ASSOCIATED CONSTRUCTORS LIMITED

DEPLOYMENT SCHEDULE OF EQUIPMENT OF ASTOLA PRO


S.N

Description

Max.

MONTHS
M12 M13

M1

M2

M3

M4

M5

M6

M7

M8

M9

M10

M11

Concrete Works
1

Concrete Pump (Stationary)

Cranes, Access Equipment & Transport


2

External Climbing Tower Crane

Hydraulic Mobile Crane

Construction Hoist

Passenger

Cargo

Scissor Lift

Air Compressor & Generator


6

Generators (Diesel 250 )

Generators (Diesel 100 KVA)

Generators (Diesel 80 KVA)

Air Compressor

Small Tools & Plants


12 Welding Plant
13

Concrete Screeding / Floating


Equipment for floors (Set)

ASSOCIATED CONSTRUCTORS LIMITED

DEPLOYMENT SCHEDULE OF EQUIPMENT OF ASTOLA PRO


S.N
14

Description
Power Tools (Drills, Grinders, Breakers,
Scabblers) (Lots)

15 Concrete Vibrators

Max.
As
Required
As
Required

MONTHS
M12 M13

M1

M2

M3

M4

M5

M6

M7

M8

M9

M10

M11

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

16 Total Station

17 Surveyors Level

ASSOCIATED CONSTRUCTORS LIMITED

DEPLOYMENT SCHEDULE OF EQUIPMENT OF ASTOLA PRO


S.N

Description

Max.

MONTHS
M12 M13

M1

M2

M3

M4

M5

M6

M7

M8

M9

M10

M11

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

Carpentery & Fabrication Shop


18 Carpentery Shop (Set)

Formwork
19 Shuttering Plates
20 Scafolding Pipe & Joints

As
Required
As
Required

Proprietary Formwork System


21 For Horizontal Elements (Sft)
22 Columns (Sft)

As
Required
As
Required

* Concrete will be delivered to the site from selected approved pre-mix concrete suppliers
* Fabricated steel rebar to be delivered to site from approved supplier.

STRUCTORS LIMITED
EQUIPMENT OF ASTOLA PROJECT
MONTHS
M14

M24 E.M.

M15

M16

M17

M18

M19

M20

M21

M22

M23

44

23

24

22

22

45

24

24

44

46

42

24

STRUCTORS LIMITED
EQUIPMENT OF ASTOLA PROJECT
MONTHS
M14

M24 E.M.

M15

M16

M17

M18

M19

M20

M21

M22

M23

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

45

87

STRUCTORS LIMITED
EQUIPMENT OF ASTOLA PROJECT
MONTHS
M14

M24 E.M.

M15

M16

M17

M18

M19

M20

M21

M22

M23

24

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

ASSOCIATED CONSTRUCTORS LIMITED


DEPLOYMENT SCHEDULE OF EQUIPMENT FOR TOWER - B
S.N

Desciption

Max.

MONTHS
M9 M10 M11 M12 M13 M14

M1

M2

M3

M4

M5

M6

M7

M8

Concrete Works
1

Concrete Pump (Stationary)

Cranes, Access Equipment & Transport


2

Internal Climbing Tower Crane

Hydraulic Mobile Crane

Construction Hoist

Air Compressor & Generator


5

Generators (Diesel 250 & 100 KVA)

Air Compressor

Small Tools & Plants


7

Welding Plant

Concrete Screeding / Floating


Equipment for floors (Set)

Power Tools (Drills, Grinders, Breakers,


Scabblers) (Lots)

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

10 Concrete Vibrators

As
Required
As
Required

11 Total Station

12 Surveyors Level

Carpentery & Fabrication Shop

ASSOCIATED CONSTRUCTORS LIMITED


DEPLOYMENT SCHEDULE OF EQUIPMENT FOR TOWER - B
S.N

Desciption

Max.

MONTHS
M9 M10 M11 M12 M13 M14

M1

M2

M3

M4

M5

M6

M7

M8

14 Shuttering Plates

10,000

5,000

###

###

###

###

###

###

###

###

###

###

###

###

###

15 Scafolding Pipe & Joints

50,000

###

###

###

###

###

###

###

###

###

###

###

###

###

###

13 Carpentery Shop (Set)


Formwork

Proprietary Formwork System


16 For Horizontal Elements (Sft)

8,800

8,800 8,800 8,800 8,800 8,800 8,800 8,800 8,800 8,800 8,800 8,800 8,800 8,800 8,800

17 Columns & Walls (Sft)

7,500

7,500 7,500 7,500 7,500 7,500 7,500 7,500 7,500 7,500 7,500 7,500 7,500 7,500 7,500

* Concrete will be delivered to the site from selected approved pre-mix concrete suppliers
* Steel section & Panel Fabrication will be done off site at approved fabrication shop.
* Fabricated steel rebar to be delivered to site from approved supplier.

STRUCTORS LIMITED

OF EQUIPMENT FOR TOWER - B


MONTHS
M15 M16 M17 M18 E.M.

32

17

18

17

53

34

34

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

A.R.

33

63

STRUCTORS LIMITED

OF EQUIPMENT FOR TOWER - B


MONTHS
M15 M16 M17 M18 E.M.
1

18

###

###

###

5,000

A.R.

###

###

###

###

A.R.

8,800 8,800 8,800 8,800

N/A

7,500 7,500 7,500 7,500

N/A