Vous êtes sur la page 1sur 150

1

GE-101

SHEET LIST

SHEET LIST

GE-101

1
GE-102

SHEET LIST

SHEET LIST

GE-102

1
GE-103

SHEET LIST

SHEET LIST

GE-103

ABC

TEAM NAME:
ADRESS:
ESPLANADE DES ARTS
ET METIERS
33405 TALENCE CEDEX
FRANCE

CLIENT
SOLAR DECATHLON EUROPE
2012

WWW.SDEUROPE.ORG

DRAWN BY:

CHECKED:

ABC TEAM

ABC TEAM

DATE:

2012.08.14

SHEET TITLE:

VILLA SOLAR PLAN

AR - 001

VILLA SOLAR PLAN


1:100

AR-001

ABC

TEAM NAME:
ADRESS:
ESPLANADE DES ARTS
ET METIERS
33405 TALENCE CEDEX
FRANCE

CLIENT
SOLAR DECATHLON EUROPE
2012

WWW.SDEUROPE.ORG

DRAWN BY:

CHECKED:

ABC TEAM

ABC TEAM

DATE:

2012.08.14

SHEET TITLE:

VILLA SOLAR PLAN

AR - 001

VILLA SOLAR PLAN


1:100

AR-001

ABC

TEAM NAME:
ADRESS:
ESPLANADE DES ARTS
ET METIERS
33405 TALENCE CEDEX
FRANCE

CLIENT
SOLAR DECATHLON EUROPE
2012

WWW.SDEUROPE.ORG

DRAWN BY:

CHECKED:
DATE:

ABC TEAM

ABC TEAM

2012.08.14

SHEET TITLE:

FLOOR PLAN DAY

1
AR 021

AR-021

ABC

TEAM NAME:
ADRESS:
ESPLANADE DES ARTS
ET METIERS
33405 TALENCE CEDEX
FRANCE

CLIENT
SOLAR DECATHLON EUROPE
2012

WWW.SDEUROPE.ORG

DRAWN BY:

CHECKED:
DATE:

ABC TEAM

ABC TEAM

2012.08.14

SHEET TITLE:

FLOOR PLAN NIGHT

FLOOR PLAN NIGHT

AR-022

ABC

TEAM NAME:
ADRESS:
ESPLANADE DES ARTS
ET METIERS
33405 TALENCE CEDEX
FRANCE

CLIENT
SOLAR DECATHLON EUROPE
2012

WWW.SDEUROPE.ORG

DRAWN BY:

CHECKED:
DATE:

ABC TEAM

ABC TEAM

2012.08.14

SHEET TITLE:

FLOOR PLAN NIGHT

FLOOR PLAN NIGHT

AR-022

2012.08.14

EAST SITE ELEVATION


1:100

WEST SITE ELEVATION


1:100

FACADE EST

FACADE OUEST

TEAM NAME:

ADRESS:

ESPLANADE DES ARTS


ET METIERS
33405 TALENCE CEDEX
FRANCE

CLIENT

ABC

SOLAR DECATHLON EUROPE


2012

ABC TEAM

WWW.SDEUROPE.ORG

DRAWN BY:

ABC TEAM

2012.08.14

CHECKED:

DATE:

SHEET TITLE:

SITE ELEVATIONS

AR-101

SOUTH SITE ELEVATION


1:100

FACADE SUD

NORTH SITE ELEVATION FACADE NORD


1:100

TEAM NAME:

ADRESS:

ESPLANADE DES ARTS


ET METIERS
33405 TALENCE CEDEX
FRANCE

CLIENT

ABC

SOLAR DECATHLON EUROPE


2012

ABC TEAM

WWW.SDEUROPE.ORG

DRAWN BY:

ABC TEAM

2012.08.14

CHECKED:

DATE:

SHEET TITLE:

SITE ELEVATIONS

AR-102

FACADE OUEST

EAST BUILDING ELEVATIONFACADE EST


1:100

WEST BUILDING ELEVATION


1:100

TEAM NAME:

ADRESS:

ESPLANADE DES ARTS


ET METIERS
33405 TALENCE CEDEX
FRANCE

CLIENT

ABC

SOLAR DECATHLON EUROPE


2012

ABC TEAM

WWW.SDEUROPE.ORG

DRAWN BY:

ABC TEAM

2012.08.14

CHECKED:

DATE:

SHEET TITLE:

BUILDING ELEVATIONS

AR-111

SOUTH BUILDING ELEVATION


1:100

NORTH BUILDING ELEVATION


1:100

FACADE SUD

FACADE NORD

TEAM NAME:

ADRESS:

ESPLANADE DES ARTS


ET METIERS
33405 TALENCE CEDEX
FRANCE

CLIENT

ABC

SOLAR DECATHLON EUROPE


2012

ABC TEAM

WWW.SDEUROPE.ORG

DRAWN BY:

ABC TEAM

2012.08.14

CHECKED:

DATE:

SHEET TITLE:

SITE ELEVATIONS

AR-112

Uw = 1,2 W/(m2.K)

Uw = 1,2 W/(m2.K)
Uw = 1,2 W/(m2.K)
Uw = 1,2 W/(m2.K)

Uw = 1,1 W/(m2.K)

Ud = 1,4 W/(m2.K)

Ud = 1,4 W/(m2.K)

Ud = 1,4 W/(m2.K)

Ud = 1,4 W/(m2.K)

Uw = 1,6 W/(m2.K)

Uw = 1,6 W/(m2.K) Uw = 1,6 W/(m2.K)

ABC

TEAM NAME:
ADRESS:
wooden floor
oak 14 mm

wooden & concrete floor


roxifloor architaloch F35 12 mm

ESPLANADE DES ARTS


ET METIERS
33405 TALENCE CEDEX
FRANCE

CLIENT
SOLAR DECATHLON EUROPE
2012

WWW.SDEUROPE.ORG

wooden & concrete floor


roxifloor architaloch F35 12 mm

DRAWN BY:

ABC TEAM

ABC TEAM

CHECKED:
DATE:

2012.08.14

SHEET TITLE:
FLOOR

FLOOR
1:50

SOL

IN-001

ABC

TEAM NAME:
ADRESS:

BEDROOMS
plywood board
white lacquered
15 mm th.

lighting : iGuzzini deeplazer

ESPLANADE DES ARTS


ET METIERS
33405 TALENCE CEDEX
FRANCE

ventilation grids

CLIENT
SOLAR DECATHLON EUROPE
2012

WWW.SDEUROPE.ORG

lighting : iGuzzini ledstrip

wooden beam

LIVING ROOM
plywood board
white lacquered
15 mm th.

DRAWN BY:

CHECKED:

ABC TEAM

ABC TEAM

DATE:

2012.08.14

SHEET TITLE:
REFLECTED CEILING

REFLECTED CEILING
1:50

SOL

IN-101

2012.08.14

DAY PLAN

NIGHT PLAN

ABC

TEAM NAME:
ADRESS:
ESPLANADE DES ARTS
ET METIERS
33405 TALENCE CEDEX
FRANCE

CLIENT
SOLAR DECATHLON EUROPE
2012

WWW.SDEUROPE.ORG

DRAWN BY:

ABC TEAM

CHECKED:

ABC TEAM

DATE:

2012.08.14

SHEET TITLE:
FURNISHING : LIVING ROOM PLAN

FURNISHING : LIVING ROOM PLAN

PLAN MOBILIER SALON

1:20
0

IN-302

2012.08.14

ABC

TEAM NAME:

DAY PLAN

NIGHT PLAN

ADRESS:
ESPLANADE DES ARTS
ET METIERS
33405 TALENCE CEDEX
FRANCE

CLIENT
SOLAR DECATHLON EUROPE
2012

WWW.SDEUROPE.ORG

DRAWN BY:

CHECKED:

ABC TEAM

ABC TEAM

DATE:

2012.08.14

SHEET TITLE:
FURNISHING : LIVING ROOM
SECTIONS

FURNISHING : LIVING ROOM SECTIONS

COUPES MOBILIER SALON

1:20
0

IN-304

DAY PLAN

NIGHT PLAN
ABC

TEAM NAME:
ADRESS:
ESPLANADE DES ARTS
ET METIERS
33405 TALENCE CEDEX
FRANCE

CLIENT
SOLAR DECATHLON EUROPE
2012

WWW.SDEUROPE.ORG

DRAWN BY:

ABC TEAM

CHECKED:

ABC TEAM

DATE:

2012.08.14

SHEET TITLE:
FURNISHING : CHILD ROOM PLAN

FURNISHING : CHILD ROOM PLAN

PLAN MOBILIER CHAMBRE ENFANT

1:20
0

IN-305

2012.08.14

ABC

TEAM NAME:
ADRESS:
ESPLANADE DES ARTS
ET METIERS
33405 TALENCE CEDEX
FRANCE

CLIENT
SOLAR DECATHLON EUROPE
2012

WWW.SDEUROPE.ORG

DRAWN BY:

CHECKED:

ABC TEAM

ABC TEAM

DATE:

2012.08.14

SHEET TITLE:
FURNISHING : CHILD ROOM
SECTION

FURNISHING : CHILD ROOM SECTIONS

COUPES MOBILIER CHAMBRE ENFANT

1:20
0

IN-307

ABC

TEAM NAME:
ADRESS:
ESPLANADE DES ARTS
ET METIERS
33405 TALENCE CEDEX
FRANCE

CLIENT
SOLAR DECATHLON EUROPE
2012

WWW.SDEUROPE.ORG

DRAWN BY:

ABC TEAM

CHECKED:

ABC TEAM

DATE:

2012.08.14

SHEET TITLE:
FURNISHING : ISLAND KITCHEN PLAN

FURNISHING : ISLAND KITCHEN PLAN

IN-308

PLAN ILOT CUISINE

1:20
0

2012.08.14

ABC

TEAM NAME:

CLOSE PLAN

OPEN PLAN

ADRESS:
ESPLANADE DES ARTS
ET METIERS
33405 TALENCE CEDEX
FRANCE

CLIENT
SOLAR DECATHLON EUROPE
2012

WWW.SDEUROPE.ORG

DRAWN BY:

ABC TEAM

CHECKED:

ABC TEAM

DATE:

2012.08.14

SHEET TITLE:
FURNISHING : PARENTAL AND
CHILD ROOM PLAN

FURNISHING : PARENTAL AND CHILD ROOM PLAN

PLAN MOBILIER PARENT ET ENFANT

1:20
0

IN-313

ABC

TEAM NAME:
ADRESS:
ESPLANADE DES ARTS
ET METIERS
33405 TALENCE CEDEX
FRANCE

CLIENT
SOLAR DECATHLON EUROPE
2012

WWW.SDEUROPE.ORG

DRAWN BY:

ABC TEAM

CHECKED:

ABC TEAM

DATE:

2012.08.14

SHEET TITLE:

KITCHEN PLAN

KITCHEN PLAN

PLAN CUISINE

1:20
0

IN-401

ABC

TEAM NAME:
ADRESS:
ESPLANADE DES ARTS
ET METIERS
33405 TALENCE CEDEX
FRANCE

CLIENT
SOLAR DECATHLON EUROPE
2012

WWW.SDEUROPE.ORG

DRAWN BY:

ABC TEAM

CHECKED:

ABC TEAM

DATE:

2012.08.14

SHEET TITLE:
BATHROOM PLAN

BATHROOM PLAN

PLAN SALLE DE BAIN

1:20
0

IN-501

\Users\Gregoire\Desktop\sumbiosi\logo\logo_sumbiosi2.PNG

ABC

TEAM NAME:
ADRESS:
ESPLANADE DES ARTS
ET METIERS
33405 TALENCE CEDEX
FRANCE

CLIENT
SOLAR DECATHLON EUROPE
2012

WWW.SDEUROPE.ORG

\Users\Gregoire\Desktop\sumbiosi\logo\logo sde orange.jpg

DRAWN BY:

ABC TEAM

CHECKED:

ABC TEAM

DATE:

2012.05.23

West Module

SHEET TITLE: Structural Blows Up

ST-201

\Users\Gregoire\Desktop\sumbiosi\logo\logo_sumbiosi2.PNG

ABC

TEAM NAME:
ADRESS:
ESPLANADE DES ARTS
ET METIERS
33405 TALENCE CEDEX
FRANCE

CLIENT
SOLAR DECATHLON EUROPE
2012

WWW.SDEUROPE.ORG

\Users\Gregoire\Desktop\sumbiosi\logo\logo sde orange.jpg

DRAWN BY:

ABC TEAM

CHECKED:

ABC TEAM

DATE:

2012.05.23

Roof Modules

SHEET TITLE: Structural Blows Up

ST-202

\Users\Gregoire\Desktop\sumbiosi\logo\logo_sumbiosi2.PNG

ABC

TEAM NAME:
ADRESS:
ESPLANADE DES ARTS
ET METIERS
33405 TALENCE CEDEX
FRANCE

CLIENT
SOLAR DECATHLON EUROPE
2012

WWW.SDEUROPE.ORG

\Users\Gregoire\Desktop\sumbiosi\logo\logo sde orange.jpg

DRAWN BY:

ABC TEAM

CHECKED:

ABC TEAM

DATE:

2012.05.23

East Module

SHEET TITLE: Structural Blows Up

ST-203

\Users\Gregoire\Desktop\sumbiosi\logo\logo_sumbiosi2.PNG

ABC

TEAM NAME:
ADRESS:
ESPLANADE DES ARTS
ET METIERS
33405 TALENCE CEDEX
FRANCE

CLIENT
SOLAR DECATHLON EUROPE
2012

WWW.SDEUROPE.ORG

\Users\Gregoire\Desktop\sumbiosi\logo\logo sde orange.jpg

DRAWN BY:

ABC TEAM

CHECKED:

ABC TEAM

DATE:

2012.05.23

North Module

SHEET TITLE: Structural Blows Up

ST-204

\Users\Gregoire\Desktop\sumbiosi\logo\logo_sumbiosi2.PNG

ABC

TEAM NAME:
ADRESS:
ESPLANADE DES ARTS
ET METIERS
33405 TALENCE CEDEX
FRANCE

CLIENT
SOLAR DECATHLON EUROPE
2012

WWW.SDEUROPE.ORG

\Users\Gregoire\Desktop\sumbiosi\logo\logo sde orange.jpg

DRAWN BY:

ABC TEAM

CHECKED:

ABC TEAM

DATE:

2012.05.23

Skylight

SHEET TITLE: Structural Blows Up

ST-205

\Users\Gregoire\Desktop\sumbiosi\logo\logo_sumbiosi2.PNG

ABC

TEAM NAME:
ADRESS:
ESPLANADE DES ARTS
ET METIERS
33405 TALENCE CEDEX
FRANCE

CLIENT
SOLAR DECATHLON EUROPE
2012

WWW.SDEUROPE.ORG

\Users\Gregoire\Desktop\sumbiosi\logo\logo sde orange.jpg

DRAWN BY:

ABC TEAM

CHECKED:

ABC TEAM

DATE:

2012.05.23

Enveloppe

SHEET TITLE: Structural Blows Up

ST-206

\Users\Gregoire\Desktop\sumbiosi\logo\logo_sumbiosi2.PNG

ABC

TEAM NAME:
ADRESS:
ESPLANADE DES ARTS
ET METIERS
33405 TALENCE CEDEX
FRANCE

CLIENT
SOLAR DECATHLON EUROPE
2012

WWW.SDEUROPE.ORG

\Users\Gregoire\Desktop\sumbiosi\logo\logo sde orange.jpg

DRAWN BY:

ABC TEAM

CHECKED:

ABC TEAM

DATE:

2012.05.23

Burst Enveloppe

SHEET TITLE: Structural Blows Up

ST-207

Pump

washing machine

Nilan VP 18 compact

Hot water tank

dish washer

washin basin

2012.08.14

DRAIN / WASTE / VENT ISOMETRIC

AXONOMETRIE EAU DE PLUIE

\Users\Gregoire\Desktop\sumbiosi\logo\logo_sumbiosi2.PNG

TEAM NAME:

ADRESS:

ESPLANADE DES ARTS


ET METIERS
33405 TALENCE CEDEX
FRANCE

CLIENT

ABC

SOLAR DECATHLON EUROPE


2012

WWW.SDEUROPE.ORG

ABC TEAM

\Users\Gregoire\Desktop\sumbiosi\logo\logo sde orange.jpg

DRAWN BY:

ABC TEAM

2012.08.14

CHECKED:

DATE:

SHEET TITLE:

DRAIN/WASTE/VENT ISOMETRIC

PL-221

hot water tank

See section ME-001

The heating system is integrated to the HVAC system

See section ME-001

The cooling system is integrated to the HVAC system

See section ME-001

The ventilation system is integrated to the HVAC system

&YDIBOHJOHUFNQFSBUVSF

)FBUJOHCZ)7"$TZTUFN
/*-"/71DPNQBDU

&OUSZBJSEVDUJOH
&YJUBJSEVDUJOH

4VQQMZBJSEVDUJOH
&YJUBJSEVDUJOH

4VQQMZBJSEVDUJOH

/*-"/71DPNQBDU

1$.BJSDBTF

1$.4:45&.

4VQQMZBJSDBTF

)FBUJOHCZ)7"$TZTUFN

&YJUBJSEVDUJOH

ABC

TEAM NAME:
ADRESS:
ESPLANADE DES ARTS
ET METIERS
33405 TALENCE CEDEX
FRANCE

CLIENT
SOLAR DECATHLON EUROPE
2012

WWW.SDEUROPE.ORG

DRAWN BY:

CHECKED:

ABC TEAM

ABC TEAM

DATE:

2012.08.14

SHEET TITLE:

ID-001

ABC

TEAM NAME:
ADRESS:
ESPLANADE DES ARTS
ET METIERS
33405 TALENCE CEDEX
FRANCE

CLIENT
SOLAR DECATHLON EUROPE
2012

WWW.SDEUROPE.ORG

DRAWN BY:

CHECKED:

ABC TEAM

ABC TEAM

DATE:

2012.08.14

SHEET TITLE:

ID-002

4 lead batteries
12 Volt 360 Ah

Protection box for DC grid

ID-003

4 mm

PV

Onduleur

Protection box for AC grid

1,5 mm

PV
Meter

1,5 mm

50 mm

DC

Battery
Meter

AC2

Inverter SMA SI
5048

Onduleur

CPV

AC1

Protection box for DC grid

ABC

TEAM NAME:
ADRESS:
Pc pilotage CPV + Mini automate

Transfor 24
V

Alimentation motorisation cpv

40A

10 mm

10A

6 mm

32A

4 mm

20A

Frigo

2,5 mm

16A

Four

4 mm

20A

Lave vaisselle

4 mm

20A

2,5 mm

16A

2,5 mm

16A

Plaques
Lave linge

Hotte

1 pompe rseau deau


1 Broyeur

1,5 mm

10A

VMC

4 mm

20A

Cuve fluide

4 mm

20A

1 pompe irrigation

2,5 mm

16A

1 pompe douche

2,5 mm

Prises cuisine ( 7 )
7 Prises pour chambres

2,5 mm

10 mm

Alimentation pour le
gnrateur du schoir

2,5 mm

16A

10 mm
Diffrentiel 40A 30mA
Type AC

Diffrentiel 63A 30mA


Type AC

Alimentation pour routeur


Ip

Load
Meter

Conso
elec

16 mm

63A

Unpolarized Disconnecting switch Uocmax


Umpp 600V 500V 25A Imax, SPD type 2
removable cartridge Uocmax 600 VDC - Up 2.8
kVDC in 15kA / 40kA Imax - Iscpv 30 A

GFCI 1P + N 25A - 30mA Type PV Asi,


SPD In 20kA / Imax 40kA

CLIENT
SOLAR DECATHLON EUROPE
2012

Safety switch 60A

WWW.SDEUROPE.ORG

MTN684064

2A

1,5 mm

Passerelle dali/knx

2A

1,5 mm

2A

Intesis

Transfor 24
V

10 mm
10A

MTN649325.MCP 1,5 mm
MTN649325.SC1
MTN693003

Diffrentiel 40A 30mA


Type AC

2A

Domotique

Ventilation Schoir avec


variateur

Protection box
for AC grid

16 mm

MTN680191

Rgulation du ventilateur
de 80 V A 230 V AC du MCP

Protection box
for DC grid

16A
16A

Passerelle KNX/Modbus
pour Nilan ( VMC)

EDF

Diffrentiel 40A 30mA


Type A

16A

2,5 mm
2,5 mm

Lumires

ESPLANADE DES ARTS


ET METIERS
33405 TALENCE CEDEX
FRANCE

Transformateur
disolement

16A

Transformateur 24 V pour le
connect sur lactionneur de stores
4 sorties

Alimentation de bus

Diffrentiel 63A 30mA


Type AC

10A

1,5 mm

Ventilateur WC

GFCI
500mA 30/
60A Type S

16 mm

20A

16 mm

1 Pompe pour l'eau chaude solaire

4 mm

10A

10A

1,5 mm

DRAWN BY:
Sjour (5 prises) + salle de
bain (2)
Local 1 + Exterieur(6 prises)

2,5 mm

16A

2,5 mm

16A

CHECKED:
Pompe schoir

MTN649325.SC2

ABC TEAM

ABC TEAM

10A

1,5 mm

DATE:

Stores SH4 SH4.2 stores


Commande des moteurs
pour les stores terrasse 5
Servo moteur MCP 10
230V TOR
Contrle de louverture
des fentres
Relais pour dtecteur
de fume + detecteur
Tv+DVD+PC
Sirne

Station mteo

MTN649912.VR5/7 1,5 mm
MTN649912.ST1/5

10A

1,5 mm

MTN649912.SER1/10

10A

10A

Diffrentiel 40A 30mA


Type AC

2012.08.14

10 mm

1,5 mm

MTN649912.OF1/7 1,5 mm

10A

MTN548001.REL

1,5 mm

10A

MTN649912.P1/3

1,5 mm

SHEET TITLE:
10A

MTN649912.SIR
MTN663990.STM

1,5 mm

10A

ID-003

ABC

TEAM NAME:
ADRESS:
ESPLANADE DES ARTS
ET METIERS
33405 TALENCE CEDEX
FRANCE

CLIENT
SOLAR DECATHLON EUROPE
2012

WWW.SDEUROPE.ORG

DRAWN BY:

CHECKED:

ABC TEAM

ABC TEAM

DATE:

2012.08.14

SHEET TITLE:

ID-004

ABC

TEAM NAME:
ADRESS:
ESPLANADE DES ARTS
ET METIERS
33405 TALENCE CEDEX
FRANCE

CLIENT

WWW.SDEUROPE.ORG

TV
DVD

Oven

Dryer

Fridge Washing
Freezer Machine

SOLAR DECATHLON EUROPE


2012

Dish- Electric
washer Cooktop

PC

Sink

Electric Box

Barrel

plug

DRAWN BY:

CHECKED:

Water
Filter

Oven: Essentiel B EFMC 71


Washing machine: Essentiel B ELT 512D3
Dish washer: Essentiel B ELVI 452
DVD: Essentiel B HD1P
PC: Smart Mouv 1701
Fridge freezer: Electrolux ENN 2914 AOW
TV: Samsung UE32H4000
Electric cooktop: Essentiel B ETVI 325

ABC TEAM

ABC TEAM

DATE:

2012.08.14

SHEET TITLE:

ID-005

ABC

TEAM NAME:
ADRESS:
ESPLANADE DES ARTS
ET METIERS
33405 TALENCE CEDEX
FRANCE

CLIENT
SOLAR DECATHLON EUROPE
2012

WWW.SDEUROPE.ORG

DRAWN BY:

ABC TEAM

ABC TEAM

CHECKED:
DATE:

2012.08.14

DELIVRABLE 6

SHEET TITLE:

1
SO-201

Load / Unload

SO 201
LOAD / UNLOAD

ABC

TEAM NAME:
ADRESS:
ESPLANADE DES ARTS
ET METIERS
33405 TALENCE CEDEX
FRANCE

CLIENT
SOLAR DECATHLON EUROPE
2012

WWW.SDEUROPE.ORG

DRAWN BY:

ABC TEAM

ABC TEAM

CHECKED:
DATE:

2012.08.14

DELIVRABLE 6

SHEET TITLE:

1
SO-301

Site Operations

SO 301

SITE OPERATIONS

ABC

TEAM NAME:
ADRESS:
ESPLANADE DES ARTS
ET METIERS
33405 TALENCE CEDEX
FRANCE

CLIENT
SOLAR DECATHLON EUROPE
2012

WWW.SDEUROPE.ORG

DRAWN BY:

ABC TEAM

ABC TEAM

CHECKED:
DATE:

2012.08.14

DELIVRABLE 6

SHEET TITLE:

1
SO-302

Site Operations

SO 302

SITE OPERATIONS

10

ABC

TEAM NAME:
ADRESS:
ESPLANADE DES ARTS
ET METIERS
33405 TALENCE CEDEX
FRANCE

CLIENT
SOLAR DECATHLON EUROPE
2012

WWW.SDEUROPE.ORG

12

11

DRAWN BY:

ABC TEAM

ABC TEAM

CHECKED:
DATE:

2012.08.14

DELIVRABLE 6

SHEET TITLE:

1
SO-303

Site Operations

SO 303

SITE OPERATIONS

14

13

ABC

TEAM NAME:
ADRESS:
ESPLANADE DES ARTS
ET METIERS
33405 TALENCE CEDEX
FRANCE

CLIENT
SOLAR DECATHLON EUROPE
2012

WWW.SDEUROPE.ORG

16

15

DRAWN BY:

ABC TEAM

ABC TEAM

CHECKED:
DATE:

2012.08.14

DELIVRABLE 6

SHEET TITLE:

1
SO-304

Site Operations

SO 304

SITE OPERATIONS

18

17

ABC

TEAM NAME:
ADRESS:
ESPLANADE DES ARTS
ET METIERS
33405 TALENCE CEDEX
FRANCE

CLIENT
SOLAR DECATHLON EUROPE
2012

WWW.SDEUROPE.ORG

20

19

DRAWN BY:

ABC TEAM

ABC TEAM

CHECKED:
DATE:

2012.08.14

DELIVRABLE 6

SHEET TITLE:

1
SO-305

Site Operations

SO 305

SITE OPERATIONS

22

21

ABC

TEAM NAME:
ADRESS:
ESPLANADE DES ARTS
ET METIERS
33405 TALENCE CEDEX
FRANCE

CLIENT
SOLAR DECATHLON EUROPE
2012

WWW.SDEUROPE.ORG

24

23

DRAWN BY:

ABC TEAM

ABC TEAM

CHECKED:
DATE:

2012.08.14

DELIVRABLE 6

SHEET TITLE:

1
SO-306

Site Operations

SO 306

SITE OPERATIONS

26

25

ABC

TEAM NAME:
ADRESS:
ESPLANADE DES ARTS
ET METIERS
33405 TALENCE CEDEX
FRANCE

CLIENT
SOLAR DECATHLON EUROPE
2012

WWW.SDEUROPE.ORG

28

27

DRAWN BY:

ABC TEAM

ABC TEAM

CHECKED:
DATE:

2012.08.14

DELIVRABLE 6

SHEET TITLE:

1
SO-307

Site Operations

SO 307

SITE OPERATIONS

30

29

ABC

TEAM NAME:
ADRESS:
ESPLANADE DES ARTS
ET METIERS
33405 TALENCE CEDEX
FRANCE

CLIENT
SOLAR DECATHLON EUROPE
2012

WWW.SDEUROPE.ORG

32

31

DRAWN BY:

ABC TEAM

ABC TEAM

CHECKED:
DATE:

2012.08.14

DELIVRABLE 6

SHEET TITLE:

1
SO-308

Site Operations

SO 308

SITE OPERATIONS

34

33

ABC

TEAM NAME:
ADRESS:
ESPLANADE DES ARTS
ET METIERS
33405 TALENCE CEDEX
FRANCE

CLIENT
SOLAR DECATHLON EUROPE
2012

WWW.SDEUROPE.ORG

36

35

DRAWN BY:

ABC TEAM

ABC TEAM

CHECKED:
DATE:

2012.08.14

DELIVRABLE 6

SHEET TITLE:

1
SO-309

Site Operations

SO 309

SITE OPERATIONS

38

37

ABC

TEAM NAME:
ADRESS:
ESPLANADE DES ARTS
ET METIERS
33405 TALENCE CEDEX
FRANCE

CLIENT
SOLAR DECATHLON EUROPE
2012

WWW.SDEUROPE.ORG

39

DRAWN BY:

ABC TEAM

ABC TEAM

CHECKED:
DATE:

2012.08.14

DELIVRABLE 6

SHEET TITLE:

1
SO-310

Site Operations

SO 310

SITE OPERATIONS

\Users\Gregoire\Desktop\sumbiosi\logo\logo_sumbiosi2.PNG

Individual protection equipment standing

ABC

TEAM NAME:
ADRESS:
ESPLANADE DES ARTS
ET METIERS
33405 TALENCE CEDEX
FRANCE

CLIENT
SOLAR DECATHLON EUROPE
2012

WWW.SDEUROPE.ORG

Individual protection equipment non standing


\Users\Gregoire\Desktop\sumbiosi\logo\logo sde orange.jpg

DRAWN BY:

ABC TEAM

CHECKED:

ABC TEAM

DATE:

2012.05.23

SHEET TITLE: Individual Protections

HS-000

ABC

TEAM NAME:
ADRESS:
ESPLANADE DES ARTS
ET METIERS
33405 TALENCE CEDEX
FRANCE

CLIENT
SOLAR DECATHLON EUROPE
2012

WWW.SDEUROPE.ORG

DRAWN BY:

ABC TEAM

ABC TEAM

CHECKED:
DATE:

2012.08.14

DELIVRABLE 6

SHEET TITLE:

1
HS 001

HEALTH AND SAFETY


in the lot and surroundings

HS 001

HEALTH AND SAFETY


in the lot and surroundings

ABC

TEAM NAME:
ADRESS:
ESPLANADE DES ARTS
ET METIERS
33405 TALENCE CEDEX
FRANCE

CLIENT
SOLAR DECATHLON EUROPE
2012

WWW.SDEUROPE.ORG

DRAWN BY:

ABC TEAM

ABC TEAM

CHECKED:
DATE:

2012.08.14

DELIVRABLE 6

SHEET TITLE:

1
HS 003

HEALTH AND SAFETY


in the lot and surroundings

HS 003

HEALTH AND SAFETY


in the lot and surroundings

ABC

TEAM NAME:
ADRESS:
ESPLANADE DES ARTS
ET METIERS
33405 TALENCE CEDEX
FRANCE

CLIENT
SOLAR DECATHLON EUROPE
2012

WWW.SDEUROPE.ORG

DRAWN BY:

ABC TEAM

ABC TEAM

CHECKED:
DATE:

2012.08.14

DELIVRABLE 6

SHEET TITLE:

1
HS 003

HEALTH AND SAFETY


in the lot and surroundings

HS 003

HEALTH AND SAFETY


in the lot and surroundings

Health and Safety during load / unload.

\Users\Gregoire\Desktop\sumbiosi\logo\logo_sumbiosi2.PNG

ABC

TEAM NAME:

Step 1:
- Mounting the spreader (4 lifting points) to the crane
- Hanging the 4 straps (6m) to the spreader
Step 2:
- Establishment of the spreader over the module
- Establishment of straps either side of the module
Step 3:
- Establishment of the straps under the module and between
the shims
- Hanging straps together using shackles
- Distribution of straps on each side evenly

ADRESS:

60 max

ESPLANADE DES ARTS ET


METIERS
33405 TALENCE CEDEX
FRANCE

CLIENT
SOLAR DECATHLON EUROPE
2012

WWW.SDEUROPE.ORG

\Users\Gregoire\Desktop\sumbiosi\logo\logo sde orange.jpg

Emprise

Grue Au

tomotrice

Strap

DRAWN BY:

ABC TEAM

CHECKED:

ABC TEAM

DATE:

Bottom of the West Module

2012.05.23
Wooden guides

Truck

- At each assembly (shackle point slinging, ...), verify that it


is properly installed
- Visually check the girth between the wedges

SHEET TITLE: Health and Safety


during load / unload.

HS-301

Health and Safety during load / unload.

\Users\Gregoire\Desktop\sumbiosi\logo\logo_sumbiosi2.PNG

ABC

TEAM NAME:

Step 1:
- Establishment of the joint compribande
Step 2:
- Mounting the spreader (4 lifting points) to the crane
- Hanging the 4 slings to the spreader
Step 3:
- Establishment of the spreader over the module
- Hooks for 4 slings to the module floor

ADRESS:
60 max

ESPLANADE DES ARTS ET


METIERS
33405 TALENCE CEDEX
FRANCE

CLIENT
SOLAR DECATHLON EUROPE
2012

WWW.SDEUROPE.ORG

\Users\Gregoire\Desktop\sumbiosi\logo\logo sde orange.jpg

Emprise

Grue Au

tomotrice
DRAWN BY:

ABC TEAM

CHECKED:

ABC TEAM

DATE:

2012.05.23

- At each assembly (shackle point slinging, ...), verify that it


is properly installed
- Check the stability of the module when lifting. He must
remain in the horizontal
- Nobody should be present in the load throughout the lifting
operation.

SHEET TITLE: Health and Safety


during load / unload.

HS-302

Health and Safety during load / unload.

\Users\Gregoire\Desktop\sumbiosi\logo\logo_sumbiosi2.PNG

ABC

TEAM NAME:

Step 1:
- Establishment of the joint compribande
- Establishment of a temporary supporting structure
Step 2:
- Mounting the spreader (4 lifting points) to the crane
- Hanging the 4 slings to the spreader
Step 3:
- Establishment of the spreader over the module
- Hooks and straps 4 slings to the module roof

ADRESS:
ESPLANADE DES ARTS ET
METIERS
33405 TALENCE CEDEX
FRANCE

Emprise

Grue Aut

CLIENT

omotrice

SOLAR DECATHLON EUROPE


2012

WWW.SDEUROPE.ORG

\Users\Gregoire\Desktop\sumbiosi\logo\logo sde orange.jpg

60 max

DRAWN BY:

ABC TEAM

CHECKED:

ABC TEAM

DATE:

2012.05.23

- At each assembly (shackle point slinging, ...), verify that it


is properly installed
- Check the stability of the module when lifting. He must
remain in the horizontal
- Nobody should be present in the load throughout the lifting
operation.

SHEET TITLE: Health and Safety


during load / unload.

HS-303

Health and Safety during load / unload.

\Users\Gregoire\Desktop\sumbiosi\logo\logo_sumbiosi2.PNG

ABC

TEAM NAME:
ADRESS:

Step 1:
- Establishment of the joint compribande
Step 2:
- Setting up the crane on top of the module
Step 3:
- Hooks and slings to Module 2 Facade North
- Lifting of the module

ESPLANADE DES ARTS ET


METIERS
33405 TALENCE CEDEX
FRANCE

CLIENT
SOLAR DECATHLON EUROPE
2012
60 max

WWW.SDEUROPE.ORG

\Users\Gregoire\Desktop\sumbiosi\logo\logo sde orange.jpg

Emprise

Grue Aut

omotrice

60 max
DRAWN BY:

ABC TEAM

CHECKED:

ABC TEAM

DATE:

2012.05.23

- At each assembly (shackle point slinging, ...), verify that it


is properly installed
- Check the stability of the module when lifting. He must
remain in the horizontal
- Nobody should be present in the load throughout the lifting
operation.

SHEET TITLE: Health and Safety


during load / unload.

HS-304

Health and Safety during load / unload.

\Users\Gregoire\Desktop\sumbiosi\logo\logo_sumbiosi2.PNG

ABC

TEAM NAME:

Step 1:
- Establishment of the joint compribande
Step 2:
- Mounting the spreader (4 lifting points) to the crane
- Hanging the 4 slings to the spreader
Step 3:
- Establishment of the spreader over the module
- Hooks and straps 4 slings to the module
Step 4:
- Lifting and moving the module into its final position
- Operators shall verify that the corners of the module
element coincide with the west side

60 max

ADRESS:
ESPLANADE DES ARTS ET
METIERS
33405 TALENCE CEDEX
FRANCE

CLIENT
SOLAR DECATHLON EUROPE
2012

WWW.SDEUROPE.ORG

\Users\Gregoire\Desktop\sumbiosi\logo\logo sde orange.jpg

Emprise

Grue Aut

omotrice

DRAWN BY:

ABC TEAM

CHECKED:

ABC TEAM

DATE:

2012.05.23

- At each assembly (shackle point slinging, ...), verify that it


is properly installed
- Check the stability of the module when lifting. He must
remain in the horizontal
- Nobody should be present in the load throughout the lifting
operation.

SHEET TITLE: Health and Safety


during load / unload.

HS-305

Health and Safety during load / unload.

\Users\Gregoire\Desktop\sumbiosi\logo\logo_sumbiosi2.PNG

ABC

TEAM NAME:
ADRESS:

Step 1:
- Establishment of the joint compribande
Step 2:
- Mounting the spreader (4 lifting points) to the crane
- Hanging the 4 slings to the spreader
Step 3:
- Establishment of the spreader over the module
- Hooks and straps 4 slings to the module

ESPLANADE DES ARTS ET


METIERS
33405 TALENCE CEDEX
FRANCE

CLIENT
Emprise

Grue Au

tomotrice

SOLAR DECATHLON EUROPE


2012

WWW.SDEUROPE.ORG

\Users\Gregoire\Desktop\sumbiosi\logo\logo sde orange.jpg

60 max

DRAWN BY:

ABC TEAM

CHECKED:

ABC TEAM

DATE:

2012.05.23

- At each assembly (shackle point slinging, ...), verify that it


is properly installed

SHEET TITLE: Health and Safety


during load / unload.

HS-306

Health and Safety Fundation installation

\Users\Gregoire\Desktop\sumbiosi\logo\logo_sumbiosi2.PNG

ABC

TEAM NAME:

Step 1:
- Level the Ground
Step 2:
- Movement of distribution plates with the carriage
Step 3:
- Studs assembly on distribution plates
Step 4:
- Installation of distribution plates with a line
- If necessary, add wood panels in the distribution plate to
raise it
Step 6:
- Setting up distribution plates with adjustable metal studs
(threaded rod)
Step 7:
- Once set, the nut down to lock the rod
Step 8:
- Verification of the relative positions of these blocks

Before setting

ADRESS:
ESPLANADE DES ARTS ET
METIERS
33405 TALENCE CEDEX
FRANCE

CLIENT

Metalic plate

Nut (position before adjustment)

SOLAR DECATHLON EUROPE


2012

Threaded rod

Wood stud

Distribution plate

WWW.SDEUROPE.ORG

\Users\Gregoire\Desktop\sumbiosi\logo\logo sde orange.jpg

After setting

- Verification of the relative positions of these blocks

DRAWN BY:

ABC TEAM

CHECKED:

ABC TEAM

Metalic plate

DATE:
Nut (position after adjustment)
Threaded rod

2012.05.23

Wood stud

Distribution plate

- Cutting wood shims with a circular saw on the cutting table


- Adapt the number of workers according to the weight
distribution plates (max: 25 kg / person.)

SHEET TITLE: Health and Safety


during assembly/disassembly
/mainenance

HS-401

Health and Safety during West module installation

\Users\Gregoire\Desktop\sumbiosi\logo\logo_sumbiosi2.PNG

ABC

TEAM NAME:
ADRESS:

Step 3:
- Lifting and moving the module into its final position
- Operators shall verify that the corners of the module
coincides with the "foundations"
Step 4:
- Fixing the module to the pad foundation
Step 5:
- Descent of light in order to remove the straps and shackles
and release the spreader with straps

ESPLANADE DES ARTS ET


METIERS
33405 TALENCE CEDEX
FRANCE

CLIENT
SOLAR DECATHLON EUROPE
2012

WWW.SDEUROPE.ORG

\Users\Gregoire\Desktop\sumbiosi\logo\logo sde orange.jpg

West
Module

DRAWN BY:

ABC TEAM

CHECKED:

ABC TEAM

DATE:

2012.05.23

- Check the stability of the module when lifting. He must


remain in the horizontal
- Nobody should be present in the load throughout the lifting
operation.
- The straps should be removed after setting the module
and when the crane men came down the hooks at eye level.

SHEET TITLE: Health and Safety


during assembly/disassembly
/mainenance

Assembly screw for fundation


Assembly bolt

HS-402

Health and Safety during roof insatllation

\Users\Gregoire\Desktop\sumbiosi\logo\logo_sumbiosi2.PNG

ABC

TEAM NAME:

Step 4:
- Lifting and moving the module into its final position
- Operators shall verify that the corners of the module
coincides with the element floor west side and foundations
Step 5:
- Fixing the module to the base element west side and
foundations
Step 6:
- Descent slight rudder to be able to get the slings

ADRESS:

60 max

ESPLANADE DES ARTS ET


METIERS
33405 TALENCE CEDEX
FRANCE

CLIENT
SOLAR DECATHLON EUROPE
2012

WWW.SDEUROPE.ORG

\Users\Gregoire\Desktop\sumbiosi\logo\logo sde orange.jpg

Assembly screw behind


module

West
Module

Floor 1

Floor 2

DRAWN BY:

ABC TEAM

CHECKED:

ABC TEAM

Floor 3

DATE:

2012.05.23

SHEET TITLE: Health and Safety

during assembly/disassembly
/mainenance

- The straps should be removed after setting the module


and when the crane men came down the hooks at eye level.
Assembly scres for fundation
Assembly bolt

HS-403

Health and Safety during roof installation

\Users\Gregoire\Desktop\sumbiosi\logo\logo_sumbiosi2.PNG

ABC

TEAM NAME:

Step 4:
- Lifting and moving the module into its final position
- Operators shall verify that the corners of the module
coincides with the element and the roof on the west side
Frontage
Step 5:
- Fixing the module to the west side and roof element to the
front
Step 6:
- Descent of the rudder slightly to the east side to unhook
slings at breast height

ADRESS:
ESPLANADE DES ARTS ET
METIERS
33405 TALENCE CEDEX
FRANCE

CLIENT
SOLAR DECATHLON EUROPE
2012

WWW.SDEUROPE.ORG

\Users\Gregoire\Desktop\sumbiosi\logo\logo sde orange.jpg

Assembly screw behind


module

West
Module

Floor 1

Floor 2

Floor 3

East
Module

DRAWN BY:

ABC TEAM

CHECKED:

ABC TEAM

DATE:

2012.05.23

- Check the stability of the module when lifting. He must


remain in the horizontal
- Nobody should be present in the load throughout the lifting
operation.
- The straps should be removed after setting the module
and when the crane men came down the hooks at eye level.

SHEET TITLE: Health and Safety


during assembly/disassembly
/mainenance

Assembly bolt

HS-404

Health and Safety during North module installation

\Users\Gregoire\Desktop\sumbiosi\logo\logo_sumbiosi2.PNG

ABC

TEAM NAME:

Step 4:
- Moving into its final position
- Operators shall verify that the corners of the module
coincides with the Bloc and the West Floor
Step 5:
- Fixing the module to West Block and floor
- Fixing the module to the floor by a push-pull
Step 6:
- Descent slight rudder to be able to get the slings

60 max

ADRESS:
ESPLANADE DES ARTS ET
METIERS
33405 TALENCE CEDEX
FRANCE

CLIENT
SOLAR DECATHLON EUROPE
2012

WWW.SDEUROPE.ORG

Facade high Beam

Faade
Assembly screw

West
Module
West Module Pole

\Users\Gregoire\Desktop\sumbiosi\logo\logo sde orange.jpg

Facade Pole

Facade Low Beam

DRAWN BY:

ABC TEAM

CHECKED:

ABC TEAM

Floor

DATE:

East Module
- Check the stability of the module when lifting. He must
remain in the horizontal
- Nobody should be present in the load throughout the lifting
operation.
- The straps should be removed after setting the module
and when the crane men came down the hooks at eye level.

2012.05.23

SHEET TITLE: Health and Safety


during assembly/disassembly
/mainenance

HS-405

Health and Safety during Eats module installation

\Users\Gregoire\Desktop\sumbiosi\logo\logo_sumbiosi2.PNG

ABC

TEAM NAME:
Roof

Step 5:
- Fixing the module to the floor and foundation pads
- Fixing the module to the front
- Establishment of the roof module 3
Step 6:
- Descent of the rudder slightly to the east side to unhook
slings at breast height.

ADRESS:

Facade high Beam

Faade
Assembly screw

West
Module

East
Module
FaadePole

ESPLANADE DES ARTS ET


METIERS
33405 TALENCE CEDEX
FRANCE

East module Pole

CLIENT
Facade low Beam

Floor

SOLAR DECATHLON EUROPE


2012
Roof assembly screw

Vis de montage toiture

Module
Ouest

Plancher 1

Plancher 2

Plancher 3

West
Module

Roof 1

Roof 2

Roof 3

East
Module

WWW.SDEUROPE.ORG

Module
Est

\Users\Gregoire\Desktop\sumbiosi\logo\logo sde orange.jpg

DRAWN BY:

ABC TEAM

CHECKED:

ABC TEAM

Assembly bolt

Dalles btons

DATE:

Boulon de montage
Vis de montage fondation

2012.05.23
SHEET TITLE: Health and Safety
during assembly/disassembly
/mainenance.

- The straps should be removed after setting the module


and when the levageur came down the hooks at eye level.

HS-406

Health and Safety during skylight installation

\Users\Gregoire\Desktop\sumbiosi\logo\logo_sumbiosi2.PNG

ABC

TEAM NAME:

Step 4:
- Lifting and moving the module near its final position
- Guidance of the module to its final position by the two
operators provided by the lifeline
- Check that the operators lenterneau fits well into the roof
Step 5:
- Attaching the module roof component from the inside
(access using a PIR)
Step 6:
- Slight downhill rudder order to qualify for the slings through
the roof

ADRESS:

60 max

ESPLANADE DES ARTS ET


METIERS
33405 TALENCE CEDEX
FRANCE

CLIENT
SOLAR DECATHLON EUROPE
2012

WWW.SDEUROPE.ORG

West
Module

Floor 1

Floor 2

Floor 3

East
Module

LANTER

NEAU

(2.1t)

\Users\Gregoire\Desktop\sumbiosi\logo\logo sde orange.jpg

Skylight assembly screw

DRAWN BY:

ABC TEAM

CHECKED:

ABC TEAM

60 max

DATE:

2012.05.23

- Check the stability of the module when lifting. He must


remain in the horizontal
- Nobody should be present in the load throughout the lifting
operation.
- The straps should be removed after setting the module
and when the levageur came down the hooks at eye level.

SHEET TITLE: Health and Safety


during assembly/disassembly
/mainenance

HS-407

ABC

TEAM NAME:

ACCESSIBILITY TOUR PLAN

800

800

695

800

1200

Regarding the accessibility requirements, we designed the


ramp in a way that makes it possible to go up for the wheelchairs and
pushing chairs. The terrace is at the exact same level all around the
house, and there arent any steps to enter or exit the house.

1500

1200
347

Inside, the whole tour is also accessible to people with motor


disabilities, as we planned to make people walk in large areas so as to
leave enough free space for wheelchairs to turn around. As a student
will be like a guide all tour long, he could easily help and support people
having trouble walking (crutches, etc.)

ADRESS:
ESPLANADE DES ARTS
ET METIERS
33405 TALENCE CEDEX
FRANCE

CLIENT
SOLAR DECATHLON EUROPE
2012

WWW.SDEUROPE.ORG

People with sensorial disabilities like deafness will have the


possibility to follow the complete explanations given by the students by

Thus everyone will be able to follow the same visit of the house,
and people with disabilities wont have to be split up, given special
attention or loose information about our design project.
Also, concerning the exterior area and the terrace, we set up for

525

nails creating a slightly rough surface at the beginning of each steps and

350
175

DRAWN BY:

150

150

ABC TEAM

attention.
ABC TEAM

CHECKED:

5
LEGEND
1 - Ramp 7.3 % slope during 4.8m
2 - Landing 2.4*1.5 m
3 - Wood deck
4 - Stairs
5 - Slighty rough surface

DATE:

2012.08.14

DELIVRABLE 6

SHEET TITLE:

SITE ACCESSIBILITY
PT 001

PT 001

SITE ACCESSIBILITY

PUBLIC TOUR DESCRIPTION


From the entrance of the site, on the south, the visitors will go directly up the
ramp, where the waiting line is located. There, we will set up explanative boards all
along the ramps handrail so as to give primary information about the project.
A : Solar Decathlon Europe
B : Team ABC
C : Sumbiosi Design Proccess
D : Grouping Housing Strategy
E : Industrialization

3
1
5

D
4
7

KIDS ZONE
9

B
A

LEGEND
SUMBIOBOY
TEAM ABC MEMBERS
1

EXPLANATION POINTS

VISITORS
/

WAITING ZONE

EXPLANATIVE BOARDS

We have created Sumbioboy the superhero of the environment !


This mascot will walk around the lot to attract visitors, guide them towards the ramps
and the waiting line and entertain them while they are waiting. Its role would mostly be
to attract visitors and manage the possible crowd and waiting line, but it will also be the
main interlocutor with kids.
Tours of the house would be available in English, French and Spanish.
We decided to make a visit for the general public, and another one a bit different
for the professionals which will be more technical and precise. And as for the kids, we
arranged a Kids Zone where the older can learn about the main characteristics of the
house without being bored by the whole tour, and the younger could play games related
to sustainable development.
For the visit, we are planning to make groups of 6 to 8 people, who would walk
together and be accompanied by one student. We will stop at 9 different points in the
house, each ones corresponding at one special feature of our design. The student guide
will present the house, walk people at the different explanation spots and introduce
them to the 5 students standing at particular points, to explain the precise features.
These students will have one explanative board to illustrate their presentation with
schemas and annotations.
We thus have a main interlocutor with the group, who is supported by others students
at the specific spots.

ADRESS:
ESPLANADE DES ARTS
ET METIERS
33405 TALENCE CEDEX
FRANCE

CLIENT
SOLAR DECATHLON EUROPE
2012

WWW.SDEUROPE.ORG

EXPLANATIONS SPOTS :
1.
Phase-Change Materials + Home Automation
2.
Childs Bedroom : modularity bed and desk
3.
Parents Bedroom : modularity bed and desk
4.
Living Space : roof window + kitchen + island (live demonstration) + east wall
modularity
5.
Bathroom : dressing mobility (live demonstration)
6.
Thermal Envelop
7.
Technical Room
8.
Lombrifiltre : vermi-filtration process
9.
Solar Systems
As soon as a group is leaving the house (spot 6), the following one will start: this
way we only have one group at the time inside. This measure will limit the affluence and
avoid having two discussions at the same time and nearly at the same place.
This is the tour planned for a low volume visits. In case the affluence is important
on the Villa Solar, we will slightly modulate the tour. For instance, the groups would be
of 10 to 12 people, and they will stay for a shorter period of time at each point. But
otherwise, visitors are more than welcome to stick around and experience the house at
a much more leisurely pace.

HOUSE TOUR FLOOR PLAN


PT 101

ABC

TEAM NAME:

HOUSE TOUR GENERAL INFORMATION


PT 201

DRAWN BY:

ABC TEAM

ABC TEAM

CHECKED:
DATE:

2012.08.14

DELIVRABLE 6

SHEET TITLE:

PT 101 / 201

HOUSE TOUR FLOOR PLAN

Vous aimerez peut-être aussi