Mobilization Works
TOTAL 9 PAGES
(Including Cover)
Purpose
PROJECT NAME
DOCUMENT NO.
: KP-00+++-MQ758-V0002
TITLE
For Approval
OWNER
For Construction
17.09.2014
Rev.
No.
DATE
First Issue
DESCRIPTION
For Information
For Review
As-Built
MP
EO
AZ
TC
PREPARED
CHECKED
REVIEWED
APPROVED
Owner
POSCO ENGINEERING
& CONSTRUCTION CO., LTD.
Main Subcontractor
1/8
Doc.No:
KP-00+++-MQ758V0002
Date:
17.09.2014
HSE Manager
QA/QC Manager
Site Manager
Name
Date
Sign
Remarks:
Any such review or consent by GAMA, shall not relieve the Subcontractor, in any case or for any reason whatsoever,
from any obligation, liability or responsibility arising out of or in connection with the Contract, including without being
limited thereto, to the responsibility for errors, omissions, discrepancies and non-compliances. Within this context, this
document shall not prevail over or amend the Contract, or relieve the Subcontractor from any of its duties, obligations,
responsibilities or liabilities under the Contract.
Anything presented herein by the Subcontractor shall in no event
i) excuse the Subcontractors non-performance under the Contract, or
ii) entitle him to a variation under the Contract or an adjustment to the Contract Price.
SUBCONTRACTOR
Rev.
No.
A
Date
Description*
Prepared
by
HSE
Manager
QA/QC
Manager
Site
Manager
Project
Manager
17.09.2014
Mobilization
Work
Mustafa
Peker
Eyyp zbay
2/8
Doc.No:
KP-00+++-MQ758V0002
Date:
17.09.2014
DOCUMENT HISTORY:
Rev.
No.
Date
17.09.2014
Remarks
(Reason for Revision)
First Issue
* Description:
Document issue purpose
-
First Issue
For Information
For Review
3/8
Doc.No:
KP-00+++-MQ758V0002
Date:
17.09.2014
CONTENT
1.0
PURPOSE ........................................................................................................................................ 4
2.0
3.0
RESPONSIBILITIES ........................................................................................................................ 4
4.0
5.0
PERSONNEL ................................................................................................................................... 4
6.0
MATERIALS ..................................................................................................................................... 4
7.0
EQUIPMENT .................................................................................................................................... 5
8.0
9.0
EXECUTION ..................................................................................................................................... 6
10.0
11.0
12.0
13.0
1.0
4/8
Doc.No:
KP-00+++-MQ758V0002
Date:
17.09.2014
PURPOSE
PurposeofthissocumentistogivebriefdetailsaboutMobilizationActivitiesofKhabat
ThermalPowerPlant1&2132kVSubstationPart.
2.0
SCOPE OF WORK
ScopeofthisMethodofStatementisMobilizationActivitiesatKhabatThermalPower
Plant1&2132kVSubstationPart.
3.0
RESPONSIBILITIES
Allpersonnelassignedtothisprojectfrome.g.Engineering,QualityandPlanningOperations
etc.;arefunctionallyresponsibletotheProjectManager,workingasateamtoachievethe
objectiveofcompletingtheprojecttothecustomerssatisfaction.
TheProjectManageristheprimarycontactregardingcommunicationbetweenthecustomer
andSIEMENS
4.0
DEFINITIONS / ABBREVIATIONS
QEHS
QA
QC
LV
ITP
AIS
5.0
:Quality,Environmental,Health&Safety
:QualityAssurance
:QualityControl
:LowVoltage
:InspectionandTestPlan
:AirIsolatedSwitchyard
PERSONNEL
SiteManager1
SiteForemen1
Workers2
Operators1
6.0
MATERIALS
RebarsS420(TSE500,fyk=420N/mm)
Concrete(Type:C25forFoundations,C20forLeanConcretes)
Formworks(timberandplywood/wood)
Gravelorcrushedstone
Perforateddrainagepipes
5/8
Doc.No:
KP-00+++-MQ758V0002
Bricks
Plasteringmaterials(roughcast,gypsumplaster)
Paints
Marble
CeramicTiles
DoorsandWindows
7.0
Date:
17.09.2014
EQUIPMENT
1.MandatoryPersonalProtectiveEquipment,
SafetyHelmet
SafetyShoes
SafetyVest
SafetyGloves
SafetyGlassess/Goggles
2.PersonalProtectiveEquipmentRequiredDuetoSpecificRisks,
SafetyHarness,
Dustand/orChemicalMasks
WeldingShield
3.SafetyBarricadingFence/NetlonFence
4.RelatedSafety/WarningSigns.
5.Machines
Crane1(10ton)
Manlift
Excavator
HandTools
Backhoeloader
Loader
Trucks
Scaffold
Concretevibrator
Concretemixer
8.0
6/8
Doc.No:
KP-00+++-MQ758V0002
Date:
17.09.2014
CompanyName
:SilopiAypanaatSan.Tic.Ltd.ti.
Address
:YesiltepeMah.2.Cad.iekApt.No:41Kat:1Silopi/SIRNAK
Tel
:04865186900
Fax
:04865186900
:mesut.aydin@silopiaypa.com
9.0
EXECUTION
9.1 Site Preparation
All materials, which will be used for installation of the prefabricated office building, will be stored
properly near installation area. The concrete platform, which will be used for installing on, will be
cleanedandpreparedforinstallation.
9.2 Carrier System Installation with External walls
Special shaped steel profiles will be fixed by using steel dowels on the concrete platform. After that
specialshapedprofiles,whichisusedasverticalcarrier,willbeinstalledbystartingfromonecornerto
another corner. At this time extarnal walls will be installed between two vertical profiles. Doors and
windowswillbeinstalledwhereisnecessary.
9.3 Interior wall Installation
Specialshapedprofileswillbeinstalledontheconcreteplatformbysteeldowelsforbuildingdesigned
rooms.Afterthatspecialshapedprofiles,whichisusedasverticalcarrier,willbeinstalledbystarting
from one corner to another corner. At this time internal walls will be installed between two vertical
profiles.Doorswillbeinstalledwhereisnecessary.
9.4 Roof Installation
Rooftrusswillbeliftedbyusingcraneandinstalledontheverticalprofiles.Afterthetrussinstallation
purlinswillbeinstalled.Afterthattheroofpanelswillbeinstalled.
9.5 Electrical wiring works
Electricalwiringswillbeinstalledbyusingsurfacemountedcablechannels.Andwiringswillbe
connectedtotheelectricboard.
Necessarypipingwillbedonetoprovidefreshwaterandremovethesewagewateratthewet
areas.Aftertheinstallationiscompleteleakagetestwillbedonevisually.
10.0
7/8
Doc.No:
KP-00+++-MQ758V0002
Date:
17.09.2014
Approximate durations will be shown below for each section. Also each step of the work will
repeated and performed together for accelerate the work. Also working Schedule will be
followed.
ForecastedStart&FinishDatesofMobilization:01/09/201407/09/2014
11.0
PROGRESS MEASUREMENT
All Mobilization Activities will be completed in one week period. The missing Items will be
followedduringcontractperiod.
12.0
QUALITY REQUIREMENTS
Toolbox talk will be done with the team who is involved in the foundation works. Job Safety
Analysis(JSA)willbepreparedanddistributedtoSiteSupervisor(s).UsingrelatedJSA,
MethodStatementandRisk
Assessmentwillbediscussedduringthetoolboxtalk.
Whileexcavationworks,barricadewillbeinstalledtothearoundthepitandwarningsignswill
beputtowarnotherpeopletokeepaway.
MandatoryPersonalProtectiveEquipmentwillbeusedbythepersoninvolvedintheoperation.
ThereisnorequirementforadditionalPPE.
RiskAssessmentwillbetakenintoconsiderationandrequiredprecautionswillbetaken.
13.0
8/8
Doc.No:
KP-00+++-MQ758V0002
Date:
17.09.2014
RISK ASSESSMENTS
WorkRiskassessmentaboutallworksandpossiblerisksatthesite,islistedasfollow.
Guidance