Vous êtes sur la page 1sur 3

Inspection & Test Plan for Khabat PP

132kV Switchyard Cable Tray


Installation Works

TOTAL 3 PAGES
(Including Cover)

PROJECT NAME

: Khabat Thermal Power Plant Units 1&2

Purpose

DOCUMENT NO.

: KP-00+++-CQ712-B7361

For Information

TITLE

: Inspection&Test Plan for Khabat PP


132kV Switchyard Cable Tray Installation Works

OWNER

: Ministry of Electricity (MOE) of


Kurdistan Regional Government

For Review
For Approval
For Construction
As-Built

04.03.2015

Issued for Construction

DE

AY

26.02.2015

First Issue

DE

AY

PREPARED

CHECKED

REVIEWED

APPROVED

Rev.
No.

DATE

DESCRIPTION

GAMA POWER SYSTEMS ENG &CONTRACTING,INC.

Owner

Ministry of Electricity (MOE)


of Kurdistan Regional Government
Contractor

POSCO ENGINEERING
& CONSTRUCTION CO., LTD.
Main Subcontractor

GAMA POWER SYSTEMS


ENGINEERING & CONTRACTING,INC.

ITP No.

Inspection & Test Plan


for CABLE TRAY INSTALLATION WORKS

Item Name

No.

Cable Tray

Inspection & Test


Activity

Inspection & Test


Description

Application
Document/Code/Spec.
Supplier/
No.

KP-00+++-CQ712-B7361

Rev. No.

Page

1/1

Document Submittal

Remarks

Inspection Status

Subcontractor

GAMA

3rd Party POSCO


/ AI
E&C

Owner

1.1

Receiving
Inspection

Visually checking of the


cable tray for and physical
damage.

Drawings and Technical


Specifications

Check List for Cable Tray Erection Item 1

1.2

Package List

Checking of package list

Assembly Catalog

Check List for Cable Tray Erection Item 2

1.3

Assembly and
fixing

Checking assembly and


fixing of cable trays

Drawings and Technical


Specifications

Check List for Cable Tray Erection Item 3

1.4

Final Inspection

Visually checking dimension


Drawings and Technical
of the equipment to verify
Specifications
compliance with the drawing

Check List for Cable Tray Erection Item 4

1.5

Site Construction
Dossier

Document preparation and


review

Site Construction Dossier

Drawings and Technical


Specifications

Notes) #1 CL (Check List) form of Cable Tray Erection is submitted as attachment of this ITP.
Legend

SIEMENS

P
H
W
S
V
R

Perform
Hold Point
Witness Point
Spot Witness
Surveillance
Report Review

CHECK LIST of Cable Tray


Erection
Num
.

Identification

Visual check of the material

Checking of Package List

Assembling of the Cable Trays

a.

Checking of cable tray supports

b.

Checking of anchor points

Accept

Reject

KHABAT THERMAL POWER PLANT UNITS


1 &2 PROJECT 132Kv AIR INSULATED
SWITCHGEAR
Rev: 0
Page No:1 of 1
Location:

N/A

Signature

Comments

Subcontractor

Final Inspection
a.

Touch-up

b.

Visual check

Checking of cable tray grounding

Cable tray numbering (labelling) check

Release steel structure for equipment erection

SIGN OFF AS ACCEPTED


SIEMENS

GAMA

POSCO

Employer

Name:
Date:
Sign:

Name:
Date:
Sign:

Name:
Date:
Sign:

Name:
Date:
Sign: