Project:
Doc No :
Date :
Consultant
Logo
Main Contractor
Sub-Contractor
Logo
Logo
Title:
Activi
ty No:
1.0
Activity Description
DOCUMENT
REVIEW
Method of
Statement
Shop Drawings
Material
Submittals
Frequency of
inspection
Acceptance criteria
Before Work
Commencement
Review of Submittals if it is in
Approved code A or B
Project Spec.
Approved
Material
Submittal
Verifying
Documents
Approved
Documents
by the
consultant
Inspection Verification
Sub Con
Main
Co
Con
n
Approved
Method
Statement
Approved Shop
Drawings
W: Witness Inspection
S Surveillance Notification
Required.
Client
Project:
Doc No :
Date :
Consultant
Logo
Sub-Contractor
Logo
Logo
Title:
Activi
ty No:
2.0
Main Contractor
Activity Description
Delivery, Storage
and Handling of
Materials:
Frequency of
inspection
Acceptance criteria
QCS
Sec. 21, Part
7 Clauses
7.1. & 7.2
Project Spec.
Verifying
Documents
Each Delivery
Approved
Material
Submittal
Approved
Method
Statement
Deliver
y note
Inspection Verification
Sub Con
Main
Co
Con
n
W/R
S/R
Approved
Material
Submittal
(Front Sheet)
Material
Inspection
report (As
per Attached
Sample)
Approved
W: Witness Inspection
S Surveillance Notification
Required.
Client
Project:
Doc No :
Date :
Consultant
Logo
Sub-Contractor
Logo
Logo
Title:
Activi
ty No:
Main Contractor
Activity Description
Frequency of
inspection
Acceptance criteria
Verifying
Documents
Inspection Verification
Sub Con
Main
Co
Con
n
Shop
Drawings
W: Witness Inspection
S Surveillance Notification
Required.
Client
Project:
Doc No :
Date :
Consultant
Logo
Sub-Contractor
Logo
Logo
Title:
Activi
ty No:
3.0
Main Contractor
Activity Description
Installation of PVC
/ UPVC Conduit,
boxes and
accessories.
Frequency of
inspection
QCS
Sec. 21,
Part 7
Clauses
7.1. & 7.2
Acceptance criteria
After
Installation of
PVC Conduits
& Accessories
Installation of PVC
To segregate different
services like low current,
BMS, lighting, power etc. &
power wiring in at least 25
mm conduit.
Project Spec.
Approved
Material
Submittal
Approved
Method
Statement
Approved
Shop
Drawings
H: Hold Point: Written notification required. Contractor may not
proceed beyond this point without written confirmation of the
engineer.
Verifying
Documents
Approved Shop
Drawing
Approved
Material
Submittal
(Front Sheet)
RFIT Request
for Inspection /
Testing (As per
attached
sample)
S Surveillance Notification
Required.
Inspection Verification
Sub Con
Main
Co
Con
n
Client
Project:
Doc No :
Date :
Consultant
Logo
Sub-Contractor
Logo
Logo
Title:
Activi
ty No:
Main Contractor
Activity Description
Frequency of
inspection
Acceptance criteria
Verifying
Documents
Inspection Verification
Sub Con
Main
Co
Con
n
W: Witness Inspection
S Surveillance Notification
Required.
Client
Project:
Doc No :
Date :
Consultant
Logo
Sub-Contractor
Logo
Logo
Title:
Activi
ty No:
Main Contractor
Activity Description
Frequency of
inspection
Acceptance criteria
W: Witness Inspection
Verifying
Documents
S Surveillance Notification
Required.
Inspection Verification
Sub Con
Main
Co
Con
n