Control Plan

Page No :

Prototype

Pre-Launch

Key Contact : Amit Parikh


Phone No - 0657 - 2371021

Production

Date (Orig.) : 07.06.2014

1 of 11

Date (Rev. 1) :

Control Plan Number : PE / CP / 6251 / 01


Part / Drg. Number / Latest Change Level - 5336251 / 01

Core Team : APP, OPS,BBS,BKR, LPM

Customer Engineering Approval / Date (If Req' d)

Part Name / Description PIPE, AIR TRANSFER.

Supplier / Plant Approval / Date

Customer Quality Approval / Date (If Req' d)

Supplier / Plant Pravin Engineering Pvt.


Ltd.

Other Approval / Date (If Req' d)

Other Approval / Date (If Req. d)

Supplier Code : P0007


Characteristics

Part / Process Name / Machine, No.


Process
Operation
Device, Jig
Number
Description
Tools for
Mfg.

Al. alloy (50016)


received and
storage.

Product

Identification

Supplier

Chemical
Composition

FORMAT NO. PE - F - QS - APQP / CP - 043


REV - 01

Methods
Process

> Verification of
composition %
of elements in
alloy.
Storage

Spl. Char. Product/Process/


Class.
Specification /
Tolerance

Identification colour
Mark given on Ingot.
(W.I. # 3.19)

Approved sources

> As per Cummins


Engg. STD -50016

> different Al. alloy

Evaluation
Measurement
Technique

Visual

Visual

Third Party
Spectro
analysis

Visual

Sample

Recor Resp
ding

Size

Freq.

Y/N

100%

cont.

100%

cont.

Control Method

>Supplier Invoice
>Supplier T.C.
>Batch wise
Raw
Material
verification
Indent

Reaction Plan

> Reject & return


to supplier
> Rework
>

Approved source list


> Reject
> W.I. # 3.19.A

Once Monthly/
Lot
Wise

> Third Party spectro


report

100%

> Stock Register for Al. > Re - arrange &


alloy.
Re-check.
> Different location for
different Al. alloy in raw
material store.

cont.

> Reject &Return


to supplier

NOTE S SUPERVISOR , IINSPECTOR , O OPERATOR

(SIGNATURE)

CONTROL PLAN
Page No :

Control Plan Number : PE / CP / 6251 / 02


Part Name / Description

Part / Drg. Number


PIPE, AIR TRANSFER

Prototype

Pre-Launch

Process
Machine,
No.
Name /
Device, Jig Tools
Operation
for Mfg.
Description

Shell Core
Making

5336251

Production
Characteristics

Part /
Process
Number

Date (Orig.) : 07.06.2014

Product

Methods
Process

Spl. Product/Process/
Char. Specification /
Class Tolerance
.

Evaluation
Measurement
Technique

Sample

Recor Resp
ding

Control Method

Reaction Plan

Size
Once

Freq.
per hour

Y/N
Y

> PCS ( F-10)


> W.I #
3.33.A

> Re-set & Re-check

> Visual

100%

Cont.

> Re-Mix & Re-check

> 60 - 70 Sec

> Visual

100%

Cont.

Dry
(moisture free)

> Visual

100%

Cont.

> W.I # 3.33


(for Shell
Core)
> Operators
awareness
> W.I # 3.33.B
(for Shell
Core)
> Operators
awareness
> Visual Sample

> Proper Clean

> Visual

100%

Cont.

> Operators
awareness
> Visual Sample

> Segregate & Reject /


Rework

> Visual

100%

Cont.

> Visual Sample.

> Check die mounting


> Die handed
over to maintenance

> Ganesh Shell


Core PE/M/72

> Die Temp.

L.H.S 330 30C > Temp. Controller


R.H.S 330 30C

> Shell Core Die


> Brush
> Knife

> Zirkote Coat


Solution

> Zirkote : water


1 : 1.5

> Curing Time

> Resin Coated


Sand

> Parting line clean

> Re-adjust & Re-check

> Pre-heat in sunlight or


under 60 Watt bulb for
moisture free

> Parting line


mismatch

(no extra sand


particle)
> No Mismatch

> Core Baking

> Proper Baking

> Visual

100%

Cont.

> Visual Sample.

> Segregate & Reject

> Inside Core

> No Solid Core

> Visual

100%

Cont.

> Visual Sample.

> Remove the extra


sand from inside the
core

> Outside Surface


of core

> Proper Coated

> Visual

100%

Cont.

> Visual Sample.

> Re-coat / Core


Repairing

10

> Damage

> No Damage

> Visual

100%

Cont.

FORMAT NO. PE - F - QS - APQP / CP - 043


REV - 01

O / I > PCS ( F-10)

> Segregate & Reject

NOTE S SUPERVISOR , IINSPECTOR , O OPERATOR

(SIGNATURE)

CONTROL PLAN
Page No :

Control Plan Number : PE / CP / 6251 / 03


Part Name / Description

Part / Drg. Number


PIPE, AIR TRANSFER

Prototype

Pre-Launch

5336251

Production
Characteristics

Part /
Process
Number

Process
Machine, Device, No.
Name /
Jig Tools for Mfg.
Operation
Description

Melting of Al. > Melting Furnace


alloy
(Electric)

> Crucible

Product

Process

> Holding Furnace


Temp.

> Molten Metal

Methods
Spl. Product/Process/
Char. Specification /
Class Tolerance

FORMAT NO. PE - F - QS - APQP / CP - 043


REV - 01

Evaluation
Measurement
Technique

Sample

Recor Resp
ding

Control Method

Reaction Plan

Size

Freq.

Y/N

> 950 C (Approx.)

> Temp. Controller

100%

Cont.

> Tempreture
Controler

> Re-Set &


Re-check

> 650 + 50C

> Temp. Indicator

Once

melt wise

> W.I # 3.41


(for Melting Furnace)

> Re-adjust &


Re-check

> Weight

Once

melt wise

> W.I # 3.41


(for Melting Furnace)

> Re-purified

100%

Cont.

> Different Bins for


different alloy
(colour code)

> Reject & Scrap

> Dipping Ladle

Date (Orig.) : 07.06.2014

-0

> Purification of metal


with Al. Cover flux

> 500 gm / 100 Kg


Molten Al.

> To avoid Mix-up of


different Al. alloy

> Melt same Al alloy > Visual

NOTE S SUPERVISOR , IINSPECTOR , O OPERATOR

( S I G NAT U R E )

CONTROL PLAN
Page No :

Control Plan Number : PE / CP / 6251 / 04


Part Name / Description

Part / Drg. Number


PIPE, AIR TRANSFER

Prototype

Pre-Launch

5336251

Production
Characteristics

Part /
Process
Number

Process
Machine, Device, No.
Name /
Jig Tools for Mfg.
Operation
Description

Preparation > Holding


of Al. alloy Furnace (Electric)

Date (Orig.) : 07.06.2014

Product

Process

Methods
Spl. Product/Process/
Char. Specification /
Class Tolerance
.

Evaluation
Measurement
Technique

Sample

Record Resp
ing

Size

Freq.

Y/N

Control Method

Reaction Plan

> Holding Furnace


Temp.

> 705 15C

> Temp. Controller

100%

Cont.

> Tempreture
Controler

> Re-Set &


Re-check

> Crucible

> Molten Metal Temp

> 625 15C

> Temp. Indicator


Calibrated

Once

per hour

> PCS ( F-08)

> Re-adjust &


Re-check

> Chemical Lab


Equipment

> Degassing with Tablet

> 2 Tab / 100 Kg of


Molten Al.

> Weight (Pc)


1 Tab = 50 gm

Once

melt wise

> W.I # 3.2.A


> Re-Degassing
(for Molten (1 tab if required)
metal)

> Purification of metal


with Al. Cover flux

> 200 gm / 100 Kg


of Molten Al.

> Weight (Pot)


1 Pot = 200 gm

Once

melt wise

> W.I # 3.2.A


> Re-purified
(for Molten
metal)

> Grain refiner


Al. Innoculent
Tablet
> Tensile Strength
> Hardness Test

> 1 Tab / 100 Kg of


Molten Al.

> Weight (Pc)


1 Tab = 50 gm

Once

melt wise

> As per Cummins


Engg. STD -50016

> Tensile Testing


Machine
Model:TKG-50KN
>
Hardness

Two

Batch
wise

> W.I # 3.2.A


> Re-Degassing
(for Molten (1 tab if required)
metal)
> Mechanical
> Reject &Return to
properties
supplier
Log. Book

(Degasser Tablet)
> Dipping Ladle

FORMAT NO. PE - F - QS - APQP / CP - 043


REV - 01

Mechanical
properties.

NOTE S SUPERVISOR , IINSPECTOR , O OPERATOR

( S I G NAT U R E )

CONTROL PLAN
Page No :

Control Plan Number : PE / CP / 6251 / 05


Part Name / Description
PIPE, AIR TRANSFER
Prototype

Pre-Launch

5336251

Production
Characteristics

Part /
Process
Number

Process
Machine,
No.
Name /
Device, Jig
Operation Tools for Mfg.
Description

Gravity Die
Casting

> Gravity Die


>
Holding
furnace
> Spoon
>
Tong
> Spray
Gun
>
Hard / Soft
Brush

Date (Orig.) : 07.06.2014

Part / Drg. Number

Product

Methods
Process

Spl. Product/Process/
Char. Specification / Tolerance
Class.

Evaluation
Measurement
Technique

Sample

Recor Resp
ding

Control Method

Reaction Plan

Size

Freq.

Y/N

> Molten Metal


Temp.

> 625 15C

>Temp. Indicator

Once

per
hour

> PCS ( F-08)

> Re-adjust &


Re-check

> Preparation of
Die coat

> French chalk powder :


water : sodium silicate
10 :15 :
0.50
> Uniformity in Die Coat
Coating

> Weight

Once

Shift

> W.I # 3.3

> Shake well before use

> Visual

100%

cont.

(for Die Coating)

> Die Coat Spray

> Die Temp.

> 175 25C

> Temp. Indicator

Once

Start

> Pouring

> Un-interupted
> Same Speed
> Same Distance

> Visual

100%

cont.

> Solidification Time

> When runner / riser


solidify
(End of liquid form)

> Visual

100%

cont.

> Operator
Awareness

> Timely Die Open

> 4.5 0.76 (W.Thick)

> Q.I.E

1st Pc

Shift

O/I

> F.P.A. (F-15)

> Reject / Take the deviation

Dimn. Parameter
( F.P.A)

> W.I # 3.3

> Re-coating &


Re-check

(for Die Coating)


> W.I # 3.5
> Die Pre Heat
(for
G.D.C. )
> Control Pouring
> Operator
Awareness

> 45.0 0.76 (I.D)


> 67.7 0.76 (I.D)
> 76.7 0.76 (O.D)

> Grain structure

> Fine

> Fracture Test

1 Pc

25 Pcs

> PCS ( F-08)

> Segregate & Reject

> Crack / Blow Hole

> No Crack / Blow Hole

> Visual

100%

cont.

> PCS ( F-08)

> Segregate & Reject

10 > Surface finish

> Smooth & No "V" Notch


at parting line (inside)

> Visual

100%

cont.

> Visual Sample

> Rectify & Recheck


(Change die coat & donot
use improper parting line
clean shell core)

11 > Product
Identification

> Should Exit

> Visual

100%

cont.

> Visual Sample

> Rectify & Recheck (Clean


the die coat layer stick in
engraving no. by pointed
pin)
> After approval from
customer part identification
will engrave

FORMAT NO. PE - F - QS - APQP / CP - 043


REV - 01

NOTE S SUPERVISOR , IINSPECTOR , O OPERATOR

(SIGNATURE)

CONTROL PLAN
Page No: 6

Control Plan Number : PE / CP / 6251 / 06


Part Name / Description
PIPE, AIR TRANSFER
Prototype

Pre-Launch

Part / Drg. Number

Date (Orig.) : 07.06.2014


5336251

Production
Characteristics

Part /
Process
Number

Process
Name /
Operation
Description

Cutting of
Runner /
Riser

Machine,
Device, Jig
Tools for
Mfg.

No.

Product

Methods
Process

Spl.
Product/Process/
Char. Specification / Tolerance
Class.

Evaluation
Measurement
Technique

Sample

Size

Fettling

>Bandsaw
Cutting M/c
> Cutting
Blade

> Flat File


>Round File
>Vice

> Vibration &


Sharpness of
cutting blade

Freq.

Control Method

> Cutting blade


10 TPI

> Visual

100%

cont

> W.I # 3.8 for


Cutting M/C

> Visual

100%

cont.

> Visual Sample

100%

cont.

> W. I # 3.9
(for fettling)
>visual
sample
-do-

> Component

> Free fronm Runner /


Riser

Parting Line

Free from Burrs.


Smooth & parting line
should not be mismatch

Visual

Reaction Plan

Y/N

> Re joint & Re grinding

> Segregate & Reject / Rework

Segregate &
Reject / Rework

Sharp edge

Smooth

Visual

100%

cont.

Unwanted
Projection

Remove & Smooth

Visual

100%

cont.

- do-

-do-

Inside surface

Smooth & Free from


sand / Foreign particles

Visual

100%

cont.

- do-

> Segregate & Reject / Rework


(Rectity the mismatch component
by filling or buffing)

FORMAT NO. PE - F - QS - APQP / CP - 043


REV - 01

Recor Resp
ding

-do-

NOTE S SUPERVISOR , IINSPECTOR , O OPERATOR

(SIGNATURE)

CONTROL PLAN
Page No: 7

Control Plan Number : PE / CP / 6251 / 07


Part Name / Description
PIPE, AIR TRANSFER
Prototype

Part / Drg. Number

Date (Orig.) : 07.06.2014


5336251

Pre-Launch

Production

Machine,
Device, Jig
Tools for
Mfg.

No.

Product

Size

Freq.

Y/N

Hot Cure Water


Temp.

90 C 5 c

Temp. Controller

Each

cycle

> Daily Check List


(For V.I)

> Re-set & Re-check

Vacuum pressure
at Auto Clave

-760 mm of Hg

Pressure Gauge

Each

cycle

> Daily Check List


(For V.I)

> Rectify & Re-check

Cycle Time

> Dry 30 min.


> Dry wet 60 min.
> Hot water 30
min.

Timer / Watch

Each

cycle

Porosity seal

Leak Proof Test

100%

cont.

> Record for V.I


> L.P.T

> Reject the Leakage components

Air Pressure

> Pressure
Gauge

100%

cont.

> Re - Set &

Re-check

> Timer

100%

cont.

> Calibration of
Gauge
> W.I.# 3.14
for LPT
> W.I # 3.14 for LPT

> Re - Set &

Re-check

100%

cont.

LPT Record

Characteristics
Part /
Process
Number

Process
Name /
Operation
Description

Vacuum
> V.I (IMP)
Impregnation PLANT

Leak Proof
Test

Leak Proof

Vacuum
impregnated
component
-

Methods

Process

Spl. Product/Process/
Char. Specification /
Class. Tolerance

1 Kg / cm

Evaluation
Measurement
Technique

Sample

Recor Resp
ding

Test fixture
> Holding time =
1min

PE/FIX/LPT/3
2
2

FORMAT NO. PE - F - QS - APQP / CP - 043


REV - 01

Leak Proof

Dipping in water

No Leakage

Visual
(Air Bubble)

Control Method

> W.I # 3.13 for V.I

Reaction Plan

> Re-set & Re-check

> Leakage Components move to


VI.

NOTE S SUPERVISOR , IINSPECTOR , O OPERATOR

(SIGNATURE)

CONTROL PLAN
Page No : 8

Control Plan Number : PE / CP / 6251 / 08


Part Name / Description
PIPE, AIR TRANSFER
Prototype

Pre-Launch

Part / Drg. Number

Production
Characteristics

Part / Process Name Machine, Device,


Process
/ Operation
Jig Tools for Mfg.
Number
Description

10

CNC Machining > CNC M/c


PE/ M/82
>
Machining Fixture
PE/
FIX/LM-34
> Facing Insert
> Grooving Insert
> Parting Tool
>Chamfering
Insert

REV - 01

Methods

No.

Product

Clamping of
component in
Fixture

> Tight Fitting in


fixture

>Tool change
frequency

> After tool blunt

FORMAT NO. PE - F - QS - APQP / CP - 043

Date (Orig.) : 07.06.2014


5336251

Process

Spl. Product/Process/
Char. Specification /
Class. Tolerance

> Facing Insert

> 8000

> Grooving Insert

> 9000

> Parting Tool

> 9000

> M/c Parameter

RPM

Feed

> Facing Insert

900

0.15

> Chamfering

900

0.15

> Grooving Insert

900

0.04

> Parting Tool

900

0.04

Evaluation
Measurement
Technique

Visual

> CRT screen

> Diameter

> Diameter

> Position

> Diameter

> Position

> Width

> Depth

> Height

> Width

> Flatness

> Center Height

> 155.8 1.02

> Chamfer

> 0.5 0.2 x 45

> Height Gauge


(Trimos)
> Profile Projector

> Chamfer

> 0.5 0.2 x 45

> Profile Projector

Sample

Reco Resp Control Method


rding

Size

Freq.

Y/N

100%

cont.

> Rectify & Re-check


> Notify
the Production Supervisor

Tool issue
register

> Replace against Quality


Issue

100%

> Programming > Lock the Program

> PCS (F-11)


> PDS
>
Cpk (major)

> 54.0 0.10

> Digital Caliper

1 Pc

25Pcs

O/I

> 56.0 0.25

> Digital Caliper

1 Pc

25Pcs

O/I

> C.M.M

1 Pc

set up

> Digital Caliper

1 Pc

25Pcs

O/I

> C.M.M

1 Pc

set up

> 3.22 0.1

> Digital Caliper

1 Pc

25Pcs

O/I

> 2.0 0.08

> C.M.M

1 Pc

set up

> 2.33 0.13

> Profile Projector

> 3.65 0.05

> Profile Projector

>

> C.M.M
1 Pc

25Pcs

O/I

1 Pc

set up

> 65.85 0.15

/ 0.10

Reaction Plan

> Segregate & Reject.

NOTE S SUPERVISOR , IINSPECTOR , O OPERATOR

(SIGNATURE)

CONTROL PLAN
Page No :

Control Plan Number : PE / CP / 6251 / 09


Part Name / Description
PIPE, AIR TRANSFER
Prototype

Pre-Launch

Part / Drg. Number


5336251

Production
Characteristics

Part /
Process
Number

Process
Name /
Operation
Description

11

Deburing

12

High
Pressure
Cleaning

Machine,
Device, Jig
Tools for Mfg.
> Flat file

High Pressure
Cleaning
Machine

No.

Product

Methods
Process

Spl.
Char.
Class.

Product/Process/
Specification /
Tolerance

Evaluation
Measurement
Technique

Size

Freq.

Y/N

> Free from burrs &


sharp edge.

Visual

100%

cont.

> Temperture
Controller

100%

cont.

100%

> Facing
surface

> Solvent
Temp.

> 55 C 5 C

> Compressed
air pressure

> 5 to 6 bars

> Free from burrs,


dust, dust oily
surface

> Component
Cleaning

FORMAT NO. PE - F - QS - APQP / CP - 043

09

Date (Orig.) : 07.06.2014

> Visual

Sample

Record Resp
ing

Control Method

Reaction Plan

Rectify & Re-check

> Daily Checklist


(for H.P.C)

> Re-set & Re-check

> Daily Checklist


(for H.P.C)

> Re-adjust & Re-check

cont.

> Millipore Test

> Re - clean & Re - check

NOTE S SUPERVISOR , IINSPECTOR , O OPERATOR

REV - 01

( S I G NAT U R E )

n Plan

Re-check

check

Re-check

Re - check

CONTROL PLAN
Page No :

Control Plan Number : PE / CP / 6251 / 10


Part Name / Description
PIPE, AIR TRANSFER
Prototype

Pre-Launch

Part / Drg. Number


5336251

Production
Characteristics

Part / Process Name /


Process
Operation
Number
Description
13

Final Inspection /
Pre Dispatch
Inspection

No.

> Diameter

> Diameter

> Width

REV - 01

Product

Methods

Machine,
Device, Jig
Tools for Mfg.

FORMAT NO. PE - F - QS - APQP / CP - 043

10

Date (Orig.) : 07.06.2014

Process

Spl.
Char.
Class.

Product/Process/
Specification /
Tolerance

Evaluation
Measurement
Technique

> 54.0 0.10

> Digital Caliper

> 65.85 0.15

> Digital Caliper

> 3.22 0.1

> Digital Caliper

> Depth

> 2.0 0.08

> C.M.M

> Flatness

>

> C.M.M

> Diameter

> 76.70 0.76

> Vernier Caliper

> Center Height

> 155.8 1.02

> Height Gauge


(Trimos)

Inner Surface

> Smooth
> Free from
sand particles

Outer Surface

/ 0.10

> Smooth
> Free from
burrs / Sharp edge
& Casting defect.

Sample

Reco Resp
rding

Size

Freq.

Y/N

As per Sampling
Plan

Lot

Visual

100%

Visual

100%

Control
Method

Reaction Plan

> PDI Report > Stop Dispatch


(F
>Segregate & Rework /
- 6)
Reject
>
Quality Plan
CATEGORY-I
(F - 37)
> For
Immediate Despatch
> Log Book
F.I. OK
For Final
component will
move
Inspection
with PDI report.
(log - 4)
> CATEGORY- II
> For Inventory
F.I. OK
component will
move
to strorage area & the PDI
report will be made
before dispatch.

NOTE S SUPERVISOR , IINSPECTOR , O OPERATOR


-

( S I G NAT U R E )

CONTROL PLAN
Control Plan Number : PE / CP / 6251 / 11

Page No : 11
Part Name / Description
PIPE, AIR TRANSFER

Prototype

Pre-Launch

Part / Drg. Number

Production
Characteristics

Part /
Process
Number

14

Process
Name /
Operation
Description

Packaging

Machine,
Device, Jig
Tools for Mfg.

> Packing slip


> Cartoon

Methods

No.

Product

Process

Spl.
Char.
Class.

Product/Process/
Specification /
Tolerance

Evaluation Measurement
Technique

Barcode Label 2D
Matrix Barcode
sticker

2D Matrix Barcode
Sticker
as per
cummins Engg. Std
No 18287

Visual

Size
100%

Freq.
cont.

Y/N
N

> Height

20

> Vernier Height Gauge

100%

cont.

> Center Distance

> Vernier Height Gauge

100%

cont.

> Height

75

> Vernier Height Gauge

100%

cont.

> Center Distance

20

> Vernier Height Gauge

100%

cont.

As per packaging
Standard of
component.

Visual

100%

cont.

> Brown Tape

15

16

Storage

Dispatch

Date (Orig.) : 07.06.2014


5336251

Sample

Record Resp
ing

Control Method

Reaction Plan

> Re- Label &


Re - check

> Repack &


Re - check

> Ware House

Tagging

Visual

100% Lot wise

> Presence of 100% > Re - tagging &


Tagging
Re - check

> Ware House

As per Invoice

Visual

100%

> PDI Report


> Packing
slip
>
Dock Audit

FORMAT NO. PE - F - QS - APQP / CP - 043

cont.

NOTE S SUPERVISOR , IINSPECTOR , O OPERATOR

REV - 01

( SIGNATURE)

> Stop the Dispatch