Table of Contents.......................................................................................................... 1
Panel Profile ................................................................................................................. 2
Clip and Attachment...................................................................................................... 3
SR2 Load Span Data .................................................................................................... 5
SR2 Performance and Testing Summary ...................................................................... 6
Cleaning and Maintenance ........................................................................................... 7
Standard Details ........................................................................................................... 8
Horizontal Gutter.................................................................................................. 8
High Eave Sculptured .......................................................................................... 9
High Eave Parapet ............................................................................................. 10
Standard Ridge .................................................................................................. 11
Field Fabricated Metal Peak Box ....................................................................... 12
End Lap ............................................................................................................. 13
6.5.1
Maximum panel length is 56-0. Panels up to 62 are available with special permitting.
Minimum panel length is 8-0. Maximum length is also color dependant. Darker colors
will result in shorter panel lengths.
(Maximum and minimum dimensions do not apply to cold storage and freezer
buildings.)
The R-values are as follows:
3 = 26
4 = 32
5 = 41
6 = 49
The R-values have been tested in accordance with ASTM C 518 steady state thermal
transmission test method.
LAST REVISION
DATE:
08/15/12
BY:
AES
CHK: EGB
6.5.2
LAST REVISION
DATE:
04/19/11
BY: TBS
CHK:AES
6.5.3
LAST REVISION
DATE:
04/19/11
BY: TBS CHK: AES
6.5.4
Spans shown are based on deflection and connection strength derived from
ASTM E-72 testing. Thermal effect due to temperature differentials has not been
considered. Consult AWIP for project requirements.
Connection patter assumes one -14 self tapping fastener at each rib and at
each minimum 16ga support.
Allowable deflection is L/240.
LAST REVISION
DATE:
04/19/11
BY: TBS CHK: AES
6.5.5
25 psi
Density (in-place):
Shear Strength:
28 to 32 psi
95%
Dimensional Stability:
LAST REVISION
DATE:
04/19/11
BY: TBS CHK: AES
6.5.6
6.5.7
LAST REVISION
DATE:
01/29/14
BY: AES CHK:
6.5.8
The profile of the high eave sculptured trim matches the profile of the sculptured rake trim so
that they can be mitered together.
LAST REVISION
DATE:
10/19/11
BY: AES CHK: EGB
6.5.9
LAST REVISION
DATE:
01/29/14
BY: AES CHK: EGB
6.5.10
The ridge cap is the same as the CFR low profile ridge cap.
LAST REVISION
DATE:
01/29/14
BY: AES CHK: EGB
6.5.11
The customer has the option of purchasing the metal peak boxes or field fabricating a metal
peak box out of a piece of standard rake trim.
The standard metal peak boxes work up through 6:12 roof slope, and only available in white.
The standard CAD detail for the field fabricated metal peak box shows a lot more information
on how to fabricate this.
The metal peak box, as shown in the detail, allows the rake trim to slide as it is designed to.
Field mitering the rake trim together at the peak with sliding clips is not recommended.
It takes anywhere from 30-60 minutes to field fabricate one of these metal beak boxes.
LAST REVISION
DATE:
04/19/11
BY: TBS CHK: AES
6.5.12
Insulation and interior metal skin is removed from portion of exterior skin that will be lapped
onto the lower panel.
Sealant is field applied.
LAST REVISION
DATE:
04/19/11
BY: TBS CHK: AES
6.5.13