N2
kN
14.67
-95.81
-23.73
-25.44
-54.72
-102.19
26.17
-192.46
13.47
157.64
157.64
132.37
132.37
97.94
47.51
47.51

R1
kN
-50.43
-21.34
-26.17
128.78
-102.19
54.72
85.75
-164.48
-47.51
192.46
39.41
31.90
12.97
66.00
37.13
25.30

U4.2 (1,2D+1,0E+L)

U4.1 (1,2D-1,0E+0,5L)
NAMA ELEMENT
Element-1
Element-2
Element-3
Element-4
Element-5
Element-6
Element-7
Element-8
Element-9
Element-10
Element-11
Element-12
Element-13
Element-14
Element-15
Element-16
Element-17
Element-18
Element-19
Element-20
Element-21
Element-22
Element-23
Element-24
Element-25

(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(

Kolom
Kolom
Kolom
Kolom
Kolom
Kolom
Kolom
Kolom
Kolom
Kolom
Balok
Balok
Balok
Balok
Balok
Balok
Balok
Balok
Balok
Balok
Kolom
Kolom
Kolom
Kolom
Kolom

)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)

R2
kN
25.44
36.71
62.58
51.41
43.13
64.23
-16.39
267.49
20.40
289.65
30.76
18.34
-46.28
-35.40
92.78
-39.20
51.19
-48.43
-121.85
-42.37
25.44
76.75
62.29
25.27
34.42

M1
kN-m
-1.58
-6.74
-16.66
-2.49
21.45
-12.16
-24.22
-32.59
17.91
3.33
102.22
72.69
41.22
160.86
-96.50
174.81
-89.21
69.63
101.54
-61.88
6.74
-32.41
-70.14
92.46
54.14

M2
kN-m
-6.74
-8.81
-28.88
-26.55
21.47
-45.64
-69.63
40.38
16.53
36.21
-142.31
-36.21
-61.84
96.50
-240.71
89.21
-145.23
-61.21
61.88
-52.85
-13.48
-23.77
-84.47
142.89
9.94

N1
kN
103.50
230.23
549.15
701.62
399.86
391.19
646.40
392.29
475.99
126.61
33.11
14.85
-11.22
-33.86
-33.86
5.04
5.04
6.39
16.41
16.41
50.67
49.66
260.47
288.28
92.22

N2
kN
-50.67
-103.39
-452.05
-586.34
-271.23
-262.57
-531.12
-263.66
-344.56
-73.78
-33.11
-65.47
11.22
33.86
33.86
-5.04
-5.04
-6.39
-16.41
-16.41
-23.89
-11.24
-212.44
-221.05
-24.98

R1
kN
-1.58
-2.83
-8.28
-5.28
7.80
-10.51
-29.79
3.32
10.93
39.54
138.83
65.57
53.73
127.54
1.14
128.31
3.70
58.09
120.99
9.74
-1.58
-14.05
-30.92
33.62
9.15

R2
kN
1.58
2.83
8.28
5.28
-7.80
10.51
29.79
-3.32
-10.93
-39.54
154.87
52.16
64.04
-1.14
169.75
-3.70
120.92
52.48
-9.74
101.52
1.58
14.05
30.92
-33.62
-9.15

U4.2 (1,2D+1,0E+L)

U4.1 (1,2D-1,0E+0,5L)
NAMA ELEMENT
Element-26
Element-27
Element-28
Element-29
Element-30
Element-31
Element-32
Element-33
Element-34
Element-35
Element-36
Element-37
Element-38
Element-39
Element-40
Element-41

(
(
(
(
(
(
(
(
(
(
(
(
(
(
(
(

Kolom
Kolom
Kolom
Balok
Kolom
Balok
Balok
Kolom
Kolom
Balok
Balok
Balok
Balok
Balok
Balok
Balok

)
)
)
)
)
)
)
)
)
)
)
)
)
)
)
)

R2
kN
50.43
21.34
26.17
-119.32
102.19
-35.79
23.73
164.48
47.51
-39.41
113.64
-12.97
5.95
-51.80
-25.30
-13.47

M1
kN-m
5.31
12.47
53.09
13.48

M2
kN-m
-8.76
-64.84
57.16
22.71

Err:504

Err:504

Err:504
Err:504

Err:504

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

N1
kN
89.09
162.14
135.32
1.58

N2
kN
-21.85
-123.72
-74.33
-1.58

R1
kN
-0.49
-13.09
17.36
23.89

R2
kN
0.49
13.09
-17.36
-12.30

PERHITUNGAN REAKSI PADA TAPAK PONDASI (FRAME - I)

U1
U2

D
L
[Ke].u
f
[Ke].u - f [Ke].u
f
[Ke].u - f [Ke].u
Err:502 Err:502
2.55 Err:502 Err:502
0.56 Err:502
Err:502 Err:502
Err:502 Err:502 Err:502
Err:502 Err:502

U3
U4
U5

Err:502 Err:502
Err:502 Err:502
Err:502 Err:502

Err:502 Err:502 Err:502


Err:502 Err:502 Err:502
Err:502 Err:502 Err:502

Err:502
Err:502
Err:502

Err:502
Err:502
Err:502

0.00
0.00
0.00

U6
U7
U8

Err:502 Err:502
Err:502 Err:502
Err:502 Err:502

Err:502 Err:502 Err:502


Err:502 Err:502 Err:502
Err:502 Err:502 Err:502

Err:502
Err:502
Err:502

Err:502
Err:502
Err:502

0.00
0.00
0.00

U9
U10
U11

Err:502 Err:502
Err:502 Err:502
Err:502 Err:502

Err:502 Err:502 Err:502


Err:502 Err:502 Err:502
Err:502 Err:502 Err:502

Err:502
Err:502
Err:502

Err:502
Err:502
Err:502

0.00
0.00
0.00

U12
U13
U14

Err:502 Err:502
Err:502 Err:502
Err:502 Err:502

Err:502 Err:502 Err:502


Err:502 Err:502 Err:502
Err:502 Err:502 Err:502

Err:502
Err:502
Err:502

Err:502
Err:502
Err:502

0.00
0.00
0.00

U15
U16
U17

Err:502 Err:502
Err:502 Err:502
Err:502 Err:502

Err:502 Err:502 Err:502


Err:502 Err:502 Err:502
Err:502 Err:502 Err:502

Err:502
Err:502
Err:502

Err:502
Err:502
Err:502

0.00
0.00
0.00

U18
U19
U20
U21
U22
U23
U24
U25
U26
U27
U28
U29
U30
U31
U32
U33
U34
U35
U36
U37
U38
U39
U40

Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502

Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502

Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502

Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

D.O.F

Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502

Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502

Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502

E
f
0.00
0.00

U41
U42
U43
U44
U45
U46
U47
U48
U49
U50
U51
U52
U53
U54
U55
U56
U57
U58
U59
U60
U61
U62
U63
U64
U65
U66
U67
U68
U69
U70
U71
U72
U73
U74
U75
U76
U77
U78
U79
U80
U81
U82
U83
U84

Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502

Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502

Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502

Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502

Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502

Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502

Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-99.11
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-123.60
0.00
0.00

U85
U86
U87
U88
U89
U90
U91
U92
U93
U94
U95
U96
U97
U98
U99
U100
U101
U102
U103
U104

Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502

U105

Err:502 Err:502

Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502

Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502

Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502

Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502

Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502

Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
-30.68
0.00

Err:502 Err:502 Err:502

Err:502

Err:502

0.00

U1 (1,4D)

U2 (1,2D+1,6L)

U3 (0,9D+L) U4 (1,2D+1,0E+L)

[Ke].u - f
34.56
Err:502

3.57
Err:502

3.95
Err:502

36.85
Err:502

38.18
Err:502

Err:502
Err:502
Err:502

Err:502
Err:502
Err:502

Err:502
Err:502
Err:502

Err:502
Err:502
Err:502

Err:502
Err:502
Err:502

Err:502
Err:502
Err:502

Err:502
Err:502
Err:502

Err:502
Err:502
Err:502

Err:502
Err:502
Err:502

Err:502
Err:502
Err:502

Err:502
Err:502
Err:502

Err:502
Err:502
Err:502

Err:502
Err:502
Err:502

Err:502
Err:502
Err:502

Err:502
Err:502
Err:502

Err:502
Err:502
Err:502

Err:502
Err:502
Err:502

Err:502
Err:502
Err:502

Err:502
Err:502
Err:502

Err:502
Err:502
Err:502

Err:502
Err:502
Err:502

Err:502
Err:502
Err:502

Err:502
Err:502
Err:502

Err:502
Err:502
Err:502

Err:502
Err:502
Err:502

Err:502
0.00
0.00
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502

Err:502

Err:502

Err:502

Err:502

Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502

Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502
Err:502

+1,0E+L)

PERHITUNGAN TEKANAN PADA DASAR PONDASI


UKURAN TAPAK
B
L
m
m

w
1/6.B.L.L

P-ULT *)
U1
kPa

U2
kPa

U3
kPa

U4
kPa

1.20

1.20

0.288 -65.03069

Err:502

Err:502

Err:502

1.50

1.50

0.563

-151.638

Err:502

Err:502

Err:502

1.50

1.50

0.563 -56.46524

Err:502

Err:502

Err:502

1.50

1.50

0.563 -69.01445

Err:502

Err:502

Err:502

1.50

1.50

0.563 -159.4094

Err:502

Err:502

Err:502

1.20

1.20

0.288 -34.04483

Err:502

Err:502

Err:502

*) P-ULT = P/A + M/w

PERENCANAAN PONDASI
2.1 Interpretasi data CPT
Berdasarkan data hasil tes CPT yang dilakukan oleh Laboratorium Mekanika Tanah, Politeknik
Negeri Lhokseumawe didapati harga qc rata-rata adalah:
146 kg/cm/cm
pada kedalaman 2 meter dari tanah asli.
Menurut informasi dari laporan tersebut, tanah asli adalah pasir berlempung. Untuk menghitung
kapasitas daya dukung tanah dapat digunakan metoda-metoda berikut di bawah ini:
*

Metoda 1
Schmertmann memberikan rumus untuk menghitung daya dukung ultimit untuk tanah takberkohesi sebagai berikut:
q-ult

q-ult

q-a

48 - 0,009(300-qc)^1,5
48

0.009

30.8 kg/cm2

3021.50
3

x(

300 -

3021.50
1007.17

146 )^

1.5

kN/m2

kPa

Metoda 2
Meyerhoff memberikan rumus untuk daya dukung izin berdasarkan data CPT dengan rumus:
q-a

N
F1

Kd

q-a

N
F2

x(

dimana:
N

qc
4

Kd

0.33

0.33 x

=
q-a

untuk B<= F4

+
B

146 =
4

Kedalaman pondasi

1.440
24
0.08

)^2

36.5

24

=
D
B

diambil:
(

F3

1.50

<=

Kd

untuk B > F4

2.00 m
1.33

2.00
1.50
1.33
+
1.50

0.3

)^

1.33

=
*

574.56

kPa

Metoda 3
Laboratorium Mekanika Tanah Politeknik Negeri Lhokseumawe merekomendasikan mengguna
persamaan di bawah ini untuk menghitung q-a:
Untuk B <= 1,2 m ................................................ q-a = qc/30 (kg/cm2)
Untuk B > 1,2 m ................................................ q-a = qc/50 (B + (0,3/B)^2) (kg/cm2)
sehingga
q-a

q-a

146
30

146
50

4.50

441.14

4.87

477.42

1.50

kg/cm2
kPa

------------>

0.3
1.50

untuk B 1,2 m

0.3 )
1.50

kg/cm2
kPa

------------>

untuk B > 1,2 m

Metoda 4
dengan grafik dari buku teknik pondasi (referensi [4])
a. qc
'
z

=
=
=

146
9.31
2

kg/cm2
kN/m3
m

po'

9.31

18.62

Vb'

146
18.62

98.07

769

didapat =

MPa

kN/m2

------->

dipakai = 37 deg.

b. dari grafik Dr = 100

------->

dipakai = 44 deg.

c. qc

------->

dipakai = 41 deg.

d.

------->

dipakai = 40 deg.

36 - 41 deg.

14.32

14.32 MPa
37

41

44
3
deg.

41

dengan sudut geser ini kita dapat menghitung daya dukung tanah dengan metoda Terzaghi:

=
40 deg.
Nc
=
95.7
Nq
=
81.3
N
=
100.4
qult

q-a

18.62

81.3

2074.6404 kPa

2074.6404 kPa
3

0.5

9.31

1.50

691.55 kPa

dari hitungan di atas didapatkan kapasitas daya dukung pondasi izin:


q-a

1007.17

574.56

441.14
4

678.60 kPa

(q-allowed)

691.55

a Tanah, Politeknik

g. Untuk menghitung

mit untuk tanah tak-

ta CPT dengan rumus:


untuk B<= F4

untuk B > F4

mendasikan menggunakan

/B)^2) (kg/cm2)

untuk B 1,2 m

(grafik 1)
(grafik 2)
(grafik 3)

gan metoda Terzaghi:

100.4

691.55

0.8

GEDUNG POLRES ACEH T


A. DESAIN TULANGAN MOMEN
> MUTU BETON RENCANA
> MUTU BAJA RENCANA
> b
> -maks

fc'
fy

> -min

NO

URAIAN

LOKASI

BENTANG
mm

h
min

=
=
=
=
=

20.36 MPa ---> K 250


320 MPa
0.0300
0.0225
0.0044

PENAMPANG
b
h
mm
mm

d'

mm

mm

Ref.
No. Frame

kg/cm2

M-renc.
(-)
KN-m

M-renc.
(+)
KN-m

BALOK LT +440
1 BL-1

LOBBY

12000

750

300

600

73

527

-362.594

64.447

1 BL-2

LOBBY

8000

500

350

750

73

677

-55.030

-1.596

1 BL-2

LOBBY

4000

250

250

500

69

432

98.191

0.000

POLRES ACEH TENGGARA

k
(-)

k
(+)

tul.m(-)

tul.m(+)

Luas
terhitung
mm2

Tumpuan
Atas
(As)

Bawah
(As')

0.8

5.440

0.967

0.0211

0.0031

3,340.21

7 D 25

4 D 25

0.8

0.429

(0.012)

0.0014

0.0000

321.56

1 D 25

4 D 25

0.8

(2.637)

-0.0077

0.0000

(829.86)

-5 D 16

4 D 25

Lapangan
Atas
(As)

Luas
terhitung
mm2

Bawah
(As')

4 D 25

2 D 25

(9.21) 4 D 25

-1 D 25

491.85

4 D 25

0 D 25

1. DESAIN KOLOM FRAME - I


Perpindahan pada elevasi +440
Rerata =
-0.0000059
U 19
=
-0.0000279
U 22
=
-0.0000297
U 25
=
-0.0000314
U 28
=
-0.0000225

(dalam meter)
-0.0000094
-0.0111075
-0.0000137
-0.0109934
-0.0000139
-0.0109954
-0.0000142
-0.0109974
-0.0000127
-0.0109963

31

-0.0000136

-0.0000113

-0.0109953

34

-0.0000059

-0.0000094

-0.0110297

U
U
U
U
U

37
40
43
46
49

=
=
=
=
=

0.0000018
0.0000107
0.0000196
0.0000178
0.0000159

-0.0000075
-0.0000061
-0.0000047
-0.0000050
-0.0000054

-0.0110641
-0.0111570
-0.0112500
-0.0113180
-0.0113861

Perpindahan pada elevasi +960

(dalam meter)

Perpindahan relative p

U
U
U
U
U
U
U
U

52
55
58
61
64
67
70
73

=
=
=
=
=
=
=
=

-0.0000211
-0.0000207
-0.0000204
-0.0000189
-0.0000175
-0.0000103
-0.0000031
-0.0000017

-0.0000161
-0.0000162
-0.0000163
-0.0000167
-0.0000171
-0.0000163
-0.0000155
-0.0000159

-0.0255024
-0.0255255
-0.0255486
-0.0255905
-0.0256323
-0.0256590
-0.0256857
-0.0257150

U
U
U
U
U
U
U
U

52
55
58
61
64
67
70
73

76

-0.0000003

-0.0000164

-0.0257443

76

79

-0.0000002

-0.0000169

-0.0258105

79

82

-0.0000001

-0.0000174

-0.0258767

82

Perpindahan pada elevasi +1050


U
U
U
U
U
U
U

85
88
91
94
97
100
103

=
=
=
=
=
=
=

0.0001128
0.0000772
0.0000415
-0.0000077
-0.0000569
-0.0000924
-0.0001278

(dalam meter)
0.0000111
0.0000042
-0.0000027
-0.0000118
-0.0000209
-0.0000275
-0.0000341

-0.0269626
-0.0269740
-0.0269853
-0.0270158
-0.0270463
-0.0271165
-0.0271866

Perpindahan relative p
U
U
U
U
U
U
U

85
88
91
94
97
100
103

erpindahan relative pada elevasi


-0.0000045
=
0.0000068
=
0.0000089
=
0.0000110
=
0.0000036
=
-0.0000039
=
-0.0000044
=
-0.0000049
=
-0.0000124

+960
(dalam meter)
-0.0000070
-0.0145553
-0.0000024
-0.0145089
-0.0000023
-0.0145301
-0.0000022
-0.0145512
-0.0000040
-0.0145941
-0.0000058
-0.0146370
-0.0000069
-0.0146294
-0.0000079
-0.0146217
-0.0000098
-0.0145580

-0.0000199

-0.0000117

-0.0144943

-0.0000180

-0.0000119

-0.0144925

-0.0000160

-0.0000120

-0.0144906

erpindahan relative pada elevasi +1050


=
=
=
=
=
=
=

0.0001332
0.0000961
0.0000590
0.0000026
-0.0000538
-0.0000907
-0.0001275

0.0000274
0.0000209
0.0000143
0.0000045
-0.0000054
-0.0000116
-0.0000177

(dalam meter)
-0.0014141
-0.0013835
-0.0013529
-0.0013567
-0.0013605
-0.0014014
-0.0014423

MENGHITUNG NILAI Q
NO

NOMOR
ELEMEN
1
2
3
4
5
6

M1
M2
kN-m kN-m
#REF! #REF!

U1 (1,4D)
U2 (1,2D+1,6
N1
N2
R1
R2
M1
M2
kN
kN
kN
kN
kN-m kN-m
#REF!
#REF! #REF! #REF! #REF! #REF!

Pu

#REF!

0.00

Vus

#REF!

lc

NO

NOMOR
ELEMEN
#REF!

#REF!

M1
M2
kN-m kN-m
#REF! #REF!

U1 (1,4D)
U2 (1,2D+1,6
N1
N2
R1
R2
M1
M2
kN
kN
kN
kN
kN-m kN-m
#REF!
#REF! #REF! #REF! #REF! #REF!

Pu

#REF!

0.00

Vus

#REF!

lc

Q
s

=
1

1
-

1
-

=
#REF!

#REF!

U2 (1,2D+1,6L)
N1
N2
R1
R2
kN
kN
kN
kN
#REF!
#REF! #REF! #REF!

#REF!
0.00
#REF!

#REF!

U2 (1,2D+1,6L)
N1
N2
R1
R2
kN
kN
kN
kN
#REF!
#REF! #REF! #REF!

#REF!
0.00
#REF!

M1
kN-m
#REF!

U3 (0,9D+1,0E)
M2
N1
N2
R1
kN-m
kN
kN
kN
#REF! #REF!
#REF! #REF!

R2
kN
#REF!

M1
kN-m
#REF!

U4 (1,2D+1,0E+0,5L)
M2
N1
N2
kN-m
kN
kN
#REF! #REF!
#REF!

M1
kN-m
#REF!

U4 (1,2D+1,0E+0,5L)
M2
N1
N2
kN-m
kN
kN
#REF! #REF!
#REF!

#REF!
-0.01
#REF!

#REF!

M1
kN-m
#REF!

U3 (0,9D+1,0E)
M2
N1
N2
R1
kN-m
kN
kN
kN
#REF! #REF!
#REF! #REF!

R2
kN
#REF!

#REF!

#REF!

-0.01

-0.01
#REF!

#REF!

1,0E+0,5L)
R1
R2
kN
kN
#REF! #REF!

1,0E+0,5L)
R1
R2
kN
kN
#REF! #REF!

#REF!

M1
kN-m
#REF!

U4 (1,2D+1,0E+L)
M2
N1
N2
R1
kN-m
kN
kN
kN
#REF! #REF!
#REF! #REF!

R2
kN
#REF!

#REF!
-0.01
#REF!

#REF!

M1
kN-m
#REF!

U4 (1,2D+1,0E+L)
M2
N1
N2
R1
kN-m
kN
kN
kN
#REF! #REF!
#REF! #REF!

R2
kN
#REF!

#REF!
-0.01
#REF!

#REF!

AS-7
U1
NO.

URAIAN

JENIS

Vu-0

Vu-L

11
12
13
14
15
16
17
18

Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504

Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504

Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

9.41
3.47
3.93
0.06
12.44
-0.20
7.93
3.25

8.74
2.43
3.75
-7.37
17.63
-5.90
9.57
3.74

23
24
25
26
27
28
29
Err:509

Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504

Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504

Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

2.83
-3.09
-0.69
-0.02
0.71
-1.13
-1.09
Err:509

7.83
-13.06
-0.67
0.80
4.00
-3.45
-2.04
Err:509

19
20
21
22

Err:504
Err:504
Err:504
Err:504

Err:504
Err:504
Err:504
Err:504

Err:504
Err:504
Err:504
Err:504

#REF!
#REF!

-0.53
6.37
0.14
1.24

-3.96
3.35
1.21
2.20

AS-I
U1
NO.

URAIAN
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

JENIS
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504

H
250
250
250
250
250
250
250
250
250
250

Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504

d
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

Vu-0
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504

Vu-L
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504

AS-I
U1
NO.

URAIAN
23
24
25
26
27
28

JENIS
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504

H
300
300
300
300
300
300

d
550
550
550
550
550
550

#REF!
#REF!

Vu-0
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504

Vu-L
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504

U2
Vu-0

Vu-L

DISTRIBUSI GAYA GESER


U3
Vu-0
Vu-L
Vu-0

95.92
49.66
41.27
114.17
-0.73
96.27
2.28
41.52

-108.73
-40.12
-45.47
-0.73
-143.76
2.28
-91.70
-37.59

159.53
72.49
59.03
129.54
2.31
142.46
4.42
65.85

-176.83
-57.27
-72.79
2.31
-177.76
4.42
-133.61
-59.44

-32.74
35.66
8.02
0.19
-8.22
13.09
24.92
Err:509

-32.74
35.66
8.02
0.19
-8.22
13.09
12.64
Err:509

-28.11
30.52
9.41
-0.91
-15.58
19.24
21.96
Err:509

85.98
6.15
-1.65
-14.35

6.15
-73.68
-1.65
-14.35

137.47
11.57
-1.46
-13.11

U2
Vu-0
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504

Vu-L
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504

Vu-L

-9.20

16.49
-61.79
48.22
-35.59
33.54
-35.01
-55.62

-158.47
-48.99
-125.05
-35.59
-139.91
-35.01
-103.56
-113.31

2.00
2.00
2.00
2.00
2.00
2.00
2.00
2.00

-28.11
30.52
9.41
-0.91
-15.58
19.24
11.44
Err:509

-55.26
-32.90
-36.94
-50.14
-16.91
-31.48
123.25
Err:509

-55.26
-32.90
-36.94
-50.14
-16.91
-31.48
116.42
Err:509

2.00
2.00
2.00
2.00
2.00
2.00
2.00
Err:509

11.57
-114.34
-1.46
-13.11

-52.44

-110.67
-168.89
22.95
54.98

2.00
2.00
2.00
2.00

-110.67
22.95
54.98

DISTRIBUSI GAYA GESER


U3
Vu-0
Vu-L
Vu-0
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504

U4

Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504

U4

Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504

Vu-L

Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

U2
Vu-0
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504

Vu-L
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504

DISTRIBUSI GAYA GESER


U3
Vu-0
Vu-L
Vu-0
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504

Err:504
Err:504
Err:504
Err:504
Err:504
Err:504

U4

Err:504
Err:504
Err:504
Err:504
Err:504
Err:504

Vu-L
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504

L
2.00
2.00
1.50
1.50
2.00
2.00

1/4L

Vu-1/4L

1.00

-19.15

1.00

-55.24

1.00

-35.44

1.00

-54.58

1.00

-49.67

1.00

-40.24

1.00

-20.55

Err:509

Err:509

2.00

-25.59

1/4L

Vu-1/4L

#REF!

Err:504

#REF!

Err:504

#REF!

Err:504

#REF!

Err:504

#REF!

Err:504

1/4L
2.75

Vu-1/4L
Err:504

DESAIN TULANGAN GESER / SENGKANG

Tumpuan:
> Vu =

> Vu =

-19.15

> Vu =

123.25

Tumpuan:

Lapangan:

0.75

#REF!

240

0.75

#REF!

240

0.75

#REF!

240

0.75

#REF!

240

0.75

#REF!

240

-52.44

Lapangan:
> Vu =

Err:509

Tumpuan:
> Vu =

fyt
MPa
240

-9.20

Lapangan:

> Vu =

0.75

fc'
MPa
#REF!

-25.59

DESAIN TULANGAN GESER / SENGKANG

Tumpuan:
> Vu =

fyt
MPa
240

0.75

#REF!

240

Err:504

Lapangan:
> Vu =

0.75

fc'
MPa
#REF!

Err:504

DESAIN TULANGAN GESER / SENGKANG

Tumpuan:
> Vu =

fyt
MPa
240

0.75

#REF!

240

Err:504

Lapangan:
> Vu =

0.75

fc'
MPa
#REF!

Err:504

SER / SENGKANG
Vc
kN
#REF!

Vs
kN
#REF!

#REF!

dia.
mm
8

Av
mm2
100.53

s
mm
#REF!

#REF!

100.53

#REF!

#REF!

#REF!

10

157.08

#REF!

#REF!

#REF!

10

157.08

#REF!

#REF!

#REF!

10

157.08

#REF!

#REF!

#REF!

10

157.08

#VALUE!

Av
mm2
100.53

s
mm
#REF!

100.53

#REF!

SER / SENGKANG
Vc
kN
#REF!

Vs
kN
#REF!

#REF!

#REF!

dia.
mm

SER / SENGKANG
Vc
kN
#REF!

Vs
kN
#REF!

#REF!

#REF!

dia.
mm
6

Av
mm2
56.55

s
mm
#REF!

56.55

#VALUE!

DESAIN BALOK
1. Ukuran Balok
B
H
Selimut beton
d'
d

=
=
=
=
=

2. Mutu Bahan
K
fc'
fy
E
s
-

=
=
=
=

s'

3. Penulangan
Atas
Bawah
dia. Sengkang
As'
As
b
-

maks

400 mm
900 mm
25 mm
72.5 mm
827.5 mm

=
=
=
=
=

250 kg/cm/cm
20.36 MPa

320 MPa
200000 MPa

=
=
=
=
=

0.400
0.900
0.025
0.073
0.828

m
m
m
m
m

20 MPa

1093.059
0.0016

5D
25
10 D
25
10 mm
2454.37 mm2
4908.74 mm2

0.030

0.022

=
=

2.454
4.909

x
x

4. Perhitungan
4.1 As2

4.2 M2

=
=

4.3 As1

4.4 a

4.5 c

=
4.6 s'

=
4.7 Nc1 + Nc2 = NT
0.85
As'

x
x[

0.85
0.00245

x
x[

5.882812
0.00245

c
x[

5.882812 c
1.472622 x (
c
5.882812
1.472622

c
c
c

5.882812

c2

5.882812

c2

pakai rumus ABC


A
B
C
c
c
4.8 Hitung Momen Tahanan
a
a

M1

=
=
=
=

s'

=
fs' efektif atau fs''
fs''

=
=

M2

=
=
=

kekuatan desain
MN

=
=
=

10-3
10-3

m2
m2

As'

2454.37

As'.fy.(d - d')
2.45 x

4.909

320 x (

0.828 -

2.454

As1 . fy
0.85 x fc' x b
2.454
0.85

x
x

0.1154997 m

10-3
20

x
x

320
0.400

0.073 )

10-3

=
=

0.593
592.976

2.454

0.1154997 m
0.85
0.135882 m
0.003 x (

0.0013993

fc'
Es

x
x

b
x
0.003 x (

135.88 135.88

72.5 )

<

1
c

x
-

c
d'

+
)

0.85

fc'

0.85 x c
c
c

+
0.073 )

0.85

20

0.073 )

17

c
20.36 x
200000 x

0.400 x
0.003 x (

+
600

x(

+
c

0.073 )

0.041724277

1.5708

1.5708

+
c

0.1067651

0.041724277

1.4726216 c

-0.106765063 -

-0.139899 c

-0.106765063

=
=
=

5.8828118
-0.139899
-0.106765

umus ABC

=
=

0.1471 m
-0.1234 m

=
147.131 mm
(tidak dipakai)

g Momen Tahanan
=
=

0.1471 m
0.1251 m

0.85

0.0417242774 c
=

0.0000

= 1.57079633

Nc . Z
0.85 x
0.650544 MN.m
650.5436 kN.m
0.003 x (

20

0.400 x

147.131 147.131

72.500 )

0.1251 x (

0.001522

tif atau fs''


0.001522 x
304.3454 MPa

200000

As'

x
fs''
x(
2.454 x
304.34536 x (
563.9668 kN.m

x(
0.9 x

650.54356 +
1214.5104

1093.059 kN.m

0.828 0.755 )

563.967 )

0.073 )

0.828 -

0.5 x

0.1251

0.593 MN.m
592.976 kN.m
2.454 x 10-3

m2

= As

0.00491 x

= 1.570796

1.57079633 c

fy

320

DESAIN BALOK
1. Ukuran Balok
B
H
Selimut beton
d'
d

=
=
=
=
=

2. Mutu Bahan
K
fc'
fy
E
s
-

=
=
=
=

s'

3. Penulangan
Atas
Bawah
dia. Sengkang
As'
As
b
-

maks

300 mm
600 mm
25 mm
66.5 mm
533.5 mm

=
=
=
=
=

0.300
0.600
0.025
0.067
0.534

250 kg/cm/cm
20.36 MPa

320 MPa
200000 MPa

m
m
m
m
m

20 MPa

=
=
=
=
=

0.0016

5D
19
10 D
19
10 mm
1417.64 mm2
2835.29 mm2

0.030

0.022

=
=

1.418
2.835

x
x

4. Perhitungan
4.1 As2

4.2 M2

=
=

4.3 As1

4.4 a

4.5 c

=
4.6 s'

=
4.7 Nc1 + Nc2 = NT
0.85
As'

x
x[

0.85
0.00142

x
x[

4.412109
0.00142

c
x[

4.412109 c
0.850586 x (
c
4.412109
0.850586

c
c
c

4.412109

c2

4.412109

c2

pakai rumus ABC


A
B
C
c
c
4.8 Hitung Momen Tahanan
a
a

M1

=
=
=
=

s'

=
fs' efektif atau fs''
fs''

=
=

M2

=
=
=

kekuatan desain
MN

=
=
=

0.5

-362.59

10-3
10-3

394.349

m2
m2

As'

1417.64

As'.fy.(d - d')
1.42 x

2.835

320 x (

0.534 -

1.418

As1 . fy
0.85 x fc' x b
1.418
0.85

x
x

0.0889502 m

10-3
20

x
x

320
0.300

0.067 )

10-3

=
=

0.212
211.853

1.418

0.0889502 m
0.85
0.1046473 m
0.003 x (

104.65 104.65

0.0010936

fc'
Es

x
x

b
x
0.003 x (

66.5 )

<

1
c

x
-

c
d'

+
)

0.85

fc'

0.85 x c
c
c

+
0.067 )

0.85

20

0.067 )

17

c
20.36 x
200000 x

0.300 x
0.003 x (

+
600

x(

+
c

0.067 )

0.024099943

0.9073

0.9073

+
c

0.056564

0.024099943

0.8505862 c

0.056563983 -

-0.080806 c

0.056563983

=
=
=

4.4121088
-0.080806
-0.056564

umus ABC

=
=

0.1228 m
-0.1044 m

=
122.753 mm
(tidak dipakai)

g Momen Tahanan
=
=

0.1228 m
0.1043 m

0.85

0.0240999426 c
=

0.0000

= 0.90729196

Nc . Z
0.85 x
0.256132 MN.m
256.1324 kN.m
0.003 x (

20

0.300 x

122.753 122.753

66.500 )

0.1043 x (

0.001375

tif atau fs''


0.001375 x
274.9574 MPa

200000

As'

x
fs''
x(
1.418 x
274.95742 x (
182.0327 kN.m

x(
0.9 x

256.13244 +
438.16515

394.3486 kN.m

0.534 0.467 )

182.033 )

0.067 )

0.534 -

0.5 x

0.1043

0.212 MN.m
211.853 kN.m
1.418 x 10-3

m2

= As

0.00284 x

= 0.907292

0.90729196 c

fy

320

DESAIN BALOK
1. Ukuran Balok
B
H
Selimut beton
d'
d

=
=
=
=
=

2. Mutu Bahan
K
fc'
fy
E
s
-

=
=
=
=

s'

3. Penulangan
Atas
Bawah
dia. Sengkang

300 mm
600 mm
25 mm
66.5 mm
533.5 mm

=
=
=
=
=

0.300
0.600
0.025
0.067
0.534

250 kg/cm/cm
20.36 MPa

320 MPa
200000 MPa

m
m
m
m
m

20 MPa

=
=
=

0.0016

4D
19
8D
19
10 mm

As'

1134.11 mm2

1.134

2268.23 mm

2.268

As
b

0.030

maks

0.022

4. Perhitungan
4.1 As2

4.2 M2

=
=

4.3 As1

4.4 a

=
4.5 c

=
4.6 s'

10-3

m2

10-3

m2

As'

1134.11

As'.fy.(d - d')
1.13 x

2.268

320 x (

0.534 -

1.134

As1 . fy
0.85 x fc' x b
1.134
0.85

x
x

10-3
20

x
x

320
0.300

0.067 )

10-3

=
=

0.169
169.482

1.134

0.07116 m
0.07116 m
0.85
0.083718 m
0.003 x (

0.000617

83.72 83.72
<

66.5 )

0.169 MN.m
169.482 kN.m