INSPECTION TEST PLAN (ITP) OF PVC CONDUITS

Title:

Activi
ty No:

1.0

Activity Description

DOCUMENT
REVIEW

Method of
Statement

Shop Drawings

Material
Submittals

Frequency of
inspection

QCS Sec. 21,


Part 7 Clause
7.1.4 5

Acceptance criteria

Before Work

Commencement

As per Client Status Code

Review of Submittals if it is in
Approved code A or B

Resubmit for the submittal


that has a code A, B & C
incorporate all consultant
comment.

Project Spec.
Approved
Material
Submittal

Verifying
Documents

Approved
Documents
by the
consultant

Inspection Verification
Sub Con
Main
Co
Con
n

Approved
Method
Statement
Approved Shop
Drawings

H: Hold Point: Written notification required. Contractor may not


proceed beyond this point without written confirmation of the
engineer.

W: Witness Inspection

S Surveillance Notification
Required.

R - Review Record ( Documents


Review)

Client

Project:

Doc No :

Date :

Consultant
Logo

Sub-Contractor

Logo

Logo

INSPECTION TEST PLAN (ITP) OF PVC CONDUITS

Title:

Activi
ty No:

2.0

Main Contractor

Activity Description

Delivery, Storage
and Handling of
Materials:

Frequency of
inspection

Acceptance criteria

Ensure that the PVC conduits


and its accessories are
carefully offloaded at site
using proper equipment to
avoid damages.

QCS
Sec. 21, Part
7 Clauses
7.1. & 7.2

Project Spec.

Verifying
Documents

Each Delivery

Approved
Material
Submittal

Ensure that the materials have


been inspected at offloading
point for any physical

damage and completeness.

Approved
Method
Statement

Also ensure that the materials


are stored as per
manufacturers instructions

Deliver
y note

Inspection Verification
Sub Con
Main
Co
Con
n

W/R

S/R

Approved
Material
Submittal
(Front Sheet)
Material
Inspection
report (As
per Attached
Sample)

Approved

H: Hold Point: Written notification required. Contractor may not


proceed beyond this point without written confirmation of the
engineer.

W: Witness Inspection

S Surveillance Notification
Required.

R - Review Record ( Documents


Review)

Client

Project:

Doc No :

Date :

Consultant
Logo

Sub-Contractor

Logo

Logo

INSPECTION TEST PLAN (ITP) OF PVC CONDUITS

Title:

Activi
ty No:

Main Contractor

Activity Description

Frequency of
inspection

Acceptance criteria

Verifying
Documents

Inspection Verification
Sub Con
Main
Co
Con
n

Shop
Drawings

H: Hold Point: Written notification required. Contractor may not


proceed beyond this point without written confirmation of the
engineer.

W: Witness Inspection

S Surveillance Notification
Required.

R - Review Record ( Documents


Review)

Client

Project:

Doc No :

Date :

Consultant
Logo

Sub-Contractor

Logo

Logo

INSPECTION TEST PLAN (ITP) OF PVC CONDUITS

Title:

Activi
ty No:

3.0

Main Contractor

Activity Description

Installation of PVC
/ UPVC Conduit,
boxes and
accessories.

Frequency of
inspection

QCS
Sec. 21,
Part 7
Clauses
7.1. & 7.2

Acceptance criteria

After
Installation of
PVC Conduits
& Accessories

Installation of PVC

Conduits and accessories


should be as per approved
shop drawing.

To segregate different
services like low current,
BMS, lighting, power etc. &
power wiring in at least 25
mm conduit.

Project Spec.
Approved
Material
Submittal
Approved
Method
Statement
Approved
Shop
Drawings
H: Hold Point: Written notification required. Contractor may not
proceed beyond this point without written confirmation of the
engineer.

Verifying
Documents

During laying all conduits


care shall be taken to
prevent any foreign matter
entering in the pipe. All open
ends shall be capped with
appropriate capping
Keep conduit at least 100
mm away from the pipes or
other non electrical services.
Take approval prior to
W: Witness Inspection

Approved Shop
Drawing

Approved
Material
Submittal
(Front Sheet)

RFIT Request
for Inspection /
Testing (As per
attached
sample)

S Surveillance Notification
Required.

Inspection Verification
Sub Con
Main
Co
Con
n

R - Review Record ( Documents


Review)

Client

Project:

Doc No :

Date :

Consultant
Logo

Sub-Contractor

Logo

Logo

INSPECTION TEST PLAN (ITP) OF PVC CONDUITS

Title:

Activi
ty No:

Main Contractor

Activity Description

Frequency of
inspection

Acceptance criteria

Verifying
Documents

Inspection Verification
Sub Con
Main
Co
Con
n

concrete for the conduit


installation.

H: Hold Point: Written notification required. Contractor may not


proceed beyond this point without written confirmation of the
engineer.

W: Witness Inspection

S Surveillance Notification
Required.

R - Review Record ( Documents


Review)

Client

Project:

Doc No :

Date :

Consultant
Logo

Sub-Contractor

Logo

Logo

INSPECTION TEST PLAN (ITP) OF PVC CONDUITS

Title:

Activi
ty No:

Main Contractor

Activity Description

Frequency of
inspection

H: Hold Point: Written notification required. Contractor may not


proceed beyond this point without written confirmation of the
engineer.

Acceptance criteria

W: Witness Inspection

Verifying
Documents

S Surveillance Notification
Required.

Inspection Verification
Sub Con
Main
Co
Con
n

R - Review Record ( Documents


Review)