Project
Owner
Conntractor

C
D
E
M/S Indcon Projects & Equipment Ltd.

Job Procedure No. IPEL-PJPL-ST-CIVIL-06


:PANIPAT-JALLANDHAR LPG PIPELINE PROJECT.
:I.O.C.L.
: M/s Indcon Projects & Equipment Ltd.

Job Procedure For :


Anti Termite Treatment
NO: IPEL-PJPL-ST-CIVIL-06

44
45
46
47
48
49
50
51
0

12.11.03

52
Rev. No.
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87

Date

For
review &
Approval
Descriptio Prepared
n
by IPEL

Checked by
IPEL

Reviewed &
Approved approved by
by IPEL IOCL

Index
Sl. No.
1
2
3
4
5
6
7
8

Description Page No.


Purpose
3
Scope
3
References
3
Equipment
3
Materials
3
Method
3
Safety
3
DocumentaIPEL-PJPL-ST-CIVIL-ITP-06 (Enclosed)
IPEL-PJPL-ST-CIVIL-FM-07 (Enclosed)

88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126

1 Purpose :
The purpose of this procedure is to prepare the sequential system control on the anti termite
activity to achieve the desired product .
2 Scope:
This procedure establishes the materials and method of accomplishing pre constructional antitermite treatment of soil for protection of building against attack by subterranean termite with the
usage of chemical emulsions in accordance with the method laid down.
3 References:Contract specification PL/E&C/CONTR/CIVIL/SSPL/ML/2002-03/20 VOLUME II of IV,
a)
b) IS-6313 (Part-II) - 1981 - Code of practice for anti-termite measures in buildings . preconstructional chemical treatment measures.
4 Equipments :
Spray gun , Mixing container , Safety gloves , Goggles.
5 Materials :
Chloropyrifos Emulsifiable concentrate ( IS: 8944); concentration 1% by volume.
6 Method:6.2 Chemicals shall have relevant test & batch certificates and within expairy date .
6.3 Chemicals are properly stored as per manufacturers requirement .
6.5 Site Preparation :Prior to start of chemical treatment, areas shall be made free from logs, stumps, timber offcuts,
levelling pegs, roots of plants/trees etc. Soil treatment shall start when foundations and plinth area
ready for laying for subgrade. Treatment shall not be carried out when it is raining or subsoil water
level is at the same or higher level than the level of the treatment. in the event of water logging of
foundations,water shall be pumped out and the chemical emulsion applied when the soil is
absorbent.
6.6 Treatment for Masonry foundations and basements:The excavation bottom surface and the sides upto a height of 300mm shall be treated at the rate of
5 Liters per sqm of surface area as shown in the drawing.
After the masonry foundation and the retaining walls of the basenent come up, the backfill in
immediate contact with the foundation structure shall be treated at the rate of 7.5 litre per sqm, of
the vertical surface of the substructure of each side.
6.7 Treatment of top surface of plinth filling:The top surface of the consolidated earth below the ground floor slab shall be treated with
6.7 chemical emulsion @ 5 litres/sqm of the surface area.If the filled earth is well rammed and the
surface does not allow the emulsion to seep through, holes upto 50 to 75 mm deep at 150mm
centres on both ways shall be made.

127
128
129
130
131
132
133
134
135
136
137

138

The top surface of the consolidated earth below the ground floor slab shall be treated with
chemical emulsion @ 5 litres/sqm of the surface area.If the filled earth is well rammed and the
surface does not allow the emulsion to seep through, holes upto 50 to 75 mm deep at 150mm
centres on both ways shall be made.
6.8 Treatment of junction of wall and the floor:Small channel 30x30 mm shall be made at all the junctions of wall and columns with the floor
(before laying the subgrade) and rod holes shall be made in the channel upto ground level 150 mm
apart and the chemical emulsion poured along the channel @ 7.5 litres/sqm of the vertical wall or
column surface.
6.9 Treatment of soil along external perimeter of building:After the building is complete, earth along the external perimeter of building shall be treated by
providing holes in the soil with iron rods aloong the external perimeter of the buildings at approx.
150 mm interval and 300 mm depth. Chemical emulsion shall be poured at the rate of 7.5 litres per
sqm of vertical surfaces.
3.8.3 Chemical consumption record shall be maintained
7 Safety :
All chemicals used for anti-termite treatment are poisonous and hazardous to health. Absorption
through the skin, prolonged exposure to dilute emulsions should be strictly avoided. Person using
or handling these chemicals should be warned of these dangers.Concentrated chemical should not
be used in direct contact of hand / eyes . It should always be used in dilute condition .Before taking
food hands to be cleaned properly with soap . In case of severe contamination, clothing should be
removed & skin must be washed properly with soap and water. Care should be taken that while
application the chemicals shall not contaminate the sources of water.

139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161

The chemical containers should be clearly labelled and should be stored carefully & securely
closed out of the reach of children & pets.
All chemicals used for anti-termite treatment are oil solutions and fire hazard. It shall never be
exposed to fire.
8 Documentation:ITP
IPEL-PJPL-ST-CIVIL-ITP-04
Formats IPEL-PJPL-ST-CIVIL-FM-07
Note: This procedure is only guideline to work at site. For detail refer contract specification .In case of
any conflict between this procedures and contract specification the later shall govern.

162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209

210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250
251
252
253
254
255
256
257

258
259
260
261
262
263
264
265
266
267
268
269
270
271
272
273
274
275
276
277
278
279
280
281
282
283
284
285
286
287
288
289
290
291
292
293
294
295
296
297
298
299
300
301
302
303
304
305

306
307

ITP06
A
1
2
3
4
5
6

B
C
D
E
F
G
M/S Indcon Projects & Equipment Ltd.
Inspection & Test Plan for Anti Termite Treatment
Project::PANIPAT-JALLANDHAR LPG PIPELINE PROJECT.
Client:I.O.C.L.
Conntractor
IPEL, NEW DELHI

Sl.No
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31

Activity Description
Approval of Chemicals to be
used

2
3

Inspection by
L&T

Verificati Records to be
on by
Submitted by
IOCL
L&T

Preparation of area to be treated


Safety during treatment

W
W

RM
RM

Clearance for treatment

RM

Chemical consumption

W - Witness
RM - Random
R - Review Documents

MTC
IPEL-PJPL-STCIVIL-FM-07
IPEL-PJPL-STCIVIL-FM-07
IPEL-PJPL-STCIVIL-FM-07

32
33
34
35
36
37
38
39
40
0

12.11.03

41
Rev. No.

Date

For
review &
Approval
Descriptio Prepared
n
by IPEL

Checked by
IPEL

42
43

Approved
by IPEL

Reviewed &
approved by
IOCL

No. IPEL-PJPL-ST-CIVIL-ITP-06

FM07
A

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22

B
C
D
E
F
G
M/S Indcon Projects & Equipment Ltd.
Inspection Report for Anti Termite Treatment
Project::PANIPAT-JALLANDHAR LPG PIPELINE PROJECT.
Client:I.O.C.L.
Contractor
IPEL, NEW DELHI
REPORT NO:
DATE:
Location:Drawing No.Sl. No.
Activities
Observation
1 Preparation of surface
2 Hole spacing / depth checked
3 Brand name of chemical used
a
Batch no.
b

Date of Manufacture / Date of


Expiry
4 Dosage as per specification
5 Consumption of chemicals

Area:

23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41

IPEL

ontrol on the anti termite

ing pre constructional antiubterranean termite with the


wn.
VOLUME II of IV,
in buildings . pre-

% by volume.

xpairy date .

ogs, stumps, timber offcuts,


en foundations and plinth area
en it is raining or subsoil water
the event of water logging of
applied when the soil is

m shall be treated at the rate of

nt come up, the backfill in


he rate of 7.5 litre per sqm, of

b shall be treated with


rth is well rammed and the
to 75 mm deep at 150mm

nd columns with the floor


nnel upto ground level 150 mm
res/sqm of the vertical wall or

building shall be treated by


er of the buildings at approx.
ured at the rate of 7.5 litres per

ardous to health. Absorption


strictly avoided. Person using
ncentrated chemical should not
n dilute condition .Before taking
tamination, clothing should be
e should be taken that while
r.

ored carefully & securely

e hazard. It shall never be

ract specification .In case of


ater shall govern.

IPELINE PROJECT.

ST-CIVIL-ITP-06

Remarks

Consumption:

IOCL
No. IPEL-PJPL-ST-CIVIL-FM-07