Along with Supply / Delivery Time VENDER shall furnish the following

documents.
i) Documents / test report as specified in sampling and criteria for conformity of IS
2171 latest revision with up to date amendment containing.
a) Copy of hydraulic pressure test, hydraulic burst failure test, and performance test
and expansion space.
b) Certificate from manufacturer about conformity of specification for the various
component and dry chemical powder.
ii) Certificate from third parity inspection agency in connection with quality assurance,
testing and performance evaluation as per the specification and provision of IS
2171.
iii) Copy of Valid ISI License No.
iv) Technical Literature / catalogue.
v) Operation & Maintenance Manual.
SCOPE OF INSPECTION:
The vender shall arrange to carry out inspection by third party inspector. The scope of
inspection by third parity shall include.
1. All Identification, verification (by chemical analysis) and certification of the
material
2. All the welder engaged for the welding shall be qualified for 6 G position as per
ASME sec. IX. Approval for same shall be taken from third party inspector.
3. Welding procedure qualification and WPS should be submitted to third party
inspector before starting of job.
4. Stage wise inspection during fabrication of extinguisher specially while welding.
5. Electrode to be used shall be anyone of given here: M / s ESAB, M/s Advani, or
M/s D&H. No. other electrode is permitted.
6. For butt belt joint, spot radiography of each extinguisher shall be carried out to
ensure quality of welding required as per IS: 2825. 3Nos of radiographs two at
dish end and one at longitudinal seam using 6 long film shall be taken.
7. For fillet joint joints, dye penetration test will be carried out for vessel as per
direction of inspector.
8. Party shall be submitted dimensional details after fabrication for review and
acceptance to the owner.
9. Testing of each safety valve for correct pressure.
10. Check the threads for quality and cap tightness.
11. Check and test for expansion space for one of the lot and dimensional check of
rest of the extinguisher in the lot.
12. Hydraulic testing of each extinguisher at 30 kg/ cm2.
13. Testing of powder as per specification.
14. Other parameter as per IS: 10658.
15. CCE certificate for the CO2 cylinder.
16. Representative of IOCL may visit the site at any time during fabrication and take
necessary action without prior notice.
17. Final performance test and tests for DCP will be witnessed by IOCL
representative also along with third party inspector.
18. Extinguisher shall be supplied with the test certificate.