Project

Location

EPIC FOR SECURATY BUILDINGS, BOUNDERY AND LANDSCAPING WORKS AT RLIC


MPAC Canopy

Contract Duration :

Temperature
Min.

Max.

Indirect Man Power


Site Staff
Site Supervisor
HSE officer

Materials/Consumables

Secondary beam canopy B


Secondary beam canopy A
Top plate canopy A
Primary beam canopy C

Item
1

Description of Activity
Canopy errection work(canopy A)

Secondary beam

Top plate fixing


Perimeter beam
Canopy errection work(canopy B)
primary beam
Secondary beam
Canopy errection work(canopy C)
primary beam
Secondary beam
Scaffold erection work
scaffold erection work between canopy B & C
Work Stoppage
Lack of Manpower
Material Rejected

1
2

Prepared by
Name: Santosh Deo
Sign: ________________

Canopy errection work(canopy A B & C)


Scaffold Erection work

AL MUSAIRIE TRADING AND CONTRACTI

Site Daily Progress Re

SECURATY BUILDINGS, BOUNDERY AND LANDSCAPING WORKS AT RLIC

Humidity
%

Sunny
Yes

Indirect Man Power

Direct Manpower
Qty
1
1

Lead man
Labour
Operator
Carpenter
Mason
Flage man
Scaffolder
Rigger

Sub-Total A
B. Sub-Contractors
Canopy errection team(Leo Steel)
Scaffolder sub contractor( first line)

MATERIALS RECEIVING
Materials/Consumables

Unit

Description of Activity

ection work(canopy A)

ection work(canopy B)

ection work(canopy C)

ection work
ction work between canopy B & C

Delays (Standby time) Affecting Progress


Weather Condition
Equipment Breakdown
Unforseen
Other Events

Requirements

Next day schedule

ection work(canopy A B & C)


ection work

Verified by
Name:
Sig

AL MUSAIRIE TRADING AND CONTRACTING CO. QATAR

Site Daily Progress Report


DPR no.
Date
Time
Client

Weather Conditions
Cloudy
..

Rainy
..

Direct Manpower
Lead man
Labour

Qty
0
0

Operator
Carpenter
Mason
Flage man
Scaffolder
Rigger

4
3
1
1
2
2

Sub-Total A

13

B. Sub-Contractors
Canopy errection team(Leo Steel)
Scaffolder sub contractor( first line)

25
7

45
MATERIALS RECEIVING
Unit

Qty

NO

NO

NO

NO

Prev.
days Qty
NO

324

NO

19

NO

10

NO

60

NO

54

NO

17

NO

Per

80.00%

Delays (Standby time) Affecting Progress of Works Due to:


Weather Condition
Equipment Breakdown
Unforseen
Other Events

Requirements

Next day schedule

Verified by
Name:
________________

Date

QATAR

22
17/4/2016
6:00AM -4:00PM
QP

r Conditions
Windy
17 Knots

Plants & Equipments


Backhoe
Excavator
Grader
Wheel Loader
Forklift
Steel Roller Big/Soil compactor
Water Truck
Welding machine
Mini Bus (8 Seater)
Pick up's
Half lorry
Dump truck
Bob Cat
Plate Compactor
Hand Roller
Plate Compactor
Crane
Manlift
Trailer with Flat bed
Air compressor
Total station Equipment
Grooving Machine
Cutting machine
Angle grinder
Drilling Machine
2.2 kw Generator

Current Qty

Qty

329

19

10

60

17

71

17

10.00%

90.00%

ks Due to:
Brief Statement of Delay:

18.4.2016

Dusty
..

ments
Qty

2
1

Reamarks