Project title
Design by
Date
:
:
:
PWC
Denise
7/31/2014
Wall type
Checked By
Time
=
=
:
:
:
24.00 kN/m3
17.66 kN/m3
Height of wall, Ha
Thickness of wall (top), tt
Thickness of wall (bottom), tb
Width of outer footing, Wo
Width of inner footing, Wi
Total width of footing, W
Thickness of footing, tf
Height of nib (key), Hn
Thickness of nib, tn
Height of backfill, Ha
=
=
=
=
=
=
=
=
=
=
1.97
230.00
230.00
0.00
770.00
1000.00
230.00
0.00
0.00
0.00
=
=
=
=
1.97
0.00
1.97
0.00
Height of backfill, Hp =
m
degree
m
kN/m2
1.05 m
Active surcharge
||||| ||||| ||||
////
///
////
////
Top of wall
+---+
| |
Backfill
| |
| |
| |
| |
Passive face
| |
Active face
(Batter / Vertical)
| |
(Vertical)
| |
| |
----------------- ----------------- | |
Hp ///
////////
| |
"B" (centre of footing)
+-------------- + +--------------+
Outer footing |
|
Inner footing
+-------------- + +--------------+
"A " Nib
| |
Hn "C"
+---+
Typical Arrangement of Retaining Wall
m
mm
mm
mm
mm
mm
mm
mm
mm
mm
----|
|
|
|
Ha
|
|
|
|
-----
L type
Leong
06:59:27
=
=
=
100.00 kN/m2
30.00 degree
0.50
0.50
0.33
3.00
2.20
0.00
2.20
0.00
12.95
Passive Pressure:
Total height of soil from base of nib
Eff. ht. of soil (Ignored top 250 mm )
Horizontal pressure at base
1.28 m
0.80 m
42.38 kN/m2
Load
=
=
=
m
m
m
kN/m2
kN/m2
Horizontal
(kN)
Distance
(m)
Active pressure:
Uniform
Triangular
0.0
14.2
1.10
0.73
0.0
-10.4
Passive pressure:
Triangular
-17.0
0.27
4.5
Total
-2.7
-5.9
Vertical Load
(KN)
10.9
0.0
0.0
5.5
26.8
0.0
0.0
0.0
0.0
0.12
0.00
0.00
0.50
0.62
0.74
0.62
0.00
0.00
1.3
0.0
0.0
2.8
16.5
0.0
0.0
0.0
0.0
0.0
0.0
1.00
1.00
0.0
0.0
Total
43.2
Area of footing, A
Modulus of elasticity, Z
Maximum pressure at "A", Pmax
Pressure below out face of wall
Pressure below inner face of wall
Minimum pressure at "C", Pmin
Forces resisting sliding,
Factor of safety against sliding
Factor of safety against overturning
20.5
=
=
=
=
=
=
=
=
=
1.00
0.17
85.37
85.37
65.97
0.99
38.55
2.71
3.46
m2
m3
kN/m2
kN/m2
kN/m2
kN/m2
kN
< P O.K.
> 0 O.K.
>1.50 O.K.
>1.50 O.K.
500.00 kN/m2
30.00 kN/m2
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
40.00
17.40
0.00
17.13
11.25
10.00
10.00
185.00
0.01
175.75
134.78
345.00
227.65
200.00
392.70
227.65
200.00
0.09
0.50
mm
kN/m2
kN/m2
kN
kNm
mm
mm
mm
=
=
=
=
=
=
18.75
10.65
0.33
107.25 N/mm2
2.00
37.50 O.K.
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
40.00
32.29
7.62
10.00
10.00
185.00
0.01
175.75
91.24
345.00
227.65
200.00
392.70
227.65
200.00
0.17
0.50
402.17
O.K.
mm
mm2/m
mm2/m
mm C/C
mm C/C
mm2/m
mm C/C
mm C/C
N/mm2
N/mm2
O.K.
O.K.
> v O.K.
(II) Deflection
Basic l/d ratio
Actual l/d ratio
M/bd2 ratio
Service stress of steel, fy
Modification factor for tension steel
Allowable l/d ratio
(c) Inner Footing
Concrete cover
Shear at face of wall, V
Moment at face of wall, M
Diameter of main steel bar
Diameter of secondary steel bar
Effective depth, d
Ratio M/fcubd2
Lever arm, z
Area of steel required, As.req
Minimum area of steel required, As.min
Spacing of main reinforcement
Provide main reinforcement at spacing
Area of steel provided, As.prov
Spacing of secondary reinforcement
Provide secondary reinf' at spacing
Shear stress at base of wall, v
Allowable shear stress, vc
Anchorage length required
mm
kN
kNm
mm
mm
mm
O.K.
mm
mm2/m
mm2/m
mm C/C
mm C/C
mm2/m
mm C/C
mm C/C
N/mm2
N/mm2
mm
O.K.
O.K.
> v O.K.
Project title
Design by
Date
:
:
:
PWC
teoh
12/22/2014
Wall type
Checked By
Time
=
=
:
:
:
L type
Leong
06:59:27
24.00 kN/m3
17.66 kN/m3
Height of wall, Ha
Thickness of wall (top), tt
Thickness of wall (bottom), tb
Width of outer footing, Wo
Width of inner footing, Wi
Total width of footing, W
Thickness of footing, tf
Height of nib (key), Hn
Thickness of nib, tn
Height of backfill, Ha
=
=
=
=
=
=
=
=
=
=
2.97
230.00
230.00
0.00
1970.00
2200.00
230.00
0.00
0.00
0.00
=
=
=
=
2.97
0.00
2.97
0.00
Height of backfill, Hp =
m
mm
mm
mm
mm
mm
mm
mm
mm
mm
m
degree
m
kN/m2
1.05 m
Active surcharge
||||| ||||| ||||
////
///
////
////
Top of wall
+---+
| |
Backfill
| |
| |
| |
| |
Passive face
| |
Active face
(Batter / Vertical)
| |
(Vertical)
| |
| |
----------------- ----------------- | |
Hp ///
////////
| |
"B" (centre of footing)
+-------------- + +--------------+
Outer footing |
|
Inner footing
+-------------- + +--------------+
"A " Nib
| |
Hn "C"
+---+
----|
|
|
|
Ha
|
|
|
|
-----
file:///var/www/apps/conversion/tmp/scratch_7/316810084.xls
Page4
=
=
=
100.00 kN/m2
30.00 degree
0.50
0.50
0.33
3.00
3.20
0.00
3.20
0.00
18.84
Passive Pressure:
Total height of soil from base of nib
Eff. ht. of soil (Ignored top 250 mm )
Horizontal pressure at base
1.28 m
0.80 m
42.38 kN/m2
Load
=
=
=
m
m
m
kN/m2
kN/m2
Horizontal
(kN)
Distance
(m)
Active pressure:
Uniform
Triangular
0.0
30.1
1.60
1.07
0.0
-32.1
Passive pressure:
Triangular
-17.0
0.27
4.5
Total
13.2
-27.6
Vertical Load
(kN)
16.4
0.0
0.0
12.1
103.3
0.0
0.0
0.0
0.0
0.12
0.00
0.00
1.10
1.22
1.54
1.22
0.00
0.00
1.9
0.0
0.0
13.4
125.5
0.0
0.0
0.0
0.0
0.0
0.0
2.20
2.20
0.0
0.0
Total
131.9
Area of footing, A
Modulus of elasticity, Z
Maximum pressure at "A", Pmax
Pressure below out face of wall
Pressure below inner face of wall
Minimum pressure at "C", Pmin
Forces resisting sliding,
Factor of safety against sliding
Factor of safety against overturning
140.8
=
=
=
=
=
=
=
=
=
2.20
0.81
99.48
99.48
91.21
20.40
82.89
2.75
5.10
m2
m3
kN/m2
kN/m2
kN/m2
kN/m2
kN
< P O.K.
> 0 O.K.
>1.50 O.K.
>1.50 O.K.
file:///var/www/apps/conversion/tmp/scratch_7/316810084.xls
Page5
500.00 kN/m2
30.00 kN/m2
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
40.00
26.23
0.00
38.94
38.55
12.00
10.00
184.00
0.04
174.80
464.35
345.00
243.56
200.00
565.49
227.65
200.00
0.21
0.57
mm
kN/m2
kN/m2
kN
kNm
mm
mm
mm
=
=
=
=
=
=
18.75
16.14
1.14
256.61 N/mm2
1.41
26.41 O.K.
O.K.
mm
mm2/m
mm2/m
mm C/C
mm C/C
mm2/m
mm C/C
mm C/C
N/mm2
N/mm2
O.K.
O.K.
> v O.K.
(II) Deflection
Basic l/d ratio
Actual l/d ratio
M/bd2 ratio
Service stress of steel, fy
Modification factor for tension steel
Allowable l/d ratio
(c) Inner Footing
Concrete cover
Shear at face of wall, V
Moment at face of wall, M
Diameter of main steel bar
Diameter of secondary steel bar
Effective depth, d
Ratio M/fcubd2
Lever arm, z
Area of steel required, As.req
Minimum area of steel required, As.min
Spacing of main reinforcement
Provide main reinforcement at spacing
Area of steel provided, As.prov
Spacing of secondary reinforcement
Provide secondary reinf' at spacing
Shear stress at base of wall, v
Allowable shear stress, vc
Anchorage length required
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
40.00
148.59
112.01
20.00
10.00
180.00
0.12
152.86
1542.71
345.00
203.64
150.00
2094.40
227.65
200.00
0.83
0.89
804.35
mm
kN
kNm
mm
mm
mm
O.K.
mm
mm2/m
mm2/m
mm C/C
mm C/C
mm2/m
mm C/C
mm C/C
N/mm2
N/mm2
mm
O.K.
O.K.
> v O.K.