Académique Documents
Professionnel Documents
Culture Documents
GE-101
SHEET LIST
SHEET LIST
GE-101
1
GE-102
SHEET LIST
SHEET LIST
GE-102
1
GE-103
SHEET LIST
SHEET LIST
GE-103
ABC
TEAM NAME:
ADRESS:
ESPLANADE DES ARTS
ET METIERS
33405 TALENCE CEDEX
FRANCE
CLIENT
SOLAR DECATHLON EUROPE
2012
WWW.SDEUROPE.ORG
DRAWN BY:
CHECKED:
ABC TEAM
ABC TEAM
DATE:
2012.08.14
SHEET TITLE:
AR - 001
AR-001
ABC
TEAM NAME:
ADRESS:
ESPLANADE DES ARTS
ET METIERS
33405 TALENCE CEDEX
FRANCE
CLIENT
SOLAR DECATHLON EUROPE
2012
WWW.SDEUROPE.ORG
DRAWN BY:
CHECKED:
ABC TEAM
ABC TEAM
DATE:
2012.08.14
SHEET TITLE:
AR - 001
AR-001
ABC
TEAM NAME:
ADRESS:
ESPLANADE DES ARTS
ET METIERS
33405 TALENCE CEDEX
FRANCE
CLIENT
SOLAR DECATHLON EUROPE
2012
WWW.SDEUROPE.ORG
DRAWN BY:
CHECKED:
DATE:
ABC TEAM
ABC TEAM
2012.08.14
SHEET TITLE:
1
AR 021
AR-021
ABC
TEAM NAME:
ADRESS:
ESPLANADE DES ARTS
ET METIERS
33405 TALENCE CEDEX
FRANCE
CLIENT
SOLAR DECATHLON EUROPE
2012
WWW.SDEUROPE.ORG
DRAWN BY:
CHECKED:
DATE:
ABC TEAM
ABC TEAM
2012.08.14
SHEET TITLE:
AR-022
ABC
TEAM NAME:
ADRESS:
ESPLANADE DES ARTS
ET METIERS
33405 TALENCE CEDEX
FRANCE
CLIENT
SOLAR DECATHLON EUROPE
2012
WWW.SDEUROPE.ORG
DRAWN BY:
CHECKED:
DATE:
ABC TEAM
ABC TEAM
2012.08.14
SHEET TITLE:
AR-022
2012.08.14
FACADE EST
FACADE OUEST
TEAM NAME:
ADRESS:
CLIENT
ABC
ABC TEAM
WWW.SDEUROPE.ORG
DRAWN BY:
ABC TEAM
2012.08.14
CHECKED:
DATE:
SHEET TITLE:
SITE ELEVATIONS
AR-101
FACADE SUD
TEAM NAME:
ADRESS:
CLIENT
ABC
ABC TEAM
WWW.SDEUROPE.ORG
DRAWN BY:
ABC TEAM
2012.08.14
CHECKED:
DATE:
SHEET TITLE:
SITE ELEVATIONS
AR-102
FACADE OUEST
TEAM NAME:
ADRESS:
CLIENT
ABC
ABC TEAM
WWW.SDEUROPE.ORG
DRAWN BY:
ABC TEAM
2012.08.14
CHECKED:
DATE:
SHEET TITLE:
BUILDING ELEVATIONS
AR-111
FACADE SUD
FACADE NORD
TEAM NAME:
ADRESS:
CLIENT
ABC
ABC TEAM
WWW.SDEUROPE.ORG
DRAWN BY:
ABC TEAM
2012.08.14
CHECKED:
DATE:
SHEET TITLE:
SITE ELEVATIONS
AR-112
Uw = 1,2 W/(m2.K)
Uw = 1,2 W/(m2.K)
Uw = 1,2 W/(m2.K)
Uw = 1,2 W/(m2.K)
Uw = 1,1 W/(m2.K)
Ud = 1,4 W/(m2.K)
Ud = 1,4 W/(m2.K)
Ud = 1,4 W/(m2.K)
Ud = 1,4 W/(m2.K)
Uw = 1,6 W/(m2.K)
ABC
TEAM NAME:
ADRESS:
wooden floor
oak 14 mm
CLIENT
SOLAR DECATHLON EUROPE
2012
WWW.SDEUROPE.ORG
DRAWN BY:
ABC TEAM
ABC TEAM
CHECKED:
DATE:
2012.08.14
SHEET TITLE:
FLOOR
FLOOR
1:50
SOL
IN-001
ABC
TEAM NAME:
ADRESS:
BEDROOMS
plywood board
white lacquered
15 mm th.
ventilation grids
CLIENT
SOLAR DECATHLON EUROPE
2012
WWW.SDEUROPE.ORG
wooden beam
LIVING ROOM
plywood board
white lacquered
15 mm th.
DRAWN BY:
CHECKED:
ABC TEAM
ABC TEAM
DATE:
2012.08.14
SHEET TITLE:
REFLECTED CEILING
REFLECTED CEILING
1:50
SOL
IN-101
2012.08.14
DAY PLAN
NIGHT PLAN
ABC
TEAM NAME:
ADRESS:
ESPLANADE DES ARTS
ET METIERS
33405 TALENCE CEDEX
FRANCE
CLIENT
SOLAR DECATHLON EUROPE
2012
WWW.SDEUROPE.ORG
DRAWN BY:
ABC TEAM
CHECKED:
ABC TEAM
DATE:
2012.08.14
SHEET TITLE:
FURNISHING : LIVING ROOM PLAN
1:20
0
IN-302
2012.08.14
ABC
TEAM NAME:
DAY PLAN
NIGHT PLAN
ADRESS:
ESPLANADE DES ARTS
ET METIERS
33405 TALENCE CEDEX
FRANCE
CLIENT
SOLAR DECATHLON EUROPE
2012
WWW.SDEUROPE.ORG
DRAWN BY:
CHECKED:
ABC TEAM
ABC TEAM
DATE:
2012.08.14
SHEET TITLE:
FURNISHING : LIVING ROOM
SECTIONS
1:20
0
IN-304
DAY PLAN
NIGHT PLAN
ABC
TEAM NAME:
ADRESS:
ESPLANADE DES ARTS
ET METIERS
33405 TALENCE CEDEX
FRANCE
CLIENT
SOLAR DECATHLON EUROPE
2012
WWW.SDEUROPE.ORG
DRAWN BY:
ABC TEAM
CHECKED:
ABC TEAM
DATE:
2012.08.14
SHEET TITLE:
FURNISHING : CHILD ROOM PLAN
1:20
0
IN-305
2012.08.14
ABC
TEAM NAME:
ADRESS:
ESPLANADE DES ARTS
ET METIERS
33405 TALENCE CEDEX
FRANCE
CLIENT
SOLAR DECATHLON EUROPE
2012
WWW.SDEUROPE.ORG
DRAWN BY:
CHECKED:
ABC TEAM
ABC TEAM
DATE:
2012.08.14
SHEET TITLE:
FURNISHING : CHILD ROOM
SECTION
1:20
0
IN-307
ABC
TEAM NAME:
ADRESS:
ESPLANADE DES ARTS
ET METIERS
33405 TALENCE CEDEX
FRANCE
CLIENT
SOLAR DECATHLON EUROPE
2012
WWW.SDEUROPE.ORG
DRAWN BY:
ABC TEAM
CHECKED:
ABC TEAM
DATE:
2012.08.14
SHEET TITLE:
FURNISHING : ISLAND KITCHEN PLAN
IN-308
1:20
0
2012.08.14
ABC
TEAM NAME:
CLOSE PLAN
OPEN PLAN
ADRESS:
ESPLANADE DES ARTS
ET METIERS
33405 TALENCE CEDEX
FRANCE
CLIENT
SOLAR DECATHLON EUROPE
2012
WWW.SDEUROPE.ORG
DRAWN BY:
ABC TEAM
CHECKED:
ABC TEAM
DATE:
2012.08.14
SHEET TITLE:
FURNISHING : PARENTAL AND
CHILD ROOM PLAN
1:20
0
IN-313
ABC
TEAM NAME:
ADRESS:
ESPLANADE DES ARTS
ET METIERS
33405 TALENCE CEDEX
FRANCE
CLIENT
SOLAR DECATHLON EUROPE
2012
WWW.SDEUROPE.ORG
DRAWN BY:
ABC TEAM
CHECKED:
ABC TEAM
DATE:
2012.08.14
SHEET TITLE:
KITCHEN PLAN
KITCHEN PLAN
PLAN CUISINE
1:20
0
IN-401
ABC
TEAM NAME:
ADRESS:
ESPLANADE DES ARTS
ET METIERS
33405 TALENCE CEDEX
FRANCE
CLIENT
SOLAR DECATHLON EUROPE
2012
WWW.SDEUROPE.ORG
DRAWN BY:
ABC TEAM
CHECKED:
ABC TEAM
DATE:
2012.08.14
SHEET TITLE:
BATHROOM PLAN
BATHROOM PLAN
1:20
0
IN-501
\Users\Gregoire\Desktop\sumbiosi\logo\logo_sumbiosi2.PNG
ABC
TEAM NAME:
ADRESS:
ESPLANADE DES ARTS
ET METIERS
33405 TALENCE CEDEX
FRANCE
CLIENT
SOLAR DECATHLON EUROPE
2012
WWW.SDEUROPE.ORG
DRAWN BY:
ABC TEAM
CHECKED:
ABC TEAM
DATE:
2012.05.23
West Module
ST-201
\Users\Gregoire\Desktop\sumbiosi\logo\logo_sumbiosi2.PNG
ABC
TEAM NAME:
ADRESS:
ESPLANADE DES ARTS
ET METIERS
33405 TALENCE CEDEX
FRANCE
CLIENT
SOLAR DECATHLON EUROPE
2012
WWW.SDEUROPE.ORG
DRAWN BY:
ABC TEAM
CHECKED:
ABC TEAM
DATE:
2012.05.23
Roof Modules
ST-202
\Users\Gregoire\Desktop\sumbiosi\logo\logo_sumbiosi2.PNG
ABC
TEAM NAME:
ADRESS:
ESPLANADE DES ARTS
ET METIERS
33405 TALENCE CEDEX
FRANCE
CLIENT
SOLAR DECATHLON EUROPE
2012
WWW.SDEUROPE.ORG
DRAWN BY:
ABC TEAM
CHECKED:
ABC TEAM
DATE:
2012.05.23
East Module
ST-203
\Users\Gregoire\Desktop\sumbiosi\logo\logo_sumbiosi2.PNG
ABC
TEAM NAME:
ADRESS:
ESPLANADE DES ARTS
ET METIERS
33405 TALENCE CEDEX
FRANCE
CLIENT
SOLAR DECATHLON EUROPE
2012
WWW.SDEUROPE.ORG
DRAWN BY:
ABC TEAM
CHECKED:
ABC TEAM
DATE:
2012.05.23
North Module
ST-204
\Users\Gregoire\Desktop\sumbiosi\logo\logo_sumbiosi2.PNG
ABC
TEAM NAME:
ADRESS:
ESPLANADE DES ARTS
ET METIERS
33405 TALENCE CEDEX
FRANCE
CLIENT
SOLAR DECATHLON EUROPE
2012
WWW.SDEUROPE.ORG
DRAWN BY:
ABC TEAM
CHECKED:
ABC TEAM
DATE:
2012.05.23
Skylight
ST-205
\Users\Gregoire\Desktop\sumbiosi\logo\logo_sumbiosi2.PNG
ABC
TEAM NAME:
ADRESS:
ESPLANADE DES ARTS
ET METIERS
33405 TALENCE CEDEX
FRANCE
CLIENT
SOLAR DECATHLON EUROPE
2012
WWW.SDEUROPE.ORG
DRAWN BY:
ABC TEAM
CHECKED:
ABC TEAM
DATE:
2012.05.23
Enveloppe
ST-206
\Users\Gregoire\Desktop\sumbiosi\logo\logo_sumbiosi2.PNG
ABC
TEAM NAME:
ADRESS:
ESPLANADE DES ARTS
ET METIERS
33405 TALENCE CEDEX
FRANCE
CLIENT
SOLAR DECATHLON EUROPE
2012
WWW.SDEUROPE.ORG
DRAWN BY:
ABC TEAM
CHECKED:
ABC TEAM
DATE:
2012.05.23
Burst Enveloppe
ST-207
Pump
washing machine
Nilan VP 18 compact
dish washer
washin basin
2012.08.14
\Users\Gregoire\Desktop\sumbiosi\logo\logo_sumbiosi2.PNG
TEAM NAME:
ADRESS:
CLIENT
ABC
WWW.SDEUROPE.ORG
ABC TEAM
DRAWN BY:
ABC TEAM
2012.08.14
CHECKED:
DATE:
SHEET TITLE:
DRAIN/WASTE/VENT ISOMETRIC
PL-221
&YDIBOHJOHUFNQFSBUVSF
)FBUJOHCZ)7"$TZTUFN
/*-"/71DPNQBDU
&OUSZBJSEVDUJOH
&YJUBJSEVDUJOH
4VQQMZBJSEVDUJOH
&YJUBJSEVDUJOH
4VQQMZBJSEVDUJOH
/*-"/71DPNQBDU
1$.BJSDBTF
1$.4:45&.
4VQQMZBJSDBTF
)FBUJOHCZ)7"$TZTUFN
&YJUBJSEVDUJOH
ABC
TEAM NAME:
ADRESS:
ESPLANADE DES ARTS
ET METIERS
33405 TALENCE CEDEX
FRANCE
CLIENT
SOLAR DECATHLON EUROPE
2012
WWW.SDEUROPE.ORG
DRAWN BY:
CHECKED:
ABC TEAM
ABC TEAM
DATE:
2012.08.14
SHEET TITLE:
ID-001
ABC
TEAM NAME:
ADRESS:
ESPLANADE DES ARTS
ET METIERS
33405 TALENCE CEDEX
FRANCE
CLIENT
SOLAR DECATHLON EUROPE
2012
WWW.SDEUROPE.ORG
DRAWN BY:
CHECKED:
ABC TEAM
ABC TEAM
DATE:
2012.08.14
SHEET TITLE:
ID-002
4 lead batteries
12 Volt 360 Ah
ID-003
4 mm
PV
Onduleur
1,5 mm
PV
Meter
1,5 mm
50 mm
DC
Battery
Meter
AC2
Inverter SMA SI
5048
Onduleur
CPV
AC1
ABC
TEAM NAME:
ADRESS:
Pc pilotage CPV + Mini automate
Transfor 24
V
40A
10 mm
10A
6 mm
32A
4 mm
20A
Frigo
2,5 mm
16A
Four
4 mm
20A
Lave vaisselle
4 mm
20A
2,5 mm
16A
2,5 mm
16A
Plaques
Lave linge
Hotte
1,5 mm
10A
VMC
4 mm
20A
Cuve fluide
4 mm
20A
1 pompe irrigation
2,5 mm
16A
1 pompe douche
2,5 mm
Prises cuisine ( 7 )
7 Prises pour chambres
2,5 mm
10 mm
Alimentation pour le
gnrateur du schoir
2,5 mm
16A
10 mm
Diffrentiel 40A 30mA
Type AC
Load
Meter
Conso
elec
16 mm
63A
CLIENT
SOLAR DECATHLON EUROPE
2012
WWW.SDEUROPE.ORG
MTN684064
2A
1,5 mm
Passerelle dali/knx
2A
1,5 mm
2A
Intesis
Transfor 24
V
10 mm
10A
MTN649325.MCP 1,5 mm
MTN649325.SC1
MTN693003
2A
Domotique
Protection box
for AC grid
16 mm
MTN680191
Rgulation du ventilateur
de 80 V A 230 V AC du MCP
Protection box
for DC grid
16A
16A
Passerelle KNX/Modbus
pour Nilan ( VMC)
EDF
16A
2,5 mm
2,5 mm
Lumires
Transformateur
disolement
16A
Transformateur 24 V pour le
connect sur lactionneur de stores
4 sorties
Alimentation de bus
10A
1,5 mm
Ventilateur WC
GFCI
500mA 30/
60A Type S
16 mm
20A
16 mm
4 mm
10A
10A
1,5 mm
DRAWN BY:
Sjour (5 prises) + salle de
bain (2)
Local 1 + Exterieur(6 prises)
2,5 mm
16A
2,5 mm
16A
CHECKED:
Pompe schoir
MTN649325.SC2
ABC TEAM
ABC TEAM
10A
1,5 mm
DATE:
Station mteo
MTN649912.VR5/7 1,5 mm
MTN649912.ST1/5
10A
1,5 mm
MTN649912.SER1/10
10A
10A
2012.08.14
10 mm
1,5 mm
MTN649912.OF1/7 1,5 mm
10A
MTN548001.REL
1,5 mm
10A
MTN649912.P1/3
1,5 mm
SHEET TITLE:
10A
MTN649912.SIR
MTN663990.STM
1,5 mm
10A
ID-003
ABC
TEAM NAME:
ADRESS:
ESPLANADE DES ARTS
ET METIERS
33405 TALENCE CEDEX
FRANCE
CLIENT
SOLAR DECATHLON EUROPE
2012
WWW.SDEUROPE.ORG
DRAWN BY:
CHECKED:
ABC TEAM
ABC TEAM
DATE:
2012.08.14
SHEET TITLE:
ID-004
ABC
TEAM NAME:
ADRESS:
ESPLANADE DES ARTS
ET METIERS
33405 TALENCE CEDEX
FRANCE
CLIENT
WWW.SDEUROPE.ORG
TV
DVD
Oven
Dryer
Fridge Washing
Freezer Machine
Dish- Electric
washer Cooktop
PC
Sink
Electric Box
Barrel
plug
DRAWN BY:
CHECKED:
Water
Filter
ABC TEAM
ABC TEAM
DATE:
2012.08.14
SHEET TITLE:
ID-005
ABC
TEAM NAME:
ADRESS:
ESPLANADE DES ARTS
ET METIERS
33405 TALENCE CEDEX
FRANCE
CLIENT
SOLAR DECATHLON EUROPE
2012
WWW.SDEUROPE.ORG
DRAWN BY:
ABC TEAM
ABC TEAM
CHECKED:
DATE:
2012.08.14
DELIVRABLE 6
SHEET TITLE:
1
SO-201
Load / Unload
SO 201
LOAD / UNLOAD
ABC
TEAM NAME:
ADRESS:
ESPLANADE DES ARTS
ET METIERS
33405 TALENCE CEDEX
FRANCE
CLIENT
SOLAR DECATHLON EUROPE
2012
WWW.SDEUROPE.ORG
DRAWN BY:
ABC TEAM
ABC TEAM
CHECKED:
DATE:
2012.08.14
DELIVRABLE 6
SHEET TITLE:
1
SO-301
Site Operations
SO 301
SITE OPERATIONS
ABC
TEAM NAME:
ADRESS:
ESPLANADE DES ARTS
ET METIERS
33405 TALENCE CEDEX
FRANCE
CLIENT
SOLAR DECATHLON EUROPE
2012
WWW.SDEUROPE.ORG
DRAWN BY:
ABC TEAM
ABC TEAM
CHECKED:
DATE:
2012.08.14
DELIVRABLE 6
SHEET TITLE:
1
SO-302
Site Operations
SO 302
SITE OPERATIONS
10
ABC
TEAM NAME:
ADRESS:
ESPLANADE DES ARTS
ET METIERS
33405 TALENCE CEDEX
FRANCE
CLIENT
SOLAR DECATHLON EUROPE
2012
WWW.SDEUROPE.ORG
12
11
DRAWN BY:
ABC TEAM
ABC TEAM
CHECKED:
DATE:
2012.08.14
DELIVRABLE 6
SHEET TITLE:
1
SO-303
Site Operations
SO 303
SITE OPERATIONS
14
13
ABC
TEAM NAME:
ADRESS:
ESPLANADE DES ARTS
ET METIERS
33405 TALENCE CEDEX
FRANCE
CLIENT
SOLAR DECATHLON EUROPE
2012
WWW.SDEUROPE.ORG
16
15
DRAWN BY:
ABC TEAM
ABC TEAM
CHECKED:
DATE:
2012.08.14
DELIVRABLE 6
SHEET TITLE:
1
SO-304
Site Operations
SO 304
SITE OPERATIONS
18
17
ABC
TEAM NAME:
ADRESS:
ESPLANADE DES ARTS
ET METIERS
33405 TALENCE CEDEX
FRANCE
CLIENT
SOLAR DECATHLON EUROPE
2012
WWW.SDEUROPE.ORG
20
19
DRAWN BY:
ABC TEAM
ABC TEAM
CHECKED:
DATE:
2012.08.14
DELIVRABLE 6
SHEET TITLE:
1
SO-305
Site Operations
SO 305
SITE OPERATIONS
22
21
ABC
TEAM NAME:
ADRESS:
ESPLANADE DES ARTS
ET METIERS
33405 TALENCE CEDEX
FRANCE
CLIENT
SOLAR DECATHLON EUROPE
2012
WWW.SDEUROPE.ORG
24
23
DRAWN BY:
ABC TEAM
ABC TEAM
CHECKED:
DATE:
2012.08.14
DELIVRABLE 6
SHEET TITLE:
1
SO-306
Site Operations
SO 306
SITE OPERATIONS
26
25
ABC
TEAM NAME:
ADRESS:
ESPLANADE DES ARTS
ET METIERS
33405 TALENCE CEDEX
FRANCE
CLIENT
SOLAR DECATHLON EUROPE
2012
WWW.SDEUROPE.ORG
28
27
DRAWN BY:
ABC TEAM
ABC TEAM
CHECKED:
DATE:
2012.08.14
DELIVRABLE 6
SHEET TITLE:
1
SO-307
Site Operations
SO 307
SITE OPERATIONS
30
29
ABC
TEAM NAME:
ADRESS:
ESPLANADE DES ARTS
ET METIERS
33405 TALENCE CEDEX
FRANCE
CLIENT
SOLAR DECATHLON EUROPE
2012
WWW.SDEUROPE.ORG
32
31
DRAWN BY:
ABC TEAM
ABC TEAM
CHECKED:
DATE:
2012.08.14
DELIVRABLE 6
SHEET TITLE:
1
SO-308
Site Operations
SO 308
SITE OPERATIONS
34
33
ABC
TEAM NAME:
ADRESS:
ESPLANADE DES ARTS
ET METIERS
33405 TALENCE CEDEX
FRANCE
CLIENT
SOLAR DECATHLON EUROPE
2012
WWW.SDEUROPE.ORG
36
35
DRAWN BY:
ABC TEAM
ABC TEAM
CHECKED:
DATE:
2012.08.14
DELIVRABLE 6
SHEET TITLE:
1
SO-309
Site Operations
SO 309
SITE OPERATIONS
38
37
ABC
TEAM NAME:
ADRESS:
ESPLANADE DES ARTS
ET METIERS
33405 TALENCE CEDEX
FRANCE
CLIENT
SOLAR DECATHLON EUROPE
2012
WWW.SDEUROPE.ORG
39
DRAWN BY:
ABC TEAM
ABC TEAM
CHECKED:
DATE:
2012.08.14
DELIVRABLE 6
SHEET TITLE:
1
SO-310
Site Operations
SO 310
SITE OPERATIONS
\Users\Gregoire\Desktop\sumbiosi\logo\logo_sumbiosi2.PNG
ABC
TEAM NAME:
ADRESS:
ESPLANADE DES ARTS
ET METIERS
33405 TALENCE CEDEX
FRANCE
CLIENT
SOLAR DECATHLON EUROPE
2012
WWW.SDEUROPE.ORG
DRAWN BY:
ABC TEAM
CHECKED:
ABC TEAM
DATE:
2012.05.23
HS-000
ABC
TEAM NAME:
ADRESS:
ESPLANADE DES ARTS
ET METIERS
33405 TALENCE CEDEX
FRANCE
CLIENT
SOLAR DECATHLON EUROPE
2012
WWW.SDEUROPE.ORG
DRAWN BY:
ABC TEAM
ABC TEAM
CHECKED:
DATE:
2012.08.14
DELIVRABLE 6
SHEET TITLE:
1
HS 001
HS 001
ABC
TEAM NAME:
ADRESS:
ESPLANADE DES ARTS
ET METIERS
33405 TALENCE CEDEX
FRANCE
CLIENT
SOLAR DECATHLON EUROPE
2012
WWW.SDEUROPE.ORG
DRAWN BY:
ABC TEAM
ABC TEAM
CHECKED:
DATE:
2012.08.14
DELIVRABLE 6
SHEET TITLE:
1
HS 003
HS 003
ABC
TEAM NAME:
ADRESS:
ESPLANADE DES ARTS
ET METIERS
33405 TALENCE CEDEX
FRANCE
CLIENT
SOLAR DECATHLON EUROPE
2012
WWW.SDEUROPE.ORG
DRAWN BY:
ABC TEAM
ABC TEAM
CHECKED:
DATE:
2012.08.14
DELIVRABLE 6
SHEET TITLE:
1
HS 003
HS 003
\Users\Gregoire\Desktop\sumbiosi\logo\logo_sumbiosi2.PNG
ABC
TEAM NAME:
Step 1:
- Mounting the spreader (4 lifting points) to the crane
- Hanging the 4 straps (6m) to the spreader
Step 2:
- Establishment of the spreader over the module
- Establishment of straps either side of the module
Step 3:
- Establishment of the straps under the module and between
the shims
- Hanging straps together using shackles
- Distribution of straps on each side evenly
ADRESS:
60 max
CLIENT
SOLAR DECATHLON EUROPE
2012
WWW.SDEUROPE.ORG
Emprise
Grue Au
tomotrice
Strap
DRAWN BY:
ABC TEAM
CHECKED:
ABC TEAM
DATE:
2012.05.23
Wooden guides
Truck
HS-301
\Users\Gregoire\Desktop\sumbiosi\logo\logo_sumbiosi2.PNG
ABC
TEAM NAME:
Step 1:
- Establishment of the joint compribande
Step 2:
- Mounting the spreader (4 lifting points) to the crane
- Hanging the 4 slings to the spreader
Step 3:
- Establishment of the spreader over the module
- Hooks for 4 slings to the module floor
ADRESS:
60 max
CLIENT
SOLAR DECATHLON EUROPE
2012
WWW.SDEUROPE.ORG
Emprise
Grue Au
tomotrice
DRAWN BY:
ABC TEAM
CHECKED:
ABC TEAM
DATE:
2012.05.23
HS-302
\Users\Gregoire\Desktop\sumbiosi\logo\logo_sumbiosi2.PNG
ABC
TEAM NAME:
Step 1:
- Establishment of the joint compribande
- Establishment of a temporary supporting structure
Step 2:
- Mounting the spreader (4 lifting points) to the crane
- Hanging the 4 slings to the spreader
Step 3:
- Establishment of the spreader over the module
- Hooks and straps 4 slings to the module roof
ADRESS:
ESPLANADE DES ARTS ET
METIERS
33405 TALENCE CEDEX
FRANCE
Emprise
Grue Aut
CLIENT
omotrice
WWW.SDEUROPE.ORG
60 max
DRAWN BY:
ABC TEAM
CHECKED:
ABC TEAM
DATE:
2012.05.23
HS-303
\Users\Gregoire\Desktop\sumbiosi\logo\logo_sumbiosi2.PNG
ABC
TEAM NAME:
ADRESS:
Step 1:
- Establishment of the joint compribande
Step 2:
- Setting up the crane on top of the module
Step 3:
- Hooks and slings to Module 2 Facade North
- Lifting of the module
CLIENT
SOLAR DECATHLON EUROPE
2012
60 max
WWW.SDEUROPE.ORG
Emprise
Grue Aut
omotrice
60 max
DRAWN BY:
ABC TEAM
CHECKED:
ABC TEAM
DATE:
2012.05.23
HS-304
\Users\Gregoire\Desktop\sumbiosi\logo\logo_sumbiosi2.PNG
ABC
TEAM NAME:
Step 1:
- Establishment of the joint compribande
Step 2:
- Mounting the spreader (4 lifting points) to the crane
- Hanging the 4 slings to the spreader
Step 3:
- Establishment of the spreader over the module
- Hooks and straps 4 slings to the module
Step 4:
- Lifting and moving the module into its final position
- Operators shall verify that the corners of the module
element coincide with the west side
60 max
ADRESS:
ESPLANADE DES ARTS ET
METIERS
33405 TALENCE CEDEX
FRANCE
CLIENT
SOLAR DECATHLON EUROPE
2012
WWW.SDEUROPE.ORG
Emprise
Grue Aut
omotrice
DRAWN BY:
ABC TEAM
CHECKED:
ABC TEAM
DATE:
2012.05.23
HS-305
\Users\Gregoire\Desktop\sumbiosi\logo\logo_sumbiosi2.PNG
ABC
TEAM NAME:
ADRESS:
Step 1:
- Establishment of the joint compribande
Step 2:
- Mounting the spreader (4 lifting points) to the crane
- Hanging the 4 slings to the spreader
Step 3:
- Establishment of the spreader over the module
- Hooks and straps 4 slings to the module
CLIENT
Emprise
Grue Au
tomotrice
WWW.SDEUROPE.ORG
60 max
DRAWN BY:
ABC TEAM
CHECKED:
ABC TEAM
DATE:
2012.05.23
HS-306
\Users\Gregoire\Desktop\sumbiosi\logo\logo_sumbiosi2.PNG
ABC
TEAM NAME:
Step 1:
- Level the Ground
Step 2:
- Movement of distribution plates with the carriage
Step 3:
- Studs assembly on distribution plates
Step 4:
- Installation of distribution plates with a line
- If necessary, add wood panels in the distribution plate to
raise it
Step 6:
- Setting up distribution plates with adjustable metal studs
(threaded rod)
Step 7:
- Once set, the nut down to lock the rod
Step 8:
- Verification of the relative positions of these blocks
Before setting
ADRESS:
ESPLANADE DES ARTS ET
METIERS
33405 TALENCE CEDEX
FRANCE
CLIENT
Metalic plate
Threaded rod
Wood stud
Distribution plate
WWW.SDEUROPE.ORG
After setting
DRAWN BY:
ABC TEAM
CHECKED:
ABC TEAM
Metalic plate
DATE:
Nut (position after adjustment)
Threaded rod
2012.05.23
Wood stud
Distribution plate
HS-401
\Users\Gregoire\Desktop\sumbiosi\logo\logo_sumbiosi2.PNG
ABC
TEAM NAME:
ADRESS:
Step 3:
- Lifting and moving the module into its final position
- Operators shall verify that the corners of the module
coincides with the "foundations"
Step 4:
- Fixing the module to the pad foundation
Step 5:
- Descent of light in order to remove the straps and shackles
and release the spreader with straps
CLIENT
SOLAR DECATHLON EUROPE
2012
WWW.SDEUROPE.ORG
West
Module
DRAWN BY:
ABC TEAM
CHECKED:
ABC TEAM
DATE:
2012.05.23
HS-402
\Users\Gregoire\Desktop\sumbiosi\logo\logo_sumbiosi2.PNG
ABC
TEAM NAME:
Step 4:
- Lifting and moving the module into its final position
- Operators shall verify that the corners of the module
coincides with the element floor west side and foundations
Step 5:
- Fixing the module to the base element west side and
foundations
Step 6:
- Descent slight rudder to be able to get the slings
ADRESS:
60 max
CLIENT
SOLAR DECATHLON EUROPE
2012
WWW.SDEUROPE.ORG
West
Module
Floor 1
Floor 2
DRAWN BY:
ABC TEAM
CHECKED:
ABC TEAM
Floor 3
DATE:
2012.05.23
during assembly/disassembly
/mainenance
HS-403
\Users\Gregoire\Desktop\sumbiosi\logo\logo_sumbiosi2.PNG
ABC
TEAM NAME:
Step 4:
- Lifting and moving the module into its final position
- Operators shall verify that the corners of the module
coincides with the element and the roof on the west side
Frontage
Step 5:
- Fixing the module to the west side and roof element to the
front
Step 6:
- Descent of the rudder slightly to the east side to unhook
slings at breast height
ADRESS:
ESPLANADE DES ARTS ET
METIERS
33405 TALENCE CEDEX
FRANCE
CLIENT
SOLAR DECATHLON EUROPE
2012
WWW.SDEUROPE.ORG
West
Module
Floor 1
Floor 2
Floor 3
East
Module
DRAWN BY:
ABC TEAM
CHECKED:
ABC TEAM
DATE:
2012.05.23
Assembly bolt
HS-404
\Users\Gregoire\Desktop\sumbiosi\logo\logo_sumbiosi2.PNG
ABC
TEAM NAME:
Step 4:
- Moving into its final position
- Operators shall verify that the corners of the module
coincides with the Bloc and the West Floor
Step 5:
- Fixing the module to West Block and floor
- Fixing the module to the floor by a push-pull
Step 6:
- Descent slight rudder to be able to get the slings
60 max
ADRESS:
ESPLANADE DES ARTS ET
METIERS
33405 TALENCE CEDEX
FRANCE
CLIENT
SOLAR DECATHLON EUROPE
2012
WWW.SDEUROPE.ORG
Faade
Assembly screw
West
Module
West Module Pole
Facade Pole
DRAWN BY:
ABC TEAM
CHECKED:
ABC TEAM
Floor
DATE:
East Module
- Check the stability of the module when lifting. He must
remain in the horizontal
- Nobody should be present in the load throughout the lifting
operation.
- The straps should be removed after setting the module
and when the crane men came down the hooks at eye level.
2012.05.23
HS-405
\Users\Gregoire\Desktop\sumbiosi\logo\logo_sumbiosi2.PNG
ABC
TEAM NAME:
Roof
Step 5:
- Fixing the module to the floor and foundation pads
- Fixing the module to the front
- Establishment of the roof module 3
Step 6:
- Descent of the rudder slightly to the east side to unhook
slings at breast height.
ADRESS:
Faade
Assembly screw
West
Module
East
Module
FaadePole
CLIENT
Facade low Beam
Floor
Module
Ouest
Plancher 1
Plancher 2
Plancher 3
West
Module
Roof 1
Roof 2
Roof 3
East
Module
WWW.SDEUROPE.ORG
Module
Est
DRAWN BY:
ABC TEAM
CHECKED:
ABC TEAM
Assembly bolt
Dalles btons
DATE:
Boulon de montage
Vis de montage fondation
2012.05.23
SHEET TITLE: Health and Safety
during assembly/disassembly
/mainenance.
HS-406
\Users\Gregoire\Desktop\sumbiosi\logo\logo_sumbiosi2.PNG
ABC
TEAM NAME:
Step 4:
- Lifting and moving the module near its final position
- Guidance of the module to its final position by the two
operators provided by the lifeline
- Check that the operators lenterneau fits well into the roof
Step 5:
- Attaching the module roof component from the inside
(access using a PIR)
Step 6:
- Slight downhill rudder order to qualify for the slings through
the roof
ADRESS:
60 max
CLIENT
SOLAR DECATHLON EUROPE
2012
WWW.SDEUROPE.ORG
West
Module
Floor 1
Floor 2
Floor 3
East
Module
LANTER
NEAU
(2.1t)
DRAWN BY:
ABC TEAM
CHECKED:
ABC TEAM
60 max
DATE:
2012.05.23
HS-407
ABC
TEAM NAME:
800
800
695
800
1200
1500
1200
347
ADRESS:
ESPLANADE DES ARTS
ET METIERS
33405 TALENCE CEDEX
FRANCE
CLIENT
SOLAR DECATHLON EUROPE
2012
WWW.SDEUROPE.ORG
Thus everyone will be able to follow the same visit of the house,
and people with disabilities wont have to be split up, given special
attention or loose information about our design project.
Also, concerning the exterior area and the terrace, we set up for
525
nails creating a slightly rough surface at the beginning of each steps and
350
175
DRAWN BY:
150
150
ABC TEAM
attention.
ABC TEAM
CHECKED:
5
LEGEND
1 - Ramp 7.3 % slope during 4.8m
2 - Landing 2.4*1.5 m
3 - Wood deck
4 - Stairs
5 - Slighty rough surface
DATE:
2012.08.14
DELIVRABLE 6
SHEET TITLE:
SITE ACCESSIBILITY
PT 001
PT 001
SITE ACCESSIBILITY
3
1
5
D
4
7
KIDS ZONE
9
B
A
LEGEND
SUMBIOBOY
TEAM ABC MEMBERS
1
EXPLANATION POINTS
VISITORS
/
WAITING ZONE
EXPLANATIVE BOARDS
ADRESS:
ESPLANADE DES ARTS
ET METIERS
33405 TALENCE CEDEX
FRANCE
CLIENT
SOLAR DECATHLON EUROPE
2012
WWW.SDEUROPE.ORG
EXPLANATIONS SPOTS :
1.
Phase-Change Materials + Home Automation
2.
Childs Bedroom : modularity bed and desk
3.
Parents Bedroom : modularity bed and desk
4.
Living Space : roof window + kitchen + island (live demonstration) + east wall
modularity
5.
Bathroom : dressing mobility (live demonstration)
6.
Thermal Envelop
7.
Technical Room
8.
Lombrifiltre : vermi-filtration process
9.
Solar Systems
As soon as a group is leaving the house (spot 6), the following one will start: this
way we only have one group at the time inside. This measure will limit the affluence and
avoid having two discussions at the same time and nearly at the same place.
This is the tour planned for a low volume visits. In case the affluence is important
on the Villa Solar, we will slightly modulate the tour. For instance, the groups would be
of 10 to 12 people, and they will stay for a shorter period of time at each point. But
otherwise, visitors are more than welcome to stick around and experience the house at
a much more leisurely pace.
ABC
TEAM NAME:
DRAWN BY:
ABC TEAM
ABC TEAM
CHECKED:
DATE:
2012.08.14
DELIVRABLE 6
SHEET TITLE:
PT 101 / 201