Piling
Nos
88
5/13/2016
5/28/2016
1.i
Nos
88
5/14/2016
6/28/2016
1.ii
Pile cap
Cum
150
5/21/2016
7/10/2016
Plinth Beam
Cum
70
7/2/2016
8/16/2016
3a
3a.i
3a.ii
Reinforcement
MT
7/27/2016
8/4/2016
3a.iii
Shuttering
Sqm
168
8/1/2016
8/14/2016
3a.iv
Casting
Cum
28
8/6/2016
8/21/2016
3b
3b.i
Shuttering
Sqm
1176
8/12/2016
9/1/2016
3b.ii
Reinforcement
MT
24
8/15/2016
9/9/2016
3b.iii
Casting
Cum
196
9/10/2016
9/10/2016
Cum
7/12/2016
8/21/2016
Slab EL +7.95m (31 x 19.5) Control room, Aes Room, Office room & toilet
5a
Column 29nos
5a.i
Reinforcement
MT
9/12/2016
9/22/2016
5a.ii
Shuttering
Sqm
252
9/15/2016
9/27/2016
5a.iii
Casting
Cum
42
9/18/2016
10/1/2016
5b
Slab +7.95 m
5b.i
Shuttering
Sqm
462
9/24/2016
10/2/2016
5b.ii
Reinforcement
MT
9.24
9/30/2016
10/8/2016
5b.iii
Casting
Cum
77
10/9/2016
10/9/2016
Column
6a.i
Reinforcement
MT
1.68
11/5/2016
11/7/2016
6a.ii
Shuttering
Sqm
84
11/6/2016
11/9/2016
6a.iii
Cum
14
11/7/2016
11/10/2016
6b
Casting
Slab +10.95m LVl
6b.i
Shuttering
Sqm
336
11/10/2016
11/22/2016
6b.ii
Reinforcement
MT
6.72
11/19/2016
11/29/2016
6b.iii
56
11/30/2016
11/30/2016
7a
Casting
Cum
Column upto EL +12.45m (23nos)
7a.i
Reinforcement
MT
3.6
10/12/2016
10/20/2016
7a.ii
Shuttering
Sqm
180
10/16/2016
10/28/2016
7a.iii
Casting
Cum
30
10/22/2016
11/1/2016
7b
7b.i
Shuttering
Sqm
588
10/25/2016
11/6/2016
7b.ii
Reinforcement
MT
11.76
10/29/2016
11/12/2016
7b.iii
Casting
Cum
98
11/13/2016
11/13/2016
Finishing
8.i
8.ii
Ground floor
10/15/2016
11/14/2016
8.iii
1st Floor EL
11/13/2016
12/13/2016
8.iv
3rd Floor
12/20/2016
1/9/2017
9/12/2016
11/30/2016
Dormitory ( 7 x 20m)
1
Excavation
360
7/10/2016
7/15/2016
PCC
13.5
7/15/2016
7/19/2016
Foundation
3.i
Reinforcement
5.237
7/19/2016
7/28/2016
3.ii
Shuttering
261.864
7/24/2016
8/5/2016
3.ii
Casting
43.644
7/30/2016
8/7/2016
4.i
Reinforcement
0.304
8/4/2016
8/6/2016
4.ii
Shuttering
15.188
8/6/2016
8/10/2016
4.iii
Casting
2.531
8/11/2016
8/16/2016
Plinth beam
43.512
8/14/2016
8/29/2016
37.275
8/31/2016
9/6/2016
Backfilling
Slab EL +3.75m (17.75 x 6.88)
7a
7a.i
Reinforcement
0.875
9/2/2016
9/9/2016
7a.ii
Shuttering
43.740
9/6/2016
9/12/2016
Dec-16
Pilling- 28-may
6.a
Nov-16
Finish Date
Oct-16
Start Date
Sep-16
Quantity
(Approx)
Aug-16
Unit
Jul-16
Activities
Jun-16
Sl. No
May-16
7a.iii
7b
Casting
Slab EL +3.75m
7b.i
Shuttering
7b.ii
Reinforcement
3.043
9/16/2016
9/21/2016
7b.iii
Casting
Slab EL +6.3m (17.75 x 6.88)
25.356
9/22/2016
9/22/2016
7.290
9/9/2016
9/14/2016
152.137
9/13/2016
9/17/2016
8.a
Column
8.a.i
Reinforcement
0.648
9/24/2016
9/27/2016
8.a.ii
Shuttering
32.414
9/26/2016
10/3/2016
8.a.iii
5.402
10/1/2016
10/6/2016
8.b
Casting
Slab EL +6.3m
8.b.i
Shuttering
152.137
10/4/2016
10/8/2016
8.b.ii
Reinforcement
3.043
10/7/2016
10/14/2016
8.b.iii
Casting
25.356
10/15/2016
10/15/2016
9.a
Column
9.a.i
Reinforcement
0.913
10/17/2016
10/24/2016
9.a.ii
Shuttering
45.644
10/22/2016
10/31/2016
9.a.iii
Casting
7.607
10/28/2016
11/4/2016
152.137
11/3/2016
11/6/2016
9.b
Slab EL +9.3m
9.b.i
Shuttering
9.b.ii
Reinforcement
3.043
11/4/2016
11/9/2016
9.b.iii
Casting
25.356
11/10/2016
11/10/2016
10
10.a
Column
10.a.i
Reinforcement
0.185
11/12/2016
11/14/2016
10.a.ii
Shuttering
9.261
11/14/2016
11/16/2016
10.a.iii
Casting
1.544
11/15/2016
11/17/2016
10.b
Slab 12.25m
10.b.i
Shuttering
11.157
11/17/2016
11/18/2016
10.b.ii
Reinforcement
0.223
11/18/2016
11/20/2016
10.b.iii
Casting
Brick work, Plaster, Painting
1.860
11/21/2016
11/21/2016
11
11.a
Ground floor
11.b
1st floor
10/27/2016
11/26/2016
11.c
2nd floor
11/19/2016
12/19/2016
11.d
3rd Floor
12/6/2016
1/5/2017
11.e
4th Floor
12/27/2016
1/26/2017
Unit
Average
Peak
Reqmnt. Per Reqmnt. Per
Day
Day
May/16
Jun/16
Jul/16
Aug/16
Sep/16
Oct/16
Nov/16
Dec/16
Jan/17
Quantities
Concrete
Reinforcement Steel
Shuttering + Scaffolding
CuM
MT
SqM
5
0.5
28
11
1.1
66
117
12
704
284
28
1,704
275
29
1,652
180
18
1,083
2
5
2
10
283
28
1,700
169
18
1,013
260
26
1,562
2
5
2
4
Manpower
Charge Hand/ Supervisor
Mason
Stagging & Shuttering Carpenter & Helper
(Making+Fixing)
Steel Fixer (Cutting/Bending + Binding)
Unskilled Helper
TOTAL MANPOWER
No.s/ Day
No.s/ Day
2
5
2
10
No.s/ Day
16
No.s/ Day
No.s/ Day
No.s/ Day
4
8
23
9
22
51
1
2
1
4
7
4
3
17
16
9
7
38
16
2
10
10
9
7
39
6
5
33
16
9
7
45
10
6
4
37
2
4
15
2
2
-
8
22
51
0
20
26
0
15
19
Note:
1) Single Shift Working/ Day is considered
2) Average Procutivity of Shuttering Carpenter for making & fixing shutters is considered as 4 SqM/Day per person
3) Average Procutivity of Steel Fixer for cutting, bending & fitting is considered as 100 Kg/Day per person
Steel Pipe
in Nos.
4) The number of masons and other labour may vary as per requirement/ nature of concrete pour, brick work
Shutttering
3mt
6mt
Clamp
1000 nos
1900 Nos
6000 nos
9450
60
Unskilled Helper
50
Steel Fixer (Cutting/Bending + Binding)
7
40
Stagging & Shuttering Carpenter & Helper
(Making+Fixing)
7
5
30
Mason
10
4
16
20
3
4
16
16
10
6
20
10
10
22
15
10
15
04
0
2-
May/16
May/16
3
Jun/16
Jun/16
7
Jul/16
Jul/16
7
Aug/16
Aug/16
5
Sep/16
Sep/16
7
Oct/16
Oct/16
4
Nov/16
Nov/16
22
Dec/16
Dec/16
20
Jan/17
Jan/17
15
16
16
10
16
10
15
Mason
10
10
Unskilled Helper