Business plan
For
ENVIERHO AQUA
LTD.
(EAP Ltd)
Working on a Green Economy
TABLE OF CONTENTS
1.0 Company ownership/Location
10
11
12
13
14
15
16
Appendices 1
17
19
20
21
22
23
24
CV
25
This started later in 1996 when reducing recycling and reusing became more and
more of an issue. More and more process integrated solutions are required. Now
anther 10 years later companies are not only concerned about these 3Rs but are also
concerned about the energy consumption associated with this.
The Goals and Strategy, lies therefore in the market where disposal of organic waste
and energy consumption are the two elements that should be reduced as much as
possible. This will take carful planning by the end-user to look at his total
consumption and waste production to aim for a Good House Keeping conscience or
ISO certification.
Educational Sector
Industrial Sector
Holiday/ Tourist Sector
Agriculture Sector
10
11
7.2 Can you show the experience and achievement to deliver the new business?
Having always been responsible for looking for NEW Business, it nearly come
natural to look for new projects.
The experience is certainly there to make it all come together.
7.3 How is the team motivated and working together?
The motivation is that this model has a huge market potential, and Ireland is the right
place to get started as we are all thinking of green jobs, and in this way we can realise
this.
7.4 Does the team have the energy to make this venture happen?
When teaming up with a flexible electrical and mechanical installer this should work
out fine
7.5 Can you outline the skill gaps and how they will be filled?
Sales and Promoter Engineer:
The Process Engineer:
Drawing of Process
Detailed Engineer
Draughtsman
Bookkeeping and Invoicing
A team of fitters
Project Manager
initially myself.
again myself.
again myself
needs to be appointed
needs to be appointed
outsourcing for the moment
service and maintenance company
needs to be appointed
12
13
14
15
11.7 What is the potential exit route e.g. trade sale , IPO?
This has not been in the picture yet, first we have to get the show on the road.
16
Appendices 1
After 100 years of dependence on fossil fuels, there's one emerging crisis that COP15's policies must now address: the crisis of dwindling crude reserves, and the
imminent end to cheap oil.
Everything is being reconsidered:
And our unique investment has set the stage to capitalize on all of this.
We're talking about...
There's not much to be said here that hasn't already been said a thousand times before.
So let's quickly review a few key issues...
Bottom line: The days of cheap, abundant oil are over. And if you don't believe it, just
look at what the experts are saying...
"Shell estimates that after 2015 supplies of easy-to-access oil and gas will no longer
keep up with demand." - Jeroem van de Veer, CEO of Shell
"Our view is that oil production will peak in the near future. We need to develop
power trains for alternative energy sources." - Katsuaki Watanbe, President, Toyota
17
"The easy, cheap oil is over. Peak oil is looming." - Shokri Ghanem, Head of Libya's
National Oil Corporation
"In the longer run, unless we take serious steps to prepare for the day that we can
no longer increase production of conventional oil, we are faced with the possibility
of a major economic shock - and the political unrest that would ensue." - Dr. James
Schlesinger, former U.S. Energy Secretary
"One thing is clear: the era of easy oil is over. What we do next will determine how
well we meet the energy needs of the entire world in this century and beyond." David O'Reilly, CEO, Chevron
So where does this leave us?
Without an immediate overhaul of our energy economy, the depletion of fossil fuels
could prove to be a crisis more devastating than most could ever imagine.
The fact is, everything we do depends on some form of energy.
Our entire way of life, and all of our economic projections, are built on the
assumption that there will always be more energy when we want it.
It took us 125 years to use the first trillion barrels of oil. It will take us only 30 years to
use the next trillion"(Chevron)
By choosing renewable energy, you go some way towards cutting down on carbon emission
Using energy more efficiently in your daily life comes easily once you get started.
18
19
Costing year 1 -3
Expectedexpenses
EnvierhoAquaProtectLtd
Costingsyear1
ProcessDevelopment
Brochures
TradeFairs
Travel/accommodation
DrawingEquipment
OfficeRental/telephone
Costingpermonth
Costingyear2
TradeFairs
Travel/accommodation
OfficeRental/telephone
ProjectManager
Costingyear3
TradeFairs
Travel/accommodation
OfficeRental/telephone
ProjectManager
Totalfor3years
date:310809
6,000.00
Net
10,000.00
10,000.00
15,000.00
10,000.00
5,000.00
10,000.00
15,000.00
10,000.00
10,000.00
60,000.00
15,000.00
10,000.00
10,000.00
60,000.00
260,000.00
20
1000Peopleperday
(1000PE)
CalculationofProfitability
Investment
date:310809
Biogasunit:
VacuumInstallation
ExtraInvestmentCost
Income
Input
Biogas
120000
kWh
0.15
c/kwh
Heat
80000kWh
7c/kWh
Savingsfromwater
12410m3
2/T
Savingsfromnotdischargingtosewer
12410m3
1/T
Incomeperyear
15
years
p/y
CostEstimate
depreciationmachinery
period
Interestrate
5%
Transportcostofresidue
Energycostapprox7%of
generated
730m3/y
8400kWh
1.5/T
0.12
C/kWh
Costofpersonel
1h/d
365d
15/h
Biologicalsupport
200/m
12
p/y
Insurancecover
Service&Maintenance
HCPplant
Service&Maint.
remainingplant
12
p/y
p/y
50/m
0,01
/kWh
0,01
/kWh
p/y
Cost
Profitperyear
p/y
net
500,000.00
100,000.00
600,000.00
18,000.00
5,600.00
24,820.00
12,410.00
60,830.00
40,000.00
2,000.00
1,095.00
1,008.00
5,475.00
4,800.00
600.00
1,200.00
1,200.00
57,378.00
3,462.00
21
ActivatedSludgePlant
1000Peopleperday
(1000PE)
CalculationofProfitability
Investment
date:310809
ActivatedSludgePlant
Total
Costs
Powerconsumption
150kWperday
SludgeProduction
Volumepermonth
10hr@25/hrper
week
Approx3/d
11m3@
5%
12m
52
365
15
years
p/y
Operation
chemicals
Costsperyear
CostEstimate
0.15
365d c/kwh
depreciationmachinery
period
Interestrate
5%
Cost
Costperyear
p/y
Net
800,000.00
800,000.00
8,212.50
24,000.00
13,000.00
1,095.00
46,307.50
53,333.33
40,000.00
93,333.33
139,640.83
22
MembraneBiological
Reactor
1000Peopleperday
(1000PE)
Calculationofcost
Investment
date:310809
waterflowisonly100
m3/d
BOD/d
2530Kg
MBRPlant
Total
Costs
Powerconsumption
30kW/d
3hr@25/hrper
week
365
d
0.15
c/kwh
52
4m3@
5%
Operation
chemicals
Costsperyear
SludgeProduction
CostEstimate
volumepermonth
depreciationmachinery
Interestrate
p/y
Cost
Costperyear
period
5%
toAD
Plant
12m
15
years p/y
Net
250,000.00
250,000.00
1,642.50
3,900.00
5,542.50
nil
16,666.00
12,500.00
29,166.00
30,708.50
23
CostWWTP
BenefitVacuum/AD
CostMBRTP
Peryear
PerYear
139,640.83
3,462.00
30,708.50
CostVacuum/AD/MBR Peryear
27,246.50
net
Biogasunit:
VacuumInstallation
MBRFacility
500,000.00
100,000.00
250,000.00
ROI
Savingsperyear
112,395.00
7.5Year
24
CURRICULUM VITAE
Name
DoB
Languages
Marital Status
: Married
: timvier@o2.ie
Mobile
QUALIFICATIONS
1978 - 1982
1974 - 1978
Duties:
Position:
Duties:
Technical Elements:
25
26
DAF Trucks
Flocculation Part two extension
AKZO, Amsterdam
Ionexchange, heavy metals (Hg) removal
HEAD Electronics,
Physical-Chemical Batch Process
printed surface board rins water treatment
TORO, Oevel, Belgium Rinsewater recycling and Batch Process
metal surface treatment rinse-water
VAM, Wijster
Physical-Chemical Treatment
Surface water from drilling platform
SIGMA Coatings, Uithoorn
Physical-Chemical Batch Process
Rinse water with Acrylic-latex emulsion treatment
Verzinkerij Dieren
Ionexchange and Batchs Process
Terrain water treatment by ionexchange
Damet Holland Recycling
Physical-Chemical and Active Charcoal Abs
Terrain water, Oil and heavy metal removal
SCA Packaging, Tilburg
Physical-Chemical Batch Process
Cardboard printing , printing ink remova
VEGE MOTOREN, Huissen
Physical-Chemical Batch Process
Engines reconditioning, Oil, heavy metals removal
ELECTRORAIL, Utrecht
Physical-Chemical Batch Process
Electro-engines, cleaning, Oil, heavy metals remova
Oil Treatment Amsterdam
Physical-Chemical and Active Carbon Abs
Oil treatment, Oil, Heavy metals and Phenol
REDLAND, Rooftiles, Weert Physical-Chemical Coagulation/Flocculation
Rooftiles colouring, Acrylic Dye removal
DAF Trucks Eindhoven Physical-Chemical Coagulation/Flocculation
metal treatment rinse water, with Zn. Cr, Phosphates reduction
Signed :
------------------------Tim Vierhout
27
Additional information
Lectured in Wastewater treatment technologies for the Netherlands Environmental Practice
School.
I was a member of the Dutch Institute of Engineers, Ingenieurs Vereninging NIRIA, from
1979 to 1998. Section: NPT Nederlandse Procestechnologen.
Completed a course on DCS Distributed Control Systems
Project Management course on Capital investments in the process industry.
Completed a course on Renewable Energy with the Tipperary Institute of Technology.
COMPUTER SKILLS
Most Windows software packages and ACT Contact Management System.
INTERESTS
REFERENCES:
28