PART 1 - GENERAL
1.01
1.02
Work Included
A.
The work shall consist of furnishing and installing expansion joints in accordance
with the details shown on the plans and the requirements of the specifications.
The joints are proprietary designs utilizing preformed metal components, gaskets
and fastening strips.
B.
Related Work
- Cast-in-place concrete
- Miscellaneous and ornamental metals
- Flashing and sheet metal
- Sealants and caulking
Submittals
A.
1.03
1.04
Acceptable Manufacturer
A.
B.
Alternate manufacturers and their products will be considered, provided they meet
the design concept and are produced of materials that are equal to or superior to
those called for in the base product specification.
C.
Any proposed alternate systems must be submitted and receive approval 21 days
prior to the bid. All post bid submittals will not be considered. This submission
shall be in accordance with MATERIALS AND SUBSTITUTIONS.
- Any manufacturer wishing to submit for prior approval must provide the following:
1. A working 6 sample of the proposed system with a letter describing how
system is considered superior to the specified system.
05800-1
Compression Seal WA
Quality Assurance
A.
B.
C.
D.
PART 2 - PRODUCT
2.01
General
A.
2.02 Materials
A.
table below exclusive of recovery and pressure sensitive tests unless specified
otherwise.
PHYSICAL PROPERTIES OF POLYCHLOROPRENE (NEOPRENE) SEAL
ELEMENT
Physical Properties
Tensile strength, min.
Elongation @ break min.
Hardness, Type A Durometer
Compression set.
70 hr. @ 212F max.
Oven aging, 70 hr. @ 212F
Tensile strength, loss, max.
Elongation, loss, max.
Hardness, Type A Durometer
(points change)
Oil Swell, ASTM oil 3, 70 hr. @
212F weight, change, max.
Ozone resistance
20% strain, 300 pphm, in air
@ 104F (wiped w/toluene to
Remove contamination)
Low temperature recovery,
72 hr. @ 14F 50% deflection, min.
Low temperature recovery, 22 hr.
@ -20%F 50% deflection, min.
High temperature recovery, 70 hr.
2.03
ASTM
Test Method
D-412
D-412
D-2240 (Modified)
D-395, Method B
(Modified)
D-573
Requirements
2000 psi
250%
(55 +/-5)
40%
20%
20%
0 to +10
45%
D-1149
No Cracks
D-2628-81
88%
D-2628-81
83%
D-2628-81
85%
B.
C.
Metal Retainers (optional) - Provide profile or shape of suitable size and design
for application indicated on contract drawings. Incorporate factory welded stop
bar for all horizontal conditions and as recommended by manufacturer. Metal
alloy and method of anchorage shall be governed by architect.
D.
Fabrication
A.
2.04
B.
C.
D.
Finishes
A.
B.
PART 3 - EXECUTION
3.01
Installation
A.
Where indicated and noted on the contract drawings, install the seals in a neat,
workmanlike manner. Utilize manufacturers optional installation tool where
applicable. All surfaces to receive elastomeric compression seal shall be free from
dirt, water, frost and any other loose foreign debris which may be detrimental to
effective joint sealing.
B.
The neoprene seal shall be supplied in the longest continuous length possible.
Factory splices will be allowed. Aron Alpha adhesive shall be used to field splice
and/or miter the seal to accomplish directional changes. Purchase adhesives from
seal manufacturer.
C.
D.
Protect all expansion joint component parts from damage during installation of
adjacent materials and thereafter until completion of structure. Protect horizontal
seals from construction traffic.
E.
05800-4
Compression Seal WA
F.
3.02
Expansion joint systems shall be set to the proper width for the ambient
temperature at the time of installation. This information is indicated in the contract
plans.
Protect system and its components during construction. After work is complete in
adjacent areas, clean exposed surfaces and remove excess adhesive with a
suitable cleaner that will not harm or attack the elastomeric seal.
05800-5
Compression Seal WA