KGL Resort At Wafra

PAYMENT APPLICATION
PROJECT
CONTRACTOR

: KGL Resort at Wafra


: Al Othman & Al Zamel Co.

TO

: KUD PROJECT MANAGER

Original Contract Value

V. O. (Additions)
:
V. O. (Omissions)
:
Released Provisional Sum :
Current Contract Value

PAYMENT APPLICATION NO. :


DATE :

KD 694,199.950
KD 32,665.850

11

6/26/2007

Date of Signing the Contract : 27/05/2006.


Date of Enterprise : 08/07/2006.
Time for Completion : 540 days

KD 726,865.800

Work Executed up to:

Kuwaiti Dinar

Work Executed of Original Contract


Work Executed of Released Provisional Sum

495,729.113

Work Executed of Variation Orders

4,635.488
1,530.554
501,895.154

KD 1,913.193 X 80%

Total Material on Site


Total Amount Due

Additions / Deductions :
KD 501,895.154 X 10%

Amount of Retention

(KD 50,189.515)

KD 69,419.995 (10 % of Contract Value)

Advance Payment
Repayment

deduct

(KD 50,189.515) (10 % of Total Amount Due)


KD 19,230.480 Balance (Add)

Release of Retention

add

19,230.480

add

Other Additions / Deductions


deduct

(KD 431,731.085)

AMOUNT DUE TO CONTRACTOR

KD 39,205.034

Previous Payments (Including Advance Payment)

Kuwaiti Dinars Thirty Nine Thousand Two Hundred and Five


and Fils Thirty Four only

CONTRACTOR

Kuwait United Development

Pay Appl/3

6/26/2007
DATE

Al-Othman Al-Zamel Co.

AL-OTHMAN & AL-ZAMIL GEN. TRAD. & CONT. Co.


KGL RESORTS AT WAFRA
BUILDINGS AND EXTERNAL WORKS
MATERIALS ON SITE
ITEM

DESCRIPTION

ANNEXURE TO PAYMENT APPLICATION NO.


BQ

UNIT

Qty.
Previous Received

REF.

Utilised in

Balance

Delivered work done

on Site

UP TO

6/25/2007

UNIT RATE

VALUE

REMARKS

KD

KD

Balance

On site

147.00

35.00

182.00

182.00

0.00

180.000

0.000

Steel reinforcement (All sizes)

Kitchen wall tiles

M2

355.00

355.00

340.00

15.00

2.611

39.165

Kitchen floor tiles

M2

140

140.00

136.00

4.00

2.849

11.396

Toilet wall tiles

M2

485

485.00

470.00

15.00

3.324

49.860

Toilet floor tiles

M2

110

110.00

72.00

38.00

2.849

108.262

Halls, restaurant floor tiles

M2

715

715.00

400.00

315.00

4.748

1,495.620

Rooms, offices floor tiles

M2

525

525.00

470.00

55.00

3.798

208.890

Total

11

0.00

0.000

0.000

10

0.000

11

0.000

12

0.000

13
14
0.000
TOTAL - Carried to Payment Application Summary

Kuwait United Development

KD

MOS-PA/4

1,913.193

Al-Othman Al-Zamel Co.

KUWAIT UNITED DEVELOPMENT Co.


AL-OTHMAN & AL-ZAMIL GEN. TRAD. & CONT. Co.
PAYMENT APPLICATION No:

11

GROSS VALUE OF WORKS EXECUTED UP TO 25/06/2007


BILL

CONTRACT
AMOUNT

DESCRIPTION

NO

EXECUTED
AMOUNT

WORK EXECUTED AS PER CONTRACT

GENERAL REQUIREMENTS

21,180.500

SITE CONSTRUCTION

35,500.000

CONCRETE

226,381.500

MASONRY

18,854.000

METAL

21,156.750

THERMAL AND MOISTURE PROTECTION

24,617.500

DOORS AND WINDOWS

12,680.500

FINISHES

59,814.813

15

MECHANICAL

28,377.000

16

ELECTRICAL

29,678.550

ADJUSTMENT BILL.

17,488.000
TOTAL AMOUNT AS PER CONTRACT

WORK EXECUTED AS PER VARIATION ORDER'S

VO -001

VO -002

495,729.113

4,635.488
TOTAL AMOUNT AS PER VO's

0.000

4,635.488

GRAND TOTAL AMOUNT

0.000

#REF!

Kuwait United Development Co.

Kuwait United Development

0.000

Al-Othman & Al-Zamel Co.

Summary/5

Al-Othman Al-Zamel Co.

KUWAIT UNITED DEVELOPMENT Co.


AL-OTHMAN & AL-ZAMIL GEN. TRAD. & CONT. Co.

PAYMENT APPLICATION No:

(11)

JUNE-07

LIST OF PAYMENTS
Sr.

PAYMENT
AMOUNT

PAYMNET & DATE

NO
1

PAYMENT (1) - ADVANCED PAYMENT

PAYMENT (2) - PROGRESS PAYMENT - SEPT. 06

PAYMENT (3) - PROGRESS PAYMENT - OCT. 06

PAYMENT (4) - PROGRESS PAYMENT - NOV. 06

PAYMENT (5) - PROGRESS PAYMENT - DEC. 06

PAYMENT (6) - PROGRESS PAYMENT - JAN. 07

PAYMENT (7) - PROGRESS PAYMENT - FEB. 07

PAYMENT (8) - PROGRESS PAYMENT - MAR. 07

PAYMENT (9) - PROGRESS PAYMENT - APRIL 07

10

PAYMENT (10) - PROGRESS PAYMENT -MAY 07

69,419.995
30,808.200
29,547.600
29,146.600
38,609.539
32,203.741
66,602.179
36,448.341
55,710.800
43,234.090

TOTAL AMOUNT OF PREVIOUS PAYMENTS

431,731.085

Al-Othman & Al-Zamil Co.

Kuwait United Development Co.

Kuwait United Development

NOTES

list/6

Al-Othman Al-Zamel Co.

ORIGINAL B.O.Q.

KGL RESORT AT WAFRA.


AL-OTHMAN & AL-ZAMIL Co.

Description

ITEM

PAYMENT No. :(11 ).


Work done upto :25/06/2007.

Qty Unit

Rate

Amount

(KD)

(KD)

GENERAL REQUIREMENTS:

% AGE. EXECUTED. AMOUNT DUE


PRV. CURNT TOTAL

0%
0%

0.000
0.000

(KD)

0.000
0.000

A. Allow for complying with all clauses of the Conditions of

Contract Document II (General Particular and special


conditions of contract)

Item 900.000

900.000

100%

0%

0.000

100%
0%

900.000
0.000

B.
Allow for complying with all clauses of General
Requirement the clauses are listed here under by
reference to main clause numbers (sub-clauses shall
deemed to be included with Main clause). The clause
which are not mentioned here under but are the contra

0%
0%

0.000
0.000

1 Section 01040 - Co-ordination, Project Planning on


Primavera

Item 1,700.000 1,700.000

Item 2,500.000

100%

0%

100%
0%
100%
0%
100%

1,700.000
0.000
2,500.000
0.000
350.000

100%

0%

5%

95%
0%
97%
0%
15% 50%
0%
5% 100%
0%

1,425.000
0.000
873.000
0.000
100.000
0.000
500.000
0.000

0%

7,000.000
0.000
420.000
0.000
4,000.000
0.000
1,187.500
0.000
225.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

0.000

2 Section 01050 - Field Engineering

2,500.000
0.000

3 Section 01095 - Reference Standard and Definitions


4 Section 01200 - Project Meeting, Progress Reports,
Update Plan

Item 350.000

350.000

100%

Item 1,500.000

1,500.000

90%

0.000

5 Section 01300 - Submittals

Item 900.000

900.000

97%

0.000

6 Section 01400 - Quality Control

Item 200.000

200.000

7 Section 01410 - Testing Laboratory Services

Item 500.000

500.000

35%

0.000

95%

0.000

8 Section 01500 - Construction Facilities and Temp


Controls.

100%
0%
100% 5% 105%
Item 400.000
400.000
0%
0.000
Item 4,000.000 4,000.000 100% 0% 100%
0%
0.000
5% 95%
Item 1,250.000 1,250.000 90%
0%
0.000
25% 25% 50%
Item 450.000
450.000
0%
0.000
0%
Item 500.000
500.000
0%
0.000
0%
Item 500.000
500.000
0%
0.000
0%
0.000
0%
0.000
0%
0.000
0%
0.000
Item 7,000.000

7,000.000
0.000

9 Section 01570 - Traffic Regulation

10 Section 01590 - Field offices and sheds

11 Section 01600 - Material and Equipment

12 Section 01720 - Project Record Documents

13 Section 01730 - Operation and Maintenance data

14 Project close out

21,180.500

TOTAL CARRIED TO SUMMARY

Kuwait United Development

100%

0.000
0.000

BILL1/7

Al-Othman Al-Zamel Co.

ORIGINAL B.O.Q.

KUWAIT UNITED DEVELOPMENT Co.


AL-OTHMAN & AL-ZAMIL Co.

Description

ITEM

PAYMENT No. :(11 ).


Work done upto :25/06/2007.

Qty Unit

Rate

Amount

(KD)

(KD)

DIVISION 2 - SITEWORK

% AGE. EXECUTED. AMOUNT DUE


PRV. CURNTTOTAL

(KD)

0.000

0%

0.000

0%

0.000

0.000

0%

0.000

0.000

0%

0.000

0.000

0%

0.000

0.000

0%

0.000

0.000

0%

0.000

0.000

0%

0.000

0.000

0%

0.000

0.000

0%

0.000

A
The Contractor is referred to the Specifications and Drawings for
alldetails related to this Division of the works & he is to include
for complying with all the requirements contained therein,
whether or not those are specifically mentioned within the ite

B SECTION 02072, 02110 - SELECTIVE DEMOLITION


AND SITE CLEARING

Demolish, remove and clean site area of all refuse existing


building walls, boundary shrubs, tree roots, etc. dismantle (if any)
all existing structures, fences, pavements, curbs, asphalt
suraces including stripping and grubbing the entire area to a
minim

Item 4,000.000

4,000.000 100%

0%

100%

SECTION 02140- DEWATERING

0.000

0%

(Provisional)

0.000

0%

4,000.000
0.000
0.000

1 Allow for installation and removal of dewatering system complete


including running and maintenance of the system, etc. complete
as per specifications and to the approval of the
Engineer/Engineer Representative.

0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000
0.000
0.000
0.000
0.000

system to

0.000

0%

0.000

sub structure excavation and protection of neighbouring


structures or

0.000

0%

0.000

0%

0.000
0.000
0.000
0.000

Per Pump

provisional

D SECTION 02160 - EXCAVATION SUPPORTING SYSTEM


(Provisional)

1 Allow for design, installation and main-tenance of the support

servicesaround streets as per specifications, and to the approval


of the

MR

0%

provisional

Engineer/Engineer Representative.

E SECTION 02200 - EARTHWORK

0.000

0%

0.000

0%

0.000

0%

1
Excavation in all kinds of soil for foundations , lift well, basement
water tank, ground beam etc, upto any depth as per drawings
and specifictions including disposal of surplus materials from site
to public dump yard to the satisfaction of the Engineer/
9000 M3

1.500

Backfilling with selected soil from the excavated soil around


foundations in layers not exceeding 20cm, compacting to
maximun dry density not less than 95%, including carrying out
field density tests by approved agency complete in all respects
as per dr
the approval of Engineer/Engineer Representative

13,500.000 100%

LS

14,000.000

100%
0%

0.000

0%

0.000

14,000.000 97%
0.000

TOTAL CARRIED TO COLLECTION

Kuwait United Development

0%

0.000

0%

3%

100%
0%

13,500.000
0.000
0.000

0.000
14,000.000
0.000
31,500.000

BILL2/8

Al-Othman Al-Zamel Co.

ORIGINAL B.O.Q.

KUWAIT UNITED DEVELOPMENT Co.


AL-OTHMAN & AL-ZAMIL Co.

Description

ITEM

PAYMENT No. :(11 ).


Work done upto :25/06/2007.

Qty Unit

Rate

Amount

(KD)

(KD)

% AGE. EXECUTED. AMOUNT DUE


PRV. CURNTTOTAL

(KD)

DIVISION 2 - SITEWORK

F TERMITE CONTROL
1

Supply and spray Anti Termite solution/ liquid to the soil below
blindingalong sides of footing, and below slab on grade and
other places wherever permanent works are to be undertaken
and concrete in contactwith soil, complete in all respects, as per
manu

Item 4,000.000

SECTION 02515 - UNIT PAVERS AND ACCESSORIES

Provide and fix precast concrete kerbstone including setting bed,


jointing, painting, etc. complete in all respects as shown in
drawings,specifications and to the approval of the
Engineer/Engineer Representative.

1 Curbstone in parking areas type 4A, 5A size 25/15x50 cm


2 Sunken Curbstone 20x30cm as shown in drawing

320 MR
20 MR

5.500
6.000

Coloured precast interlocking concrete pavers, type and colour


as selected by the Engineer including joints filled with bitumen
impregrated celotex and pointed with mastic joint filler, all as
specified.

0.000

0%

0.000

0.000

0%

0.000

0.000

0%

0.000

4,000.000 97%

3%

100%

4,000.000

0.000

0%

0.000

0.000

0%

0.000

0.000

0%

0.000

0.000

0%

0.000

0.000

0%

0.000

0.000

0%

0.000

0.000

0%

0.000

0.000

0%

0.000

0.000

0%

0.000

0.000

0%

0.000

0.000

0%

0.000

1,760.000

0%

0.000

0.000

0%

0.000

120.000

0%

0.000

0.000

0%

0.000

0.000

0%

0.000

0.000

0%

0.000

8,400.000

0%

0.000

0.000

0%

0.000

13,360.000

0%

0.000

0.000

0%

0.000

0.000

0%

0.000

0.000

0%

0.000

0.000

0%

0.000

200.000

0%

0.000

0.000

0%

0.000

250.000

0%

0.000

0.000

0%

0.000

0.000

0%

0.000

0.000

0%

0.000

3,700.000

0%

0.000

0.000

0%

0.000

4,200.000

0%

0.000

1
60mm thick precast concrete interlocking pavers, laid to falls on
and including sand bed as required and jointing and pointing.

2 Asphalt pavement as per drawings & specifications

1400 M2
1670 M2

6.000
8.000

Traffic road marking

Painted parking lines

2 Kerb stone painting

1
1

LS
LS

200.000
250.000

Prepare play courts of standard size as per international norms


and standard specifications to the satisfaction of the engineer

1 Basket ball court


2 Tennis Court

1
1

LS
LS

3,700.000
4,200.000

TOTAL CARRIED TO COLLECTION

Kuwait United Development

4,000.000

BILL2/9

Al-Othman Al-Zamel Co.

KUWAIT UNITED DEVELOPMENT Co.


AL-OTHMAN & AL-ZAMIL Co.

Description

ITEM

ORIGINAL B.O.Q.

Work done upto :25/06/2007.

Qty Unit

Rate

Amount

(KD)

(KD)

BILL 2
SITE CONSTRUCTIONS
COLLECTION

PAGE 1
PAGE 2

TOTAL CARRIED TO SUMMARY

Kuwait United Development

PAYMENT No. :(11 ).

BILL2/10

% AGE. EXECUTED. AMOUNT DUE


PRV. CURNTTOTAL

(KD)

0.000

0%

0.000

0.000

0%

0.000

0.000

0%

0.000

0.000

0%

0.000

0.000

0%

0.000

0.000

0%

0.000

0.000

0%

0.000

0.000

0%

0.000

0.000

0%

0.000

0.000

0%

31,500.000

0.000

0%

0.000

0.000

0%

4,000.000

0.000

0%

0.000

0.000

0%

0.000

0.000

0%

0.000

0.000

0%

0.000

0.000

0%

0.000

0.000

0%

0.000

0.000

0%

0.000

0.000

0%

0.000

0.000

0%

0.000

0.000

0%

0.000

0.000

0%

0.000

0.000

0%

0.000

0.000

0%

0.000

0.000

0%

0.000

0.000

0%

0.000

0.000

0%

0.000

0.000

0%

0.000

0.000

0%

0.000

0.000

0%

0.000

0.000

0%

0.000

0.000

0%

0.000

0.000

0%

0.000

0.000

0%

0.000

0.000

0%

0.000

0.000

0%

0.000

0.000

0%

0.000

0.000

0%

0.000

0.000

0%

0.000

0.000

0%

0.000

0.000

0%

0.000

0.000

0%

0.000

0.000

0%

0.000

0.000

0%

0.000

0.000

0%

0.000

0.000

0%

0.000

0.000

0%

0.000

0.000

0%

0.000

0.000

0%

0.000

0.000

0%

0.000

0.000

0%

0.000

0.000

0%

35,500.000

Al-Othman Al-Zamel Co.

Description

ITEM

A.

PAYMENT No. :(11 ).

ORIGINAL B.O.Q.

KGL RESORT AT WAFRA.


AL-OTHMAN & AL-ZAMIL Co.

Work done upto :25/06/2007.


Qty

Unit

Rate

Amount

(KD)

(KD)

% AGE. EXECUTED.
PRV. CURNTTOTAL

DIVISION 3 - CONCRETE

0.000

0%

0.000

The Contractor is referred to the Specifications and Drawings


for alldetails related to this Division of the works and he is to
include for complying with all the requirements contained
therein, whether or not those are specifically mentioned within
the i

0.000

0%

0.000

0%

0.000

0%

0.000

0%

SUBSTRUCTURE

0.000

0%

0.000
0.000
0.000
0.000
0.000

Plain cement concrete having minimum crushing strength


150kg/cm2 using sulphate resistant cement Type "V" including
tamping, curing, necessary formwork, etc. as per specifications
and drawings.

0.000

0%

0.000

0%

B. SECTION 03300 - CAST IN PLACE CONCRETE

1 100 mm Thick blinding under raft / isolated foundations for


columns, walls, trenches sump pits,boundary wall, etc.

1300

M2

4.250

5525.000 100%

100%

0.000

0%

0.000

2 50 mm Thick blinding under slab on grade

2360

M2

2.250

5310.000 90%

0%
8%

0.000

AMOUNT DUE
(KD)

50 mm Thick protection screed over water proofing membrane

400

M2

2.000

Reinforced cement concrete having minimum crushing strength


300kg/cm2 or as noted in drawings using sulphate resistant
cement Type "V" to all concrete which is in contact with soil
including vibrating, roding, finishing, formwork, reinfocement,
curing etc

4 Foundations

680

M3

98%
0%

800.000 100%

100%

0.000

0%

0.000

0%

0.000

0%

81.000 55080.000 100%

0%

100%

0.000

0%

0.000

0%

0.000

5 Swimming pool foundation

130

M3

93.000 12090.000 100%

6 Retaining walls

105

M3

95.000

9975.000 100%

7 Column Necks

38

M3

95.000

3610.000 100%

8 Ground beams

225

M3

90.000 20250.000 100%

0%
0%

100%

0%

100%

0%

100%

0.000

0%

0.000

0%

0.000

0%
100%

0.000

0%

0.000
0.000
5,525.000
0.000
0.000
5,203.800
0.000
800.000
0.000

0.000
0.000
55,080.000
0.000
0.000
0.000
12,090.000
0.000
9,975.000
0.000
3,610.000
0.000
20,250.000
0.000

9 15 cm thick slab on grade including extra thickening,

construction joints, laid in panels with steel angle back to back


spacing not more than 6 mts,finished smooth by machine
trowelling all as shown in drawings

2140

M2

11.250 24075.000 95%

5%

100%

0.000

0%

0.000

0%

24,075.000
0.000
0.000

10 18 cm thick slab on grade including extra thickening,

construction joints, laid in panels with steel angle back to back


spacing not more than 6 mts,finished smooth by machine
trowelling all as shown in drawings

220

M2

13.250

2915.000 80%
0.000

98%
0%

2,856.700
0.000
139465.500

TOTAL CARRIED TO COLLECTION

Kuwait United Development

18%

BILL3/11

Al-Othman Al-Zamel Co.

Description

ITEM

PAYMENT No. :(11 ).

ORIGINAL B.O.Q.

KGL RESORT AT WAFRA.


AL-OTHMAN & AL-ZAMIL Co.

Work done upto :25/06/2007.


Qty

Unit

Rate

Amount

(KD)

(KD)

DIVISION 3 - CONCRETE
SUPERSTRUCTURE

% AGE. EXECUTED.
PRV. CURNTTOTAL

0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000

0%

AMOUNT DUE
(KD)
0.000
0.000
0.000
0.000

C
Reinforced cement concrete having minimum crushing strength
350kg/cm2 or as noted in drawings using ordinary cement
including vibrating, roding, finishing, formwork,
reinforcement,curing etc. as per drawings and specifications.

0.000

1 Columns

102

M3

94.000

146

M3

90.000 13140.000 100%

3 Suspended flat slab thickness 12 cm

60

M2

10.750

645.000 100%

Suspended flat slab thickness 14 cm

940

M2

12.500

11750.000 100%

5 Suspended flat slab thickness 16 cm

80

M2

14.000

1120.000 100%

6 Suspended flat slab thickness 18 cm

170

M2

15.500

2635.000 100%

7 Stairs including landing slab, steps, etc,

12

M3

90.000

1080.000 80%

8 Rib slabs type H1

220

M2

32.000

7040.000 100%

9 Pergola type 1

195

M2

85.000 16575.000 100%

10 Pergola type 2

180

M2

85.000 15300.000 100%

8 Parapets and upstands

35

M3

89.000

3115.000 100%

9 Arches

14

M2

100.000

1400.000 100%

30

M3

87.000

2610.000 100%

0%

9588.000 100%

100%

0.000

Beams

0%
100%

0.000

0%
100%

0.000

0%
100%

0.000

0%
100%

0.000

0%
0%

100%

10%

90%

0.000

0%

0.000

0%
100%

0.000

0%
100%

0.000

0%
100%

0.000

0%
0%

0.000

0%
100%

0.000

10 15cm thick Attic slabs in areas shown in drawings

0%
0%

0.000

11

Reinforced concrete bases for chillers, pumps , A/C machine


,different types of fans, linde equipments, etc, including cork or
foam concrete complete in all respects to the requirments of
equiments suppliers and to approval of Engineer/Engineer
Represent

12

M3

90.000

100%
0%

20%

95%

0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000

0%

1,026.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
86916.000

TOTAL CARRIED TO COLLECTION

Kuwait United Development

1080.000 75%

100%

0.000
0.000
0.000
0.000
9,588.000
0.000
13,140.000
0.000
645.000
0.000
11,750.000
0.000
1,120.000
0.000
2,635.000
0.000
972.000
0.000
7,040.000
0.000
16,575.000
0.000
15,300.000
0.000
3,115.000
0.000
1,400.000
0.000
2,610.000
0.000

BILL3/12

Al-Othman Al-Zamel Co.

Description

ITEM

Work done upto :25/06/2007.


Qty

Unit

Rate

Amount

(KD)

(KD)

BILL 3
CONCRETE WORKS
COLLECTION

PAGE 1
PAGE 2

TOTAL CARRIED

Kuwait United Development

PAYMENT No. :(11 ).

ORIGINAL B.O.Q.

KGL RESORT AT WAFRA.


AL-OTHMAN & AL-ZAMIL Co.

BILL3/13

% AGE. EXECUTED.
PRV. CURNTTOTAL

0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000

0%

AMOUNT DUE
(KD)
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
139465.500
0.000
86916.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
226381.500

Al-Othman Al-Zamel Co.

ORIGINAL B.O.Q.

KGL RESORT AT WAFRA.


AL-OTHMAN & AL-ZAMIL Co.
ITEM

Work done upto :25/06/2007.

Qty Unit

Description

Rate

Amount

(KD)

(KD)

DIVISION 4 - MASONRY
The Contractor is referred to the Specifications and Drawings for all
details related to this Division of the works and he is to include for
complying with all the requirements contained therein, whether or not
those are specifically mentioned within the items.
SECTION 04200 AND 04220 - UNIT MASONRY AND CONCRETE
UNIT MASONRY

A Concrete Masonry Units (CMU) with light weight aerated blocks of


maximum density 600kg/m3 including reinforced concrete lintels, curing,
scaffolding upto any height in any floor complete in all respects as per
drawings, specifications and to the entire satisfaction of the
Engineer/Engineer Representative.

1 200 mm Thick walls to external periphery

PAYMENT No. :(11 ).

1100 M2

8.000

B Concrete Masonry Units (CMU) with sand cement blocks including


reinforced concrete lintels,ties, columns, curing, scaffolding up to any
height in any floor complete in all respects as per drawings, specifications
and to the entire satisfaction of Engineer/Engineer Representative.

1 200 mm thick walls

460 M2

6.900

1 150 mm thick walls

1040 M2

5.750

2 100 mm thick walls

180

5.000

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
8800.000
0.000
0.000
0.000
0.000
0.000
0.000
3174.000
0.000
5980.000
0.000
900.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

% AGE. EXECUTED.

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
100%

0%

100%
0%
0%
0%
0%
0%
0%

100%

0%

100%

100%

0%

100%

100%

0%

100%

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

(KD)

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
8800.000
0.000
0.000
0.000
0.000
0.000
0.000
3174.000
0.000
5980.000
0.000
900.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

18854.000

TOTAL CARRIED TO SUMMARY

Kuwait United Development

AMOUNT DUE

PRV. CURNTTOTAL

BILL4/14

Al-Othman Al-Zamel Co.

ORIGINAL B.O.Q.

KGL RESORT AT WAFRA.


AL-OTHMAN & AL-ZAMIL Co.
ITEM

Description

PAYMENT No. :(11 ).


Work done upto :25/06/2007.

Qty Unit

Rate

Amount

% AGE. EXECUTED.

AMOUNT DUE

(KD)

(KD)

PRV. CURNTTOTAL

(KD)

DIVISION 5 - METALS

0%

The Contractor is referred to the Specifications and Drawings for all


details related to this Division of the works and he is to include for
complying with all the requirements contained therein, whether or not
those are specifically mentioned within the items.

SECTION 05510 - STAIRS, LADDERS AND GRATING ASSEMBLIES

LADDERS
Steel ladder with 38 mm diameter side rail including
steel rungs, anchor sockets, rubber bumpers, caps and stainless steel
100 mm wide treads, etc. complete as shown in drawings, specifications
and to the approval of the Engineer/Engineer Representative

No

150.000

50 mm Diameter handrail comprising of four top and intermediate rails


along with 40 mm diameter mild steel galvanized balustrades including
powder coated finish, fixtures, etc.

50 mm Diameter galvanised wall mounted handrail

50 mm Diameter handrail comprising of four top and intermediate rails


along with 40 mm diameter mild steel galvanized balustrades including
powder coated finish, fixtures, etc.

Supply and fix powder coated steel frame structure in the slab openings
of out door arcade as shown in drawings

145 MR 145.000

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
600.000
0.000
0.000
0.000
21,025.000 55%

0.000
560.000 70%
0.000
0.000
0.000
35 MR 75.000 2,625.000 10%
0.000
0.000
24 M2 100.000 2,400.000 55%
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
14 MR

40.000

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
25%

80%

10%

80%

0%
0%
0%
0%
65%

75%
0%
0%

25%

80%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

21156.750

TOTAL CARRIED TO SUMMARY

Kuwait United Development

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
16820.000
0.000
448.000
0.000
0.000
0.000
1968.750
0.000
0.000
1920.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

BILL5/15

Al-Othman Al-Zamel Co.

ORIGINAL B.O.Q.

KGL RESORT AT WAFRA.


AL-OTHMAN & AL-ZAMIL Co.

Description

ITEM

PAYMENT No. :(11 ).


Work done upto :25/06/2007.

Qty Unit

Rate

Amount

(KD)

(KD)

% AGE. EXECUTED.
PRV. CURNTTOTAL

AMOUNT DUE
(KD)

DIVISION 7 - THERMAL AND MOISTURE PROTECTION

The Contractor is referred to the Specifications and Drawings


for alldetails related to this Division of the works and he is to
include for complying with all the requirements contained
therein, whether or not those are specifically mentioned within
the i

0.000

0%

0.000

0.000

0%
0%

0.000

0%
0%

0.000

0.000

A SECTION 07120 - EMULSION BITUMINOUS

0.000

DAMPPROOFING

0.000

0.000

0.000

1 Apply bituminous water proofing paint to all concrete surfaces


incontact with soil soil complete as per specifications
andmanufacturer's recommendations and to approval of the
Engineer/Engineer Representative.

Item

900.000

900.000 100%
0.000

B SECTION 07150 - DAMPPROOFING

0.000
0.000

Waterproofing system for all wet areas like bath & toilets in
First floorincluding bitumenous paint to all surfaces and
upstands, 20 mm screed, two layers of waterproofing
membrane, 20 mm screed, light weight foamfoam concrete laid
to slope, vapour barri

900.000
0.000
0.000
0.000

50% 50%
0%

0.000

0%

997.500
0.000
0.000
0.000

Provide and lay the following complete roofing system complete

0.000

in all respects as per drawings, specifications and to

0.000

the satisfaction of the Engineer/Engineer Representative.

0.000

0%
0%
0%
0%
0%
0%
0%
0%

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

95%
0%
0%
0%
0%
0%
0%
0%
0%

16,720.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

0%
0%

0.000

0%
0%
0%

0.000

210

M2

9.500 1,995.000
0.000

0% 100%
0%
0%
0%

0.000

3 coats of bituminous waterproofing paint.

1100 M2

0.000
0.000

b 20 mm thick cement sand screed (1:3 ) mortar .

1100 M2

0.000
0.000

50mm minimum thick light weight concrete bed laid to falls and

1100 M2

16.000

cross falls

17,600.000

0.000
0.000

d Waterproofing membrane - one layer 4mm thick

1100 M2

75mm thick rigid insulation density 45kg/m3

1100 M2

Polypropylene nylon mesh

1100 M2

25x25x2.5cm terrazo tiles including skirting laid in panels


including filling joints with mastic and sealant

0.000
0.000
0.000
0.000
0.000
0.000

1100 M2

0.000
0.000

h Allow for 10 years Gurantee for water proofing system in the


form of

Bank guarantee from approved Kuwaiti bank.

0.000
1

Item

1,400.000

1,400.000
0.000

TOTAL CARRIED TO COLLECTION

Kuwait United Development

93%

2%

0.000

0.000
0.000
18,617.500

BILL7/16

Al-Othman Al-Zamel Co.

ORIGINAL B.O.Q.

KGL RESORT AT WAFRA.


AL-OTHMAN & AL-ZAMIL Co.

Description

ITEM

PAYMENT No. :(11 ).


Work done upto :25/06/2007.

Qty Unit

Rate

Amount

(KD)

(KD)
0.000

C SECTION 07110- MEMBRANE WATER PROOFING

0.000

1 Supply & fix horizontal water proofing membrane 4mm thick in 2


layers below raft

1200 M2

5.000 6,000.000
0.000

2 Supply and fix water proofing membrane for external walls of


water tank including protection board.

140

M2

5.000

700.000
0.000

E. SECTION 07120 -LIQUID APPLIED WATER PROOFING

0.000
0.000

1 Flower boxes

LS

450.000

450.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

TOTAL CARRIED TO COLLECTION

Kuwait United Development

% AGE. EXECUTED.
PRV. CURNTTOTAL

0%
0%
100% 100%

0%
50% 50%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

AMOUNT DUE
(KD)
0.000
0.000

6,000.000
0.000
350.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
6,350.000

BILL7/17

Al-Othman Al-Zamel Co.

KGL RESORT AT WAFRA.


AL-OTHMAN & AL-ZAMIL Co.

Description

ITEM

ORIGINAL B.O.Q.

PAYMENT No. :(11 ).


Work done upto :25/06/2007.

Qty Unit

Rate

Amount

(KD)

(KD)

% AGE. EXECUTED.
PRV. CURNTTOTAL

AMOUNT DUE
(KD)

BILL 7
THERMAL & MOISTURE PROTECTION
COLLECTION

PAGE 1

18,617.500

PAGE 2

6,000.000

24,617.500

TOTAL CARRIED TO SUMMARY

Kuwait United Development

BILL7/18

Al-Othman Al-Zamel Co.

ORIGINAL B.O.Q.

KGL RESORT AT WAFRA.

PAYMENT No. :(11 ).


Work done upto :25/06/2007.

AL-OTHMAN & AL-ZAMIL Co.


ITEM

Description

Qty Unit

Rate

Amount

(KD)

(KD)

DIVISION 8 - DOORS AND WINDOWS


The Contractor is referred to the Specifications and Drawings for
all details related to this Division of the works and he is to
include for complying with all the requirements contained therein,
whether or not those are speciically mentioned within the items.

The rate for doors and windows shall include for all frames, sub frames,
linings, threshold, cill, window boards, flashings, architraves, stops, beads
panelling, moulding, flyscreens, glazing, trims, weather bars, inserts,
dust seals, intumescent stripss, smoke seals, acoustic seals, fixing,
dpc's pointing, decoration and like, complete in accordance with
the drawings and specification.

SECTION 08200 - WOOD DOOR


D

Fabricate, supply and install flush wood doors having dark wood frame
as shown on drawings including all ironmongery,painting or laquer finished

Door type D1, size 2200 x 1000 mm

12

No

180.000

Door type D2, size 2200 x 900 mm

13

No

170.000

Door type D3, size 2200 x 800 mm

18

No

160.000

Door type D6, size 2200 x 800 mm

No

160.000

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
2,160.000
0.000
2,210.000
0.000
2,880.000
0.000
1,280.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

% AGE. EXECUTED.
PRV. CURNTTOTAL

(KD)

0%

0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000

15%

5%

20%

432.000

30%

5%

35%

773.500

30%

5%

35%

1,008.000

0.000
0.000
0.000

5%

5%

64.000
0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000

2,277.500

TOTAL CARRIED TO COLLECTION

Kuwait United Development

AMOUNT DUE

BILL8/19

Al-Othman Al-Zamel Co.

ORIGINAL B.O.Q.

KGL RESORT AT WAFRA.

PAYMENT No. :(11 ).


Work done upto :25/06/2007.

AL-OTHMAN & AL-ZAMIL Co.


ITEM

Description

Qty Unit

Rate

Amount

(KD)

(KD)

DIVISION 8 - DOORS AND WINDOWS


ALUMINIUM WINDOWS
F

Design, fabricate, supply and install enframent Aluminium


Aluminium window with exterior mullion levers and interior
structural members including insulated glass of approved
colour, sealants, fascias, trims and other related components,
complete in all respects as per drawings, specifications
including shade system.

Window type W1, size 1000 x 1900 mm

24 Nos 120.000

Window type W2, size 2000 x 1900 mm

10 Nos 230.000

Window type W3, size 1500 x 1900 mm

window type W4, size 1500 x 1000 mm

12 Nos

95.000

Window type W5, size 1000 x 800 mm

18 Nos

80.000

Window type W1*, size 5600 x 2100 mm

Nos 765.000

Window type W2*, size 7800 x 2100 mm

Nos 1065.000

Window type W3*, size 2700 x 2100 mm

Nos 370.000

Window type W4*, size 4000 x 2100 mm

Nos 545.000

10 Window type W5*, size 1000 x 2100 mm

Nos 140.000

11

Window type W6*, size 2000 x 2100 mm

Nos 270.000

12 Window type W7*, size 1500 x 1600 mm

Nos 155.000

13 Window type W8*, size 2000 x 1600 mm

Nos 210.000

14 Window type W9*, size 800 x 1600 mm

Nos

85.000

15 Window type W10*, size 800 x 1200 mm

Nos

75.000

Nos 180.000

Aluminum Doors
1

Door type D1 2000x2700 mm

Nos 405.000

Door type D3 1000x2200 mm

Nos 170.000

Door type D4 900x2200 mm

Nos 160.000

Door type D5 1600x2200 mm

Nos 300.000

Door type D7 1800x2200 mm

Nos 320.000

TOTAL CARRIED TO COLLECTION

Kuwait United Development

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
2,880.000
0.000
2,300.000
0.000
180.000
0.000
1,140.000
0.000
1,440.000
0.000
765.000
0.000
1,065.000
0.000
1,110.000
0.000
545.000
0.000
840.000
0.000
1,080.000
0.000
465.000
0.000
840.000
0.000
170.000
0.000
150.000
0.000
0.000
0.000
2,025.000
0.000
1,190.000
0.000
320.000
0.000
300.000
0.000
320.000
0.000

% AGE. EXECUTED.
PRV. CURNTTOTAL

AMOUNT DUE
(KD)

0%

0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000

60% 35% 95%

2,736.000

60% 35% 95%

2,185.000

60% 35% 95%

171.000

60% 35% 95%

1,083.000

60% 35% 95%

1,368.000

0%

0.000

0%

0.000

55% 55%

610.500

55% 55%

299.750

55% 55%

462.000

55% 55%

594.000

55% 55%

255.750

55% 55%

462.000

55% 55%

93.500

55% 55%

82.500

0%

0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000

10,403.000

BILL8/20

Al-Othman Al-Zamel Co.

ORIGINAL B.O.Q.

KGL RESORT AT WAFRA.

PAYMENT No. :(11 ).


Work done upto :25/06/2007.

AL-OTHMAN & AL-ZAMIL Co.


ITEM

Description

Qty Unit

Rate

Amount

(KD)

(KD)

% AGE. EXECUTED.
PRV. CURNTTOTAL

AMOUNT DUE
(KD)

BILL 8
DOORS & WINDOWS
COLLECTION

PAGE 1

2,277.500

PAGE 2

10,403.000

TOTAL CARRIED TO SUMMARY

12,680.500

Kuwait United Development

BILL8/21

Al-Othman Al-Zamel Co.

ORIGINAL B.O.Q.

KGL RESORT AT WAFRA.


AL-OTHMAN & AL-ZAMIL Co.
ITEM

Work done upto :25/06/2007.

Qty Unit

Description

Rate

Amount

% AGE. EXECUTED.

AMOUNT DUE

(KD)

(KD)

PRV. CURNT TOTAL

(KD)

DIVISION 9 - FINISHES

The Contractor is referred to the Specifications and Drawings


for all details related to this Division of the works and he is to
include for complying with all the requirements contained
therein, whether or not those are specifically mentioned within
the items.

B SECTION 09200 - PLASTER


1

20 mm thick cement plaster including metal lathe wherefer required to walls


columns, beams, etc., Complete including all respects as shown in drawings

& as per specifications, including for staircase walls.

2200 M2

2.750

Plaster 200 mm thick for ceiling

540 M2

3.250

approval of the Engineer/Engineer Representative

765 M2

10.750

Moisture resistant gypsum board ceiling 12 mm thick

130 M2

11.000

A SECTION 09260 - GYPSUM BOARD


Provide and install suspended gypsum board ceiling including
verticles, coves, decorative patterns, suspension system,
accessories, sealant, edge trim, etc. complete in all respects
respects as shown in drawings, specifications and to the

B SECTION 09310 - CERAMIC TILE

Provide and fix coloured ceramic tiles in patterns, including


sand cement screed bedding, fixed over sand cement mortar
or approved adhesive, jointed, pointed, grouting by approved
water tight grout, cleaning, etc. complete in all respects as
shown in drawings, specifications and to the approval of
the Engineer/Engineer Representative

FLOORS

Ceramic Floor tiles for baths & toilets, size 200 x 200 x 8mm thick.

Ceramic floor tiles for kitchen, size 300 x 300 mm

Ceramic floor tiles for other areas, size 300 x 300 mm

Ceramic floor tiles for balconies, size 300 x 300 mm

E
F

105 M2

10.250

90

M2

10.000

870 M2

10.000

M2

9.500

Ceramic floor tiles for swimming pool outside area

460 M2

10.500

Ceramic floor tiles for swimming pool inside area

260 M2

11.000

20

TOTAL CARRIED TO COLLECTION

Kuwait United Development

PAYMENT No. :(11 ).

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
6,050.000
0.000
1,755.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
8,223.750
0.000
1,430.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
1,076.250
0.000
900.000
0.000
8,700.000
0.000
190.000
0.000
4,830.000
0.000
2,860.000
0.000
0.000
0.000
0.000

97%

0%

90%

3%

10% 50%
90%

65%
97%
30% 63%
97%

0%

0.000

0%

0.000

0%

0.000

0%

0.000

97%
0%
93%
0%
0%
0%
0%
0%
0%
0%
60%
0%
90%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
65%
0%
97%
0%
93%
0%
97%
0%
0%
0%
0%
0%
0%
0%
0%

5,868.500
0.000

1,632.150
0.000
0.000
0.000
0.000
0.000
0.000
0.000
4,934.250
0.000
1,287.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
699.563
0.000
873.000
0.000
8,091.000
0.000
184.300
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
23,569.763

BILL9/22

Al-Othman Al-Zamel Co.

ORIGINAL B.O.Q.

KGL RESORT AT WAFRA.


AL-OTHMAN & AL-ZAMIL Co.
ITEM

Description

Work done upto :25/06/2007.

Qty Unit

Rate

Amount

% AGE. EXECUTED.

AMOUNT DUE

(KD)

(KD)

PRV. CURNT TOTAL

(KD)

WALLS

Ceramic wall tiles, size 200 x 300 x 6 mm thick for bath and toilets

560 M2

10.500

Ceramic wll tiles, size 150 x 150 mm for kitchens

240 M2

10.250

Ceramic wll tiles, to swimming pool

340 M2

12.000

INTERIOR STONE WORK

C Section 09751 Interior Stone Work


Provide and fix interior stone/marble flooring in pattern including trim, borders,
band threshold, granite, fillers, morten setting beds, cement sand screed
brass strips, etc. complete in all respect as per drawings and specifications

Floors

A Marble flooring

210 M2

40.000

B 30 mm thick marble for staircase landings

30

M2

48.000

C 30 mm thick threads for staircases

140 MR

18.000

D 20 mm thick risers for staircases

140 MR

12.000

E Counter marble

20

M2

150.000

F Skirt up marble - 10mm thick & 100 mm high

140 MR

7.750

G Kitchen top platform granite

20

M2

140.000

D TERRAZO TILES
1 Terrazo tile flooring 25 x 25 x 2.5 cm at set over cm as
2

per specifications
Terrazzo skirting

630 M2

6.000

75

4.500

MR

TOTAL CARRIED TO COLLECTION

Kuwait United Development

PAYMENT No. :(11 ).

0.000
0.000
5,880.000 20% 77%
0.000
2,460.000 30% 67%
0.000
4,080.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
8,400.000
0.000
1,440.000
0.000
2,520.000
0.000
1,680.000
0.000
3,000.000
0.000
1,085.000
0.000
2,800.000
0.000
0.000
0.000
3,780.000
0.000
337.500
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

0%
0%
0%
97%
0%
97%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0.000
0.000
0.000
5,703.600
0.000
2,386.200
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
8,089.800

BILL9/23

Al-Othman Al-Zamel Co.

KGL RESORT AT WAFRA.


AL-OTHMAN & AL-ZAMIL Co.
ITEM

Description

ORIGINAL B.O.Q.

Work done upto :25/06/2007.

Qty Unit

Rate

Amount

% AGE. EXECUTED.

AMOUNT DUE

(KD)

(KD)

PRV. CURNT TOTAL

(KD)

SECTION 09900 - PAINTING


Prepare and apply to walls and columns paint of approved colour, minimum
3 coats with 2 coats of primer and one coat of Alkali resistant as per
drawings & specifications

For internal walls and ceiling

Provide and fix 2cm thick plaster over which apply 5mm thick textured/

2740 M2

1.500

sigma coating at the outer faade including fixing of steel-u channel for
divider line as shown in drawings and as per specifications (including
protective paint over sigma coating).

Kuwait United Development

PAYMENT No. :(11 ).

2900 M2

9.250

BILL9/24

0.000
0.000
0.000
0.000
0.000
0.000
0.000
4,110.000 60%
0.000
0.000
0.000
0.000
26,825.000 90%
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

5%

5%

0%
0%
0%
0%
0%
0%
0%
0%
65%
0%
0%
0%
0%
95%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
2,671.500
0.000
0.000
0.000
0.000
25,483.750
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000

Al-Othman Al-Zamel Co.

KGL RESORT AT WAFRA.


AL-OTHMAN & AL-ZAMIL Co.
ITEM

Description

ORIGINAL B.O.Q.

Work done upto :25/06/2007.

Qty Unit

Rate

Amount

% AGE. EXECUTED.

(KD)

(KD)

PRV. CURNT TOTAL

AMOUNT DUE
(KD)

28,155.250

TOTAL CARRIED TO COLLECTION

Kuwait United Development

PAYMENT No. :(11 ).

BILL9/25

Al-Othman Al-Zamel Co.

KGL RESORT AT WAFRA.


AL-OTHMAN & AL-ZAMIL Co.
ITEM

Description

ORIGINAL B.O.Q.

PAYMENT No. :(11 ).


Work done upto :25/06/2007.

Qty Unit

Rate

Amount

% AGE. EXECUTED.

AMOUNT DUE

(KD)

(KD)

PRV. CURNT TOTAL

(KD)

BILL 9

FINISHING WORKS
COLLECTION

PAGE 1

23,569.763

PAGE 2

8,089.800

PAGE 3

28,155.250

59,814.813

TOTAL CARRIED TO SUMMARY

Kuwait United Development

BILL9/26

Al-Othman Al-Zamel Co.

ORIGINAL B.O.Q.

KGL RESORT AT WAFRA.


AL-OTHMAN & AL-ZAMIL Co.
ITEM

Description

PAYMENT No. :(11 ).


Work done upto :25/06/2007.

Qty Unit

Rate

Amount

(KD)

(KD)

% AGE. EXECUTED.
PRV. CURNTTOTAL

0%

DIVISION 10 - SPECIALTIES

A The Contractor is referred to the Specifications and Drawings


Specifications and Drawings for all details related to this
Division of the works and he is to include for complying
with all the requirements contained therein, whether or not
those are specifically mentioned within the items.

SECTION 10800 - TOILET AND BATH ACCESSORIES

C Provide and install toilet and bath accessories as shown


in drawing , specifications and to the approval of the Engineer/Engineer
Representative.

1 Mirror with frame

18

No

20.000

2 Shelve

18

No

15.000

3 Toilet soap holders

18

No

18.000

4 Bath soap holders

18

No

18.000

5 Towel rails

18

No

15.000

6 Coat hook - stainless steel

18

No

15.000

AMOUNT DUE
(KD)
0.000

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
360.000
0.000
270.000
0.000
324.000
0.000
324.000
0.000
270.000
0.000
270.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

0.000

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
TOTAL CARRIED TO COLLECTION

Kuwait United Development

0.000

BILL10/27

Al-Othman Al-Zamel Co.

ORIGINAL B.O.Q.

KGL RESORT AT WAFRA.


AL-OTHMAN & AL-ZAMIL Co.
ITEM

Description

PAYMENT No. :(11 ).


Work done upto :25/06/2007.

Qty Unit

Rate

Amount

(KD)

(KD)

% AGE. EXECUTED.
PRV. CURNTTOTAL

AMOUNT DUE
(KD)

MISCELLANEOUS

0.000
Providing and installation of kitchen cabinets and all applicables
and fixtures & kitchen sinks as per drawings & specifications at
both kitchens and at all typical floor.

A Base units of 600 mm depth and 900 mm height including 30 mm thick


4 No
worktop as per equipment drawing as per specifications.
B Wall clipboard units of 350 mm depth and 600 mm height as per drawings
4 No
& specifications.
C Kitchen sinks 1200 x 600 mm stainless steel complete with fixture
fixtures and fittings

No

0.000
0.000
0.000
0.000
400.000 1,600.000
0.000
0.000
200.000 800.000
0.000
0.000
160.000 640.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

Kuwait United Development

BILL10/28

Al-Othman Al-Zamel Co.

KGL RESORT AT WAFRA.


AL-OTHMAN & AL-ZAMIL Co.
ITEM

Description

ORIGINAL B.O.Q.

Work done upto :25/06/2007.

Qty Unit

Rate

Amount

(KD)

(KD)

TOTAL CARRIED TO COLLECTION

Kuwait United Development

PAYMENT No. :(11 ).


% AGE. EXECUTED.
PRV. CURNTTOTAL

AMOUNT DUE
(KD)
0.000

BILL10/29

Al-Othman Al-Zamel Co.

ORIGINAL B.O.Q.

KGL RESORT AT WAFRA.


AL-OTHMAN & AL-ZAMIL Co.
ITEM

Description

PAYMENT No. :(11 ).


Work done upto :25/06/2007.

Qty

Unit

Rate

Amount

(KD)

(KD)

% AGE. EXECUTED.
PRV. CURNTTOTAL

AMOUNT DUE
(KD)

0%
0%
0%

0.000

0%
0%

0.000

0%
0%

0.000

0.000

0.000

0%

0.000

0.000

0%

0.000

0.000

0%

0.000

0.000

0.000

0.000

0%
0%

0.000

0%

0.000

0.000

0%

0.000

0.000

0.000

0.000

0%
0%

0.000

0%

0.000

0.000

0%
0%

0.000

0%
0%

0.000

0%
0%

0.000

0%
0%

0.000

0%
0%

0.000

0%
0%

0.000

0%
0%

0.000

0%

0.000

0%

0.000

Division 15 - Mechanical
H.V.A.C SYSTEM

0.000

GENERAL NOTES

0.000
0.000

Contractor is responsible to get approval of all the authorities


required for his proposed equipments.

0.000

The following BOQ is a guide, Contractor is responsible for the


operation of HVAC system with good workmanship and should
include all accessories required during preparation of shop
drawings.

Contractor shall include in his offer full details and catalogues for
all HVAC equipments and accessories in which the prices are
based upon

Contractor should be minimum Grade III registered in CTC

Any interpretation or conflict raised for the quality of the installation


of HVAC system during construction, the minimum acceptable
quality is MPW standards.

PACKAGE / SPLIT DX-UNITS

0.000

0.000

0.000

0.000

0.000

Package / Split unit complete with duct heater, vibration isolator,


electrical power controls, bases, fresh air inlets and all other
accessories required to the satisfaction of the Engineer. Approved
Carrier manufacturers are York, Trane, Hitachi Carrie

0.000

A PK G1capacity 3200 CFM 90 MBTU/hr. and 9 KW duct heater.

No.

1,800.000

1,800.000
0.000

B PK G2 capacity 3200 CFM 90 MBTU/hr. and 9 KW duct heater.

No.

1,800.000

1,800.000
0.000

PK-G3 capacity 3900 CFM 110 MBTU/hr. and 12 KW duct heater.


1

No.

2,100.000

2,100.000
0.000

D PK-G4 capacity 3900 CFM 110 MBTU/hr. and 12 KW duct heater.

No.

2,100.000

2,100.000
0.000
0.000
0.000
0.000
0.000

Total Carried to Collection

Kuwait United Development

BILL15/30

0.000

0.000

0.000

0.000

0.000

0.000

0.000

Al-Othman Al-Zamel Co.

ORIGINAL B.O.Q.

KGL RESORT AT WAFRA.


AL-OTHMAN & AL-ZAMIL Co.
ITEM

Description

PAYMENT No. :(11 ).


Work done upto :25/06/2007.

Qty

Unit

Rate

Amount

(KD)

(KD)

% AGE. EXECUTED.
PRV. CURNTTOTAL

AMOUNT DUE
(KD)

0%
MINI SPLIT UNITS

0.000
0.000

Mini split unit


complete with DDC type thermostat, brackets,
electrical controls and all other accessories.

0.000
0.000

Type MSU-W 24 Wall Mounted

24

No.

325.000

C Type MSU-C 24 Cassette type

No.

No.

285.000

450.000

513.000

0.000

0%

0.000

0.000

0%

0.000

0.000

0%
0%

0.000

0%
0%

0.000

0%
0%

0.000

0%
0%

0.000

0%
0%

0.000

0%
0%
0%

0.000

0%
0%

0.000

0%
0%

0.000

0%
0%

0.000

0%
0%

0.000

0%
0%
0%

0.000

0%
0%

0.000

0.000

0%
0%

0.000

0.000

0%
0%

0.000

480.000

E 150 CFM Capacity

No.

50.000

300.000

0.000

0.000
0.000
0.000
200.000

800.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

0.000

Total Carried to Collection

Kuwait United Development

BILL15/31

0.000
810.000

0.000

40.000

NO

0.000

0.000

No.

0.000

0%
0%
0%

12

200 CFM CAPACITY

0.000

70% 20% 90%


0%
0.000
0%
0.000
900.000 70% 20% 90%

D 100 CFM Capacity

"TEDERER ADDITION

0.000

570.000

0.000

Wall mounted propeller fans, complete with automatic shutter,


power, controls and all other accessories required

0%
0%

0.000

7,020.000

0.000
EXHAUST FANS

0.000

70% 20% 90%


0%

7,800.000
0.000

B Type MSU-W 18 Wall Mounted

0%
0%

0.000
0.000

0.000

0.000

0.000

0.000

0.000

0.000
0.000

0.000

0.000

0.000

0.000

0.000
0.000

0.000

0.000

0.000

0%

0.000

0%

8,343.000

Al-Othman Al-Zamel Co.

ORIGINAL B.O.Q.

KGL RESORT AT WAFRA.


AL-OTHMAN & AL-ZAMIL Co.
ITEM

Description

PAYMENT No. :(11 ).


Work done upto :25/06/2007.

Qty

Unit

Rate

Amount

(KD)

(KD)

AIR OUTLETS

0.000

0%
0%

0.000

0%
0%

0.000

0%
0%

0.000

0%
0%
0%

0.000

0%
0%

0.000

0%
0%

0.000

0%
0%

0.000

0%
0%

0.000

0%
0%

0.000

0%
0%

0.000

0%
0%

0.000

0%
0%
0%

0.000

0%
0%

0.000

0%
0%

0.000

0%
0%

0.000

0%
0%

0.000

0.000

0.000

0%
0%
0%

0.000

0%

0.000

0%

0.000

0%

0.000

0.000

0.000
0.000

No.

20.000

140.000
0.000

B 9x9 inch size

No.

21.000

147.000
0.000

12x12 inch size

No.

25.000

125.000
0.000
0.000

Supply air linear diffuser complete with all accessories required.


0.000
0.000

4 slots, 3/4 in thick each

40

MR

30.000

120.000
0.000

E 3 slots, 3/4 in thick each

20

MR

25.000

500.000
0.000

2 slots, 3/4 in thick each

90

MR

20.000

1,800.000
0.000

Supply or return air register complete with all accessories required.


0.000
0.000

G 24 x 8 inch size

No.

30.000

60.000

H 20 x 8 inch size

No.

25.000

50.000

0.000

0.000

16 x 8 inch size

No.

25.000

25.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

Total Carried to Collection

Kuwait United Development

BILL15/32

(KD)
0.000

0.000

6x6 inch size

AMOUNT DUE

0%
0%

0.000

Supply air diffusers complete with all accessories required.

PRV. CURNTTOTAL

0%
0.000

Air outlets complete with dampers, fixing frames and all other
accessories required (color as per false ceiling and Engineer's
approval)

% AGE. EXECUTED.

0.000

0.000

0.000

0.000

0.000
0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000
0.000

0.000

0.000

0.000

0.000

0.000
0.000

Al-Othman Al-Zamel Co.

ORIGINAL B.O.Q.

KGL RESORT AT WAFRA.


AL-OTHMAN & AL-ZAMIL Co.
ITEM

Description

PAYMENT No. :(11 ).


Work done upto :25/06/2007.

Qty

Unit

Rate

Amount

(KD)

(KD)

Fresh air intake with sand louver, 4 inch filter an damper and all
other accessories required.

% AGE. EXECUTED.
PRV. CURNTTOTAL

0.000

0%
0%

0.000

0%
0%

0.000

0%
0%

0.000

0.000

0.000

0%
0%

0.000

0%

0.000

0.000

No.

60.000

120.000
0.000

B 24 x 12 inch size

No.

65.000

130.000
0.000
0.000

SHEET METAL

L.S.

3,500.000

3,500.000

95%

2%

0.000
INSULATION

1 inch flexible duct insulation density 24 Mg/Mt 3& 2 inch rigid


insulation density 48 kg/m3 for exposed ducts and water proofing
for all exposed ducts as specified.

E Aluminium cladding 0.7mm thick complete with bracing system and


all other accessories.

0.000

0.000

0.000

L.S.

L.S.

1,500.000

1,900.000

SUNDRIES

L.S.

250.000

0%

0.000

1,500.000

95%

L.S.

L.S.

1,900.000

0%

0.000

0.000

0%
0%

0.000

0%
0%

0.000

0%
0%
0%

0.000

250.000

200.000
0.000

Testing and commissioning including two years maintenance

L.S.

500.000

500.000
0.000

J Other items if not mentioned state hereafter

L.S.

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

0.000

Total Carried to Collection

Kuwait United Development

BILL15/33

1,455.000
0.000

INCLUDED
200.000

97%
0%

0.000

H Preparation of shop drawings, as built drawings.

2%

0.000

0.000

0.000
Electrical power and controls related to HVAC works

0.000

0.000

0.000

3,395.000

0.000

0.000

F All complete works related HVAC works

97%
0%

0.000

0.000

0.000

0%
0%

0.000

0.000

Ducts of galvanized sheet metal as per (SMACNA) standards


complete with volume dampers, split dampers, fire dampers,
hangers, supports and all other accessories required.
1

(KD)

0%
0%

0.000

A 20x12 inch size

AMOUNT DUE

50%

0%
50%

0.000

0.000

0.000

0.000
100.000

0%
0%

0.000

0%
0%

0.000

0%
0%

0.000

0%
0%

0.000

0%
0%
0%

0.000

0%
0%

0.000

0%
0%

0.000

0.000

0.000

0.000

0.000

0.000
0.000

0.000

0.000

0%

0.000

0%

4,950.000

Al-Othman Al-Zamel Co.

ORIGINAL B.O.Q.

KGL RESORT AT WAFRA.


AL-OTHMAN & AL-ZAMIL Co.
ITEM

Description

PAYMENT No. :(11 ).


Work done upto :25/06/2007.

Qty

Unit

Rate

Amount

(KD)

(KD)

PRV. CURNTTOTAL

AMOUNT DUE
(KD)

0%
0%

0.000

0%
0%

0.000

0.000

0.000

0%
0%

0.000

0%

0.000

0.000

0.000

0.000

0%
0%

0.000

0%

0.000

0.000

0%

0.000

PLUMBING
0.000
GENERAL NOTES

% AGE. EXECUTED.

0.000

0.000

0.000

0.000

BOQ mentioned below is a guide for pricing. Contractor should


verify the quantities, and quote for a lump sum price for entire
plumbing system including commissioning, testing and handing
over and maintenance according to Engineer's approved.

DRAINAGE

0.000

HDPE OR PP DRAIN PIPES drain pipes to DIN 8075/19535 &


DIN 19560 as per Engineer approval complete with electric or bult
welding fittings, including fittings, hangers, supports, excavations,
backfilling, concrete encasement all other accessories requi

0.000

A 6" dia pipe

290

MR

10.500

3,045.000
0.000

0%
50% 50%
0%

0%
2,012.500 55% 35% 90%
0%
0.000
0%
0.000
0.000

B 4" dia pipe

C 3" dia pipe

230

30

MR

MR

8.750

6.000

180

MR

5.000

UPVC pressure pipes PN 15 complete with all accessories


required.

E 4" dia pipe

15

MR

8.000

0.000

765.000
0.000

0.000

0%

0.000

0.000

0%
0%

0.000

0%
0%
0%

0.000

0%
0%

0.000

0.000

0.000

0%
0%

0.000

0%

0.000

0.000

0%
0%

0.000

0%
0%
0%

0.000

0%
0%

0.000

120.000

0.000
0.000
0.000
0.000

0.000

0.000
0.000

BILL15/34

0.000

0.000

0.000

Kuwait United Development

0.000

0%
900.000 50% 35% 85%
0%
0.000

0.000

Total Carried to Collection

0.000
1,811.250

162.000

0.000

0.000

90% 90%
0%

180.000
0.000

2" dia pipe (pressure type)

0.000
1,522.500

0.000

0.000
0.000

0.000

0.000

0.000

0.000
0.000

0.000

0%

0.000

0%

4,260.750

Al-Othman Al-Zamel Co.

ORIGINAL B.O.Q.

KGL RESORT AT WAFRA.


AL-OTHMAN & AL-ZAMIL Co.
ITEM

Description

PAYMENT No. :(11 ).


Work done upto :25/06/2007.

Qty

Unit

Rate

Amount

(KD)

(KD)

WATER SUPPLY

% AGE. EXECUTED.
PRV. CURNTTOTAL

AMOUNT DUE
(KD)

0%

0.000

0.000
0.000

0%
0%

0.000
0.000

0.000

0%
0%

0.000

0%
0%

0.000

0%
0%

0.000

Polypropylene PPR-3 to DIN 8077 with aluminum Jacket for pipes


exposed to sun complete with all accessories, supports, hangers,
and all other accessories required, and directed by Engineer.
0.000

3" dia pipe

15

MR

165.000

2,475.000
0.000

B 2-1/2" dia pipe

30

MR

13.000

390.000

C 2" dia pipe

140

MR

11.000

1,540.000

D 1-1/2" dia pipe

130

MR

10.000

E 1-1/4" dia pipe

120

MR

8.800

1,056.000

F 1" dia pipe

85

MR

6.750

573.750

G 3/4" dia pipe

330

MR

4.500

1,485.000

H 1/2" dia pipe

130

MR

3.500

455.000

0.000

50% 40% 90%


0%
0.000
1,300.000 95% 5% 100%
0.000

0%

95%

5% 100%

95%

5% 100%

95%

5% 100%

95%

5% 100%
0%
0%

0.000

0%

0.000

0%

0.000

0.000
0.000
INSULATION

Insulate all hot and exposed cold water pipes with 3/4" rigid
fiberglass of density 24 Mg/Mt 3 and protect with canvas, foster
and aluminum cladding 24 gauge.

L.S.

900.000

commission and mainatin all plumbing fixtures &


accessories as per owners selection

L.S.

2,750.000

0.000
1,485.000
0.000
455.000
0.000
0.000

0.000

0.000

0%
0%

0.000

0%
0%

0.000

2,750.000

0.000
0.000
0.000
0.000
0.000

0.000
0.000
0.000

BILL15/35

0.000
573.750

0%

0.000

Kuwait United Development

0.000
1,056.000

900.000

0.000

Total Carried to Collection

0.000
1,300.000

0.000
0.000

0.000

0.000
1,386.000

0%
0%

0.000

J Install

0.000

0.000
0.000

0.000
FIXTURES & ACCESSORIES

0%

0.000

15% 15%
0%

0.000

0.000
412.500
0.000

0%
0%
0%

0.000

0%
0%

0.000

0%
0%

0.000

0%
0%

0.000

0%
0%

0.000

0%
0%

0.000

0.000
0.000

0.000

0.000

0.000

0.000

0.000

0%

0.000

0%

6,668.250

Al-Othman Al-Zamel Co.

ORIGINAL B.O.Q.

KGL RESORT AT WAFRA.


AL-OTHMAN & AL-ZAMIL Co.
ITEM

Description

PAYMENT No. :(11 ).


Work done upto :25/06/2007.

Qty

Unit

Rate

Amount

(KD)

(KD)

EQUIPMENTS

% AGE. EXECUTED.
PRV. CURNTTOTAL

0.000
0.000

0%
0%
0%

AMOUNT DUE
(KD)
0.000
0.000
0.000

A Booster set multistage, 2 vertical pumps total capacity 60 GPM at


4-5 bars, (50, 50) complete with pressure tank, frequency drive,
electrical panels, header base, vibration isolates and all other
accessories required and directed by Engineer.

Set

2,200.000

2,200.000
0.000

0%
0%

0.000
0.000

Set

2,000.000

2,000.000

0%
0%

0.000

0.000

B Booster set multistage, for irrigation system capacity 40 GPM at 4-5


bars, (50, 50) complete with small pressure tank, frequency drive,
electrical panels, header base, vibration isolates and all other
accessories required and directed by Engineer.

Mesh Filter stainless steel 20 Micron complete with automatic back


wash and all other accessories capacity 40 GPM.

D Fertilizer dosing pump complete with tank, pump and controller.


E Sand Filter, multi media 10 micron steel or GRP body automatic

No.

500.000

500.000
0.000

0%
0%

0.000
0.000

No.

350.000

350.000

0%
0%

0.000

0.000

0.000

No.

900.000

900.000
0.000

0%
0%

0.000
0.000

15

No.

90.000

1,350.000
0.000

0%
0%

0.000
0.000

No.

45.000

270.000
0.000

0%
0%

0.000
0.000

gpm at 30 ft head complete with all accessories.

Set

2,000.000

2,000.000
0.000

5%

0%

5%
0%

100.000
0.000

Floor drain clean out (FDCO) complete with all accessories


required.

30

No.

45.000

1,350.000
0.000

90%

5%

95%
0%

1,282.500
0.000

15

No.

85.000

1,275.000
0.000

50% 40% 90%


0%

1,147.500
0.000

20

No.

35.000

700.000
0.000

No.

675.000

0% 100%
0%
0%
0%
0%

back wash capacity 60 GPM.

F Individual hot water boiler 50 ltr. capacity 1.5 KW (pressure type).


G Stainless steel type cartridge filter 5 micron complete with all
accessories.

H Sump pit complete with sump pump set 2 nos. each capacity 50
I

0.000

J Floor / Ground cleans out (FCO/CO) complete with all accessories


required.

K Roof drain (R.D) complete with all accessories required.


L Greeze trap complete with all accessories.

700.000 100%
0.000
675.000
0.000

Rain water shoe complete with all accessories

20

No.

18.000

360.000
0.000
0.000
0.000

0.000
0.000

Total Carried to Collection

Kuwait United Development

BILL15/36

0.000
0.000
0.000

0%
0%

0.000

0%
0%
0%

0.000

0%
0%

0.000

0%
0%

0.000

0.000

0.000
0.000

0.000

0.000

0%

0.000

0%

3,230.000

Al-Othman Al-Zamel Co.

ORIGINAL B.O.Q.

KGL RESORT AT WAFRA.


AL-OTHMAN & AL-ZAMIL Co.
ITEM

Description

Work done upto :25/06/2007.


Qty

Unit

Rate

Amount

(KD)

(KD)

Swimming Pool

A Sand filter complete with automatic back wash, multi media and all

PAYMENT No. :(11 ).


% AGE. EXECUTED.
PRV. CURNTTOTAL

AMOUNT DUE
(KD)
0.000

0.000
0.000

0%
0%
0%

0.000
0.000

No.

1,500.000

1,500.000
0.000

0%
0%

0.000
0.000

No.

800.000

2,400.000
0.000

0%
0%

0.000
0.000

No.

1,500.000

3,000.000
0.000

0%
0%

0.000
0.000

D Stainless steel inlet fitting.

23

No.

35.000

805.000
0.000

0%
0%

0.000
0.000

E Stainless steel main drain.

No.

90.000

270.000
0.000

0.000
0.000

F Stainless steel /Chrome plated vacuum fitting.

No.

50.000

400.000
0.000

G Gutter main drain (anti vortex) Stainless Steel.

26

No.

45.000

1,170.000
0.000

0%
0%
0%
0%
0%
0%

H Chemical feeder with controllers and all other accessories.

Set

900.000

900.000
0.000

0%
0%

0.000
0.000

No.

1,300.000

1,300.000
0.000

0%
0%

0.000
0.000

L.S.

850.000

850.000

other accessories capacity 60m3/hr.

B End suction pump complete bronze with basket strainer valves and
all other accessories capacity 60m3/hr, 1450 RPM (one stand by)

C Instantaneous heating boiler stainless steel, complete with all


accessories capacity 60KW.

0%

Ozonator with crona discharge complete with all accessories.

J PVC pressure pipes PN16 complete with all accessories.

0.000

95%

5% 100%
0%

0.000
0.000
0.000
0.000

850.000
0.000

K Swimming pool accessories such as ladders, jumping board,


vaccum cleaner, testing kit, balancing tanks and other required
itmes as directed by Engineer.

L.S.

2,800.000

0%
0%

0.000

0%
0%

0.000

0%
0%

0.000

0%
0%

0.000

0%
0%
0%

0.000

0%
0%

0.000

0%
0%

0.000

0%
0%

0.000

0%
0%

0.000

0.000

0.000

0%
0%

0.000

0%

0.000

2,800.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

0.000
0.000

Total Carried to Collection

Kuwait United Development

BILL15/37

0.000

0.000

0.000

0.000

0.000
0.000

0.000

0.000

0.000

0.000

0.000

0%

0.000

0%

850.000

Al-Othman Al-Zamel Co.

ORIGINAL B.O.Q.

KGL RESORT AT WAFRA.


AL-OTHMAN & AL-ZAMIL Co.
ITEM

Description

PAYMENT No. :(11 ).


Work done upto :25/06/2007.

Qty

Unit

Rate

Amount

(KD)

(KD)

SUNDRIES

% AGE. EXECUTED.
PRV. CURNTTOTAL

0.000
0.000

A Supports including fixing, anchors, insulating blocks and antivibration devices.

L.S

200.000

200.000
0.000

Identification including plates, discs, labels charts and color coding.


1

L.S

175.000

175.000
0.000

C Testing and commissioning including operating completed


installations and providing fuel and power.

INCLUDED

LS.

maintenance manuals.

L.S

150.000

150.000
0.000

E Painting and disinfections and disinfections for plumbing systems

L.S

INCLUDED
0.000

F Other items if not mentioned state hereafter

L.S

0%
0%

0.000

0%
0%

0.000

50%
0%
0%
0%

0.000

0.000

0.000

0.000
75.000
0.000

0.000

0%
0%

0.000

0%
0%

0.000

0%
0%

0.000

0%
0%
0%

0.000

0%
0%

0.000

0%
0%

0.000

0%
0%

0.000

0%
0%

0.000

0%
0%
0%

0.000

0%
0%

0.000

0.000

0.000

0%
0%

0.000

0.000

0%
0%
0%
0%

0.000

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

0.000
0.000

BILL15/38

0.000

0.000

0.000

Kuwait United Development

0.000

0%
0%

0%
0%

0.000
0.000

Total Carried to Collection

50%

(KD)

0%

0%
0%

0.000

D Documents including drawings, operating instructions and

AMOUNT DUE

0.000

0.000

0.000

0.000

0.000
0.000

0.000

0.000

0.000

0.000

0.000
0.000

0.000

0.000

0.000

0.000

0%

0.000

0%

75.000

Al-Othman Al-Zamel Co.

ORIGINAL B.O.Q.

KGL RESORT AT WAFRA.


AL-OTHMAN & AL-ZAMIL Co.
ITEM

PAYMENT No. :(11 ).


Work done upto :25/06/2007.

Description

Qty

Unit

Rate

Amount

(KD)

(KD)

BILL 15
MECHANICAL WORKS
COLLECTION:

PAGE 1
PAGE 2
PAGE 3
PAGE 4
PAGE 5
PAGE 6
PAGE 7
PAGE 8
PAGE 9

TOTAL CARRIED TO SUMMARY

Kuwait United Development

0.000

BILL15/39

% AGE. EXECUTED.
PRV. CURNTTOTAL

AMOUNT DUE
(KD)

0%
0%

0.000

0%
0%

0.000

0%
0%

0.000

0%
0%

8,343.000

0%
0%
0%

4,950.000

0%
0%

3,230.000

0%
0%

75.000

0%
0%

0.000

0%
0%

0.000

0%
0%

0.000

0%
0%
0%

0.000

0%
0%

0.000

0%
0%

0.000

0%
0%

0.000

0%
0%

0.000

0%
0%
0%

0.000

0%
0%

0.000

0%
0%

0.000

0%
0%

0.000

0%
0%

0.000

0.000

0.000

0.000

0.000

4,260.750
6,668.250

850.000

0.000

0.000

0.000

0.000

0.000
0.000

0.000

0.000

0.000

0.000

0.000
0.000

0.000

0.000

0.000

0.000

0%

0.000

0%

28,377.000

Al-Othman Al-Zamel Co.

ORIGINAL B.O.Q.

KGL RESORT AT WAFRA.

PAYMENT No. :(11 ).


Work done upto :25/06/2007.

AL-OTHMAN & AL-ZAMIL Co.


ITEM

Description

Qty Unit

Rate

Amount

(KD)

(KD)

Division 16 Electrical

0.000

Basic Electrical Requirements

0.000
0.000

Supports including fixings, anchors, insulating blocks, fire proofing


and anti-vibration devices.

Item

250.000

Identification including plates, disc labels, charts and colour


codes.

Item

250.000

Testing and commissioning including operating complete


installation, until commissioning is satisfactory.

Item

325.000

Documents including drawings operating instructions and


manintenance manuals.

Item

100.000

Tools and spares as quantified in the specification.

Item

600.000

0.000
0.000
0.000

0.000

0%
0%

0.000

0.000

0.000

0%
0%
0%
0%

0.000

0%
0%

325.000

100.000
0.000

(KD)

0%
0%

250.000

0.000
D

0%
0%
0%
0%

0.000

0.000
C

PRV. CURNTTOTAL

0%
0%

250.000
0.000

% AGE. EXECUTED. AMOUNT DUE

600.000

0.000

0.000

0.000

0.000
0.000
0.000

F
Allow for all work as described in connection with the incoming
electrical main supply to be installed by MEW including MEW's
including MEW's cable lugs, cable glands, etc.
G

Item

BY MEW

Item

Item

500.000

0.000

0%
0%
0%
0%

0.000

0%
0%

500.000
0.000

Allor for coordination with other engineering installation

Allow for cutting or forming holes, chases, mortices or the like and
making good finishes

0.000

Allow for obtaining approvals as required for working and as built


drawings and obtaining approvals after inspections of completed
installation by MEW, MOC, KFB

Allow for building in or cutting and painting brackets or the like and
making good finishing

Item

item

INCLUDED

INCLUDED

INCLUDED
0.000
0.000
0.000
0.000
0.000
0.000

0.000
0.000
Total Carried to Collection

Kuwait United Development

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

BILL16/40

0.000
0.000

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

Al-Othman Al-Zamel Co.

ORIGINAL B.O.Q.

KGL RESORT AT WAFRA.

PAYMENT No. :(11 ).


Work done upto :25/06/2007.

AL-OTHMAN & AL-ZAMIL Co.


ITEM

Description

Qty Unit

Rate

Amount

(KD)

(KD)

Main Sub Main Switch Boards

0.000

Supply, install, connec, commission and test the main


switch board cubicle floor mounted type totally enclosed
complete with volmeter, ammeter, KWHMeter, indication
lamps, H.R.C. fuses, conduits, termination and main feeder
cable from main supply and incl

0.000

% AGE. EXECUTED. AMOUNT DUE


PRV. CURNTTOTAL

0.000
0.000
1.1 MSB-1 as shown on the drawings

No

2,800.000

2,800.000

1.2 MSB-2 as shown on the drawings

No

2,632.000

2,632.000

1.3 MSB-3 as shown on the drawings

No

2,240.000

2,240.000

80%

0.000

80%

0.000

80%

0%

0.000

0.000
0.000
0.000
2-

Distribution Boards

0.000

Supply, install, connect, commission and test the distribution


boards wall monuted type totally enclosed complete with H.R.C
fuses, conduits, termination and main feeder cable from main
supply and including the PVC pipes, cable trays, trunk period and
wit

0.000
0.000

2.1 DB- 1 as shown on the drawings

No

392.000

392.000

2.2 DB-2 as shown on the drawings

No

336.000

336.000

2.3 D.B - 3 as shown on the drawings

No.

359.000

359.000

2.4 D.B - 4 as shown on the drawings

No.

359.000

359.000

2.5 D.B - 5 as shown on the drawings

No.

381.000

381.000

2.6 D.B - 6 as shown on the drawings

No.

387.000

387.000

2.7 D.B - 7 as shown on the drawings

No.

420.000

420.000

85%

5%

85%

5%

85%

5%

85%

5%

85%

5%

85%

5%

85%

5%

0.000
0.000
0.000
0.000
0.000
0.000
0.000

Total Carried to Collection

Kuwait United Development

0.000

0%
0%
0%
0%
80%
0%
80%
0%
80%
0%
0%
0%
0%
0%
0%
0%

0.000

0%
0%
90%
0%
90%
0%
90%
0%
90%
0%
90%
0%
90%
0%
90%
0%
0%
0%
0%
0%

BILL16/41

(KD)

0%
0%
0%

0.000
0.000

0.000
0.000
0.000
2,240.000
0.000
2,105.600
0.000
1,792.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

0.000
0.000
352.800
0.000
302.400
0.000
323.100
0.000
323.100
0.000
342.900
0.000
348.300
0.000
378.000
0.000
0.000
0.000
0.000
8,508.200

Al-Othman Al-Zamel Co.

ORIGINAL B.O.Q.

KGL RESORT AT WAFRA.

PAYMENT No. :(11 ).


Work done upto :25/06/2007.

AL-OTHMAN & AL-ZAMIL Co.


ITEM

Description

Qty Unit

Rate

Amount

(KD)

(KD)

2.8 D.B - 8 as shown on the drawings

No.

404.000

2.9 D.B - 9 as shown on the drawings

No.

280.000

2.1 FP- 1 as shown on the drawings

No.

980.000

2.11 DB - SP

No.

224.000

2.12 DB - KIT.

No.

168.000

5 . SWITCH FUSES
Supply, install, connect, commission and test the following switch
fuses including conduits, wiring, main cable from main switch
board termination and main feeder cable, H.R.C fuses, weather
proof enclosure and all other necessary accessories as shown on

% AGE. EXECUTED. AMOUNT DUE


PRV. CURNTTOTAL

0%
0%
0.000
404.000 85% 5% 90%
0%
0.000
280.000 85% 5% 90%
0%
0.000
980.000 85% 10% 95%
0%
0.000
80% 80%
224.000
0%
0.000
168.000 85% 5% 90%
0%
0.000
0%
0%
0%
0%
0%
0.000
0%
0.000
0%
0.000

0.000
0.000

5.1 SIF 15 A SPN as specified

Nos.

45.000

270.000

28 Nos.

36.000

1,008.000

40% 10%

0.000
5.2 ISOL 20 A SPN as specified

50%

0.000
5.3 20 A TPN Switch fuse as specified

Nos.

51.000

357.000

5.4 30 A TPN Switch fuse as specified

Nos.

68.000

340.000

5.5 40 A TPN Switch fuse as specified

Nos.

73.000

292.000

5.6 60 A TPN Switch fuses as specified

Nos.

84.000

168.000

5.7 200 A TPN Switch fuses as specified

Nos.

280.000

560.000

15% 35%

0.000

50%

0.000

50%

0.000

50%

0.000
0.000
0.000
0.000

0.000

0.000
0.000
0.000
Total Carried to Collection

Kuwait United Development

50%

0%
0%
50%
0%
50%
0%
50%
0%
50%
0%
50%
0%
50%
0%
50%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

BILL16/42

(KD)
0.000
0.000
363.600
0.000
252.000
0.000
931.000
0.000
179.200
0.000
151.200
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

0.000
0.000
135.000
0.000
504.000
0.000
178.500
0.000
170.000
0.000
146.000
0.000
84.000
0.000
280.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
3,374.500

Al-Othman Al-Zamel Co.

ORIGINAL B.O.Q.

KGL RESORT AT WAFRA.

PAYMENT No. :(11 ).


Work done upto :25/06/2007.

AL-OTHMAN & AL-ZAMIL Co.


ITEM

Description

Qty Unit

Rate

Amount

(KD)

(KD)

6 . WIRING AND ACCESSORIES

% AGE. EXECUTED. AMOUNT DUE


PRV. CURNTTOTAL

0.000

supply, install, connect and test the following electric points


complete with conduites, wiring, junction boxes, switches and all
other necessary accessories including all builder works as shown
on the drawings and specificatons.

0.000
0.000

6.1 Light points as specified

517 Nos.

10.000

5,170.000

75%

0.000

(KD)

0%
0%

0.000

0%
0%
0%
75%
0%

0.000

0.000

0.000
0.000
3,877.500
0.000

6.2
13A 3 pin switched socket with socket W.T type as specified

Nos.

28.000

84.000
0.000

6.3 13A 3 pin switched socket points as specified

109 Nos.

13.500

1,471.500

23 Nos.

19.000

437.000

19.000

38.000

50%

0%

50%

0%

0.000
6.4 13A 3 pin twin switched socket points as specified

0.000
6.5 15 A 3 pin socket points as specified

Nos.

0.000
6.6 Junction box 15A with 20A D.P switch points as specified

47 Nos.

20.000

940.000
0.000
0.000

7 . EARTHING SYSTEM

0.000
0.000

supply, install, connect and test complete earthing system


including earth roads, earthing pit, cu. Tape, cu. Wires, ring earth,
bonding connection to each equipment, pit cover as shown on the
drawings and as per M.E.W specifictions and regulations.

L.S. 2,800.000

2,800.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

0.000

Total Carried to Collection

Kuwait United Development

50%

0%

0%
0%
50%
0%
50%
0%
0%
0%
50%
0%
0%
0%
0%

50% 25% 75%


0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

BILL16/43

0.000
0.000
735.750
0.000
218.500
0.000
0.000
0.000
470.000
0.000
0.000
0.000
0.000

2,100.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
7,401.750

Al-Othman Al-Zamel Co.

ORIGINAL B.O.Q.

KGL RESORT AT WAFRA.

PAYMENT No. :(11 ).


Work done upto :25/06/2007.

AL-OTHMAN & AL-ZAMIL Co.


ITEM

Description

Qty Unit

Rate

Amount

(KD)

(KD)

Provision Item
Type of Light Fittings
Type
A
B
C
D
E
F
G
H
J
K
L
M
N
EM
EX
PL-1
BL-1
FL-1
SPI
A1

28
16
11
95
3
8
16
4
18
31
78
2
41
10
5
11
28
8
13
91

Nos.
Nos.
Nos.
Nos.
Nos.
Nos.
Nos.
Nos.
Nos.
Nos.
Nos.
Nos.
Nos.
Nos.
Nos.
Nos.
Nos.
Nos.
Nos.
Nos.

LIGHT FITTINGS ARE TO SUPPLIED BY OWNER

Total Carried to Collection

Kuwait United Development

BILL16/44

EACH
3.300

1,706.100

% AGE. EXECUTED. AMOUNT DUE


PRV. CURNTTOTAL

(KD)

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0.000

0%

0.000

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

Al-Othman Al-Zamel Co.

ORIGINAL B.O.Q.

KGL RESORT AT WAFRA.

PAYMENT No. :(11 ).


Work done upto :25/06/2007.

AL-OTHMAN & AL-ZAMIL Co.


ITEM

Description

Qty Unit

Rate

Amount

(KD)

(KD)

PRV. CURNTTOTAL

0%
0%

FIRE ALARM SYSTEM

Supply, install, connect and commission in oerable manner


fire alarm system including conduits power supply unit
battery and the battery chargers, wiring and all other
accessories complete as specified and shown on the
drawings and as per the specificatio

Nos. 1,680.000

Addressable main fire alarm panel

Smoke detector

heat detactor

Nos.

33.600

Break glass call point

Nos.

44.800

Alarm bell 6"

Nos.

44.800

Wiring, conduits, accessories

L.S

Battery and battery charger

Nos.

840.000

Emergency light fitting

10 Nos.

30.000

Exit sign board fittings single sided

19 Nos.

28.000

2,800.000

Nos.

Total Carried to Collection

Kuwait United Development

% AGE. EXECUTED. AMOUNT DUE

33.600

0%
0%
0% 0%
1,680.000
0%
0.000
0% 0%
532.000
0%
0.000
0%
33.600
0%
0.000
0%
89.600
0%
0.000
0%
134.400
0%
0.000
2,800.000 50% 20% 70%
0%
0.000
0%
840.000
0%
0.000
0%
300.000
0%
0.000
0%
168.000
0%
0.000
0%
0.000
0%
0.000
0%
0.000
0%
0.000
0%
0.000
0%
0.000
0%
0%
0%
0%
0%
0%
0%
0.000
0%
0.000
0%
0%
0%
0%
0%
0.000
0%
0.000
0%
0.000
0%
0.000
0%
0.000
0%
0%
0%

0.000
0.000

0.000

0.000

0.000

0.000

0%

BILL16/45

(KD)

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
1,960.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
1,960.000

Al-Othman Al-Zamel Co.

ORIGINAL B.O.Q.

KGL RESORT AT WAFRA.

PAYMENT No. :(11 ).


Work done upto :25/06/2007.

AL-OTHMAN & AL-ZAMIL Co.


ITEM

Description

Qty Unit

Rate

Amount

(KD)

(KD)

TELEPHONE SYSTEM

0.000

Supply, install, connect test and commission in operable manner


telephone system including wiring, conduits, etc., complete as
specified and shown on the drawing, and as per M.O.C
specification

0.000

% AGE. EXECUTED. AMOUNT DUE


PRV. CURNTTOTAL

0.000
1

Terminal box (30x30x7.5 cm)

No.

135.000

135.000

Terminal box 20x20x10cm

Nos.

79.000

395.000

80%

0%

80%

0%

80%

0%

80%

0%

60%

0%

50%

0%

0.000
0.000
3

Terminal box 30x45x10cm

No.

145.000

145.000
0.000

Terminal box 45x45x10cm

No.

220.000

220.000
0.000

Telephone points

56 Nos.

14.000

784.000
0.000

Telephone outlet, 2 sockets (jack-in type)

56 Nos.

7.500

420.000
0.000

EPABX as shown in the drawings

No.

3,225.000

3,225.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

0.000
0.000
0.000
0.000
0.000
0.000

0.000
0.000
Total Carried to Collection

Kuwait United Development

BILL16/46

(KD)

0%
0%
0%

0.000

0%
0%
80%
0%
80%
0%
80%
0%
80%
0%
60%
0%
50%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0.000

0.000
0.000

0.000

108.000
0.000
316.000
0.000
116.000
0.000
176.000
0.000
470.400
0.000
210.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

0%
0%
0%
0%
0%
0%

0.000

0%
0%

0.000

0%

1,396.400

0.000
0.000
0.000
0.000
0.000

0.000

Al-Othman Al-Zamel Co.

ORIGINAL B.O.Q.

KGL RESORT AT WAFRA.

PAYMENT No. :(11 ).


Work done upto :25/06/2007.

AL-OTHMAN & AL-ZAMIL Co.


ITEM

Description

Qty Unit

Rate

Amount

(KD)

(KD)

% AGE. EXECUTED. AMOUNT DUE


PRV. CURNTTOTAL

TV & SATELLITE SYSTEM


Supply, install, TV and satellite system points including conduits,
complete as specified and as shown on the drawing.

0.000
0.000

TV & SAT box 12"x12"x4"

TV & SAT points

Head end unit - 100 P

Nos.

67.000

134.000

24 Nos.

22.000

528.000

135.000

135.000

10%

0.000
0.000

No.

0.000
4

KTV Anteena

No.

90.000

90.000
0.000

Satellite Dish

Nos.

110.000

330.000
0.000

Arab Sat

0.000

Nile Sat

0.000

Hotbird

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

0.000
0.000
0.000

0.000
0.000
13.400
0.000
132.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

0%
0%

0.000

0.000
0.000

0%

0.000

0%

145.400

0.000
0.000
0.000

0.000

BILL16/47

0%
0%
10%
0%
25%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0.000

0.000

Kuwait United Development

0.000

0%
0%
0%
0%
0%

0.000

Total Carried to Collection

25%

(KD)

0%

0.000
0.000
0.000
0.000

0.000

Al-Othman Al-Zamel Co.

ORIGINAL B.O.Q.

KGL RESORT AT WAFRA.

PAYMENT No. :(11 ).


Work done upto :25/06/2007.

AL-OTHMAN & AL-ZAMIL Co.


ITEM

Description

Qty Unit

Rate

Amount

(KD)

(KD)

% AGE. EXECUTED. AMOUNT DUE


PRV. CURNTTOTAL

COMPUTER SYSTEM

Supply, install raceways for CCTV system as shown on drawings


and as specified

L.S. 2,800.000

2,800.000

95%

0%

0.000
0.000
PUBLIC SYSTEM

0.000
0.000

Supply, install raceways for CCTV system as shown on drawings


and as specified

L.S. 1,700.000

1,700.000

85%

0%

0.000
INTERCOM SYSTEM WORKS

0.000
0.000

Supply, install, connect, commission and test intercom points and


network including pipe wire, switches all as shown on the
drawings and as per specifications.

0.000
The wires for intercom system should be provided with 30% spare.

L.S. 1,230.000

1,230.000

75%

0%

80%

0%

0.000
Intercom outlet

18

Nos

Nos
.

11.500

207.000
0.000

Outdoor audio intercom station point

17.000

119.000

80%

0%

0.000

Intercom panel

Nos.

110.000

220.000
0.000

Shops drawings and as built drawings with necessary instruments


and equipments catalogues should be submitted for the approval
of the Supervision Engineer.

L.S.

175.000

175.000

50%

0.000
CCTV SYSTEM
Supply, install raceways for CCTV system as shown on drawings
and as specified

0.000

L.S. 1,685.000

1,685.000
0.000
0.000
0.000
0.000
0.000

Total Carried to Collection

Kuwait United Development

BILL16/48

0%

0.000

0%

0.000

0%

0.000

0%

0.000

0%
0%
0%

0.000

90%

0%

0.000
0.000

95%
0%
0%
0%
0%

2,660.000

85%
0%
0%
0%

1,445.000

0%
0%

0.000

(KD)

0.000
0.000
0.000
0.000

0.000
0.000
0.000

0.000
0.000

75%
0%
80%
0%

922.500

80%
0%
0%
0%

95.200

50%
0%
0%

87.500

90%
0%
0%
0%
0%
0%

1,516.500

0.000
165.600
0.000

0.000
0.000
0.000

0.000
0.000

0.000
0.000
0.000
0.000
0.000

0%
0%
0%
0%
0%

0.000

0%

6,892.300

0.000
0.000
0.000
0.000

Al-Othman Al-Zamel Co.

ORIGINAL B.O.Q.

KGL RESORT AT WAFRA.

PAYMENT No. :(11 ).


Work done upto :25/06/2007.

AL-OTHMAN & AL-ZAMIL Co.


ITEM

Description

Qty Unit

Rate

Amount

(KD)

(KD)

ELECTRICAL WORKS
COLLECTION:
PAGE
1
2
3
4
5
6
7
8
9

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

Total Carried to Summary

Kuwait United Development

BILL16/49

% AGE. EXECUTED. AMOUNT DUE


PRV. CURNTTOTAL

(KD)

0%
0%
0%
0%

0.000
0.000
0.000

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0.000
8,508.200
3,374.500
7,401.750
0.000
1,960.000
1,396.400
145.400
6,892.300
0.000
0.000
0.000
0.000
0.000

0%
0%

0.000

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0.000

0%
0%
0%
0%

0.000

0%
0%

0.000

0%

29,678.550

0.000

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

0.000
0.000
0.000

0.000

Al-Othman Al-Zamel Co.

ORIGINAL B.O.Q.

KGL RESORT AT WAFRA.


AL-OTHMAN & AL-ZAMIL Co.
ITEM

Description

CONTRACT ADJUSTMENT (Addition)


div
5 CHAIN LINK FENCE AT MAIN ENTERANCE SIDE
QTY. 160 M' * 20 KD = 3200.000 KD

Work done upto :25/06/2007.

Qty Unit

Rate

Amount

(KD)

(KD)

% AGE. EXECUTED.
PRV. CURNTTOTAL

Ls

3,200.000

ROOFING SYSTEM QTY. 600 M2 * 16 = 9600.000 K 1

Ls

9,600.000

SKYLIGHT FOR ADMINISTRATION BLDG. (LS)

Ls

10,950.000

GYPSUM CORNICE AT FAADE (LS).

Ls

10,700.000

Total Carried to Summary

BILL ADJ/50

40%

53%

80%

0%

AMOUNT DUE
(KD)

0%

0.000
0.000
0.000
0.000
0.000
8928.000
0.000
0.000
0.000
0.000
0.000
8560.000
0.000
0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000

0%

Kuwait United Development

PAYMENT No. :(11 ).

0%
0%
0%
0%
93%
0%
0%
0%
0%
0%
80%
0%

0%

0.000

0%

17,488.000

Al-Othman Al-Zamel Co.

KUWAIT UNITED DEVELOPMENT Co.


KGL RESORT AT WAFRA

6/25/2007

VO-001
Works executed upto 25/06/2007.
Progress Payment # 11
Additional Requirements
Instruction

Description

Amount
(KD)

SUMMARY
SWI-001

Kithchen Exit Door

SWI-002

Doors at Balcony Area

SWI-003

Window opening for the Saloon & Pantry area,Chalet No.4

SWI -4 & 7

Architectural Approved samples

SWI-005

Over flow type Swimming Pool

SWI-006

Partition Glsass

KUD Letter
KU13/07982/So/so

308.750

Buffet Hall Extension

2,894.988

TOTAL AMOUNT

Kuwait United Development

1,431.750

SUMMARY-vo/51

4,635.488

Al-Othman Al-Zamel Co.

VARIATIONS DUE TO EXTENDING BUFFET / RESTAURANT AREA


Ref.KU13/07-982/So/so Dated 21 April,2007

Works executed upto 25/06/2007.


Progress Payment # 11

ITEM

Amount
(KD)

Description

Elevating Buffet Area

1,311.800

Extending Buffet/Restaurant Area

1,583.188

TOTAL

2,894.988

KUD

Kuwait United Development

OZ

Sumary Buffet/52

Al-Othman Al-Zamel Co.

VARIATIONS DUE TO ELEVATING BUFFET AREA (7.20 x13.50 m) - ADMINISTRATION BUILDING

ITEM

Ref.KU13/07-982/So/so Dated 21 April,2007

ORIGINAL B.O.Q.

ADDITIONS - REINFORCED SLAB ON GRADE


Description
B.O.Q Qty
REF.

Unit Rate
(KD)

PAYMENT No. :(11 ).


Work done upto :25/06/2007.

Amount % AGE. EXECUTED.AMOUNT DUE


(KD) PRV. CURNTTOTAL
(KD)
0%

ADDITIONS
1 Backfilling 20 cm. with compaction

LS

175.000

0.000

0%

0.000

0.000

0%

0.000

0.000

0%

0.000

175.000

100% 100%

0.000
2 PE sheet under slab on grade

98

M2

0.350

34.300

0%
100% 100%

0.000
3 Reinforced Concrete for slab on grade

98

M2

11.250

1,102.500

0%
100% 100%

0.000
1,102.500

0%

0.000

0%

0.000

0.000

0%

0.000

0.000

0%

0.000

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

0%

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
1,311.800

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

buft-30elev/53

34.300

0.000

0.000
0.000
0.000
0.000
0.000

Kuwait United Development

0.000

0.000

0%

Total Carried to Collection

175.000

0%

Al-Othman Al-Zamel Co.

VARIATIONS DUE TO EXTENDING BUFFET / RESTAURANT AREA


Ref.KU13/07-982/So/so Dated 21 April,2007

ORIGINAL B.O.Q.

PAYMENT No. :(11 ).

A- DELETED ITEMS

Work done upto :25/06/2007.

ITEM

Description

B.O.Q Qty Unit Rate


REF.
(KD)

Amount % AGE. EXECUTED.


(KD) PRV. CURNTTOTAL
0%

A- DELETED ITEMS

0.000

0%

0.000
1 Aluminum window W1 - size 560 x 210 cm

NO

765.000

765.000

2 Plaster works

24

M2

2.750

66.000

3 Sigma

39

M2

9.250

360.750

0%
0%

0.000

0%
100% 100%

0.000

0%
100% 100%

0.000
4 Hand rail

4.5

145.000

652.500

0%

0%
100% 100%

0.000

0%

0.000

0%

0.000

0%

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0.000
0.000
0.000
0.000
0.000
Total Carried to Collection

Kuwait United Development

0%
0%
0%
0%
0%
0%

buft-ext/54

0%

Al-Othman Al-Zamel Co.

SWI No. 1a :VARIATIONS DUE TO EXTENDING BUFFET / RESTAURANT AREA


B- ADDITION ITEMS
Description

ITEM

PAYMENT No. :(11 ).

ORIGINAL B.O.Q.

Qty Unit Rate


(KD)

Work done upto :25/06/2007.

Amount % AGE. EXECUTED.


(KD) PRV. CURNTTOTAL
0%

B- ADDITION ITEMS

0.000

0%

0.000
1 RC for beams

2.5

M3

90.000

0%

225.000

100% 100%

0.000
2 14 cm th solid slab

27

M2

12.500

0%

337.500

100% 100%

0.000
3 20 cm cement blocks for parapet

13

M2

6.900

0%

89.700

100% 100%

0.000
4 30 cm white blocks

19.5 M2

12.000

234.000

0%
100% 100%

0.000

0%

5 20 cm white blocks

13

M2

8.000

104.000
0.000

0%

6 New Alum. Window 210 x 210 cm

NO

287.000

0%

7 New Alum Window 120 x 210 cm

NO

165.000

8 Roofing

27

M2

16.000

9 2 cm. cement plaster

25

M2

2.750

10 decorative ceiling

27

M2

10.750

11 ceramic floor tiles

27

M2

10.000

12 internal paints

31

M2

1.500

37.55

M2

9.250

14 dismantle block wall, parapet wall, lintel

LS

200.000

15 breaking 5 cm of concrete slab on grade

LS

150.000

16 Corriguated sheet to be placed above pergola trellies under the concr 28

M2

3.000

287.000
0.000
495.000
0.000
432.000
0.000
68.750
0.000
290.250
0.000
270.000
0.000
46.500
0.000
347.300
0.000
200.000
0.000
150.000
0.000
84.000

17 Electrical works

LS

250.000

13 sigma

100% 100%

0%
0%
0%

50%

45%

95%
0%

100% 100%
0%
25%

25%
0%
0%
0%

50%

15%

65%
0%

50%

50%

100%

100%

0%

100%

0%
0%
0%
0%
100% 100% 200%
0%

18 HVAC works 1. Package unit capacity increased


2.linear duct
3. duct works w/ insulation

1
8
1

Total Carried to Collection

Kuwait United Development

LS
M
LS

360.000
30.000
250.000

250.000
0.000
0.000
360.000
240.000
250.000
0.000
0.000
0.000
0.000
0.000
0.000

50%

50%
0%
0%
0%
0%

100% 100%
0%
0%
0%
0%
0%
0%
0%

buft-ext/55

Al-Othman Al-Zamel Co.

SWI No. 1a :VARIATIONS DUE TO EXTENDING BUFFET / RESTAURANT AREA

PAYMENT No. :(11 ).

ORIGINAL B.O.Q.

ITEM

Description

Qty Unit Rate


(KD)

Work done upto :25/06/2007.

Amount % AGE. EXECUTED.


(KD) PRV. CURNTTOTAL
0%

SUMMARY

A- DELETED ITEMS

B- ADDITION ITEMS

0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
Total Carried to Summary

Kuwait United Development

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

buft-ext/56

0%

Al-Othman Al-Zamel Co.

No. :(11 ).

e upto :25/06/2007.

AMOUNT DUE
(KD)
0.000
0.000
0.000
0.000
66.000
0.000
360.750
0.000
652.500
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
1,079.250

Kuwait United Development

buft-ext/57

Al-Othman Al-Zamel Co.

No. :(11 ).

e upto :25/06/2007.

AMOUNT DUE
(KD)
0.000
0.000
225.000
0.000
337.500
0.000
89.700
0.000
234.000
0.000
104.000
0.000
0.000
0.000
0.000
0.000
410.400
0.000
68.750
0.000
72.563
0.000
0.000
0.000
30.225
0.000
347.300
0.000
200.000
0.000
0.000
0.000
168.000
0.000
125.000
0.000
0.000
0.000
0.000
250.000
0.000
0.000
0.000
0.000
0.000
0.000
2,662.438

Kuwait United Development

buft-ext/58

Al-Othman Al-Zamel Co.

No. :(11 ).

e upto :25/06/2007.

AMOUNT DUE
(KD)
0.000
0.000
0.000
-1,079.250
0.000
0.000
2,662.438
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
1,583.188

Kuwait United Development

buft-ext/59

Al-Othman Al-Zamel Co.

SWI 6 : Partition Glass

ORIGINAL B.O.Q.

PAYMENT No. :(11 ).


Work done upto :25/06/2007.

ITEM

Description

BOQ Qty
Ref.

Unit

Rate
(KD)

Amount % AGE. EXECUTED.AMOUNT DUE


(KD)
(KD)
PRV. CURNTTOTAL
0%

ADDITIONS
Ref. SWI KU13/06 DATED 10 MARCH. 2007.

0.000

0%

0.000

0.000

0%

0.000

0.000

0%

0.000

0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000

0.000
A Partition Glass for Toilet (Size 1.20 m x 2.0 m Ht)

New

12

NO

175.000 2,100.000

0%

0.000
0.000

0%

0.000

0.000

0%

0.000

0.000

0%

0.000

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

0%

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0.000
Total Carried to Collection

Kuwait United Development

0%
0%

SWI 6/60

Al-Othman Al-Zamel Co.

SWI-05 : OVER FLOW TYPE SWIMMING POOL

ORIGINAL B.O.Q.

PAYMENT No. :(11 ).


Work done upto :25/06/2007.

ITEM

Description

B.O.Q Qty Unit Rate


(KD)
REF.

Amount % AGE. EXECUTED.AMOUNT DUE


(KD)
(KD)
PRV. CURNTTOTAL
0%

ADDITIONS
Providing 20x30 gutter for over flow of the swimming pool
consists of
A Corner / Special Pieces of ceramics

0.000
0.000

0%
0%

0.000
0.000

0.000

0%

0.000

0%

0.000

0.000

0%

0.000

0%

0%

0.000

0%

0%

0.000

1. Handhold piece w/ safety marking (RAK-step white - DBL)

New

142 M

12.250 1,739.500

2. 4 lines of grooved tile (700 WHITE C)

New

568 M

3.300 1,874.400

0%

0.000

0.000

0%

0.000

0.000

0%

0.000

0.000

0%

0.000

17.350 2,342.250

0%

0.000

0.000

0%

0.000

0.000

B White color PVC cover grating 24 cm wide w/ corner angles as


sample provided.

New

135 M

C Concrete works beside the swimming pool to make the gutter.


1. Plain concrete 5 cm. th. Under slab on grade

42.750

100% 100%

42.750

2. Reinforced concrete

P4/B-5

13 M3 93.000 1,209.000

100% 100%

1,209.000

3. RC for beams ( for part through mech. Room roof slab)

P5/C-2

100% 100%

180.000

Ceramic for sides of gutter same as swimming pool wall tiles

Water proofing for part passing through mech. Room roof


cementitious applied w/p

P12 / F

P13 / 3

New

2.250

0.000

19 M2

D Ceramic for base of gutter same as swimming pool floor tiles

0%
P4/B-2

M3 90.000

36 M2 11.000

72 M2 12.000

23

6.000

180.000
0.000
0.000
396.000
0.000
0.000
864.000
0.000
0.000
138.000
0.000

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

G Water proofing for exposed area of the mech. Room roof slab
1. One layer of w/p membrane
2. 2 cm protection sand cement screed

New
New

60 M2
60 M2

3.000
1.500

0.000
180.000
90.000
0.000
0.000

0%
0%
0%
0%
0%
0%

0.000
0.000

0%
0%
0%

0.000
0.000
Total Carried to Collection

Kuwait United Development

0%
0%
0%

SWI 5/61

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
1,431.750

Al-Othman Al-Zamel Co.

SWI 4 & 7 :Architectural Approved samples

ORIGINAL B.O.Q.

PAYMENT No. :(11 ).


Work done upto :25/06/2007.

ITEM

Description

BOQ Qty Unit Rate


Ref.
(KD)

Amount
(KD)

% AGE. EXECUTED.
PRV. CURNTTOTAL
0%

ADDITIONS
STONE FLOOR
1 STONE FLOOR FOR ARCHADE PASSAGE FOR CHALET BLDG.
RAK STONE FLOOR (7GPSLD RG-1) SIZE 400x400x12 mm.

3 STONE FLOOR FOR WALKWAYS & OPEN PLATFORM AREA


RAK STONE FLOOR (7GPSLD RG-3) SIZE 400x400x12 mm.

CERAMIC FLOOR
4 CERAMIC FLOOR TILES RAK-GP133 600x600
(ADMN. BLDG AREAS OF Main enterance, lobby, reception and
prayer room)

0%

0.000

0%

0.000

0%

0.000

0%

0.000

0%

320 M2 22.950 7,344.000

0%

0.000

0%

0.000

0%

0.000

0%

355 M2 26.750 9,496.250

0%

0.000

0%

0.000

0%

0.000

0%

11,406.150

0%

0.000
0.000
0.000
0.000
0.000
178 M2 10.000 1,780.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

0%

2 STONE FLOOR FOR AREA AROUND SWIMMING POOL


RAK STONE FLOOR (7GPSLD RG-5) SIZE 400x400x12 mm.

0.000

497 M2 22.950

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0.000
0.000
Total Carried to Collection

Kuwait United Development

0%
0%
0%

SWI 4 &5 /62

Al-Othman Al-Zamel Co.

SWI 4 & 7 :Architectural Approved samples

ORIGINAL B.O.Q.

PAYMENT No. :(11 ).


Work done upto :25/06/2007.

ITEM

Description

BOQ Qty Unit Rate


Ref.
(KD)

Amount
(KD)

% AGE. EXECUTED.
PRV. CURNTTOTAL
0%

0.000

0%

0.000

0%

0.000

0%

1 CERAMIC FLOOR TILES FOR SWIMMING POOL OUTSIDE P1


AREA
2/E 460 M2 10.500 4,830.000

0%

0.000

0%

P1
3/A 210 M2 40.000 8,400.000
0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

0%

DELETION

2 MARBLE FLOORING

0%

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0.000
0.000
Total Carried to Collection

Kuwait United Development

0%
0%
0%

SWI 4 &5 /63

Al-Othman Al-Zamel Co.

SWI 4 & 7 :Architectural Approved samples

ORIGINAL B.O.Q.

PAYMENT No. :(11 ).


Work done upto :25/06/2007.

ITEM

Description

BOQ Qty Unit Rate


Ref.
(KD)

Amount
(KD)

% AGE. EXECUTED.
PRV. CURNTTOTAL
0%

SUMMARY

ADDITIONS

DELETIONS

0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0.000
0.000
Total Carried to Collection

Kuwait United Development

0%
0%
0%

SWI 4 &5 /64

Al-Othman Al-Zamel Co.

No. :(11 ).

e upto :25/06/2007.

AMOUNT DUE
(KD)
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

Kuwait United Development

SWI 4 &5 /65

Al-Othman Al-Zamel Co.

No. :(11 ).

e upto :25/06/2007.

AMOUNT DUE
(KD)
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

Kuwait United Development

SWI 4 &5 /66

Al-Othman Al-Zamel Co.

No. :(11 ).

e upto :25/06/2007.

AMOUNT DUE
(KD)
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

Kuwait United Development

SWI 4 &5 /67

Al-Othman Al-Zamel Co.

SWI 3 : Window opening for the Saloon & Pantry area,Chalet No.4

PAYMENT No. :(11 ).

ITEM

ORIGINAL B.O.Q.

Description

BOQ
Ref.

Qty

Unit

Rate
(KD)

Work done upto :25/06/2007.

Amount % AGE. EXECUTED.AMOUNT DUE


(KD)
(KD)
PRV. CURNTTOTAL
0%

ADDITIONS
Ref. SWI KU13/03 DATED 14 FEB. 2007.

0.000

0%

0.000

0.000

0%

0.000

0.000

0%

0.000

0.000

0%

0.000

0.000
A Window type W 02 size 2000 x 1900 mm.

P11/F-2

NO

230.000

230.000 60%

B Window type W 04 size 1000 x 1500 mm.

P11/F-4

NO

95.000

95.000 60%

0%

0.000

35%

95%

218.500

0%

0.000

35%

95%

90.250

0%

0.000

0.000
0.000

0%

0.000

0.000

0%

0.000

0.000

0%

0.000

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

0%

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
308.750

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0.000
Total Carried to Collection

Kuwait United Development

0%
0%

SWI 3/68

Al-Othman Al-Zamel Co.

SWI 1 : KITCHEN EXIT DOOR

PAYMENT No. :(11 ).

ITEM

ORIGINAL B.O.Q.

Description

BOQ
Ref.

Qty Unit

Rate
(KD)

Work done upto :25/06/2007.

Amount % AGE. EXECUTED.AMOUNT DUE


(KD)
(KD)
PRV. CURNTTOTAL
0%

ADDITIONS
Ref. SWI KU13/01 DATED 11 FEB. 2007.
A Door type D4 900X2200 mm.

P11/F-4

NO

160.000

0.000

0%

0.000

0.000

0%

0.000

0.000

0%

0.000

0.000

0%

0.000

0.000

0%

0.000

160.000

0%

0.000

0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000

0%

0.000

0.000

0%

0.000

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

0%

0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0.000
Total Carried to Collection

Kuwait United Development

0%
0%

SWI 1/69